This is a Request for Bids document issued by Southwest Mississippi Regional Medical Center (SMRMC) in McComb, Mississippi for parking lot improvements at the medical center facility. The project scope includes removal of existing site elements (trees, curbstops, signs, inlets, concrete curb and pavement), excavation and fill work, sodding, installation of precast concrete curbstops, asphalt pavement placement totaling 1,500 tons, concrete sidewalk and curb installation, detectable warning panels, thermoplastic markings and legends, traffic signage, and maintenance of traffic. Bidders must submit sealed bids by September 24, 2026 at 10:00 a.m. local time at the Owner's office located at 215 Marion Avenue, McComb, MS 39648. Bids are to be submitted on a unit price basis with estimated quantities provided for each line item. No pre-bid conference will be held. Bidders are encouraged to visit the site to conduct thorough visual examinations. Contract times specify 90 calendar days for substantial completion and 120 calendar days for final completion. Liquidated damages are assessed at $1,410 per day for delay beyond substantial completion and $970 per day for delays in final completion.
All bidders must possess a current Mississippi Board of Contractors Certificate of Responsibility and appropriate classification for the project type, with the certificate number displayed on the exterior of the sealed bid envelope. Bid security of 5 percent of the maximum bid price in the form of a bid bond is required. Unit price work will result in final contract pricing based on actual quantities performed. Bids will be evaluated and awarded to the lowest responsive and responsible bidder. The successful bidder must execute the agreement, provide performance and payment bonds, and obtain all required licenses within 15 days of Notice of Award. Progress payments will be made at 95 percent of completed work value with 5 percent retainage until the project reaches 50 percent completion, after which retainage is reduced to 2.5 percent. Upon substantial completion, payment increases to 100 percent less the cost of punch list items. Bidding documents are available for download at www.neel-schafferplans.com, and prospective bidders must register as plan holders with Plan House Printing (601-336-6378). Out-of-state contractors must include documentation of their resident state's preference laws or obtain a letter from an officer of the court stating no such preference law exists.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PLANS_-_REDUCED1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NEEL-SCHAFFER, INC. TABLE OF CONTENTS
00 01 10-1
SMRMC PARKING LOT IMPROVEMENTS
TABLE OF CONTENTS
VOLUME 1 – SPECIFICATIONS
PAGES
PART 1 – BIDDING REQUIREMENTS
SECTION 00 11 13 ADVERTISEMENT FOR BIDS ................................................................ 00 11 13-1 SECTION 00 21 13 INSTRUCTIONS TO BIDDERS ............................................................. 00 21 13-10 SECTION 00 41 43 BID FORM ................................................................................................. 00 41 43-5 SECTION 00 43 13 BID BOND ................................................................................................. 00 43 13-2 SECTION 00 43 36 LIST OF SUBCONTRACTORS ............................................................... 00 43 36-1 SECTION 00 45 13 PROJECT REFERENCES ......................................................................... 00 45 13-1
SECTION 00 45 19 CERTIFICATION REGARDING DEBARMENT, SUSPENSION,
NON-COLLUSION AND OTHER RESPONSIBILITY MATTERS ....... 00 45 19-1
PART 2 – CONTRACT FORMS
SECTION 00 51 00 NOTICE OF AWARD ............................................................................... 00 51 00-1 SECTION 00 52 43 CONTRACT .............................................................................................. 00 52 43-5 SECTION 00 55 00 NOTICE TO PROCEED ............................................................................ 00 55 00-1 SECTION 00 61 13.13 PERFORMANCE BOND ..................................................................... 00 61 13.13-4 SECTION 00 61 13.16 PAYMENT BOND ............................................................................... 00 61 13.16-4
PART 3 – CONDITIONS OF THE CONTRACT
SECTION 00 70 00 STANDARD GENERAL CONDITION OF THE
CONSTRUCTION CONTRACT ............................................................. 00 70 00-70
SECTION 00 73 00 SUPPLEMENTARY CONDITIONS OF THE
CONSTRUCTION CONTRACT ............................................................... 00 73 00-9
PART 4 – SPECIFICATIONS
THE MISSISSIPPI DEPARTMENT OF TRANSPORTATION, MISSISSIPPI STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE
CONSTRUCTION, 2017 EDITION, SECTIONS 200-800 ARE INCLUDED AS IF ATTACHED HEREIN.
