472_17032_RWG_Newberry CF (NCF) WiFi Cabling - DC Spec.pdf

PDF 2 MB Posted

Attached to
472/17032. RWG; Newberry C. F. - Wi-Fi Cabling Infrastructure
Solicitation number
RFQ-171-250000000398-3
Issued by
Livingston County, Michigan

About this file

This is a comprehensive government bidding and contract document for a Wi-Fi Cabling Infrastructure project issued by the State of Michigan Department of Technology, Management and Budget (DTMB) for the Michigan Department of Corrections (MDOC), specifically targeting the Newberry Correctional Facility. The project involves installing a new wireless network cabling system, including CAT-6A and fiber optic cabling, wireless access point (WAP) installations, raceways, electrical power circuits, and associated infrastructure. The bid is scheduled for opening on May 28, 2025, with a contract time of 180 days from the Notice to Proceed. The project will require a mandatory pre-bid walk-through on May 16, 2025, and contractors must submit questions by May 12, 2025.

The project is funded under the Electronic Communications funding code 472, with a total estimated budget including allowances of $60,000 (a $25,000 contingency allowance, $25,000 hydrovac allowance, and $10,000 electrical allowance). Bidders must provide a 5% bid guarantee and are subject to prevailing wage requirements. The contract will be awarded based on best value considerations, with potential preference given to Qualified Disabled Veteran (QDV) businesses. The scope includes installing wireless access points in multiple buildings, routing cables through various pathways, terminating and testing cables, providing a 40-foot Conex storage container on-site, and coordinating with the owner's network team for equipment configuration and installation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bidding and Contract Document (R 03/25) Project Name: Wi-Fi Cabling Infrastructure File No. 472/17032.RWG

State of Michigan Department of Technology, Management and Budget

State Facilities Administration Design and Construction Division

DCSPEC

Bidding and Contract Document Minor Projects

File No. 472/17032.RWG Funding Code: 472ElectronicComm

Department of Corrections

Wi-Fi Cabling Infrastructure

Newberry Correctional Facility (NCF)

5/2/2025

Bidding and Contract Document (R 03/25) Project Name: Wi-Fi Cabling Infrastructure File No. 472/17032.RWG

BID SUMMARY

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

STATE FACILITIES ADMINISTRATION

DESIGN AND CONSTRUCTION DIVISION

3111 W. St. Joseph Street Lansing, Michigan 48917

Bids must be submitted electronically at: https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService

FILE NUMBER

472/17032.RWG

DEPARTMENT/AGENCY

Corrections

CONTRACT TIME(S)

180 Days from Notice to Proceed

PROJECT NAME

WiFi Cabling Infrastructure

LOCATION

Newberry C.F. (NCF)

BID OPENING DATE

Wednesday 5/28/2025 at 2:00 pm ET

FOR AN EXAMINATION OF THE SITE CONTACT:

Must attend Mandatory pre-bid walk through

SEE SECTION 00100 INSTRUCTIONS TO BIDDERS AND SECTION 00700 GENERAL CONDITIONS PROVIDED WITH THE BIDDING DOCUMENTS.

BID: WE PROPOSE TO FURNISH, PERFORM AND COMPLETE THE ENTIRE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS IN

CONSIDERATION OF THE BID PRICE (S) STATED BELOW.

FIRM NAME AND COMPLETE ADDRESS TELEPHONE NUMBER and E-MAIL ADDRESS

□ Qualified Disabled Veteran

SIGMA VENDOR NUMBER

(protected information required for processing payments)

BIDDER'S SIGNATURE AND TITLE DATE

WITNESS' SIGNATURE DATE

By signing this bid above, bidder certifies their enclosed Qualified Disabled Veteran and Michigan-Based Business Certifications.

BASE BID FROM BID SCHEDULE (Include specified Allowances):

____________________________________________________________________________Dollars $____________________ (use words) (in figures)

Alternate1: (Add/Subtract) ______________________________________________________ Dollars $ ____________________ (use words) (in figures)

Alternate 2: (Add/Subtract) ______________________________________________________Dollars $ ____________________ (use words) (in figures)

Alternate 3: (Add/Subtract) ______________________________________________________Dollars $ ____________________ (use words) (in figures)

A PERFORMANCE BOND AND A PAYMENT BOND ARE REQUIRED FOR ALL BIDS OVER $50,000.00. EACH BID MUST BE ACCOMPANIED BY A FIVE (5) PERCENT BID GUARANTEE. BUILDERS RISK INSURANCE IS REQUIRED TO BE PROVIDED BY THE

CONTRACTOR UNLESS OTHERWISE INDICATED IN THE BID DOCUMENTS.

BIDDERS ARE ALSO CAUTIONED TO FAMILIARIZE THEMSELVES WITH ALL OF THE OTHER CONDITIONS OF THE CONTRACT.

Project Scope of Work:

• The MDOC is obtaining a new WIFI cabling system and installation and connection of owner provided Wireless Network equipment.

• The scope of this project is the provision and installation of the cabling, raceway and systems as described below, on the drawings and in the detailed specifications.

• Electrical Power o Provide and install power circuits where shown on the drawings and as described in the specifications.

o Label all outlets and update labels in electrical panels.

o Additional panel location will be provided during the project https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService

Bidding and Contract Document (R 03/25) Project Name: Wi-Fi Cabling Infrastructure File No. 472/17032.RWG

• Systems Grounding o Install ground bars and bond equipment to the ground bars as shown on the drawings and as described in the specifications

• Wireless network equipment shall include:

o Wireless Access points –(WAPS) and their enclosures. Interior and Exterior. All these devices and their enclosures are provided by owner, Contractor installs.

o Contractor shall install WAPS and WAP enclosures at each building. Owner will provide the WAPS and Oberon type enclosures.

