467092 Chamberlain Shop LED 100 Percent.pdf

PDF 3 MB Posted

Attached to
Dept of Military; Install LED Lighting-Chamberlain FMS 6 Project
Solicitation number
25IFB14006
Issued by
Butte County, South Dakota

About this file

This is a 100% design document and lighting plan prepared by the South Dakota Department of the Military's Construction and Facilities Management Office for an LED lighting installation project at the Chamberlain facility located at 400 E Good Street in Butte County, South Dakota. The project involves removing and replacing existing lighting fixtures with new LED fixtures across multiple areas including Rooms 110, 114, and exterior locations, as well as the cold storage building. The scope of work includes installation of 11 shop lights (Lithonia CPHB-24000LM-HEF-GCL-MD-MVOLT-GZ10-40K-80CRI-DWH-BAA), 10 one-by-four wall mount shop lights (Lithonia EMS L96 12000 IMAFD WD MVOLT GZ10 40K 80CRI BAA), 9 wall-mounted exterior lights (Lithonia DSXW2 LED models with varying specifications), 3 exit signs (Lithonia LE-S-1-R-EL N-BAA), and 3 emergency lights (Lithonia ELM6L-BAA), along with associated occupancy sensors and switching system modifications. The project includes demolition and recycling of existing fixtures, conduit installation and rework, and wall paint touch-ups. Bid submissions are due between March 13 and March 27, 2025, with an optional pre-bid conference scheduled for March 18, 2025, at 1:00 PM CT at the project site. The project must be completed within 90 calendar days from the notice to proceed.

Bid security requirements are 5% for bids under $100,000 or 10% for bids exceeding $100,000, to be submitted as certified check, cashier's check, or bid bond. All products must comply with the Build America Buy America (BAAB) Act, and the contractor is responsible for verifying compliance. The design document specifies that LED components must be recycled as e-waste per Defense Logistics Agency requirements, and all demolished components must be recycled in accordance with applicable local and higher standards. The contractor assumes sole responsibility for job site conditions, safety, and must defend and indemnify the design professional from liability except for the design engineer's sole negligence. All lighting work must be completed quickly, preferably within the same day per room, to minimize impact on building occupants. Questions regarding the project should be directed to Kyle Roe at (605) 737-6605 or kyle.roe@state.sd.us.

View the file

Other files

File Type Posted
Invitation to Builders Exchanges.pdf PDF
Project Manual Chamberlain Lights.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET No:

G-101

SOUTH DAKOTA DEPARTMENT

OF THE MILITARY

INSTALL LED LIGHTING

CFMO# 467092

Chamberlain March 12, 2025

TE

OF

SOUTH DAKOTAATS

R G

TA

E L

AES9881

U

REDN

DOG

EL

UR

ELP

OET PEH

SO

U

TH

D

AK

O

TA

A

RM

Y

N

AT

IO

N

AL

G

U

AR

D

CO

N

ST

RU

CT

IO

N

F

AC

IL

IT

Y M

AN

AG

EM

EN

T O

FF

IC

E

W

ES

T M

AI

N

S

TR

EE

T, R

AP

ID

C

IT

Y, S D

5)

-6

FA

X

(6

) 7

-6

DATE:

SUBMITTAL:

100%

CO

VE

R

SH

EE

T

DE

PA

RT

MENT OF THE MIL ITARY

S T

A T E O F S O U T H D A K O T

A

DEPARTM

ENT

OF

TH

E M

IL ITARY

S T A

T E

O F

S

U

T H

D

A K

O

TA

03/2025

IN

ST

AL

L

LE

D

LI

G

HT

IN

G Ch am be rla in

CF

M

O

COVER SHEET, NOTES & GENERAL INFORMATION

G-101-------------------------COVER SHEET

ED-101----------------------- SHOP DEMO PLAN

ED-101----------------------- COLD STORAGE DEMO PLAN

E-101------------------------- SHOP LIGHTING PLAN

E-102------------------------- COLD STORAGE LIGHTING PLAN

REVISIONS

ZONE LTR DATE APPROVED

UNAUTHORIZED CHANGES

THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR,

UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS. ALL CHANGES TO THE PLANS

MUST BE IN WRITING AND MUST BE APPROVED BY THE PREPARER OF THESE PLANS. THE

ENGINEER SIGNING THESE PLANS IS RESPONSIBLE FOR ASSURING THE ACCURACY AND

ACCEPTABILITY OF THE DESIGN HERON.