SPECIAL PROVISION 907-234-1 SILT FENCE
SPECIAL PROVISION 907-401-4 ASPHALT PAVEMENT – GENERAL
SPECIAL PROVISION 907-403-4 ASPHALT PAVEMENTS
SPECIAL PROVISION 907-608-2 DETECTABLE WARNING PANELS
SPECIAL PROVISION 907-618-12 TRAFFIC CONTROL MANAGEMENT
SPECIAL PROVISION 907-626-5 THERMOPLASTIC BLUE ADA MARKINGS
SPECIAL PROVISION 907-626-12 THERMOPLASTIC TRAFFIC MARKINGS
SPECIAL PROVISION 907-653-1 TRAFFIC AND STREET NAME SIGNS
NEEL-SCHAFFER, INC. ADVERTISEMENT FOR BIDS
00 11 13-1
SECTION 00 11 13
ADVERTISEMENT FOR BIDS
General Notice:
The Southwest Mississippi Regional Medical Center (Owner) is requesting Bids for the construction of the following Project:
Bids for the construction of the Project will be received at Southwest Mississippi Regional Medical Center, 6th Floor Board Room, located at 215 Marion Avenue, McComb, MS 39648, until Thursday, September 24, 2026 at 10:00 a.m. local time and the Bids received will be publicly opened and read.
The Project includes the following Work:
Parking lot improvements at Southwest Mississippi Regional Medical Center in McComb, MS.
Bids are requested for the following Contract: SMRMC PARKING LOT IMPROVEMENTS
Obtaining the Bidding Documents:
Information and Bidding Documents for the Project can be found at the following designated website:
www.neel-schafferplans.com
Bidding Documents may be downloaded from the designated website. Prospective Bidders must register with the designated website as a plan holder. All plan holders are required to have a valid email address for registration. The designated website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website. All bid documents must be purchased through the website. The cost of bid documents is non-refundable. For information regarding online orders for the purchase of original paper copies and the website registration, please contact Plan House Printing at 601-336-6378. For information regarding this project, contact Neel-Schaffer’s office at 601-684- 4564 in McComb, Mississippi.
For an electronic bid, documents can be downloaded from Plan House Printing. Electronic bids shall be submitted at www.neel-schafferplans.com. For any questions relating to the electronic bidding process, please call Plan House Printing at 601-336-6378.
“Mississippi Standard Specifications for Road and Bridge Construction, 2017 Edition” as referred to herein may be purchased from the Mississippi Department of Transportation.
A Pre-Bid Conference will not be held.
Instructions to Bidders.
For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.
This Advertisement is issued by:
Owner: Southwest Mississippi Regional Medical Center By: Mallory Ginn Title: Chief Financial Officer Date: August 25, 2026
Dates of Publication:
08/25/26 09/01/26 http://www.neel-schafferplans.com/ http://www.neel-schafferplans.com/
NEEL-SCHAFFER, INC. INSTRUCTIONS TO BIDDERS
00 21 13-i
SECTION 00 21 13
INSTRUCTIONS TO BIDDERS
FOR CONSTRUCTION CONTRACT
TABLE OF CONTENTS
Page
Article 1— Defined Terms
Article 2— Bidding Documents
Article 3— Qualifications of Bidders
Article 4— Pre-Bid Conference
Article 5— Site and Other Areas; Existing Site Conditions; Examination of Site; Owner’s Safety Program; Other Work at the Site
Article 6— Bidder’s Representations and Certifications
Article 7— Interpretations and Addenda
Article 8— Bid Security
Article 9— Contract Times
Article 10— Substitute and “Or Equal” Items
Article 11— Subcontractors, Suppliers, and Others
Article 12— Preparation of Bid
Article 13— Basis of Bid
Article 14— Submittal of Bid
Article 15— Modification and Withdrawal of Bid
Article 16— Opening of Bids
Article 17— Bids to Remain Subject to Acceptance
Article 18— Evaluation of Bids and Award of Contract
Article 19— Bonds and Insurance
Article 20— Signing of Agreement
Article 21— Sales and Use Taxes: Not used
Article 22— Contracts to Be Assigned: not used
00 21 13-1
GENERAL
The Contract Documents are divided into parts, divisions and sections in keeping with accepted industry practice to separate categories of subject matter for convenient reference thereto. Generally, there has been no attempt to divide the Specification sections into Work performed by the various building trades, Work by separate subcontractors, or Work required for separate facilities in the Project.
A general description of the Work to be done is contained in Section 00 52 43, Contract. The Scope is indicated on the accompanying Drawings and specified in applicable parts of these Contract Documents.
Where the drawings are reduced in size from the original tracings, the amount of reduction is indicated by a note and/or bar on the drawings.
ARTICLE 1—DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:
A. Issuing Office—The office from which the Bidding Documents are to be issued, and which registers plan holders (Neel-Schaffer, Inc., 206 Maryland Avenue, McComb, MS 39648).
B. Command-- Type sentences are used in the Contract Documents. These refer to and are directed to the Contractor.
C. Responsive Bidder-- Any person, firm or corporation submitting a bid for the work contemplated whose bid form is complete and regular, free of exclusions special conditions or unbalanced unit prices and has no alternative bids for any item unless required in the technical specifications.
