467548 Spec.docx
DOCX document 18 KB Posted
- Attached to
- Hidex Triathler LSC - NO SUBSTITUTIONS
- Solicitation number
- 467548
- Issued by
-
Department of Energy Office of Science
About this file
This document is a Technical Specification for a Liquid Scintillator Counter (LSC) solicitation issued by Brookhaven National Laboratory (BNL) under Department of Energy Office of Science. The solicitation (Number 467548) is a Small Business Set Aside Firm Fixed Price requirement for a Hidex Triathler LSC, seeking a benchtop instrument with specific technical requirements including detection of beta-emitters up to 2000 keV, compatibility with various sample types, automatic chemiluminescence elimination, and on-site software installation and training.
The procurement is fiscally sensitive with a deadline of 9/26/25, requiring vendors to be SAM-registered small businesses. Key procurement details include submission of a quote with manufacturer origin, Unique Entity Identifier, published price list, and insurance documentation. The basis of award will be the lowest total price from a responsive and responsible offeror meeting all technical specifications. Vendors must provide an "all-inclusive" price covering the LSC system, remote training, annual service contract, and all associated shipping, tariffs, and handling fees, with pricing to remain valid for 60 days.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BSA_Commercial_Product_Rev23 - may 2025.pdf | ||
| 467548 draft po.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 1
Technical Specifications Requisition 467548
Specifications for Biology Department’s Liquid Scintillator Counter (LSC)
a. Small profile LSC for benchtop work - approximately 10” Wide and 13” Deep. (Limited space on current area benchtop)
b. Detection of beta-emitters up to 2000 keV
c. Sample types to include LSC vials, microtubes, test tubes
d. Automatic elimination of chemiluminescence.
e. No need for dark adapting of C-14 samples
f. UL approve/listed or have an NRTL inspection
g. Software to be installed on site as needed. (System is run off of a BNL laptop. They will install for us)
h. Training to be provided as needed. Training to include operation, troubleshooting and self-normalization and calibration.
File details come from the government source that posted it. Updated .