• WIFI cabling scope shall include but not be limited to:

o Provide, install, terminate, test and label a complete CAT-6A cabling infrastructure to support a new WIFI (wireless) network.

o Provide, install, terminate, test and label a complete CAT-6 cabling infrastructure where noted to transition existing cables to racks or cabinets.

o Provide and install raceways and cable supports as specified and as required to support all new cabling and Wireless Access Points.

o Upgrade and/or add communications racks and equipment to the racks. Make change as noted on the drawings and specifications o See drawings and specifications for raceways and pathways.

• Provide new raceways inside and outside building to route CAT-6A cables and fiber cable between buildings. See drawings and specs for raceway requirements

• Install fiber cabling between the Admin and the buildings/cabinet noted. Contractor shall terminate and test all fiber cables.

o Terminate all into patch panels. Label all fiber cables and panels o Install fiber into stowage rings on the wall prior to routing into the fiber path panels o Label all fiber cables in the tunnel and inside each cabinet and handhole.

• The contract shall include the installation and connection of Wireless network equipment. Work shall include:

o Providing a 40’ long Conex box onsite for the duration of the project. Coordinate location with the owner.

o Moving of WAPS and enclosures from the delivery truck to the owner’s storage building.

o Moving of WAPS and enclosures from the owner’s storage location to the actual building where they will be installed.

o Installation of all wireless network equipment. this includes:

▪ Mounting of owner provided WAPS and enclosures in all buildings.

▪ Mounting of owner provided WAPS on the building exterior or poles at the site.

▪ Owner will install Ethernet Switches and provide/install Patch cables at the switches

• Provide and install CAT-6A patch cords at each WAP. See specifications for types and lengths required.

o Owner will provide and install CAT-6A patch cords at the Ethernet Switches

• Verify connectivity lights on all WAPS after the owner installs the Ethernet Switches.

• Label WAP patch panels with the WAP number as shown in the drawings and specifications.

• The owners (and their Cisco Partner) work on the WIFI network equipment includes:

o Obtaining of Wireless network equipment and storage at their warehouse in Michigan.

o Deliver of WAPS and WAP enclosures to the site.

o Configuration of all wireless network equipment per owners’ recommendations o Labeling of WAPS with WAP number and labeling outside of WAP enclosure with WAP number and building where it is to be installed

Bidding and Contract Document (R 03/25) Project Name: Wi-Fi Cabling Infrastructure File No. 472/17032.RWG

The Bidder must figure its Base Bid on the specified, or Addendum-approved, materials and equipment only. No “or equal” or substitution proposals will be permitted after Bid opening, except as provided in the General Conditions.

Addenda: Bidder acknowledges receipt of Addenda: No. ___ dated: ________, No. ___ dated: ________ No. ___ dated:

BID SCHEDULE

Base Bid Schedule - The Bidder will complete the Work and accept as full payment, for the Work items listed, the following Unit Prices and/or Item Bid Prices, as applicable:

Base Bid Item No.

Bid Quantity

Description

Unit Price

Item Bid Price

1 1 Data cabling, racks/cabinets and fiber cabling equipment

2 1 Data cabling, racks/cabinets and fiber cabling labor

3 1 Raceway equipment

4 1 Raceway labor

5 1 Electrical power equipment

6 1 Electrical power labor

7 1 Conex Box Container

8 1 WAP Installation equipment

9 1 WAP Installation labor

10 1 2% Code Approval

11 1 2% Warranty

12 1 2% As-Builts

ALLOWANCE AMOUNT $25,000.00 $25,000.00

HYDROVAC ALLOWANCE AMOUNT $ 25,000.00 $ 25,000.00

ELECTRICAL ALLOWANCE $10,000.00 $10,000.00

TOTAL (This amount should equal the Base Bid amount on the Bid Summary Form) $

Base Bid (Sum of Item Bid Prices for all Base Bid Items):

__________________________________________________________________ Dollars $__________________________ (use words) (in figures)

Bidding and Contract Document (R 03/25) Project Name: Wi-Fi Cabling Infrastructure File No. 472/17032.RWG

Schedule of Alternates - The Bidder will complete (or deduct from the Contract) the parts of the Work designated by the Alternates that follow and accept in full payment (or allow in full credit) for those parts of the Work the following Item Bid Prices:

Alternate Item No.

Bid

Item Bid

The Bidder further acknowledges and agrees that the separate prices bid on this “Schedule of Alternates,” where they are applicable and deemed acceptable by the Owner, will be used if incorporated into the Contract when the Owner issues the Notice of Award.

Schedule of Unit Prices or Contingent Change Order Prices - The Bidder shall use this “Schedule” to quote unit prices identified in the bid documents or propose other contingent Change Order prices. The proposed Unit Prices or contingent Change Order prices set forth in this schedule, at the sole discretion of the Owner, may, or may not be incorporated into the Contract Documents. The Owner reserves the right to negotiate Unit Prices or contingent Change Order prices set forth herein prior to their possible incorporation into the Contract Documents.

Item No. Bid

Item Bid

Bidding and Contract Document (R 03/25) Project Name: Wi-Fi Cabling Infrastructure File No. 472/17032.RWG

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

State Facilities Administration

Design & Construction Division

Qualified Disabled Veteran (QDV) Business Representation

‘Qualified Disabled Veteran,’ means a business entity that is 51% or more owned by one or more veterans with a service-connected disability.

‘Qualified Disabled,’ means a business entity that is 51% or more owned by one or more with a service-connected disability.

The vendor represents that it IS _____, a qualified disabled veteran.

The contractor represents and warrants that the company meets the above (when checked) and has attached supporting documentation per the following:

Each bid requesting the Qualified Disabled Veterans (QDV) preference, in accordance with Public Act 22 of 2010, MCL 18.1241.3 shall include a DD214 Proof of Service and Discharge, a Veterans Administration rating decision letter, proof of disability (if the disability is not indicated on the DD214), and appropriate legal documents setting forth the 51% natural persons QDV ownership.

Fraudulent Certification as a Qualified Disabled Veteran may result in debarment under MCL 18.264.