D. Responsible Bidder--Any person, firm or corporation submitting a bid for the work contemplated who maintains a permanent place of business, has adequate plant equipment to do the work properly and within the time limit that is established, and has adequate financial status to meet his obligations contingent to the work.
ARTICLE 2—BIDDING DOCUMENTS
2.01 Bidder shall obtain a complete set of Bidding Requirements and proposed Contract Documents (together, the Bidding Documents). See the Agreement for a list of the Contract Documents. It is Bidder’s responsibility to determine that it is using a complete set of documents in the preparation of a Bid. Bidder assumes sole responsibility for errors or misinterpretations resulting from the use of incomplete documents, by Bidder itself or by its prospective Subcontractors and Suppliers.
2.02 Bidding Documents are made available for the sole purpose of obtaining Bids for completion of the Project and permission to download or distribution of the Bidding Documents does not confer a license or grant permission or authorization for any other use. Authorization to download documents, or other distribution, includes the right for plan holders to print documents solely for their use, and the use of their prospective Subcontractors and Suppliers, provided the plan holder pays all costs associated with printing or reproduction. Printed documents may not be re-sold under any circumstances.
2.03 Owner has established a Bidding Documents Website as indicated in the Advertisement or invitation to bid.
Owner recommends that Bidder register as a plan holder with the Issuing Office at such website, and obtain a complete set of the Bidding Documents from such website. Bidders may rely that sets of Bidding Documents obtained from the Bidding Documents Website are complete, unless an omission is blatant.
Registered plan holders will receive Addenda issued by Owner.
00 21 13-2
2.04 Bidder may register as a plan holder and obtain complete sets of Bidding Documents, in the number and format stated in the Advertisement or invitation to bid, from the Issuing Office. Bidders may rely that sets of Bidding Documents obtained from the Issuing Office are complete, unless an omission is blatant. Registered plan holders will receive Addenda issued by Owner.
2.05 Plan rooms (including construction information subscription services, and electronic and virtual plan rooms) may distribute the Bidding Documents, or make them available for examination. Those prospective bidders that obtain an electronic (digital) copy of the Bidding Documents from a plan room are encouraged to register as plan holders from the Bidding Documents Website or Issuing Office. Owner is not responsible for omissions in Bidding Documents or other documents obtained from plan rooms, or for a Bidder’s failure to obtain Addenda from a plan room.
2.06 Electronic Documents
A. When the Bidding Requirements indicate that electronic (digital) copies of the Bidding Documents are available, such documents will be made available to the Bidders as Electronic Documents in the manner specified.
1. Bidding Documents will be provided in Adobe PDF (Portable Document Format) (.pdf) that is readable by Adobe Acrobat Reader. It is the intent of the Engineer and Owner that such Electronic Documents are to be exactly representative of the paper copies of the documents. However, because the Owner and Engineer cannot totally control the transmission and receipt of Electronic Documents nor the Contractor’s means of reproduction of such documents, the Owner and Engineer cannot and do not guarantee that Electronic Documents and reproductions prepared from those versions are identical in every manner to the paper copies.
B. Unless otherwise stated in the Bidding Documents, the Bidder may use and rely upon complete sets of Electronic Documents of the Bidding Documents, described in Paragraph 2.06.A above. However, Bidder assumes all risks associated with differences arising from transmission/receipt of Electronic Documents versions of Bidding Documents and reproductions prepared from those versions and, further, assumes all risks, costs, and responsibility associated with use of the Electronic Documents versions to derive information that is not explicitly contained in printed paper versions of the documents, and for Bidder’s reliance upon such derived information.
C. After the Contract is awarded, the Owner will provide or direct the Engineer to provide for the use of the Contractor documents that were developed by Engineer as part of the Project design process, as Electronic Documents in native file formats.
1. Electronic Documents that are available in native file format include:
a. AutoCAD files in AutoCAD 2022 or later.
2. Release of such documents will be solely for the convenience of the Contractor per the conditions outlined in the Release Form for Electronic Files. No such document is a Contract Document.
3. Unless the Contract Documents explicitly identify that such information will be available to the Successful Bidder (Contractor), nothing herein will create an obligation on the part of the Owner or Engineer to provide or create such information, and the Contractor is not entitled to rely on the availability of such information in the preparation of its Bid or pricing of the Work. In all cases, the Contractor shall take appropriate measures to verify that any electronic/digital information provided in Electronic Documents is appropriate and adequate for the Contractor’s specific purposes.
4. In no case will the Contractor be entitled to additional compensation or time for completion due to any differences between the actual Contract Documents and any related document in native file format.
00 21 13-3
ARTICLE 3—QUALIFICATIONS OF BIDDERS
3.01 Bidder is to submit the following information with its Bid to demonstrate Bidder’s qualifications to perform the Work:
A. For all bids submitted in excess of $50,000, Bidder shall write its current Mississippi Board of Contractors Certificate of Responsibility Number on the exterior of the sealed bid envelope in order to be opened and considered.
