This file consists of construction contract plans for the O.C. Phillips Road Over Brushy Creek Bridge Replacement project (FPID: 430468-1-58-01) in Escambia County, Florida, prepared by CONSOR Engineers, LLC under the direction of Professional Engineer Leahann E. Powell. The project involves the replacement of Bridge No. 484299, a timber bridge over Brushy Creek, with a new three-span cast-in-place deck supported structure. The detailed structure plans include comprehensive specifications for foundation work with 24-inch square prestressed concrete piles at four bent locations (End Bent 1, End Bent 4, and Intermediate Bents 2 and 3), substructure elements utilizing Class IV concrete with neoprene bearing pads, and superstructure components featuring Florida slab beams with Class II concrete and reinforcing steel. Key quantity estimates provided in the bid documents include removal of the existing 1,915-square-foot structure, installation of 880 linear feet of prestressed concrete piling, 3,272 tons of riprap and bank stabilization materials, 69.8 cubic yards of substructure concrete, 26,775 pounds of superstructure reinforcing steel, and 890 linear feet of 12-inch Florida slab beams. The contract duration is 530 consecutive calendar days with 500 days allocated for substantial completion and 30 days for final completion. A pre-bid meeting is scheduled for July 17, 2025, and sealed bids are due September 2, 2025, at 10:00 a.m., with all meetings conducted via Microsoft Teams.
The project is federally funded and requires FDOT pre-qualification in multiple work classifications including debris removal, drainage, grading, flexible paving, guardrail installation, bridge construction, and pile driving, with a minimum of three years in business and three similar projects completed within the past five years. Contractors must provide performance and payment bonds for 100 percent of the contract amount and are subject to liquidated damages of $2,667 per calendar day of delay. The county has established an overall 10.54 percent Disadvantaged Business Enterprise (DBE) participation goal, and contractors are required to submit a Bidders Opportunity List within three business days of bid submission identifying all subcontractors and sub-consultants. Buy America regulations mandate that all manufacturing processes for iron and steel products occur in the United States. The design standards referenced include FDOT specifications for FY 2024-25, the AASHTO Load and Resistance Factor Design Bridge Design Specifications (9th Edition), and the FDOT Structures Manual dated January 2024, with concrete strength requirements varying by location from 3,400 psi for traffic railings to 8,500 psi for prestressed concrete beams.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEX OF STRUCTURE PLANS
SHEET NO.
8-1
8-2
BQl-1
8-3
8-4
8-5
8-6
8-7
81-1
81-2
81-3
81-4
81-5
81-6
81-7
81-8
81-9
81-10
81-11
81-12
81-13
81-14
81-15
81-16
81-17
81-18
81-19
81-20
81-21
81-22
81-23
81-24
81-25
81-26
81-27
82-1
82-2
SHEET DESCRIPTION
STRUCTURE KEY SHEET
SIGNATURE SHEET
SUMMARY OF STRUCTURE QUANTITIES
GENERAL NOTES
RUBBLE RIPRAP DETAILS (] OF 4)
RUBBLE RIPRAP DETAILS (2 OF 4)
RUBBLE RIPRAP DETAILS (3 OF 4)
RUBBLE RIPRAP DETAILS (4 OF 4)
PLAN AND ELEVATION
PROFILE GRADE
BRIDGE HYDRAULIC RECOMMENDATIONS
REPORT OF CORE BORINGS (1 OF 2)
REPORT OF CORE BORINGS (2 OF 2)
CONSTRUCTION SEQUENCE
SECTION THROUGH BRIDGE
FOUNDATION LAYOUT
PILE DATA TABLE