Certification of a Michigan Based Business

(Information Required Prior to Contract Award for Application of State Reciprocity Provisions)

To qualify as a Michigan Based Business:

Vendor must have, during the 12 months immediately preceding this bid deadline:

or If the business is newly established, for the period the business has been in existence, it has:

(Check all that apply):

Filed a Michigan single business tax return showing a portion, or all the income tax base allocated or apportioned to the State of Michigan pursuant to the Michigan Single Business Tax Act, 1975 PA 228, MCL 208.1 – 208.145:

or

Filed a Michigan income tax return showing income generated in or attributed to the State of Michigan; or

Withheld Michigan income tax from compensation paid to the bidder’s owners and remitted the tax to the

Department of Treasury; or

I certify that I have personal knowledge of such filing or withholding, that it was more than a nominal filing for the purpose of gaining the status of a Michigan business, and that it indicates a significant business presence in the state, considering the size of the business and the nature of its activities.

I authorize the Michigan Department of Treasury to verify that the business has or has not met the criteria for a Michigan business indicated above and to disclose the verifying information to the procuring agency.

Bidder shall also indicate one of the following:

Bidder qualifies as a Michigan business (provide zip code: ________________)

Bidder does not qualify as a Michigan business (provide name of State: _____________).

Principal place of business is outside the State of Michigan, however service/commodity provided by a location within the State of Michigan (provide zip code: (___________).

Fraudulent Certification as a Michigan business is prohibited by MCL 18.1268 § 268. A BUSINESS THAT PURPOSELY OR WILLFULLY SUBMITS A FALSE CERTIFICATION THAT IT IS A MICHIGAN BUSINESS OR FALSELY INDICATES THE STATE IN WHICH IT HAS ITS PRINCIPAL PLACE OF BUSINESS IS GUILTY OF A FELONY, PUNISHABLE BY A FINE OF NOT LESS THAN $25,000 and subject to debarment under MCL 18.264.

Bidding and Contract Document (R 03/25) Project Name: Wi-Fi Cabling Infrastructure File No. 472/17032.RWG

ASBESTOS ABATEMENT ATTESTATION

Pursuant to the Public Entity Asbestos Removal Verification Act, PA 59 of 2024, MCL 338.3371 et seq. (“the Act”), the Owner will conduct the background investigation as required of any asbestos abatement contractor, or a general contractor that contracts with an asbestos abatement contractor, for the abatement of asbestos. Under the Act, an "Asbestos abatement contractor" means a business entity that is licensed under the asbestos abatement contractors licensing act, 1986 PA 135, MCL 338.3101 to 338.3319, and that carries on the business of asbestos abatement on the premises of another business entity and not on the asbestos abatement contractor's premises. Asbestos abatement contractor includes an individual or person with an ownership interest in a business entity described in MCL 338.3373(b).

THE SCOPE OF WORK TO BE COVERED UNDER THIS CONTRACT DOES NOT CONTAINS ASBESTOS

ABATEMENT AND THIS ATTESTATION IS TO BE LEFT BANK.

Contractor attests that: (check one:)

1. The Contractor will self-perform all asbestos abatement project work and attests that Contractor has not been issued 5 or more notices of violation of environmental regulations (State and/or Federal), nor has been subject to an administrative consent order or a consent judgment involving environmental regulations.

2. The Contractor will self-perform all asbestos abatement project work; however, Contractor has been issued 5 or more notices of violation of environmental regulations (State and/or Federal), or has been subject to an administrative consent order or a consent judgment involving environmental regulations, requiring Owner to conduct a background investigation and a public hearing pursuant to PA 59 of 2024, MCL 338.3371 et seq.

3. The Contractor nominates the following Sub-contractor for all asbestos abatement project work and attests that the nominated Sub-contractor has not been issued 5 or more notices of violation of environmental regulations (State and/or Federal), nor has been subject to an administrative consent order or a consent judgment involving environmental regulations:

Nominated Sub-contractor: _______________________________________________________________________

4. The Contractor nominates the following Sub-contractor for all asbestos abatement project work; however, the nominated Sub-contractor has been issued 5 or more notices of violation of environmental regulations (State and/or Federal), or has been subject to an administrative consent order or a consent judgment involving environmental regulations, requiring Owner to conduct a background investigation and a public hearing pursuant to PA 59 of 2024, MCL 338.3371 et seq.

Nominated Sub-contractor: _______________________________________________________________________

Bidding and Contract Document (R 03/25) Project Name: Wi-Fi Cabling Infrastructure File No. 472/17032.RWG

BID BOND

BID SUBMITTED ON the _______ day of ________________, 20____.

Bid Security is in the form of a Bid Bond _______ Bid Bond form has been duly executed _______; or

A Bank Certified or Cashier's check ___ or Money Order ___ is attached to this page ____ (If Bid Security is by Check or Money Order, the original check or money order must be delivered to the issuing office before Bid Due Time. ALL other SIGMA bid submittals are also still to be made).

If the Bidder is an Individual:

Name of Individual: _________________________________________________________

Name & Title of Person Authorized to sign: ___________________________________________

Signature: _________________________________________________________ (If not the Individual, Attach Power of Attorney) Date

Doing Business as: _________________________________________________________

Business Address: _________________________________________________________

County of registration _________________________

Telephone: _________________________ FAX: ______________________

If the Bidder is a Partnership:

By: _________________________________________________________ (True Name of the Partnership)

Partner Authorized to Sign Date

Signature: _________________________________________________________ (Attach evidence of Authority to sign) Date

Business Address: _________________________________________________________

County of registration _________________________

Telephone: _________________________ FAX _______________________

If the Bidder is a Corporation:

By: _________________________________________________________ (Legal Corporation Name)

Name & Title of Authorized Officer: __________________________________________________

Signature: _________________________________________________________ (Attach evidence of Authority to sign) Date

Name & Title of Officer Attesting: __________________________________________________

Signature: _________________________________________________________ Date

Business Address: _________________________________________________________

Telephone: _________________________ FAX _______________________

(State of Incorporation): _________________________________________________________

If The Bidder is A Joint Venture: JOINT VENTURE SIGNATURES MUST BE AS PROVIDED IN INSTRUCTIONS TO BIDDERS.

