472-19320.JBB_ Alger Showers Addendum #1.pdf
PDF 381 KB Posted
- Attached to
- 472/19320. JBB; Alger C. F. - Shower Renovations
- Solicitation number
- RFQ-171-250000000316-2
- Issued by
- Alger County, Michigan
About this file
This document is a Construction Bid Addendum No. 1 issued by the Michigan Department of Technology, Management and Budget (DTMB), Design and Construction Division for shower renovations at the Alger Correctional Facility. The addendum, dated 4/11/2025, is for a project with a bid opening on 4/16/2025, involving DS Architects, Inc. as the professional. The addendum provides clarifications and modifications to the original contract documents, including specifying base bid housing units as Maple and Pine, with alternate housing units of Birch and Spruce. The contractor must coordinate with the facility to determine access to housing units and is required to obtain State Project Registrations (SPRs) for the project.
Key additional requirements include submitting SPRs for the contractor and all subcontractors, with an annual registration fee of $500, and complying with new prevailing wage law changes effective 4/2/2025. The addendum includes specific technical details about the shower renovation, such as installation requirements for stainless steel wall panels, field measurements, and installation training. The project involves specific construction sequencing, with work to be completed in phases across different housing wings, and includes provisions for temporary barricades, material handling, and coordination with facility operations. Contractors must also submit certified payroll documentation directly to DTMB via email within 10 days of each pay period.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 10/22)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND
BUDGET
State Facilities Administration Design and Construction Division
CONSTRUCTION BID ADDENDUM NO. 1
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
4/11/2025
Alger Correctional Facility (LMF) – Shower Renovations FILE NUMBER
472/19320.JBB
PROFESSIONAL
DS Architects, Inc.
PROJECT DIRECTOR
Jeff Barsch
BID OPENING DATE:
4/16/2025
This Addendum is issued for the purpose of modifying and/or clarifying the original Contract Documents and shall take precedence over them.
All work included herein shall be in accordance with the original drawings and specifications except as specifically noted herein. All incidental items required to provide the following modifications shall be included even though not specifically described.
This addendum is being sent to all bidders receiving plans and specifications. Receipt of this Addendum shall be noted on the Proposal Form in the appropriate location.
Attachments
1. Pre-Bid Meeting Attendance Record dated 4-2-25.
2. Schedule of alternates.
3. Prevailing wage FAQ dated 4-8-25.
Changes to Drawings/Specifications
1. Removed deduct alternate #1 from drawings referring to the powder coated Armstrong ceiling.
Revised the schedule of alternates, see attached.
Clarifications/General Notes
1. Base bid housing units: Maple and Pine. Alternate housing units: Birch and Spruce.
Contractor to coordinate with the facility to determine which housing unit/wings the contractor will be provided with access to first.
2. State Project Registrations (SPRs) are required for this project (and all projects due 04/16/25 or after).
The Contractor shall include in a bid for a state project a copy of the state project registration for the Contractor and for each Subcontractor of the Contractor that has been selected at the time the Contractor submits the Bid. SPRs may be applied for at the LEO Prevailing Wage Website, which LEO currently charges $500 for an annual registration: https://www.michigan.gov/leo/bureaus-agencies/ber/wage-and-hour/prevailing-wage
3. An FAQ Document for the recent Prevailing Wage and Asbestos Abatement laws will be posted to the DCD public website.
http://www.michigan.gov/SIGMAVSS https://www.michigan.gov/leo/bureaus-agencies/ber/wage-and-hour/prevailing-wage https://www.michigan.gov/leo/bureaus-agencies/ber/wage-and-hour/prevailing-wage
4. I-CON is to visit the site and take field measurements for the shower cabinets prior to creating the shop drawings. This is to ensure dimensions, shower drain locations, construction constraints, and path into shower area.
5. The contractor shall be responsible for all dimensions on the shop drawings and accountable for any potential discrepancies.
6. I-CON is to provide up to 3 days of installation training and assistance for the first pair of showers installation.
7. Stainless steel wall panels shall be fastened to the wall along the vertical and horizontal edges with drive pins, maximum 18” O.C.
8. Any overlapping vertical seams of the stainless-steel wall panels shall have a continuous 1/4" bead of clear silicone behind the panel, 1” back from the edge. No sealant along the bottom edge.
9. The overlapping vertical seams of the stainless-steel wall panels are to get 3/16” x 2” welds at a maximum of 18” O.C. evenly spaced.
Questions
1. Will temporary construction walls be required in Building Unit Birch if it is unoccupied?
Answer: no temporary construction walls will not be required in Birch.