B. Bidder’s Mississippi Board of Contractors Certificate of Responsibility Classification for this project shall be suitable for the project type. Bidder’s Classification shall be written on the exterior of the sealed bid envelope along with the Certificate of Responsibility Number in order to be opened and considered.
C. Out of state Bidders, licensed in the State of Mississippi, shall include with their bid package a copy of their resident state’s current preference law, if any, pertaining to such state’s treatment of nonresident contractors. Failure to do so shall result in Bidder’s proposal being rejected and not considered. If the Bidder’s resident state does not have a preference law, the Bidder shall submit a letter stating such from an officer of the court.
3.02 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.
ARTICLE 4—PRE-BID CONFERENCE
4.01 A pre-bid conference will not be conducted for this Project.
4.02 Information presented at the pre-Bid conference does not alter the Contract Documents. Owner will issue Addenda to make any changes to the Contract Documents that result from discussions at the pre-Bid conference. Information presented, and statements made at the pre-bid conference will not be binding or legally effective unless incorporated in an Addendum.
ARTICLE 5—SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF SITE;
OWNER’S SAFETY PROGRAM; OTHER WORK AT THE SITE
5.01 Site and Other Areas
A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.
5.02 Existing Site Conditions
A. Subsurface and Physical Conditions; Hazardous Environmental Conditions
1. The Supplementary Conditions identify the following regarding existing conditions at or adjacent to the Site:
a. Those reports of explorations and tests of subsurface conditions at or adjacent to the Site that contain Technical Data.
b. Those drawings known to Owner of existing physical conditions at or adjacent to the Site, including those drawings depicting existing surface or subsurface structures at or adjacent to the Site (except Underground Facilities), that contain Technical Data.
c. Reports and drawings known to Owner relating to Hazardous Environmental Conditions that have been identified at or adjacent to the Site.
d. Technical Data contained in such reports and drawings.
00 21 13-4
2. Owner will make copies of reports and drawings referenced above available to any Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
3. If the Supplementary Conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of the General Conditions will apply.
B. Underground Facilities: Underground Facilities are shown or indicated on the Drawings, pursuant to Paragraph 5.05 of the General Conditions, and not in the drawings referred to in Paragraph 5.02.A of these Instructions to Bidders. Information and data regarding the presence or location of Underground Facilities are not intended to be categorized, identified, or defined as Technical Data.
5.03 Other Site-related Documents
A. In addition to the documents regarding existing Site conditions referred to in Paragraph 5.02.A, the following other documents relating to conditions at or adjacent to the Site are known to Owner and made available to Bidders for reference:
1. None
5.04 Site Visit and Testing by Bidders
A. Bidder is encouraged to visit the Site and conduct a thorough visual examination of the Site and adjacent areas. During the visit the Bidder must not disturb any ongoing operations at the Site.
B. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.
C. On request, and to the extent Owner has control over the Site, and schedule permitting, the Owner will provide Bidder general access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site.
Bidder is responsible for establishing access needed to reach specific selected test sites.
D. Bidder must comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.
E. Bidder must fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.
5.05 Owner’s Safety Program
A. Site visits and work at the Site may be governed by an Owner safety program. If an Owner safety program exists, it will be noted in the Supplementary Conditions.
5.06 Other Work at the Site
A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) and relates to the Work contemplated by these Bidding Documents. If Owner is party to a written contract for such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.
ARTICLE 6—BIDDER’S REPRESENTATIONS AND CERTIFICATIONS
6.01 Express Representations and Certifications in Bid Form, Agreement
00 21 13-5
A. The Bid Form that each Bidder will submit contains express representations regarding the Bidder’s examination of Project documentation, Site visit, and preparation of the Bid, and certifications regarding lack of collusion or fraud in connection with the Bid. Bidder should review these representations and certifications, and assure that Bidder can make the representations and certifications in good faith, before executing and submitting its Bid.
B. If Bidder is awarded the Contract, Bidder (as Contractor) will make similar express representations and certifications when it executes the Agreement.
ARTICLE 7—INTERPRETATIONS AND ADDENDA
7.01 Owner on its own initiative may issue Addenda to clarify, correct, supplement, or change the Bidding Documents.
7.02 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows:
A. Garrett Smith, P.E.
Neel-Schaffer, Inc.
206 Maryland Avenue McComb, MS 39648 601-684-4564 Garrett.smith@neel-schaffer.com
7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered.
7.04 Only responses set forth in an Addendum will be binding. Oral and other interpretations or clarifications will be without legal effect. Responses to questions are not part of the Contract Documents unless set forth in an Addendum that expressly modifies or supplements the Contract Documents.
