4370405_CDRL1_REPORT.pdf

PDF 94 KB Posted

Attached to
F-15 Valve, Linear Direct
Solicitation number
SPRTA126R0206
Issued by

About this file

This is a Contract Data Requirements List (DD Form 1423-1) specifying a single data item requirement for contract FD20302600983 between the U.S. Air Force and a contractor for F-15 Valve Linear Direct components. The requiring office is 423 SCMS/GUMB at Tinker Air Force Base, Oklahoma, with primary coordinator Kennith Towler.

The required data item is a Production Surge Plan, specifically identified as a Capability Analysis Plan (CAP) under Data Acquisition Document DI-MGMT-80969. The contractor must submit this plan 30 days after contract award, with submission serving all basic years and option years. The CAP shall include a delivery schedule demonstrating the maximum sustainable rate of delivery achievable within the contractor's existing facilities, equipment, and subcontracting structure, with month-by-month acceleration projections. The plan must address surge capacity available at no additional cost to contract prices as well as surge capacity requiring additional cost. Following CAP submission, the government may negotiate to increase contract quantities by no more than x percent and accelerate delivery rates, with pricing to be established after award or through subsequent negotiation. The document is approved for unlimited public and foreign distribution. Jennifer L. Maxfield prepared the form on March 17, 2026, approved by Jenny Ewy on the same date.

View the file

Other files

File Type Posted
4371292_DID.pdf PDF
1835503_UIIEC_REPORT.pdf PDF
4371890_TRNSPDATA_REPORT.pdf PDF
SPRTA126R0206.pdf PDF
4371886_PKGRQMT_REPORT.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F-15 / Valve Linear Direct

E. CONTRACT / PR NO.

FD20302600983

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Production Surge Plan

3. SUBTITLE

Capability Analysis Plan (CAP)

4. AUTHORITY

DI-MGMT-80969

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

423 SCMS/GUMB

7. DD 250 REQ

LT

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Maxfield, Jennifer LNAME: 16 MAR 2026DATE:

NSN: 4810013963097HS

P/N: A71504-6

THIS CDRL WILL SERVE BASIC YEARS AND ALL OPTION YEARS.

In the event that the DoD experiences an unplanned spike or sudden increase in demand, due to major theater warfare or a national emergency (also known as surge, reference DFARs 217.208-70 and DFARs 252.217.7001), and invokes surge: The Contractor is willing to work to meet and sustain this demand for quantity levels above and beyond normal peacetime requirements.

Block 9: Approved for Unlimited Public and Foreign Distribution. Other requests shall be referred to 848 SCMG/EN, Tinker Air Force Base, Oklahoma.

Block 10, 11, 12, 13: The Capability Analysis Plan (CAP) shall be prepared IAW DI-MGMT-80969 and shall be submitted 30 days after the contract award.

This Plan shall include a delivery schedule showing the maximum sustainable rate of delivery for items in this contract.

This delivery schedule shall provide acceleration by month up to the maximum sustainable rate of delivery achievable within the Contractor's existing facilities, equipment, and subcontracting structure. This Plan will address the surge capacity possible at no increase to the contract prices as well as the surge capacity possible at an additional cost. Based on this Plan, a mutually agreed to increase the quantity of supplies or services called for under this contract by no more than x % percent; and the accelerate the rate of delivery may be established for this contract, at a price or cost established after contract award or to be established by negotiation.

COORDINATORS:

423 SCMS/GUMB

3001 Staff Drive, Annex 4, Suite # 1AD 100A Tinker Air Force Base, Oklahoma 73145 Attention : Kennith Towler

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Maxfield, Jennifer L

423 SCMS / GUMB

405-734-3252

H. DATE

17 MAR 2026

I. APPROVED BY

//ELECTRONICALLY SIGNED//

Ewy, Jenny

423 SCMS / GUEAA 405-582-9974 / 852-9974

J. DATE

17-MAR-26

Page 1 of 1DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 18 Mar 2026

PREVIOUS EDITION MAY BE USED.

File details come from the government source that posted it. Updated .