472/17032. RWG; Newberry C. F. - Wi-Fi Cabling Infrastructure
Solicitation number
RFQ-171-250000000398-3
Issued by
Livingston County, Michigan

About this file

This is a Project Advertisement from the Michigan Department of Technology, Management and Budget (DTMB), State Facilities Administration, Design & Construction Division for a Wi-Fi Cabling Infrastructure project at the Newberry Correctional Facility. The project involves installing a new Wi-Fi cabling system and connecting owner-provided wireless network equipment, with a mandatory pre-bid conference scheduled for May 16th, 2025, at 9:00 AM at the facility located in Newberry, MI. Electronic bids are due on May 28th, 2025, at 2:00 PM local time. The scope includes providing and installing CAT-6A and CAT-6 cabling infrastructure, raceways, cable supports, communications racks, fiber cabling between buildings, and mounting wireless access points (WAPs) in various locations.

The project requires a 5% bid security and has specific submission requirements, including uploading bids to SIGMA VSS with a maximum of two attachments under 6 MB. Contractors must submit a Vendor/Contractor LEIN Request form five business days prior to the pre-bid meeting. Questions should be emailed to Bret Emerson at bids@commtechdesign.com by May 20th, 2025, at 3:00 PM Eastern. The project involves close coordination with the owner, who will provide wireless network equipment, Ethernet switches, and perform configuration, while the contractor will handle physical installation, cabling, and equipment mounting. Documents can be obtained from the SIGMA Michigan website, with Commtech Design, Inc. serving as the point of contact.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0415 (R 02/22)

PROJECT ADVERTISEMENT

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

STATE FACILITIES ADMINISTRATION

DESIGN & CONSTRUCTION DIVISION

This form is required for the advertisement of all construction projects. (1984 PA 431)

TO:

DESIGN & CONSTRUCTION DIVISION

DATE:

5/2/2025

FROM:

Rob Gruesbeck

PROJECT MANAGER:

Rob Gruesbeck

DTMB FILE NUMBER:

472/17032.RWG

ACCOUNTING TEMPLATE

472ElectronicComm

ADVERTISEMENT DATE

5/2/2025

ELECTRONIC BID DUE DATE

5/28/2025 – 2:00 PM Local Time

PROJECT NAME AND LOCATION (INCLUDE STREET ADDRESS)

Wi-Fi Cabling Infrastructure – Newberry Correctional Facility - 13747 E. Country Road 428, Newberry, MI 49868

WALK-THROUGH INSPECTION DATE, TIME, AND LOCATION

A MANDATORY pre-bid Conference will be held at:

Newberry Correctional Facility - 13747 E. Country Road 428, Newberry, MI 49868 on Friday May 16th, 2025, at 9:00 AM

LEIN CHECK (Dept. of Corrections ONLY) All contractor/vendor representatives attending a Pre-Bid Walk Through Meeting must submit a Vendor/Contractor LEIN Request five business days prior to the meeting date, (See the attached Vendor/Contractor LEIN Request form). Send the LEIN Request form, filled out and signed, by email to Daniel T. Smith at email address: SmithD76@michigan.gov. The email “Subject” must include (Facility Name, Project Name, Date & Time of Pre-Bid Walk Through Meeting).

NOTE: An individual is only permitted to represent one bidder at a mandatory walk-through.

DESCRIPTION OF WORK:

Project Scope of Work:

• The MDOC is obtaining a new WIFI cabling system and installation and connection of owner provided Wireless Network equipment.

• The scope of this project is the provision and installation of the cabling, raceway and systems as described below, on the drawings and in the detailed specifications.

• Electrical Power o Provide and install power circuits where shown on the drawings and as described in the specifications.

o Label all outlets and update labels in electrical panels.

o Additional panel location will be provided during the project

• Systems Grounding o Install ground bars and bond equipment to the ground bars as shown on the drawings and as described in the specifications

• Wireless network equipment shall include:

o Wireless Access points –(WAPS) and their enclosures. Interior and Exterior. All these devices and their enclosures are provided by owner, Contractor installs.

o Contractor shall install WAPS and WAP enclosures at each building. Owner will provide the WAPS and Oberon type enclosures.

mailto:SmithD76@michigan.gov

• WIFI cabling scope shall include but not be limited to:

o Provide, install, terminate, test and label a complete CAT-6A cabling infrastructure to support a new WIFI (wireless) network.

o Provide, install, terminate, test and label a complete CAT-6 cabling infrastructure where noted to transition existing cables to racks or cabinets.

o Provide and install raceways and cable supports as specified and as required to support all new cabling and Wireless Access Points.

o Upgrade and/or add communications racks and equipment to the racks. Make change as noted on the drawings and specifications o See drawings and specifications for raceways and pathways.