2. How should the temporary barricades be fastened to the walls and floors?
Answer: use concrete screw Tapcons 24” o.c. on the inside of the temporary barricade. Screw tap cons into the adjacent masonry wall and concrete floor. Once construction is complete in that wing, fill hole left behind from Tapcons removal and paint wall and floor to match existing finish/color.
3. Will there be any material lay-down storage areas in the housing units?
Answer: No, any materials brought into housing units, inside the secure perimeter, must be actively installed that day. Any materials not installed will need to be removed at the end of the day.
4. Reference drawing P-301: The notes on this drawing state that the drains and associated sanitary plumbing are to be removed. With the current sequencing of construction and only being able to shut down (1) shower at a time, there is a concern that we will not have access to the plumbing from below while the bottom wing showers remain active i.e A & C Wings. Additionally, is there access below the bottom floor wings to access the plumbing or is it the intent to remove concrete? There are no notes that state concrete is to be removed.
Answer: The existing floor drains are to be demolished and removed as indicated on plumbing drawings. Existing sanitary piping serving the existing floor drains is to be modified as required to be connected to the new shower enclosure drain as indicated on plumbing drawing. Concrete floor is only to be demolished as required to modify existing sanitary piping to connect to new shower enclosure drain. Patch concrete floor as required to match existing and be flush.
5. Where do the current, existing exhaust fans duct work run to? Will the contract be able to connect the
A & C Wings exhaust to the existing system while the upper wings B & D are being remodeled?
a. Currently construction sequence is seen as follows: First Phase Wing B, Second Phase Wing
A, Third Phase Wing D, and Fourth Phase Wing C. This allows for the new duct work and exhaust fan to be installed in the roof and ran to the Wing B & D showers and then to have the new ductwork installed and connected to the upper level exhaust ducts.
Answer: The current HVAC systems serving each shower group is to remain active until upgrades in the shower group are made as shown on the construction documents in relation with the construction sequence. For the phasing of construction, the Wing B shower group must be completed before the Wing A shower group, and the Wing D shower group must be completed before the Wing C shower group. This allows for the new exhaust fans to be installed and the exhaust ductwork/grilles serving the Wing B and Wing D shower groups to be active for the LARA inspections, Facility inspections, and punchlist. When the exhaust ductwork is installed for the Wing B and Wing D shower groups, the ductwork is to be routed to prep for the Wing A and Wing C shower group construction and capped.
When construction in the Wing A and Wing C shower group occurs, the new exhaust ductwork/grilles can be installed and tied into the capped ductwork to provide the fully operable system for the LARA inspections, Facility inspections, and punchlist without disrupting the Wing B and Wing D shower groups.
6. Referenced Documents – Drawing Sheet M-400 – General HVAC Notes
Drawing M-400 states that McGrath roofing should be contacted to do the roof patching and curb work to maintain the warranty. It has been found that McGrath did not install the roofs at this facility.
a. Please clarify what type and manufacturer of roofing is currently installed on the roof.
Answer: contractor to coordinate with facility staff to determine, if any areas of the roofing that are being disturbed have a roof warranty, contractor to take appropriate measures to ensure roof warranty if maintained, if any warranty exists.
7. Is the intent to have two deductive alternates for the white powder coated ceiling? One for the Base Bid Spruce & Birch and one for the Alternate Maple & Pine units?
Answer: the alternate for the powder coated ceiling has been eliminated from the project. See changes to drawings/specifications #1 and attached revised schedule of alternates.
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
PROFESSIONAL: DS Architects, Inc. DATE: 4/11/2025
APPROVED BY:
PROJECT DIRECTOR: DATE: Click to enter date
STATE OF MICHIGAN (OWNER AND CONTRACTOR) BID SUMMARY
MICHSPEC DTMB 00300 − 4 (R 02/24)
6.2 Schedule of Alternates - The Bidder will complete (or deduct from the Contract) the parts of the Work designated by the Alternates that follow and accept in full payment (or allow in full credit) for those parts of the Work the following Bid Prices:
Alternate Item No.
Bid Quantity
Description
Unit Price
Item Bid Price
Add Alternate #1 1LS After base bid work is complete, work in housing unit Birch and Spruce to be completed.
The Bidder further acknowledges and agrees that the separate prices bid on this “Schedule of Alternates,” where they are applicable and deemed acceptable by the Owner, will be used if incorporated into the Contract when the Owner issues the Notice of Award.
Name of the Bidder _________________________________________ File No. _____________
Date _________________________
SIGMA VENDOR NUMBER _________________________________
Telephone No. _______________________
DTMB-SFA- DESIGN AND CONSTRUCTION
Frequently Asked Questions for Recent Law Changes April 8, 2025
Prevailing Wage Law Q: What has changed in the prevailing wage laws?