ARTICLE 8—BID SECURITY
8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of five (5) percent of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a Bid bond issued by a surety meeting the requirements of Paragraph 6.01 of the General Conditions. Such Bid bond will be issued in the form included in the Bidding Documents.
8.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract, furnished the required Contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract and furnish the required Contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited, in whole in the case of a penal sum bid bond, and to the extent of Owner’s damages in the case of a damages-form bond. Such forfeiture will be Owner’s exclusive remedy if Bidder defaults.
8.03 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of 7 days after the Effective Date of the Contract or 1 day after the last effective day of the Bid as outlined in the Bid Form, whereupon Bid security furnished by such Bidders will be released.
8.04 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within 7 days after the Bid opening.
mailto:Garrett.smith@neel-schaffer.com
00 21 13-6
ARTICLE 9—CONTRACT TIMES
9.01 The number of days within which, or the dates by which, the Work is to be (a) substantially completed and
(b) ready for final payment, and (c) Milestones (if any) are to be achieved, are set forth in the Agreement.
9.02 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement.
ARTICLE 10—SUBSTITUTE AND “OR EQUAL” ITEMS
10.01 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents without consideration during the bidding and Contract award process of possible substitute or “or-equal” items. In cases in which the Contract allows the Contractor to request that Engineer authorize the use of a substitute or “or-equal” item of material or equipment, application for such acceptance may not be made to and will not be considered by Engineer until after the Effective Date of the Contract.
10.02 All prices that Bidder sets forth in its Bid will be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda.
Any assumptions regarding the possibility of post-Bid approvals of “or-equal” or substitution requests are made at Bidder’s sole risk.
ARTICLE 11—SUBCONTRACTORS, SUPPLIERS, AND OTHERS
11.01 A Bidder must be prepared to retain specific Subcontractors and Suppliers for the performance of the Work if required to do so by the Bidding Documents or in the Specifications. If a prospective Bidder objects to retaining any such Subcontractor or Supplier and the concern is not relieved by an Addendum, then the prospective Bidder should refrain from submitting a Bid.
11.02 Subcontractor’s proposed for subcontracts for all or any portion of the construction exceeding $50,000 are required to have a current Certificate of Responsibility Number issued by the Mississippi Board of Contractors and such subcontractors shall hold Classifications required for those portions of the work that they will be performing. A listing of all such subcontractors along with their Certificate Number and Classification(s) shall be provided with the Bidder’s proposal.
11.03 If requested by Owner, such list must be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor or Supplier. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor or Supplier, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit an acceptable substitute, in which case apparent Successful Bidder will submit a substitute, Bidder’s Bid price will be increased (or decreased) by the difference in cost occasioned by such substitution, and Owner may consider such price adjustment in evaluating Bids and making the Contract award.
11.04 If apparent Successful Bidder declines to make any such substitution, Owner may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors and Suppliers. Declining to make requested substitutions will constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor or Supplier, so listed and against which Owner or Engineer makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to subsequent revocation of such acceptance as provided in Paragraph 7.07 of the General Conditions.
ARTICLE 12—PREPARATION OF BID
12.01 The Bid Form is included with the Bidding Documents.
A. All blanks on the Bid Form must be completed in ink and the Bid Form signed in ink. Erasures or alterations must be initialed in ink by the person signing the Bid Form. A Bid price must be indicated for each section, Bid item, alternate, adjustment unit price item, and unit price item listed therein.
12.02 If Bidder has obtained the Bidding Documents as Electronic Documents, then Bidder shall prepare its Bid on a paper copy of the Bid Form printed from the Electronic Documents version of the Bidding Documents. The
00 21 13-7 printed copy of the Bid Form must be clearly legible, printed on 8½ inch by 11-inch paper and as closely identical in appearance to the Electronic Document version of the Bid Form as may be practical. The Owner reserves the right to accept Bid Forms which nominally vary in appearance from the original paper version of the Bid Form, providing that all required information and submittals are included with the Bid.
12.03 Any bid shall be deemed informal which contains material omissions, or irregularities, or which in any manner shall fail to conform to the conditions of the published Invitation to Bid.
12.04 Only one bid from any individual, firm, partnership, or corporation, under the same or different names, will be considered.
12.05 A Bid by a corporation must be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate address and state of incorporation must be shown.
12.06 A Bid by a partnership must be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign. The official address of the partnership must be shown.
12.07 A Bid by a limited liability company must be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm must be shown.
12.08 A Bid by an individual must show the Bidder’s name and official address.
12.09 A Bid by a joint venture must be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The joint venture must have been formally established prior to submittal of a Bid, and the official address of the joint venture must be shown.
12.10 All names must be printed in ink below the signatures.
12.11 The Bid must contain an acknowledgment of receipt of all Addenda, the numbers of which must be filled in on the Bid Form.