NOTICE TO CONTRACTOR/COUNTY

THE CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY

ACCEPTED CONSTRUCTION PRACTICES, HE/SHE WILL BE REQUESTED TO ASSUME

SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE

COURSE OF CONSTRUCTION OF THE PROJECT, INCLUDING THE SAFETY OF ALL

PERSONS AND PROPERTY. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND

NOT BE LIMITED TO NORMAL WORKING HOURS. THE CONSTRUCTION CONTRACTOR

FURTHER AGREES TO DEFEND, INDEMNIFY AND HOLD THE DESIGN PROFESSIONAL

HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH

THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING LIABILITY ARISING

FROM THE SOLE NEGLIGENCE OF THE DESIGN ENGINEER.

SHEET INDEX

STATE REFERENCE MAP

HARDING

PERKINS

CORSON

CAMBELL

McPHERSON

BROWN

MARSHALL ROBERTS

BUTTE

LAWRENCE

PENNINGTON

CUSTER

FALL RIVER

MEADE

SHANNON

BENNETT

WASHABAUGH

JACKSON

HAAKON

ZIEBACH

DEWEY

STANLEY

JONES

MELLETTE

TODD

TRIPP

LYMAN

HUGHES

SULLY

POTTER

WALWORTH

EDMUNDS

FAULK

SPINK

HYDE

HAND

BUFFALO

BRULE

CHARLES

MIXGREGORY

DAY

CLARK

CODINGTON

GRANT

DEUEL

HAMLIN

BEADLE

KINGSBURY BROOKINGS

JERAULD

MINER

LAKE

MOODY

AURORA McCOOK MINNEHAHA

DOUGLAS

HUTCHINSON

TURNER

LINCOLN

BON

HOMME

YANKTON

CLAY

SANBORN

DA

VI

SO

N

H

AN

SO

N

UNION

Chamberlain

MEN

PARTS

WASHER

SHOP

SHOP

PARTS/TOOL

STORAGE

FLAMMABLE

STORAGE

BATTERY

ROOM

HALL

WOMEN

HALL

OFFICE

JANITOR

BREAK /

CLASSROOM

FITNESS

ROOM

VEST.

HALL

2 1 1 d B

A

B

A A

A A B

B

A d d b b b c c c c a a

A e e A

B

B e e

A A e e e

AB

e e a

CC

C1

C1

C1

C1

C

C b

X

X

X

EM

EM

EM

C1

C1 d a e e eB B B e e

6 6

OS

e

Sheet Specific Notes:

1. Contractor to extend circuit to mount type A from new unistrut spanned across roof joist. Lights to be mounted above bottom of joist . Contractor to coordinate final position of lights with owner at time of install.

2. Remove all existing wall mounted brackets and touch up paint. All type B lights in room 114 and 110 to be mounted 10' AFF.

Lights to be surface mounted to walls.

3. Install exterior fixtures onto existing junction boxes. Existing mounting method with flexible conduit is not acceptable.

4. Emergency lights are to be added on the circuits of the exit signs.

5. Fixture is to be mounted between the wall and garage door frame.

6. Existing wall brackets are to be reused and moved to match light lengths.

7. Contractor to change existing switching so that all the lights in Room 110 are turned on simultaneously. Work to include wiring, switches, occupancy sensor and conduit rework for a complete switching system. Intent of new wiring is to have three 4-way switches feeding occupancy sensor and then feeding all lights.

8. Connect to nearest existing ALWAYS ON circuit.

FMS LIGHTING PLANS

FIXTURES QUANTITY EXISTING PROPOSED

A 11 Shop lights LITHONIA: CPHB-24000LM-HEF-GCL-MD-MVOLT-GZ10-40K-80CRI-DWH-BAA B 10 1X4 Wall Mount Shop Light LITHONIA: EMS L96 12000 IMAFD WD MVOLT GZ10 40K 80CRI BAA

EMSANGBKT

C 3 Wall Mounted Exterior Light LITHONIA: DSXW2 LED P6 40K 80CRI T4M MVOLT DDBXD BAA PIRH

C1 4 Wall Mounted Exterior Light LITHONIA: DSXW2 LED P2 40K 80CRI T4M MVOLT DDBXD BAA PIR X 3 Exit Sign LITHONIA: LE-S-1-R-EL N-BAA

EM 3 Emergency Light LITHONIA: ELM6L-BAA

OS 1 SENSORSWITCH: CMR-PDT-6-BAA

General Notes:

1. Conduit and wire are not shown. Provide conduit and wire as required for the indicated circuitry. Minimal rewiring is expected on this project.