EACH JOINT VENTURER SIGNING THE BID MUST SIGN IN THE MANNER INDICATED FOR AN INDIVIDUAL, A PARTNERSHIP OR A CORPORATION. IF MORE THAN TWO JOINT VENTURERS OF THE SAME TYPE ARE INCLUDED, USE ADDITIONAL PAGES. JOINT VENTURE STATE OF INCORPORATION ___________________ OR COUNTY OF REGISTRATION

Bidding and Contract Document (R 03/25) Project Name: Wi-Fi Cabling Infrastructure File No. 472/17032.RWG

POST-BID SUBMITTALS

The PSC will request this submittal after bid opening. Complete and submit these items within two business days after the request.

BIDDER’S EXPERIENCE MODIFICATION RATING (EMR) ____________

Attach letter of explanation if the Bidder does not have an EMR.

PROPOSED PROJECT SUPERINTENDENT _______________________________

Attach brief resume or list of similar successful projects.

LIST OF SIMILAR PROJECTS COMPLETED BY THE BIDDER

Please list at least three completed projects of similar size and complexity to the project being bid, with reference contact information

REFERENCE #___

Owner: _____________________________________________________________________________________

Project/Contract Name: ________________________________________________________________________

Location of Project/Contract: ____________________________________________________________________

Contract Price: _______________________ Project/Contract Started: ____________ Completed: ____________

Owner's Representative (Name and Telephone): _____________________________________________________

Scope of Project/Contract: ______________________________________________________________________

REFERENCE #___

Owner: _____________________________________________________________________________________

Project/Contract Name: ________________________________________________________________________

Location of Project/Contract: ____________________________________________________________________

Contract Price: _______________________ Project/Contract Started: ____________ Completed: ____________

Owner's Representative (Name and Telephone): _____________________________________________________

Scope of Project/Contract: ______________________________________________________________________

REFERENCE #___

Owner: _____________________________________________________________________________________

Project/Contract Name: ________________________________________________________________________

Location of Project/Contract: ____________________________________________________________________

Contract Price: _______________________ Project/Contract Started: ____________ Completed: ____________

Owner's Representative (Name and Telephone): _____________________________________________________

Scope of Project/Contract: ______________________________________________________________________

Bidding and Contract Document (R 03/25) Project Name: Wi-Fi Cabling Infrastructure File No. 472/17032.RWG

POST BID SUBMITTALS: LIST OF SUBCONTRACTORS

The Apparent Low Bidder shall nominate for each Division of Specification and/or trade category, the Subcontractor to be awarded Sub-agreements, including the apparent Low Bidder if work is to be self-performed. Nominated subcontractors shall not be removed, replaced, or added to except by written request for good reason, subject to Owner acceptance.

Notwithstanding anything to the contrary, the Owner has the right to object, regardless of cause, to any asbestos abatement Subcontractor nominated by the Contractor to be awarded a Sub-agreement that has 5 or more notices of violation of environmental regulations, or has been subject to an administrative consent order or a consent judgment involving environmental regulations, within the immediately preceding 5 years.

Division, Specification Section Nominated Amount of Subcontract and/or Trade Subcontractor(s)

1.________________________ _________________________ __________________

2.________________________ _________________________ __________________

3.________________________ _________________________ __________________

4.________________________ _________________________ __________________

5.________________________ _________________________ __________________

6.________________________ _________________________ __________________

7.________________________ _________________________ __________________

8.________________________ _________________________ __________________

9.________________________ _________________________ __________________

10._______________________ _________________________ __________________

11._______________________ _________________________ __________________

12._______________________ _________________________ __________________

13._______________________ _________________________ __________________

14._______________________ _________________________ __________________

The undersigned Apparent Low Bidder _____________________________________________________________ certifies that all the information and data furnished in this List of Subcontractors are current, accurate and complete as of the date stated below.

Signed by:____________________________Name_______________________________ Title ________________________ on this __________ day of ____________________, 20_______.

Bidding and Contract Document (R 03/25) Project Name: Wi-Fi Cabling Infrastructure File No. 472/17032.RWG

PERFORMANCE BOND

SURETY COMPANY REFERENCE No. __________________________________

That "the Contractor," ___________________________________________________, a corporation ___, individual ___, partnership ___, joint venture ___ of the State of __________________, qualified to do business in the State of Michigan, as Principal, and "the Surety," ____________________________________________________________________, of the State of _________________, as surety, are held and bound unto the State of Michigan, "the Owner," as Obligee, in the amount of __________________________________________________________________________ Dollars ($_________________), for the payment of which the Contractor and Surety bind themselves, their respective heirs, successors, legal representatives and assigns, jointly and severally, in compliance with 1963 PA 213, as amended, MCL 129.201 et seq.

The Contractor has entered into "the Contract" with the Owner for _______________________________________________ _______________, "the Work," covered by the Contract Documents, which are incorporated into this Performance Bond by this reference.

If the Contractor faithfully performs and fulfills all the undertakings, covenants, terms, conditions, warranties, indemnifications and agreements of the Contract Documents within the Contract Time (including any authorized changes, with or without notice to the Surety) and during the Correction Period, and if the Contractor also performs and fulfills all the undertakings, covenants, terms, conditions, warranties, indemnifications and agreements of any and all duly authorized modifications of the Contract Documents, then THIS

OBLIGATION IS VOID, OTHERWISE TO REMAIN IN FULL

FORCE AND EFFECT.

A. No change in Contract Price or Contract Time, "or equal" or substitution or modification of the Contract Documents (including addition, deletion, or other revision) releases the Surety of its obligations under this Section 00610 Performance Bond. The Surety expressly waives notice of any such change in Contract Price or Contract Time, "or equal" or substitution or modification of the Contract Documents (including addition, deletion, or other revision).

B. This Performance Bond must be solely for the protection of the Owner and its successors, legal representatives or assigns.