12.12 Postal and e-mail addresses and telephone number for communications regarding the Bid must be shown.
ARTICLE 13—BASIS OF BID
13.01 Lump Sum
A. Bidders must submit a Bid on a lump sum basis as set forth in the Bid Form.
13.02 Unit Price
A. Bidders must submit a Bid on a unit price basis for each item of Work listed in the unit price section of the Bid Form.
B. The “Bid Price” (sometimes referred to as the extended price) for each unit price Bid item will be the product of the “Estimated Quantity”, which Owner or its representative has set forth in the Bid Form, for the item and the corresponding “Bid Unit Price” offered by the Bidder. The total of all unit price Bid items will be the sum of these “Bid Prices”; such total will be used by Owner for Bid comparison purposes. The final quantities and Contract Price will be determined in accordance with Paragraph 13.03 of the General Conditions.
C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
00 21 13-8
ARTICLE 14—SUBMITTAL OF BID
14.01 The documents required to be submitted as part of the Bid Package include, at a minimum, the Bid Form, the Bid Bond Form and other documents as required under the terms of Article 2 of the Bid Form. If bids are submitted electronically, Bidder shall scan and submit the same.
14.02 A Bid must be received no later than the date and time prescribed and at the place indicated in the Advertisement or invitation to bid and must be enclosed in a plainly marked package with the Project title, and, if applicable, the designated portion of the Project for which the Bid is submitted, the name and address of Bidder, Bidder’s Certificate of Authority (for Bids exceeding $50,000), Bidder’s Certificate of Authority Classification, and must be accompanied by the Bid security and other required documents. If a Bid is sent by mail or other delivery system, the sealed envelope containing the Bid must be enclosed in a separate package plainly marked on the outside with the notation “BID ENCLOSED.” A mailed Bid must be addressed to the location designated in the Advertisement.
14.03 Bids received after the date and time prescribed for the opening of bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the Bidder unopened.
14.04 When submitting an electronic bid, the bid must be submitted in “pdf” format and shall contain the same information and forms as required for the paper bids. Electronic bids must be secured with a bid bond. When submitting a bid electronically, the authorized signature shall be an electronic signature or handwritten in blue-ink signature. In the event that an electronically submitted bid has a corrupted attachment, the bid will be considered null and void. When bids are submitted electronically, the requirement for including a certificate of responsibility, or a statement that the bid enclosed does not exceed Fifty Thousand Dollars ($50,000.00), on the exterior of the bid envelope shall be deemed in compliance by including the same information as an attachment with the electronic bid submittal.
14.05 Any bid submitted by a nonresident contractor which does not include the nonresident contractor’s current state law shall be rejected and not considered for award. If the state does not have a preference law, then the contractor shall submit a letter stating such from an officer of the court.
14.06 In order to perform public work, the successful bidder shall, as applicable, hold or obtain such Contractor's and business licenses as required by state statutes. Bidder is required by Mississippi Statute 31-3-21 to have a current Certificate of Responsibility issued by the State Board of Public Contractors prior to bidding on the project. The bidder shall include his Certificate of Responsibility Number or a statement that the Bid herein is less than $50,000 on the outside of the envelope, failing which, said Bid shall not be opened or considered.
Provide cover sheet with the following information:
SMRMC Parking Lot Improvements McComb, Mississippi Contractor’s Name and Address Certificate of Responsibility No. #####
BID ATTACHED
14.07 The Owner will confirm the validity of the Bidder’s Contractor’s License Number prior to opening the bid.
This will be accomplished by using the Board of Public Contractor’s Website located at http://www.msboc.us/contractors.cfm. It shall be the Bidder’s responsibility to ensure his License Number appears on the site. If the number does not appear, the bid will be returned unopened, regardless of whether or not the number was valid at the time of the bid opening.
14.08 Bidders must ensure that their electronic submission can be accessed and viewed by the Owner immediately upon bid opening. The Owner will consider any file that cannot be immediately accessed and viewed at the time of the bid opening (such as, encrypted files, password protected files, or incompatible files) to be blank or incomplete as context requires, and are therefore unacceptable. A bidder will not be permitted to unencrypt files, remove password protections, or resubmit documents after bid opening to make a file viewable if those documents are required with the bid.
http://www.msboc.us/contractors.cfm
00 21 13-9
ARTICLE 15—MODIFICATION AND WITHDRAWAL OF BID
15.01 An unopened Bid may be withdrawn by an appropriate document duly executed in the same manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids. Upon receipt of such notice, the unopened Bid will be returned to the Bidder.
15.02 If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid in the manner specified in Paragraph 15.01 and submit a new Bid prior to the date and time for the opening of Bids.
15.03 If within 24 hours after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, the Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, the Bidder will be disqualified from further bidding on the Work.
