4572_Plans.pdf
PDF 3 MB Posted
- Attached to
- Roseville Road RR Crossing Streetlight Project
- Solicitation number
- Contract No. 4572
- Issued by
- California
About this file
These engineering plans are for the Roseville Road RR Crossing - Section 130 Street Light Installation Project, prepared by the Sacramento County Department of Transportation and Community Services Agency. The project involves installing street lighting infrastructure along Roseville Road, with specific work spanning from Palm Avenue to the project end point. The plans include detailed electrical schematics, pole location diagrams, pavement restoration plans, and construction details across seven total sheets. The project involves precise street light pole positioning, electrical conduit installation, and pavement restoration with options for conform grinding and asphalt overlay.
The plans indicate multiple bid alternatives for pavement restoration, including a 2-inch asphalt concrete overlay and different grinding techniques. The project includes provisions for utility coordination, with a utility representatives contact list provided. Technical specifications cover pole placement, trench details, electrical routing, and restoration requirements, with careful attention to existing infrastructure and precise measurement standards. The contract number is 4572, and the drawings are dated March 2022, suggesting a contemporary infrastructure improvement initiative focused on enhancing road safety and lighting along the Roseville Road corridor.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Roseville_Road_RR_Crossing_Streetlight_Project_(Addendum_#1_Revision).pdf | ||
| 4572_Specification.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
cresst Text Box
EARTH SAW TRENCH DETAIL
NOT TO SCALE
A
CD1
POLE LOCATION
NOT TO SCALE
C
CD1
SHOULDER TRENCH DETAIL
NOT TO SCALE
B
CD1
6'-6" MIN
AB AGGREGATE BASE
APN ASSESSOR'S PARCEL NUMBER
AVE AVENUE
AWG AMERICAN WIRE GAUGE
CGS CURB, GUTTER, SIDEWALK
C/L CENTERLINE
CLSM CONTROLLED LOW-STRENGTH MATERIAL
DTL DARK-TO-LIGHT
DWG DRAWING
EX EXISTING
EP EDGE OF PAVEMENT
JP JOINT POLE
LED LIGHT EMITTING DIODE
LF LINEAR FOOT
MIN MINIMUM
PEC PHOTOELECTRIC CELL
PL PROPERTY LINE
PROP PROPOSED
R/W RIGHT OF WAY
RD ROAD
RR RAILROAD
SL STREET LIGHT
SS SANITATION SEWER
UG UNDERGROUND
XING CROSSING
GAS GAS GAS GAS
D E
P A
R
TM
E N
T O
F
TR
A N
S P
O R
TA
TI
O N
C O
U N
TY
O
F S
A C
R A
M E
N
TO
C O
M M
U N
IT
Y
S E
R V
IC
E
S A
G E
N C
Y
SCALE
DRAWING
DA
TE
RE
VI
SI
ON
S
PREPARED BY
AP
PR
SHEET
DATE
2 7
RO
SE
VI
LL
E R
OA
D
RR
C
RO
SS
IN
G
- S
EC
TIO
N
CO
NS
TR
UC
TIO
N
DE
TA
ILS
/ L
EG
EN
DS
CD1 CD1
ST
RE
ET
LI
GH
T I
NS
TA
LL
AT
IO
N
PR
OJ
EC
T
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GASGASGASGASGASGASGASGASGASGASGASGAS
GAS GAS GAS
G
AS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS GAS GAS GAS GAS
GAS GAS GAS GAS GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
G
AS
G
AS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
G
AS
GAS GAS GAS GAS
POLE & EQUIPMENT SCHEDULE
STANDARD LUMINAIRE & MAST ARM POLE LOCATION
NOTES
ID POLE TYPE HEIGHT LENGTH WATT TYPE STA Y
B TYPE-A 16'-0" 10'-0" 50 LED LIGHT PATTERN - TYPE 3
C TYPE-A 28'-6" 10'-0" 50 LED LIGHT PATTERN - TYPE 3
SC SERVICE
CAN
CONTRACTOR SHALL INSTALL METERED (120/240V) STREET LIGHT SERVICE PEDESTAL ENCLOSURE AT TWO LOCATIONS