C. It is the intention of the Contractor and Surety that they must be bound by all terms and conditions of the Contract Documents (including, but not limited to General Conditions and this Performance Bond). However, this Performance Bond is executed pursuant to 1963 PA 213, as amended, MCL 129.201 et seq., and if any provision(s) of this Performance Bond is/are illegal, invalid, or unenforceable, all other provisions of this Performance Bond must nevertheless remain in full force and effect, and the Owner must be protected to the full extent provided by 1963 PA 213, as amended, MCL 129.201 et seq.

IMPORTANT: The Surety must be authorized to do business in the State of Michigan by the Department of Licensing and Regulatory Affairs, must be listed on the current U.S. Department of the Treasury Circular 570, and, unless otherwise authorized by the Owner in writing, must have at least an A− Best's rating and a Class VII or better financial size category per current A. M. Best Company ratings.

Name, Address and Telephone of the Surety: Address and Telephone of Agent, who is either a resident of, or whose principal office is maintained in, the State of Michigan

Signed and sealed this __________ day of _______________________, 20_____.

THE CONTRACTOR: (Print Full Name and Sign) By:___________________________________________________________

WITNESS ______________________________ Name & Title: __________________________________________________

Telephone No. _________________________________________________

THE SURETY: (Print Full Name and Sign) Agent: ________________________________________________________

WITNESS ______________________________ Attorney-in-Fact: ________________________________________________

Telephone No. _______________________________________________

Email:. _____________________________________________________

Bidding and Contract Document (R 03/25) Project Name: Wi-Fi Cabling Infrastructure File No. 472/17032.RWG

PAYMENT BOND

SURETY COMPANY REFERENCE No.___________________________________

“the Contractor,” ___________________________________________________, a corporation ___, individual ___, partnership ___, joint venture ___ of the State of __________________, qualified to do business in the State of Michigan, as Principal, and “the Surety,” ____________________________________________________________________, of the State of _________________, as surety, are held and bound unto the State of Michigan, “the Owner,” as Obligee, in the amount of __________________________________________________________________________ Dollars ($_________________), for the payment of which the Contractor and Surety bind themselves, their respective heirs, successors, legal representatives and assigns, jointly and severally, in compliance with 1963 PA 213, as amended, MCL 129.201 et seq.

The Contractor has entered into “the Contract” with the Owner for _____________________________________________ __________________, “the Work,” covered by the Contract Documents, which are incorporated into this Payment Bond by this reference.

If the Contractor promptly pays all claimants supplying labor or materials to the Contractor or to the Contractor’s Subcontractors in the prosecution of the Work, then THIS

OBLIGATION IS VOID, OTHERWISE TO REMAIN IN FULL

FORCE AND EFFECT.

A. All rights and remedies on this Payment Bond are solely for the protection of all claimants supplying labor and materials to the Contractor or the Contractor’s Subcontractors in the prosecution of the Work and must be determined in accordance with Michigan Law.

B. No change in Contract Price or Contract Time, “or equal” or substitution or modification of the Contract Documents (including addition, deletion, or other revision) must release the Surety of its obligations under this Payment Bond. The Surety hereby expressly waives notice of any such change in Contract Price or Contract Time, “or equal” or substitution or modification of the Contract Documents (including addition, deletion, or other revision).

C. It is the intention of the Contractor and Surety that they must be bound by all terms and conditions of the Contract Documents (including, but not limited to this Payment Bond). However, this Payment Bond is executed pursuant to 1963 PA 213, as amended, MCL 129.201 et seq., and if any provision(s) of this Payment Bond is/are illegal, invalid, or unenforceable, all other provisions of this Payment Bond must nevertheless remain in full force and effect, and the Owner must be protected to the full extent provided by 1963 PA 213, as amended, MCL 129.201 et seq.

IMPORTANT: The Surety must be authorized to do business in the State of Michigan by the Department of Licensing and Regulatory Affairs, must be listed on the current U.S. Department of the Treasury Circular 570, and, unless otherwise authorized by the Owner in writing, must have at least an A− Best’s rating and a Class VII or better financial size category per current A. M. Best Company ratings.

Name, Address and Telephone of the Surety:

Address and Telephone of Agent, who is either a resident of, or whose principal office is maintained in, the State of Michigan

Signed and sealed this __________ day of _______________________, 20_____.

THE CONTRACTOR: (Print Full Name and Sign) By:___________________________________________________________

WITNESS ______________________________ Name & Title: __________________________________________________

Telephone No. _________________________________________________

THE SURETY: (Print Full Name and Sign) Agent: ________________________________________________________

WITNESS ______________________________ Attorney-in-Fact: ________________________________________________

Telephone No. ____________________________________________________

Email: _________________________________________________________

Bidding and Contract Document (R 03/25) Project Name: Wi-Fi Cabling Infrastructure File No. 472/17032.RWG