ARTICLE 16—OPENING OF BIDS
16.01 Bids will be opened at the time and place indicated in the advertisement or invitation to bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.
ARTICLE 17—BIDS TO REMAIN SUBJECT TO ACCEPTANCE
17.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.
ARTICLE 18—EVALUATION OF BIDS AND AWARD OF CONTRACT
18.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner also reserves the right to waive all minor Bid informalities not involving price, time, or changes in the Work.
18.02 Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible.
18.03 More than one Bid for the same Work from an individual or entity under the same or different names will not be considered. Reasonable grounds for believing that any Bidder has an interest in more than one Bid for the Work may be cause for disqualification of that Bidder and the rejection of all Bids in which that Bidder has an interest.
18.04 If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, whether in the Bid itself or in a separate communication to Owner or Engineer, then Owner will reject the Bid as nonresponsive.
18.05 If Owner awards the contract for the Work, such award will be to the responsible Bidder submitting the lowest responsive Bid.
18.06 Evaluation of Bids
A. In evaluating Bids, Owner will consider whether the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the Bid Form or prior to the Notice of Award.
B. For determination of the apparent low Bidder(s) when sectional bids are submitted, Bids will be compared on the basis of the aggregate of the Bids for separate sections and the Bids for combined sections that result in the lowest total amount for all of the Work.
C. For the determination of the apparent low Bidder when unit price bids are submitted, Bids will be compared on the basis of the total of the products of the estimated quantity of each item and unit price Bid for that item, together with any lump sum items.
00 21 13-10
18.07 In evaluating whether a Bidder is responsible, Owner will consider the qualifications of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents.
18.08 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.
ARTICLE 19—BONDS AND INSURANCE
19.01 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds, other required bonds (if any), and insurance. When the Successful Bidder delivers the executed Agreement to Owner, it must be accompanied by required bonds and insurance documentation.
19.02 Article 8, Bid Security, of these Instructions, addresses any requirements for providing bid bonds as part of the bidding process.
ARTICLE 20—SIGNING OF AGREEMENT
20.01 When Owner issues a Notice of Award to the Successful Bidder, it will be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement.
Within 15 days thereafter, Successful Bidder must execute and deliver the required number of counterparts of the Agreement and any bonds and insurance documentation required to be delivered by the Contract Documents to Owner. Within 10 days thereafter, Owner will deliver one fully executed counterpart of the Agreement to Successful Bidder, together with printed and electronic copies of the Contract Documents as stated in Paragraph 2.02 of the General Conditions.
ARTICLE 21—SALES AND USE TAXES: NOT USED.
ARTICLE 22—CONTRACTS TO BE ASSIGNED: NOT USED.
NEEL-SCHAFFER, INC. BID FORM
00 41 43-1
SECTION 00 41 43
BID FORM
The terms used in this Bid with initial capital letters have the meanings stated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions.
ARTICLE 1—OWNER AND BIDDER
1.01 This Bid is submitted for:
SMRMC Parking Lot Improvements
1.02 This Bid is submitted to:
Southwest Mississippi Regional Medical Center
215 Marion Avenue
McComb, MS 39648
1.03 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.
ARTICLE 2—ATTACHMENTS TO THIS BID
2.01 The following documents are submitted with and made a condition of this Bid:
A. Required Bid security in the form of Bid Bond, Section 00 43 13.
B. Contractor’s Certificate of Responsibility written on the outside of the Bid envelope.
C. If the Bidder resides out of state, a copy of the Bidder’s resident state law regarding preference, if any, pertaining to such state’s treatment of non-resident contractors. If the Bidder’s resident state does not have a preference law, the Bidder shall submit a letter stating such form an office of the court.