SP SERVICE
POINT
INSTALL 17" X 30" SMUD PULLBOX AND 10LF 3" RISER AT SMUD POLE (UD#116159)
240'
32'
FH
6 6
550' TO PULLBOX
3'
D E
P A
R
TM
E N
T O
F
TR
A N
S P
O R
TA
TI
O N
C O
U N
TY
O
F S
A C
R A
M E
N
TO
C O
M M
U N
IT
Y
S E
R V
IC
E
S A
G E
N C
Y
SCALE
DRAWING
DA
TE
RE
VI
SI
ON
S
PREPARED BY
AP
PR
SHEET
DATE
3 7
RO
SE
VI
LL
E R
OA
D
RR
C
RO
SS
IN
G
- S
EC
TIO
N
EL
EC
TR
IC
AL
P
LA
N
E1 E3
ST
RE
ET
LI
GH
T I
NS
TA
LL
AT
IO
N
PR
OJ
EC
T
3'
5'
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GASGAS
GASGASGASGASGASGASGASGASGASGAS
GAS G
AS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
D E
P A
R
TM
E N
T O
F
TR
A N
S P
O R
TA
TI
O N
C O
U N
TY
O
F S
A C
R A
M E
N
TO
C O
M M
U N
IT
Y
S E
R V
IC
E
S A
G E
N C
Y
SCALE
DRAWING
DA
TE
RE
VI
SI
ON
S
PREPARED BY
AP
PR
SHEET
DATE
4 7
RO
SE
VI
LL
E R
OA
D
RR
C
RO
SS
IN
G
- S
EC
TIO
N
EL
EC
TR
IC
AL
P
LA
N
E2 E3
ST
RE
ET
LI
GH
T I
NS
TA
LL
AT
IO
N
PR
OJ
EC
3'
D E
P A
R
TM
E N
T O
F
TR
A N
S P
O R
TA
TI
O N
C O
U N
TY
O
F S
A C
R A
M E
N
TO
C O
M M
U N
IT
Y
S E
R V
IC
E
S A
G E
N C
Y
SCALE
DRAWING
DA
TE
RE
VI
SI
ON
S
PREPARED BY
AP
PR
SHEET
DATE
5 7
RO
SE
VI
LL
E R
OA
D
RR
C
RO
SS
IN
G
- S
EC
TIO
N
EL
EC
TR
IC
AL
P
LA
N
E3 E3
ST
RE
ET
LI
GH
T I
NS
TA
LL
AT
IO
N
PR
OJ
EC
GAS GAS GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GASGASGASGASGASGASGASGASGASGASGASGAS
GAS GAS GAS
G
AS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS GAS GAS GAS GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
G
AS
G
AS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
G
AS
GAS GAS GAS GAS GAS
D E
P A
R
TM
E N
T O
F
TR
A N
S P
O R
TA
TI
O N
C O
U N
TY
O
F S
A C
R A
M E
N
TO
C O
M M
U N
IT
Y
S E
R V
IC
E
S A
G E
N C
Y
SCALE
DRAWING
DA
TE
RE
VI
SI
ON
S
PREPARED BY
AP
PR
SHEET
DATE
6 7
RO
SE
VI
LL
E R
OA
D
RR
C
RO
SS
IN
G
- S
EC
TIO
N
PA
VE
M
EN
T R
ES
TO
RA
TIO
N
PL
AN
PR1 PR2
350'
36'
ST
RE
ET
LI
GH
T I
NS
TA
LL
AT
IO
N
PR
OJ
EC
T
50' 50' 50'
50'
18'
400'
190'
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GASGAS
GASGASGASGASGASGASGASGASGASGAS
GAS G
AS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
D E
P A
R
TM
E N
T O
F
TR
A N
S P
O R
TA
TI
O N
C O
U N
TY
O
F S
A C
R A
M E
N
TO
C O
M M
U N
IT
Y
S E
R V
IC
E
S A
G E
N C
Y
SCALE
DRAWING
DA
TE
RE
VI
SI
ON
S
PREPARED BY
AP
PR
SHEET
DATE
7 7
RO
SE
VI
LL
E R
OA
D
RR
C
RO
SS
IN
G
- S
EC
TIO
N
PA
VE
M
EN
T R
ES
TO
RA
TIO
N
PL
AN
PR2 PR2
ST
RE
ET
LI
GH
T I
NS
TA
LL
AT
IO
N
PR
OJ
EC
T
120'
115' 50'
400'
| Sheets and Views |
| 1 Cover Sheet |
| Roseville Rd - Section 130 Railroad Crossing Project Rev47 (trans)-2 Construction Details.pdf |
| Sheets and Views |
| 2 Construction Details |
| Roseville Rd - Section 130 Railroad Crossing Project Rev47 (trans)-3 Electrical.pdf |
| Sheets and Views |
| 3 Electrical |
| Roseville Rd - Section 130 Railroad Crossing Project Rev47 (trans)-4 Electrical.pdf |
| Sheets and Views |
| 4 Electrical |
| Roseville Rd - Section 130 Railroad Crossing Project Rev47 (trans)-5 Electrical.pdf |
| Sheets and Views |
| 5 Electrical |
| Roseville Rd - Section 130 Railroad Crossing Project Rev47 (trans)-6 Pavement.pdf |
| Sheets and Views |
| 6 Pavement |
| Roseville Rd - Section 130 Railroad Crossing Project Rev47 (trans)-7 Pavement.pdf |
| Sheets and Views |
| 7 Pavement |
File details come from the government source that posted it. Updated .