TABLE OF CONTENTS

CONTRACT FORMS

BID SUMMARY FORM

BID SCHEDULE

QUALIFIED DISABLED VETERAN (QDV) BUSINESS REPRESENTATION

CERTIFICATION OF A MICHIGAN BASED BUSINESS

ASBESTOS ABATEMENT ATTESTATION

BID BOND

POST-BID SUBMITTALS

PERFORMANCE BOND

PAYMENT BOND

TABLE OF CONTENTS

DIVISION 00 BIDDING REQUIREMENTS AND CONTRACT CONDITIONS

SECTION TITLE PAGE

00010 PRE-BID INFORMATION 00-1

00100 INSTRUCTIONS TO BIDDERS 00-3

00120 SUPPLEMENTARY INSTRUCTIONS 00-8

00200 INFORMATION TO BIDDERS 00-8

00700 GENERAL CONDITIONS 00-9

00750 SPECIAL WORKING CONDITIONS 00-24

00800 SUPPLEMENTARY CONDITIONS 00-24

00900 ADDENDA 00-24

DIVISION 01 - GENERAL REQUIREMENTS

01010 SUMMARY OF WORK 01-1

01020 ALLOWANCES 01-1

01025 MEASUREMENT AND PAYMENT 01-1

01030 ALTERNATES 01-1

01040 COORDINATION 01-2

01050 FIELD ENGINEERING 01-2

01060 REGULATORY REQUIREMENTS 01-2

01090 REFERENCES 01-4

01100 PROJECT PROCEDURES 01-5

01200 PROJECT MEETINGS 01-5

01300 SUBMITTALS 01-6

01400 QUALITY CONTROL 01-9

01500 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS 01-10

01600 MATERIAL AND EQUIPMENT 01-10

01650 FACILITY START-UP 01-11

01700 CONTRACT CLOSE-OUT 01-11

01800 MAINTENANCE 01-11

APPENDIX I – GLOSSARY

APPENDIX II – SPECIAL WORKING CONDITIONS

APPENDIX III – SPECIAL PROJECT PROCEDURES

APPENDIX IV – REQUIRED PROJECT SIGN

APPENDIX V – PREVAILING WAGE

Bidding and Contract Document (R 03/25) Project Name: Wi-Fi Cabling Infrastructure File No. 472/17032.RWG

TECHNICAL SPECIFICATIONS – BOUND WITHIN

DIVISION 28 - SECURITY AND COMMUNICATIONS

28 1000 TECHNOLOGY OVERVIEW

28 1150 COMMUNICATIONS ROOM

28 1150 COMMUNICATIONS GROUNDING

28 1500 FIBER CABLING

28 1600 CAT-6A CABLING

28 2000 HYDRO EVACUATION

28 2100 EXTERIOR PATHWAYS

28 2110 INTERIOR RACEWAYS

28 2130 DIRECTIONAL BORING

28 2150 TECHNOLOGY & INSTALLATION STANDARDS

28 6250 WIRELESS NETWORK INSTALL

28 7100 TECHNOLOGY PASS-THRU AND FIRESTOP

28 7200 TECHNOLOGY SUBMITTALS

28 7600 TECHNOLOGY LABELING

28 7700 TECHNOLOGY TESTING

28 7800 TECHNOLOGY WARRANTY

DRAWINGS - BOUND SEPARATELY

SECURITY AND COMMUNICATIONS

TC701 CABLING LEGENDS AND DETAILS

TC702 CABLING DETAILS

TC703 CABLING DETAILS

TC704 CABLING DETAILS

TC705 RACK LAYOUT DETAILS

TC706 NETWORK WAP CONNECTIVITY AND HANDHOLE DETAILS

TC707 RACK LAYOUTS

TC708 RACK LAYOUTS

TC709 FIBER BACKBONE

TC800 NEWBERRY DEPUTY - HEALTH - UNIT Q - UNIT 11 FIRST FLOOR

TC801 NEWBERRY DEPUTY - HEALTH - UNIT Q - UNIT 11 BASEMENT

TC802 NEWBERRY UNITS 1 & 2

TC803 NEWBERRY UNITS 3,4,5 FIRST FLOOR

TC804 NEWBERRY UNITS 3,4,5 BASEMENT

TC805 NEWBERRY KITCHEN FIRST FLOOR AND BASEMENT

TC806 NEWBERRY UNITS 6,7,8 FIRST FLOOR

TC807 NEWBERRY UNITS 6,7,8 BASEMENT

TC808 NEWBERRY UNITS 9 & 10

TC809 NEWBERRY PROGRAMS BUILDING FIRST FLOOR

TC810 NEWBERRY PROGRAMS BUILDING BASEMENT

TC811 NEWBERRY WAREHOUSE FIRST FLOOR

TC812 NEWBERRY WAREHOUSE BASEMENT

TC813 NEWBERRY MAINTENANCE FIRST FLOOR & MEZZANINE

TC814 PIPE SHOP FIRST FLOOR & BASEMENT

TC815 POWERHOUSE FIRST FLOOR, BASEMENT & MEZZANINE

TC816 FULL SITE PLAN

Bidding and Contract Document (R 03/25) Project Name: Wi-Fi Cabling Infrastructure File No. 472/17032.RWG

DIVISION 00

BIDDING REQUIREMENTS AND CONTRACT CONDITIONS

Bidding and Contract Document (R 03/25) Project Name: Wi-Fi Cabling Infrastructure File No. 472/17032.RWG

00-1

SECTION 00010 PRE-BID INFORMATION

1. Invitation to Bid (ITB) − Your firm is invited to submit a Bid. The State of Michigan as the Owner will receive bids electronically through the SIGMA VSS website at https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService, for Wi-Fi Cabling Infrastructure at Newberry Correctional Facility until 2:00 p.m., ET, on May 28, 2025. The State reserves the right to cancel this Invitation to Bid (ITB) or change the date and time for submitting Bids by announcing same at any time before the established date and time for Bid opening. Bids must remain open for acceptance by the Owner for no less than the Bid hold period.

Contractor may agree to extend the Bid hold period. However, any such extension must be based upon no increase in the Bid Price and/or Contract Time.

2. Work Description − The Work, Wi-Fi Cabling Infrastructure Agency No: 472 Funding Code. 472ElectronicComm, DTMB File No. 472/17032.RWG includes, but is not necessarily limited to:

• The MDOC is obtaining a new WIFI cabling system and installation and connection of owner provided Wireless Network equipment.

• The scope of this project is the provision and installation of the cabling, raceway and systems as described below, on the drawings and in the detailed specifications.

• Electrical Power o Provide and install power circuits where shown on the drawings and as described in the specifications.

o Label all outlets and update labels in electrical panels.

o Additional panel location will be provided during the project

• Systems Grounding o Install ground bars and bond equipment to the ground bars as shown on the drawings and as described in the specifications

• Wireless network equipment shall include:

o Wireless Access points –(WAPS) and their enclosures. Interior and Exterior. All these devices and their enclosures are provided by owner, Contractor installs.

o Contractor shall install WAPS and WAP enclosures at each building. Owner will provide the WAPS and Oberon type enclosures.