2. For all emergency wall mounted lights, contractor to wash/paint wall area previously covered by prior equipment or fixtures to ensure new install has no shadowed paint from previous fixture. Color, Pitt-Glaze WB1 Semi-Gloss White, and Pitt-Glaze WB1 Semi-Gloss Neutral Base`:

SW7525 Tree Branch.

3. Contractor to verify light count. Light count shown on schedule is for reference only.

4. Contractor to provide proper supports for light fixtures.

5. If new conduit is to be installed, conduit is to be painted to match existing conduit used elsewhere in the same room.

6. If conduit is removed, contractor to clean/paint shadow on wall to match wall paint.

7. If proposed wiring plans leaves a prior used breaker without any load, panel description shall be updated to show breaker being vacant.

8. Contractor to verify mounting heights of all fixtures so that when equipment in the space is in use it will clear fixtures.

9. Contractor to complete removal of existing lighting and installation of new lighting in a particular room as quickly as possible. Preferably within the same day to limit impact on building occupants.

10. Requirements per Defense Logistic Agency, LED Components need to be recycled as E-waste.

11. All components that are called to be demolished shall be recycled as completely as possible per applicable local and higher standards.

12. CONTRACTOR IS RESPONSIBLE TO CLARIFY THAT ALL PRODUCTS USED ARE BUILD AMERICA BUY AMERICA ACT COMPLIANT. BAA

COMPLIANCE DOES NOT GUARANTEE BABAA COMPLIANCE. MORE INFORMATION AVAILIBLE HERE:

https://www.whitehouse.gov/wp-content/uploads/2022/07/Build-American-Buy-American-Factsheet-and-FAQs-for-

Award-Recipients.pdf

SHEET No:

SO

U

TH

D

AK

O

TA

A

RM

Y

N

AT

IO

N

AL

G

U

AR

D

CO

N

ST

RU

CT

IO

N

F

AC

IL

IT

Y M

AN

AG

EM

EN

T O

FF

IC

E

W

ES

T M

AI

N

S

TR

EE

T, R

AP

ID

C

IT

Y, S D

5)

-6

FA

X

(6

) 7

-6

DATE:

SUBMITTAL:

SH

O

P

LI

GH

TI

N G

PL

AN

IN

ST

AL

L

LE

D

LI

G

HT

IN

G Ch am be rla in

F M

S

CF

M O

DEPARTM

ENT

O F

TH

E M

IL ITARY

S T A T

E

U

K

O

TA

100%

03/2025

E-101

SCALE: 1' = 3/32"

REPLACE ALL INDICATED LIGHTING FIXTURES WITH NEW LED FIXTURES. THIS INCLUDES EMERGENCY LIGHTS, EXIT LIGHTS, AND EXTERIOR LIGHTS.

BID/Project Extents: Replace lights in rooms 110, 114, and Exterior

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

C1 C1

C1 C1

C1

PANEL

COLD STORAGE LIGHTING PLANS

FIXTURES QUANTITY EXISTING PROPOSED

C1 5 Wall Mounted Exterior Light LITHONIA: DSXW2 LED P2 40K 80CRI T4M MVOLT DDBXD BAA PIR

SHEET No:

SO

U

TH

D

AK

O

TA

A

RM

Y

N

AT

IO

N

AL

G

U

AR

D

CO

N

ST

RU

CT

IO

N

F

AC

IL

IT

Y M

AN

AG

EM

EN

T O

FF

IC

E

W

ES

T M

AI

N

S

TR

EE

T, R

AP

ID

C

IT

Y, S D

5)

-6

FA

X

(6

) 7

-6

DATE:

SUBMITTAL:

CO

LD

S

TO

RA

GE

L

IG

HT

IN

G

PL

AN

IN

ST

AL

L

LE

D

LI

G

HT

IN

G Ch am be rla in

F M

S

CF

M O

DEPARTM

ENT

O F

TH

EM

IL ITARY

S T A T

E

U

K

O

TA

100%

03/2025

E-102

SCALE: 1' = 1/8"

General Notes:

1. Conduit and wire are not shown. Provide conduit and wire as required for the indicated circuitry.

Minimal rewiring is expected on this project.

2. Contractor to verify light count. Light count shown on schedule is for reference only.

3. Contractor to provide proper supports for light fixtures.

4. If proposed wiring plans leaves a prior used breaker without any load, panel description shall be updated to show breaker being vacant.