A: Per Public Act 10 of 2023, amended per PA110 of 2024, all contractors and subcontractors performing work for the State of Michigan as a construction mechanic must register with Labor and Economic Opportunity (LEO) Wage and Hour and receive a State Project Registration (SPR) and pay the associated annual fee to be able to submit bids for state work and submit certified payroll during the project.
Q: When did the change become effective?
A: April 2, 2025.
Q: Does this change apply to projects bid and/or already under a contract before April 2, 2025?
A: No, the change applies to all projects with bids due on or after April 2, 2025.
Q: How do I get a State Project Registration (SPR) register with LEO Wage and Hour?
A: Instructions can be found on the LEO Wage and Hour Prevailing Wage website for attaining the required State Project Registration (SPR) for all contractors and subcontractors.
Q: How much does it cost and how do I pay the annual fee?
A: The fee will be determined by LEO Wage and Hour and is currently $500. The fee is paid directly to LEO Wage and Hour through their website. Please contact LEO Wage and Hour for any assistance or questions relating to issues for registration or payment.
Q: What happens if I submit a bid without the required SPR?
A: As the law requires, the bid will be determined not responsive and cannot be awarded a contract.
Q: Do I have to provide a SPR for every subcontractor that I provide with post bid submittals when I am being considered for award of a contract?
A: No, but the SPR’s must be available if requested. If it is not able to be provided, the contract may be terminated.
Q: What happens if I need to change a subcontractor after the work begins?
A: The General Contractor must immediately notify the Owner of any change in registration status for themselves and any subcontractor and is required to ensure that all subcontractors maintain a SPR with LEO Wage and Hour.
https://legislature.mi.gov/documents/mcl/pdf/MCL-ACT-10-OF-2023.pdf
Q: How do I submit the required certified payroll?
A: For projects with bids due April 2, 2025 and after, starting April 2, 2025 until April 2, 2026, certified payroll for both the contractor and subcontractors is required to be submitted directly to DTMB via email at DTMB-DCDCertPay@michigan.gov not later than 10 days after the end of a pay period.
Q: What size files can be submitted?
A: Files shall be one combined .pdf file containing all certified payroll for the contractor and all subcontractors named according to the naming convention of 20mb or less.
Q: What is the naming convention?
A: [CP###] [CH]-[Client]-[Vendor] [CN] [SFN] [ProjectID] – [County],pdf
CP###: A 3-digit ID of the Certified Payroll and the sequential order that it is for this specific project CH: Contract Holder – this would be ‘DTMB’.
Client: Acronym of the agency the project is for Vendor: Abbreviated Contractor name CN: DTMB Contract Number – Y##### SFN: The 4th through 8th number of this project file number ###/#####.AAA ProjectID: Project name or abbreviated description County: The county the work is taking place
Q: What happens after April 2, 2026?
A: LEO Wage and Hour will require all certified payrolls to be submitted directly to them via the internet.
DTMB will need the certified payroll to be provide with the next payment request for record.
Q: What happens if certified payroll is not submitted?
A: The work may be stopped at the expense of the contractor until all certified payroll is provided.
Q: Who do I ask for assistance with determining the appropriate wage rate?
A: LEO Wage and Hour.
END
mailto:DTMB-DCDCertPay@michigan.gov
| schedule of alternates.pdf |
| STATE OF MICHIGAN |
| DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET |
| STATE FACILITIES ADMINISTRATION |
| MICHSPEC 2008 VERSION, OWNER AND CONTRACTOR |
| STANDARD CONTRACT FORMS AND CONDITIONS OF THE CONTRACT |
| MICHSPEC No. 97.0820 00020 THROUGH 97.0820 00440 |
| RELEASED ON NOVEMBER 1, 1997. |
| Developed from |
| 1997 Edition/R 02/24 Version |
| 1.1 Defined Terms: |
| STATE OF MICHIGAN MODEL |
| 1.2 Division 0 Rules of Construction: |
| DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET |
| PART 1 - GENERAL |
| 1.01 SUMMARY |
| PART 3 EXECUTION |
| END OF SECTION 01310 |
| APPENDIX I |
| SPECIAL WORKING CONDITIONS |
| DEMOLITION/REMODELING PROJECT PROCEDURES |
| HAZARDOUS MATERIALS PROJECT PROCEDURES |
| STATE OF MICHIGAN PREVAILING WAGE SCHEDULES |
| & WAGE RATE SCHEDULES |