• WIFI cabling scope shall include but not be limited to:

o Provide, install, terminate, test and label a complete CAT-6A cabling infrastructure to support a new WIFI (wireless) network.

o Provide, install, terminate, test and label a complete CAT-6 cabling infrastructure where noted to transition existing cables to racks or cabinets.

o Provide and install raceways and cable supports as specified and as required to support all new cabling and Wireless Access Points.

o Upgrade and/or add communications racks and equipment to the racks. Make change as noted on the drawings and specifications o See drawings and specifications for raceways and pathways.

• Provide new raceways inside and outside building to route CAT-6A cables and fiber cable between buildings. See drawings and specs for raceway requirements

• Install fiber cabling between the Admin and the buildings/cabinet noted. Contractor shall terminate and test all fiber cables.

o Terminate all into patch panels. Label all fiber cables and panels o Install fiber into stowage rings on the wall prior to routing into the fiber path panels o Label all fiber cables in the tunnel and inside each cabinet and handhole.

• The contract shall include the installation and connection of Wireless network equipment. Work shall include:

o Providing a 40’ long Conex box onsite for the duration of the project. Coordinate location with the owner.

o Moving of WAPS and enclosures from the delivery truck to the owner’s storage building.

o Moving of WAPS and enclosures from the owner’s storage location to the actual building where they will be installed.

o Installation of all wireless network equipment. this includes:

Bidding and Contract Document (R 03/25) Project Name: Wi-Fi Cabling Infrastructure File No. 472/17032.RWG

00-2

▪ Mounting of owner provided WAPS and enclosures in all buildings.

▪ Mounting of owner provided WAPS on the building exterior or poles at the site.

▪ Owner will install Ethernet Switches and provide/install Patch cables at the switches

• Provide and install CAT-6A patch cords at each WAP. See specifications for types and lengths required.

o Owner will provide and install CAT-6A patch cords at the Ethernet Switches

• Verify connectivity lights on all WAPS after the owner installs the Ethernet Switches.

• Label WAP patch panels with the WAP number as shown in the drawings and specifications.

• The owners (and their Cisco Partner) work on the WIFI network equipment includes:

o Obtaining of Wireless network equipment and storage at their warehouse in Michigan.

o Deliver of WAPS and WAP enclosures to the site.

o Configuration of all wireless network equipment per owners’ recommendations o Labeling of WAPS with WAP number and labeling outside of WAP enclosure with WAP number and building where it is to be installed

The site is located at: 13747 E. Country Road 428, Newberry, MI 49868 as shown on the Drawings.

3. Bidding Documents − Sets of Bidding Documents may be obtained at https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService .

4. Bid Security − Each Bid must enclose a duly executed Bid Security, in the amount of five percent (5%) of the Bidder's Base Bid, paid to the “State of Michigan” in the form of a certified or cashier’s check or money order drawn upon a bank insured by an agency of the Federal Government, or a bid bond signed by both the Contractor and authorized surety company. If Bid Security is by check or money order, such certified or cashier’s check or money order must be delivered in original copy before the Bid Due Time to:

State Facilities Administration Design & Construction Division

3111 W. St. Joseph Street

All other Bid information must be submitted via SIGMA as per standard bidding procedure

5. Pre-Bid Conference − Newberry Correctional Facility - 13747 E. Country Road 428, Newberry, MI 49868 on Friday May 16th, 2025, at 9:00 AM Local Time. A tour will be held on the same day, starting at local time. 10:00 AM. All prospective Bidders are required the tour, if held. Other parties interested in the Work are encouraged to attend the tour. Addenda may be issued, in response to issues raised at the pre-bid conference and tour, or as the Owner and/or Professional may otherwise consider necessary. An individual is only permitted to represent one bidder at a mandatory Pre-Bid Conference.

The purpose of the pre-bid conference and inspection is to answer questions and provide an inspection tour of the Project site at the scheduled time on the day of the meeting. A representative will be available to assist the Contractors. Other inspection visits may be allowed if needed. Individuals needing special services to fully participate in the meeting due to a disability may contact Frank Suriano at (906) 293-6307.

FOR CORRECTIONAL FACILITIES ONLY: All contractor/vendor representatives attending a Pre-Bid Walk Through Meeting must submit a Vender/Contractor LEIN Request five business days prior to the meeting date, (LEIN Request For CAJ-1037 attached to Bid posting). Send the LEIN Request form, filled out and signed, by email to SmithD76@michigan.gov & FrostS1@michigan.gov . The email “Subject” must include (Facility Name, Project Name, Date & Time of Pre-Bid Walk Through Meeting).

6. SIGMA VENDOR NUMBER: If you are bidding a State job for the first time, visit the State of Michigan SIGMA website, https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService, and follow the “SOM VSS User Guide for New Vendors” instructions, located under Forms and Reference Documents. Registration is required for bid submission. Do not wait until the last minute to submit a proposal, as the SIGMA system requires the creation of an account and entry of certain information, in addition to uploading and submitting the materials. The SIGMA system will not allow a proposal to be submitted after the proposal deadline, even if a portion of the proposal has been updated.

Questions on how to submit information or how to navigate in the SIGMA VSS system can be answered by calling (517) 373-4111 or

(888) 734-9749.

mailto:SmithD76@michigan.gov mailto:FrostS1@michigan.gov

Bidding and Contract Document (R 03/25) Project Name: Wi-Fi Cabling Infrastructure File No. 472/17032.RWG

00-3

7. Equal Employment Opportunity − Covenants to not discriminate in employment by Contractors, Subcontractors and Suppliers required by Law are contained in Instructions to Bidders and General Conditions and are applicable to the Work and any Sub-agreement under the Contract.

8. Contract Times − The Contract Times and the associated liquidated damages are specified in the Contract.

9. Contact Person − All requests or inquiries concerning the Bidding Documents, or the Work must be addressed to Bret Emerson, Commtech Design, bids@commtechdesign.com. Questions will be accepted until May 12, 2025, at 3:00 PM ET.