D. Attach evidence of authority to sign.
E. List of Proposed Subcontractors, Section 00 43 36.
F. List of Project References, Section 00 45 13.
G. Certification Regarding Debarment, Suspension, Non-Collusion and Other Responsibility Matters, Section 00 45 19.
ARTICLE 3—BASIS OF BID—LUMP SUM BID AND UNIT PRICES
3.01 Unit Price Bids
A. Bidder will perform the following Work at the indicated unit prices:
00 41 43-2
BASE BID – SMRMC Parking Lot Improvements
Item Description Unit Qty. Unit Price Amount 202-B Removal of Trees EA 8 202-B Removal of Curbstop (Salvage and
Reinstall)
EA 95
202-B Removal of Sign EA 4 202-B Removal of Inlet EA 1 202-B Removal of Concrete Curb LF 415 202-B Removal of Concrete SY 125 203-E Borrow Excavation (LVM) CY 100 202-G Excess Excavation (LVM) CY 450 216-A Solid Sodding SY 550 234-A Temporary Silt Fence LF 500
907-242-PP Precast Concrete Curbstop EA 91 304-H Size 610 Crushed Stone, LVM CY 275 403-A 9.5-mm, ST, Asphalt Pavement TON 1,500 406-A Cold Milling of Bituminous Pavement, All
Depths
SY 4,415
608-A Concrete Sidewalk, Without Reinforcement
SY 210
608-C Detectable Warning Panels SF 115 609-B Concrete Curb, Type 1 LF 310 618-A Maintenance of Traffic LS 1 620-A Mobilization LS 1 626-G Thermoplastic Detail Stripe, White LF 7,783 626-G Thermoplastic Detail Stripe, Blue-ADA LF 1,940 626-H Thermoplastic Legend, White LF 597
907-626-H Thermoplastic Legend, Blue-ADA Handicap Symbol
EA 41
653-A Traffic Sign, R7-8 EA 41 653-A Traffic Sign, R7-8a EA 3
TOTAL BASE BID (TO BE READ ALOUD):
B. The Owner reserves the right to award a Contract for the BASE BID and any Alternate(s) to the lowest, responsible, responsive, qualified bidder. The Owner will adjust the final contract amount by utilizing any combination of Alternates to adjust the scope of work for the available funds for the project.
3.02 Bidder(s) being considered for award may be required to provide a further detailed breakdown of the work within 72 hours following receipt of the request from the Owner. Refer to Section SUBMITTALS DURING CONSTRUCTION of Division 1, GENERAL REQUIREMENTS. The price breakdown shall be fairly apportioned to the items listed. If so requested, the Bidder shall substantiate any price or prices with additional detailed price breakdown.
A. Bidder acknowledges that:
1. each Bid Unit Price includes an amount considered by Bidder to be adequate to cover Contractor’s overhead and profit for each separately identified item, and
2. estimated quantities are not guaranteed, and are solely for the purpose of comparison of Bids, and final payment for all Unit Price Work will be based on actual quantities, determined as provided in the Contract Documents.
00 41 43-3
3.03 The apparent low bidder is required to submit the following documents:
A. List of Proposed Subcontractors, Section 00 43 36, if their portion of the project exceeds $75,000.
Include their Certificate of Responsibility and Classification.
B. List of Project References, Section 00 45 13.
ARTICLE 4—TIME OF COMPLETION
4.01 Bidder agrees that the Work will be substantially complete and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before the dates or within the number of calendar days indicated in the Agreement.
4.02 Submittals required under this Contract that would affect the start of actual construction can be submitted by the Engineer/Contractor any time after the Owner issued the Notice of Award, notwithstanding the fact that the Contract has not been executed nor the Notice-To-Proceed issued. Notwithstanding the Engineer/Contractor’s right to make early submittals, no cause for a delay or time extension shall arise under the Contract unless the owner fails to respond to such submittals within 20 days after issuance of the Notice-to-Proceed and the delay impacts the Contract completion date. The time for completion of this Contract shall begin on the day the Notice-to-Proceed is issued by the Owner.
4.03 Bidder accepts the provisions of the Agreement as to liquidated damages.
ARTICLE 5—BIDDER’S ACKNOWLEDGEMENTS: ACCEPTANCE PERIOD, INSTRUCTIONS, AND
RECEIPT OF ADDENDA
5.01 Bid Acceptance Period
A. This Bid will remain subject to acceptance for 90 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner.
5.02 Instructions to Bidders
A. Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security.
5.03 Receipt of Addenda
A. Bidder hereby acknowledges receipt of the following Addenda:
Addendum Number Addendum Date
ARTICLE 6—BIDDER’S REPRESENTATIONS AND CERTIFICATIONS
6.01 Bidder’s Representations
A. In submitting this Bid, Bidder represents the following:
1. Bidder has examined and carefully studied the Bidding Documents, including Addenda.
2. Bidder has visited the Site, conducted a thorough visual examination of the Site and adjacent areas, and become familiar with the general, local, and Site conditions that may affect cost, progress, and performance of the Work.
3. Bidder is familiar with all Laws and Regulations that may affect cost, progress, and performance of the Work.
4. Bidder has carefully studied the reports of explorations and tests of subsurface conditions at or adjacent to the Site and the drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, with respect to the Technical Data in such reports and drawings.
00 41 43-4
5. Bidder has carefully studied the reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, with respect to Technical Data in such reports and drawings.
6. Bidder has considered the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Technical Data identified in the Supplementary Conditions or by definition, with respect to the effect of such information, observations, and Technical Data on (a) the cost, progress, and performance of the Work; (b) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, if selected as Contractor; and (c) Bidder’s (Contractor’s) safety precautions and programs.
7. Based on the information and observations referred to in the preceding paragraph, Bidder agrees that no further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract.
8. Bidder is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents.
9. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and of discrepancies between Site conditions and the Contract Documents, and the written resolution thereof by Engineer is…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .