4383049_CDRL1_REPORT.pdf
PDF 94 KB Posted
- Attached to
- AXIAL PISTON PUMP
- Solicitation number
- SPRTA126R0289
- Issued by
-
Defense Logistics Agency Aviation
About this file
This is a Contract Data Requirements List (DD Form 1423-1) documenting a single data item requirement for contract FD20302600910.
The contract pertains to KC-135 Axial Piston Pumps and requires the contractor to submit a Production Surge Plan, formally titled the Capability Analysis Plan (CAP), prepared in accordance with Data Acquisition Document DI-MGMT-80969. The CAP must be submitted 30 days after contract award and shall remain applicable throughout all basic years and option years. The plan must include a delivery schedule demonstrating the maximum sustainable rate of delivery for contract items, with monthly acceleration profiles up to the contractor's maximum achievable delivery rate within existing facilities, equipment, and subcontracting structure. The CAP shall address surge capacity available at no additional cost to contract prices as well as surge capacity available at increased cost. Based on this analysis, a mutually agreed quantity increase of no more than x percent and delivery rate acceleration may be established for the contract, with pricing to be negotiated post-award. This requirement addresses potential unplanned demand spikes resulting from major theater warfare or national emergencies, as referenced in DFARS 217.208-70 and DFARS 252.217.7001. The requiring office is 423 SCMS/GUMF at Tinker Air Force Base, Oklahoma, with distribution approved for unlimited public and foreign distribution. The data item is categorized as "OTHER" and requires one draft and one final copy for submission.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SPRTA1-26-R-0289.pdf | ||
| DID.pdf | ||
| 4383441_TRNSPDATA_REPORT.pdf | ||
| 4383440_PKGRQMT_REPORT.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
KC-135 / Axial Piston Pumps
E. CONTRACT / PR NO.
FD20302600910
F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Production Surge Plan
3. SUBTITLE
Capability Analysis Plan (CAP)
4. AUTHORITY
DI-MGMT-80969
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS
6. REQUIRING OFFICE
423 SCMS/GUMF
7. DD 250 REQ
LT
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Maxfield, Jennifer LNAME: 31 MAR 2026DATE:
THIS CDRL WILL SERVE BASIC YEARS AND ALL OPTION YEARS.
In the event that the DoD experiences an unplanned spike or sudden increase in demand, due to major theater warfare or a national emergency (also known as surge, reference DFARs 217.208-70 and DFARs 252.217.7001), and invokes surge: The Contractor is willing to work to meet and sustain this demand for quantity levels above and beyond normal peacetime requirements.
Block 9: Approved for Unlimited Public and Foreign Distribution. Other requests shall be referred to 848 SCMG/EN, Tinker Air Force Base, Oklahoma.
Block 10, 11, 12, 13: The Capability Analysis Plan (CAP) shall be prepared IAW DI-MGMT-80969 and shall be submitted 30 days after the contract award.
This Plan shall include a delivery schedule showing the maximum sustainable rate of delivery for items in this contract.
This delivery schedule shall provide acceleration by month up to the maximum sustainable rate of delivery achievable within the Contractor's existing facilities, equipment, and subcontracting structure. This Plan will address the surge capacity possible at no increase to the contract prices as well as the surge capacity possible at an additional cost. Based on this Plan, a mutually agreed to increase the quantity of supplies or services called for under this contract by no more than x % percent; and the accelerate the rate of delivery may be established for this contract, at a price or cost established after contract award or to be established by negotiation.
COORDINATORS:
423 SCMS/GUMF
3001 Staff Drive, Annex 4, Suite # 1AG1 92B Tinker Air Force Base, Oklahoma 73145 Attention : LeeAnna McWhorter
0 1 0
0 1 015. TOTAL
G. PREPARED BY
Maxfield, Jennifer L
423 SCMS / GUMB
405-734-3252
H. DATE
31 MAR 2026
I. APPROVED BY
//ELECTRONICALLY SIGNED//
Mcwhorter, Leeanna F
423 SCMS / GUMF 405-736-3549 / 336-3549
J. DATE
31-MAR-26
Page 1 of 1DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 02 Apr 2026
PREVIOUS EDITION MAY BE USED.
File details come from the government source that posted it. Updated .