• Provide new raceways inside and outside building to route CAT-6A cables and fiber cable between buildings. See drawings and specs for raceway requirements

• Install fiber cabling between the Admin and the buildings/cabinet noted. Contractor shall terminate and test all fiber cables.

o Terminate all into patch panels. Label all fiber cables and panels o Install fiber into stowage rings on the wall prior to routing into the fiber path panels o Label all fiber cables in the tunnel and inside each cabinet and handhole.

• The contract shall include the installation and connection of Wireless network equipment. Work shall include:

o Providing a 40’ long Conex box onsite for the duration of the project. Coordinate location with the owner.

o Moving of WAPS and enclosures from the delivery truck to the owner’s storage building.

o Moving of WAPS and enclosures from the owner’s storage location to the actual building where they will be installed.

o Installation of all wireless network equipment. this includes:

▪ Mounting of owner provided WAPS and enclosures in all buildings.

▪ Mounting of owner provided WAPS on the building exterior or poles at the site.

▪ Owner will install Ethernet Switches and provide/install Patch cables at the switches

• Provide and install CAT-6A patch cords at each WAP. See specifications for types and lengths required.

o Owner will provide and install CAT-6A patch cords at the Ethernet Switches

• Verify connectivity lights on all WAPS after the owner installs the Ethernet Switches.

• Label WAP patch panels with the WAP number as shown in the drawings and specifications.

• The owners (and their Cisco Partner) work on the WIFI network equipment includes:

o Obtaining of Wireless network equipment and storage at their warehouse in Michigan.

o Deliver of WAPS and WAP enclosures to the site.

o Configuration of all wireless network equipment per owners’ recommendations o Labeling of WAPS with WAP number and labeling outside of WAP enclosure with WAP number and building where it is to be installed

Please NOTE:

• Bid responses and bid attachments MUST be uploaded to SIGMA VSS.

• Contractors should only submit a maximum of two (2) attachments (both being less than 6 MB) for bid responses.

One attachment is to be bid documents (Bid Summary, Bid Schedule, Bid Bond, Certification forms, Signature Authority, etc.) and if applicable, the other attachment should be Qualified Disabled Veteran (QDV) information (DD214, Proof of 51% Ownership and Proof of Service-Connected Disability)

• Do not wait until just before the 2:00 p.m. solicitation deadline to submit your bid response.

• SIGMA VSS will not allow a proposal to be submitted after 2:00 p.m., even if a portion of the bid response has been uploaded.

• If you experience issues or have questions regarding your electronic submission, you must contact the SIGMA Help Desk for assistance prior to the 2:00 p.m., solicitation deadline. You may contact the SIGMA Help Desk by telephone at 517.284.0540 or toll-free at 888.734.9749. You may also email the SIGMA Help Desk at sigma-procurement-helpdesk@michigan.gov

• Please email the Design and Construction Contract Specialists if you are having SIGMA VSS issues. Please include your SIGMA ticket number and any supporting documentation (i.e., screenshots) to Anne Watros (WatrosA@michigan.gov) and Don Klein (KleinD4@michigan.gov).

• You may be asked by our contract specialists to email your bid response. Emailed submissions will require DCD approval and will be handled on a case-by-case basis.

• Approved emailed submissions MUST be received prior to 2:00 p.m. deadline to be considered responsive and responsible.

• Bid Responses should not be emailed to the Project Director.

5% Bid Security:

Required

Not Required

NIGP CODES: 91438

ACCEPTING QUESTIONS UNTIL: Please do not submit online questions via SIGMA VSS.

ALL questions should be emailed to Bret Emerson at bids@commtechdesign.com no later than 3:00 p.m., Eastern on May 20, 2025.

Documents may be obtained from:

https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService

PSC/Agency: Commtech Design, Inc.

Address: 6581 Belding Road. NE Rockford, MI 49341

Phone: 616-863-8132

Attention: Bret Emerson RCCD. NTS

Email: bids@commtechdesign.com