467046 TL Invitation to Builders Exchanges.pdf
PDF 172 KB Posted
- Solicitation number
- 25IFB17244
- Issued by
- Pennington County, South Dakota
About this file
This document is a Request for Design-Build Proposal issued by the South Dakota Department of the Military for the "Replace Well Pump on Camp Rapid - RC Camp Rapid" project (CFMO# 467046). The project involves constructing a well pump replacement and providing engineering and construction services to completely irrigate the parade field at Camp Rapid. The solicitation is published for bidders between September 4, 2025, and September 18, 2025, with an optional pre-bid conference scheduled for September 11, 2025, at 8:00 AM MT in the north parking lot of Building 450. The project is to be substantially completed by May 22, 2026.
Bidders must submit a bid security of 5% or 10% for bids exceeding $100,000, with drawings and specifications available from the Construction and Facilities Management Office. The project contact is Kyle Roe, who can be reached at (605) 737-6605 or kyle.roe@state.sd.us. The project is located at 2823 West Main St. Bldg 420 in Rapid City, SD 57702, with the Construction and Facilities Management Office serving as both the Architect/Engineer and the Issuing Office for this design-build opportunity.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 467046 Camp Rapid Irrigation RFP.pdf | ||
| 467046 Camp Rapid Irrigation Bid documents.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE
MILITARY
STATE OF SOUTH DAKOTA
September 3, 2025
SUBJECT: Replace Well Pump on Camp Rapid – RC Camp Rapid
CFMO# 467046
Enclosed is a Request for Design-Build Proposal for the above referenced project to be published in your builders exchange bulletin between the following dates: September 4, 2025 and September 18, 2025. Please send Confirmation of Receipt and Publication of the Invitation to Bid to the Project Manager listed below.
Solicitation/Project #: CFMO 467046
Owner: South Dakota Department of the Military
2823 West Main St. Bldg 420, Rapid City, SD 57702, Phone: 605.737.6637
Questions are to be directed to: Kyle Roe
(605) 737-6605 Kyle.roe@state.sd.us
Architect/Engineer: Construction and Facilities Management Office
2823 W. Main St. – Bldg 420 Rapid City, SD 57702 Phone: (605) 737-6637
Issuing Office: The Architect or Engineer is the issuing office on this project.
Deposit: Copies of the drawings and specifications may be obtained by bidders at the Construction and Facilities Management Office.
Bid Security: Each bid in excess of $100,000 must be accompanied by a certified check, cashier’s check, or draft in the amount of five percent (5%) or a ten percent (10%) bid bond.
Completion: Substantially complete by May 22, 2026.
Site Visit: An optional pre-bid conference is being scheduled for September 11, 2025 at 8:00 AM MT. All Design-Builders can meet in the north parking lot of Building 450 (adjacent to parade field).
Description: Design-builder to construct the "Replace Well Pump on Camp Rapid - RC Camp Rapid" plans dated February 2024 in addition to providing engineering and construction services to completely irrigate the parade field on Camp Rapid.
Should you have any questions, please contact me at (605) 737-6605 or kyle.roe@state.sd.us.
Sincerely, Kyle Roe SD Dept. of the Military
Enc: Request for Design-Build Proposals, Construction Plans & Project Manual
File details come from the government source that posted it. Updated .