10. Award − Subject to any agreed extension of the period for holding Bids, Bids must remain valid for acceptance by the Owner for 60 Calendar Days after the date of Bid opening. In addition, the Owner expressly reserves the right, within the Owner's sole discretion, to reject any or all Bids, to waive any irregularities, to issue post-Bid Addenda and re-bid the Work without re-advertising, to re-advertise for Bids, to withhold the award for any reason the Owner determines and/or to take any other appropriate action.

11. Performance and Payment Bonds – A performance bond and a payment bond are required for all contracts over $50,000.00 for the contract award amount.

END OF SECTION 00010

Bidding and Contract Document (R 03/25) Project Name: Wi-Fi Cabling Infrastructure File No. 472/17032.RWG

00-6

SECTION 00100 INSTRUCTIONS TO BIDDERS

1. PREPARATION OF BID: Execute Bid fully and properly. Bid Summary Form (DTMB -0401D) and Bid Form Attachments must be used and completely filled out for the Bid to be considered responsive and meeting the requirements of the contract solicitation.

All Bid prices must be printed or typed in both words and figures.

2. BID CHECKLIST: Submit Bid Summary Form with original signatures plus Bid Form Attachments in accordance with the electronic bidding procedures on the SIGMA VSS website.

A complete Bid will consist of the following forms, which are included immediately following the Bid Summary Form:

Bids SUBMIT THESE Bid Forms and Bid Form Attachments

All Bids □ Signed and completed Bid Summary Form (DTMB-0401D).

□ Bid Schedule.

□ Qualified Disabled Veteran (QDV) Business Representation.

□ Bid Security in the amount of 5% of Base Bid Price.

If Bid Security is by check or money order, such certified or cashier’s check or money order must be delivered in original copy before the Bid Due Time to:

State Facilities Administration Design & Construction Division

3111 W. St. Joseph Street

All other Bid information must be submitted via SIGMA as per standard bidding procedure

□ Signature Authorization or copy of the partnership agreement if signed by all partners.

□ Byrd Anti-Lobbying Certification (Only when Federal Provisions Addendum is included)

□ Asbestos Abatement Attestation

□ State Project Registration (SPR) for the Contractor and subcontractors

(if applicable pursuant to 2023 PA 10, as amended, MCL 408.1101 et seq.)

□ Other Forms; None.

Over $50K □ Forms listed under All Bids.

□ Payment and Performance Bond (upon issuing the Notice of Award).

Over $100K □ Forms listed under All Bids.

□ Certification of a Michigan Based Business.

Over $250K □ Forms listed under All Bids.

□ Certification of a Michigan Based Business.

Apparent Low Bidders ONLY (upon request from the Professional)

□ Experience Modification Rating (EMR), or a letter stating why the Bidder does not have one.

□ Identification of the proposed project superintendent, with a resume or list of similar projects handled by that individual.

□ A list of at least three (3) projects completed by the Bidder, within the last three (3) years of similar size and complexity, with contact information for references for each.

□ A list of nominated sub-contractors, including proposed self-performed categories, for each

Division/Trade/etc.

3. BID SUBMISSION: Bids must be submitted electronically through the SIGMA VSS website at https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService.

Bidding and Contract Document (R 03/25) Project Name: Wi-Fi Cabling Infrastructure File No. 472/17032.RWG

4. BID GUARANTEE: Each proposal must be accompanied by either a bank certified or cashier's check on an open, solvent bank or a bid bond with an authorized surety company (the surety must be listed on the current U.S. Department of the Treasury Circular 570) in the amount of five percent of the base bid payable to the State of Michigan, as a guarantee of good faith.

If the successful Bidder fails to furnish satisfactory bonds and insurance within fifteen Calendar Days after Notice of Award, such guarantee must be forfeited to the State as liquidated damages. If Bid Security is by check or money order, such certified or cashier’s check or money order must be delivered in original copy before the Bid Due Time to the Issuing Office. The bid security, exclusive of bid bonds, of all unsuccessful Bidders will be returned when an award is made or upon substitution of a bid bond. The bid security of the successful Bidder will be returned when the performance bond and labor and material bond are approved.

5. Left Blank Intentionally.

6. MICHIGAN BASED BUSINESS CERTIFICATION: All Bidders submitting Bids in excess of $100,000.00 must complete the

Certification of Michigan Based Business. This information will determine if a Bidder qualifies as a "Michigan" business for purposes of application of reciprocity where applicable.

7. POST-BID SUBMITTAL: For all projects, the Professional may request a Post-Bid Submittal from the Apparent Low

Bidders. The Apparent Low Bidders must submit to the Professional, within two Business Days after receipt of the Professional’s request,

• Experience Modification Rating (EMR), or a letter stating why the Bidder does not have one.

• Identification of the proposed project superintendent with a resume or list of similar projects managed by that individual.

• A list of at least three (3) projects completed by the Bidder, within the last three (3) years of similar size and complexity, with contact information for references for each.

Failure to provide the submittals may disqualify the Bid.

8. SIGNATURES: All Bids, notifications, claims, and statements must be signed as follows:

(a) Corporations: Signature of official must be accompanied by a certified copy of the Resolution of the Board of Directors authorizing the individual signing to bind the corporation.

(b) Partnerships: Signature of one partner must be accompanied by a signed copy of the legal document (e.g., Power of Attorney or partnering agreement) authorizing the individual signing to bind all partners. If Bid is signed by all partners, no authorization is required.

(c) Individual: No authorization is needed. Each signature must be witnessed.

9. BID PRICES: The Bidder’s Base Bid and Alternate Bid prices must include, and payment for completed Work will compensate in full for: all services, obligations, responsibilities, management, supervision, labor, materials, devices, equipment, construction equipment, general conditions, permits, patent fees and royalties, testing, inspection and approval responsibilities, warranties, temporary facilities, small tools, supplies, Bonds, insurance, taxes, mobilization, close-out, overhead and profit and all connections, appurtenances and any other incidental items of any kind…

This is the start of the file's text. The full file is on GovTribe.