5. Contractor to verify mounting heights of all fixtures so that when equipment in the space is in use it will clear fixtures.

6. Contractor to complete removal of existing lighting and installation of new lighting in a particular room as quickly as possible. Preferably within the same day to limit impact on building occupants.

7. Requirements per Defense Logistic Agency, LED Components need to be recycled as E-waste.

8. All components that are called to be demolished shall be recycled as completely as possible per applicable local and higher standards.

9. CONTRACTOR IS RESPONSIBLE TO CLARIFY THAT ALL PRODUCTS USED ARE BUILD AMERICA BUY

AMERICA ACT COMPLIANT. BAA COMPLIANCE DOES NOT GUARANTEE BABAA COMPLIANCE.

MORE INFORMATION AVAILIBLE HERE: https://www.whitehouse.gov/wp-content/ uploads/2022/07/Build-American-Buy-American-Factsheet-and-FAQs-for-Award-Recipients.pdf

REPLACE ALL INDICATED LIGHTING FIXTURES WITH NEW LED FIXTURES. THIS INCLUDES EMERGENCY

LIGHTS, EXIT LIGHTS, AND EXTERIOR LIGHTS.

BID: Replace all exterior lights.

MEN

PARTS

WASHER

SHOP

SHOP

PARTS/TOOL

STORAGE

FLAMMABLE

STORAGE

BATTERY

ROOM

HALL

WOMEN

HALL

OFFICE

JANITOR

BREAK /

CLASSROOM

FITNESS

ROOM

VEST.

HALL

X

X

X b c

All fixtures circled with the cloud are to be demolished.

ROOM 110, 114, and Exterior.

General Notes:

1. Requirements per Defense Logistic Agency, LED

Components need to be recycled as E-waste.

2. All components that are called to be demolished shall be recycled as completely as possible per applicable local and higher standards.

3. Some light switches in Room 110 to be demolished

SHEET No:

SO

U

TH

D

AK

O

TA

A

RM

Y

N

AT

IO

N

AL

G

U

AR

D

CO

N

ST

RU

CT

IO

N

F

AC

IL

IT

Y M

AN

AG

EM

EN

T O

FF

IC

E

W

ES

T M

AI

N

S

TR

EE

T, R

AP

ID

C

IT

Y, S D

5)

-6

FA

X

(6

) 7

-6

DATE:

SUBMITTAL:

S

HO

P

DE

M O

P

LA

N

IN

ST

AL

L

LE

D

LI

G

HT

IN

G Ch am be rla in

F M

S

CF

M O

DEPARTM

ENT

O F

TH

E M

IL ITARY

S T A T

E

U

K

O

TA

100%

03/2025

ED-101

SCALE: 1' = 3/32"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

PANEL

All fixtures circled with the cloud are to be demolished.

COLD STORAGE BUILDING.

General Notes:

1. Requirements per Defense Logistic Agency, LED

Components need to be recycled as E-waste.

2. All components that are called to be demolished shall be recycled as completely as possible per applicable local and higher standards.

SHEET No:

SO

U

TH

D

AK

O

TA

A

RM

Y

N

AT

IO

N

AL

G

U

AR

D

CO

N

ST

RU

CT

IO

N

F

AC

IL

IT

Y M

AN

AG

EM

EN

T O

FF

IC

E

W

ES

T M

AI

N

S

TR

EE

T, R

AP

ID

C

IT

Y, S D

5)

-6

FA

X

(6

) 7

-6

DATE:

SUBMITTAL:

CO

LD

S

TO

RA

GE

DE

M

O P

LA

N

IN

ST

AL

L

LE

D

LI

G

HT

IN

G Ch am be rla in

F M

S

CF

M O

DEPARTM

ENT

O F

TH

E M

IL ITARY

S T A T

E

U

K

O

TA

100%

03/2025

ED-102

SCALE: 1' = 1/8"

Chamberlain Shop & Cold Storage LIGHTING PLAN G101.pdf
Sheets and Views
Title
Chamberlain Shop & Cold Storage LIGHTING PLAN E101.pdf
Sheets and Views
Planned Lighting
Chamberlain Shop & Cold Storage LIGHTING PLAN E102.pdf
Sheets and Views
Cold Storage Planned Lighting
Chamberlain Shop & Cold Storage LIGHTING PLAN ED101.pdf
Sheets and Views
Shop Demo
467092 ChaMB Shop & Cold Storage LIGHTING PLAN ED102.pdf
Sheets and Views
Cold Storage Demo

File details come from the government source that posted it. Updated .