END BENT 1
END BENT 4
END BENT DETAILS (1 OF 3)
END BENT DETAILS (2 OF 3)
END BENT DETAILS (3 OF 3)
INTERMEDIATE BENTS 2 AND 3
INTERMEDIATE BENT DETAILS
FLORIDA SLAB BEAM TABLE OF BEAM VARIABLES
TYPICAL SECTION THROUGH BRIDGE DECK
SUPERSTRUCTURE
SUPERSTRUCTURE DETAILS (1 OF 2)
SUPERSTRUCTURE DETAILS (2 OF 2)
FINISH GRADE ELEVATIONS (1 OF 3)
FINISH GRADE ELEVATIONS (2 OF 3)
FINISH GRADE ELEVATIONS (3 OF 3)
REINFORCING BAR LIST (1 OF 2)
REINFORCING BAR LIST (2 OF 2)
LOAD RATING SUMMARY TABLE
TEMPORARY DETOUR BRIDGE GENERAL NOTES
TEMPORARY DETOUR BRIDGE PLAN AND ELEVATION
DEVELOPMENTAL DESIGN STANDARDS
D400-092 APPROACH SLABS (20 FT.) (FLEXIBLE PAVEMENT APPROACHES)
STANDARD PLANS FOR BRIDGE CONSTRUCTION
TEMPORARY DETOUR BRIDGE GENERAL NOTES AND DETAILS
TEMPORARY DETOUR BRIDGE - TIMBER PILE FOUNDATIONS
TEMPORARY DETOUR BRIDGE - STEEL H PILE FOUNDATIONS
TEMPORARY DETOUR BRIDGE - STEEL PILE PIPE FOUNDATIONS
TEMPORARY DETOUR BRIDGE THRIE-BEAM GUARDRAIL
BAR BENDING DETAILS (STEEL)
FLORIDA SLAB BEAM TYPICAL DETAILS AND NOTES
12" FLORIDA SLAB BEAM
ESCAMBllA COUNTY
CONTRACT PLANS
FINANCIAL PROJECT ID 430468-1-58-01
(FEDERAL FUNDS)
ESCAMBIA COUNTY
OCCI E (O.C.) PHI LLI PS ROAD OVER BRUSHY CREEK
BRIDGE REPLACEMENT
BRIDGE NO. 484299
STRUCTURE PLANS
102-200
102-210
102-220
102-230
102-240
415-001
450-450
450-451
455-001
455-002
455-003
455-024
458-110
521-427
630-010
SQUARE PRESTRESSED CONCRETE PILES - TYPICAL DETAILS & NOTES
SQUARE PRESTRESSED CONCRETE PILE SPLICES
SQUARE PRESTRESSED CONCRETE PILES - EDC INSTRUMENTATION
24" SQUARE PRESTRESSED CONCRETE PILE
EXPANSION JOINT SYSTEM - POURED JOINT WITH BACKER ROD
TRAFFIC RAILING - (36" SINGLE-SLOPE)
CONDUIT DETAILS - EMBEDDED
5chambm 3/5/2024
LOCATION OF PROJECT
9:56:52 AM
STRUCTURE PLANS
ENGINEER OF RECORD:
LEAHANN E. POWELL, P.E.
P.E. NO. 70045
(850) 289-1000
CONSOR ENGINEERS, LLC
4489 WOODBINE ROAD
PACE, FLORIDA 325 71
VENDOR NO. F0593221706- 011
PROJECT MANAGER:
TIM CARDEN
COUNTY COMMISSIONERS:
DISTRICT ONE - JEFF BERGOSH
DISTRICT TWO - MIKE KOHLER
WEST PALM
BEACH
FT LAUDERDALE
MIAMI
DISTRICT THREE - LUMON MAY (CHAIRMAN)
DISTRICT FOUR - ROBERT BENDER
DISTRICT FIVE - STEVEN BARRY (VICE CHAIRMAN)
CONSTRUCTION
CONTRACT NO.
TBD
FISCAL
YEAR
c:\pw _work\american-pw-01\dms03975\B 1 KeySheet0 1.DGN
SHEET
NO.
8-1
C
C
IQ
LIJ
ti:
i i
Ill ci
LIJ
u
LIJ
Ill
RH 12-23
CB 11-23
RH 12-23
BRIDGE NO. 484299
JV 11-23
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
ROAD NO. COUNTY FINANCIAL PROJECT ID
REVISIONS
DATE BY DESCRIPTION DATE BY DESCRIPTION
N/A ESCAMBIA 430468-1-58-01
5chambm 3/5/2024 9:56:53 AM c:\pw_work\american-pw-01\dms03975\Signst01.DGN
ESCAMBIA COUNTY
FAX: (850) 289-1001
PHONE: (850) 289-1000
PACE, FL 32571
4489 WOODBINE ROAD
CONSOR ENGINEERS, LLC
P.E. LICENSE NUMBER 70045
LEAHANN E. POWELL, P.E.
STATE OF
R E
E
NI
G
NE LANOI
S S
E
F O
R P
A
DIROL
F
No 70045
ESNECIL
B-2
SIGNATURE SHEET
SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND
ON THE DATE ADJACENT TO THE SEAL
SHEET NO. SHEET DESCRIPTION
THIS ITEM HAS BEEN DIGITALLY SIGNED AND SEALED BY:
RULE 61G15-23.004, F.A.C.
THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL BE RESPONSIBLE FOR THE FOLLOWING SHEETS IN ACCORDANCE WITH
STATE OF
R E
E
NI
G
NE LANOI
S S
E
F O
R P
A
DIROL
F
No 79361
ESNECIL
SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND
ON THE DATE ADJACENT TO THE SEAL
SHEET NO. SHEET DESCRIPTION
THIS ITEM HAS BEEN DIGITALLY SIGNED AND SEALED BY:
RULE 61G15-23.004, F.A.C.
THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL BE RESPONSIBLE FOR THE FOLLOWING SHEETS IN ACCORDANCE WITH
L L
E
WOP .E NNA
H A
E L
STATE OF
R E
E
NI
G
NE LANOI
S S
E
F O
R P
A
DIROL
F
No 66577
ESNECIL
SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND
ON THE DATE ADJACENT TO THE SEAL
SHEET NO. SHEET DESCRIPTION
THIS ITEM HAS BEEN DIGITALLY SIGNED AND SEALED BY:
RULE 61G15-23.004, F.A.C.
THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL BE RESPONSIBLE FOR THE FOLLOWING SHEETS IN ACCORDANCE WITH
B1-5
B1-4
B-2
REPORT OF CORE BORINGS (2 OF 2)
REPORT OF CORE BORINGS (1 OF 2)
SIGNATURE SHEET
B1-3
B-2
BRIDGE HYDRAULIC RECOMMENDATIONS
SIGNATURE SHEET
N
OS
LEN .K CI
R
E
B2-2
B2-1
B1-27
B1-26
B1-25
B1-24
B1-23
B1-22
B1-21
B1-20
B1-19
B1-18
B1-17
B1-16
B1-15
B1-14
B1-13
B1-12
B1-11
B1-10
B1-9
B1-8
B1-7
B1-6
B1-2
B1-1
B-7
B-6
B-5
B-4
B-3
BQ1-1
B-2
B-1
TEMPORARY DETOUR BRIDGE PLAN AND ELEVATION
TEMPORARY DETOUR BRIDGE GENERAL NOTES
LOAD RATING SUMMARY TABLE
REINFORCING BAR LIST (2 OF 2)
REINFORCING BAR LIST (1 OF 2)
FINISH GRADE ELEVATIONS (3 OF 3)
FINISH GRADE ELEVATIONS (2 OF 3)
FINISH GRADE ELEVATIONS (1 OF 3)
SUPERSTRUCTURE DETAILS (2 OF 2)
SUPERSTRUCTURE DETAILS (1 OF 2)
SUPERSTRUCTURE
TYPICAL SECTION THROUGH BRIDGE DECK
FLORIDA SLAB BEAM TABLE OF BEAM VARIABLES
INTERMEDIATE BENT DETAILS
INTERMEDIATE BENTS 2 AND 3
END BENT DETAILS (3 OF 3)
END BENT DETAILS (2 OF 3)
END BENT DETAILS (1 OF 3)
END BENT 4
END BENT 1
PILE DATA TABLE
FOUNDATION LAYOUT
SECTION THROUGH BRIDGE
CONSTRUCTION SEQUENCE
PROFILE GRADE
PLAN AND ELEVATION
RUBBLE RIPRAP DETAILS (4 OF 4)
RUBBLE RIPRAP DETAILS (3 OF 4)
RUBBLE RIPRAP DETAILS (2 OF 4)
RUBBLE RIPRAP DETAILS (1 OF 4)
GENERAL NOTES
SUMMARY OF STRUCTURE QUANTITIES
SIGNATURE SHEET
STRUCTURE KEY SHEET
S
BOCAJ .V HTIE
K
KEITH V. JACOBS, P.E. NO. 66577
FAX: (850) 433-7027
PHONE: (850) 434-0846
PENSACOLA, FLORIDA 32501
328 EAST GADSDEN STREET
LARRY M. JACOBS & ASSOCIATES, INC.
LEAHANN E. POWELL, P.E. NO. 70045
FAX: (850) 289-1001
PHONE: (850) 289-1000
PACE, FLORIDA 32571
4489 WOODBINE ROAD
CONSOR ENGINEERS, LLC
ERIC K. NELSON, P.E. NO. 79361
FAX: (813) 435-2601
PHONE: (813) 435-2600
WESLEY CHAPEL, FLORIDA 33544
2818 CYPRESS RIDGE BLVD, SUITE 200
CONSOR ENGINEERS, LLC
OCCIE (O.C.) PHILLIPS ROAD OVER BRUSHY CREEK
T H
E
O F
F I
C I
A L
R
C O
D
I
S
E E
T
E C
T R
O N
C
G I
T A
L
Y
G N
N
A L
U
D
L E
G
A
C
RH 12-23
CB 11-23
RH 12-23
BRIDGE NO. 484299
JV 11-23
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
ROAD NO. COUNTY FINANCIAL PROJECT ID
REVISIONS
5chambm 3/5/2024 9:56:57 AM c:\pw_work\american-pw-01\dms03975\B1SumOfQuantities01.DGN
PACE, FL 32571
4489 WOODBINE ROAD
CONSOR ENGINEERS, LLC
P.E. LICENSE NUMBER 70045
LEAHANN E. POWELL, P.E.
BQ1-1
SUMMARY OF STRUCTURE QUANTITIES
KD 10-20
SUMMARY OF STRUCTURE QUANTITIES - BRIDGE NO. 484299
SECTION
NO.
PAY ITEM
PAY ITEM DESCRIPTION LOCATION UNIT
QUANTITY TOTAL
NOTES
DESIGN
REMARKS
CONSTRUCTION
P F P F
LUMP SUM ITEMS 0110 3 REMOVAL OF EXISTING STRUCTURE BRIDGE LS/SF 1 1 1915 SF
FOUNDATION
0455 34 5 PRESTRESSED CONCRETE PILING (24" SQ.) END BENT 1 LF 180 800 4 REQUIRED
END BENT 4 180 4 REQUIRED
INTERMEDIATE BENT 2 220 4 REQUIRED
INTERMEDIATE BENT 3 220 4 REQUIRED
0455143 5 TEST PILES-PRESTRESSED CONCRETE (24" SQ.) END BENT 1 LF 60 270 1 REQUIRED
END BENT 4 60 1 REQUIRED
INTERMEDIATE BENT 2 75 1 REQUIRED
INTERMEDIATE BENT 3 75 1 REQUIRED
0530 1 RIPRAP-SAND CEMENT END BENT 1 CY 15.5 31.7
END BENT 4 16.2
0530 3 3 RIPRAP-RUBBLE (F&I, BANK AND SHORE) END BENT 1 TN 1399.4 2186.0
END BENT 4 786.6
0530 74 BEDDING STONE END BENT 1 TN 498.4 778.5
END BENT 4 280.1
SUBSTRUCTURE
0400 4 5 CLASS IV CONCRETE (SUBSTRUCTURE) END BENT 1 CY 17.7 69.8
END BENT 4 17.7
INTERMEDIATE BENT 2 17.2
INTERMEDIATE BENT 3 17.2
0400 148 PLAIN NEOPRENE BEARING PAD END BENT 1 CF 1.6 9.3
END BENT 4 1.6
INTERMEDIATE BENT 2 3.1
INTERMEDIATE BENT 3 3.1
0415 1 5 REINFORCING STEEL (SUBSTRUCTURE) END BENT 1 LB 2902 10062
END BENT 4 2902
INTERMEDIATE BENT 2 2129
INTERMEDIATE BENT 3 2129
APPROACH SLABS
0400 2 10 CLASS II CONCRETE (APPROACH SLABS) APPROACH SLAB 1 CY 30.2 60.4
APPROACH SLAB 2 30.2
0415 1 9 REINFORCING STEEL (APPROACH SLABS) APPROACH SLAB 1 LB 5646 11292
APPROACH SLAB 2 5646
SUPERSTRUCTURE
0400 2 47
SHRINKAGE REDUCING ADMIXTURE)
CLASS II CONCRETE (CIP TOPPING WITH
SPAN 1 CY 36.7 110.1
SPAN 2 36.7
SPAN 3 36.7
0415 1 4 REINFORCING STEEL (SUPERSTRUCTURE) SPAN 1 LB 8925 26775
SPAN 2 8925
SPAN 3 8925
0400 7
LESS THAN 8.5")
BRIDGE DECK GROOVING AND PLANING (DECK
SPAN 1 SY 145.0 435
SPAN 2 145.0
SPAN 3 145.0
0450 8 12
CARBON STEEL, WIDTH 54"
PRESTRESSED BEAM: FLORIDA SLAB BEAM, 12"
SPAN 1 LF 297 890
SPAN 2 297
SPAN 3 297
0458 1 11
BACKER ROD) TYPE D SILICONE
CONSTRUCTION - F&1) (POURED JOINT WITH
BRIDGE DECK EXPANSION JOINT (NEW
END BENT 1 LF 38 152
INTERMEDIATE BENT 2 LF 38
INTERMEDIATE BENT 3 LF 38
END BENT 4 LF 38
BARRIERS
RAILING/
0521 5 13
SINGLE SLOPE)
CONCRETE TRAFFIC RAILING-BRIDGE (36"
APPROACH SLAB 1 LF 43 316
BRIDGE 230
APPROACH SLAB 2 43
0630 2 16
CONCRETE BARRIERS AND TRAFFIC RAILINGS)
CONDUIT, FURNISH & INSTALL (EMBEDDED
BRIDGE LF 946 946
0635 3 13
EMBEDDED
JUNCTION BOX, FURNISH AND INSTALL
BRIDGE EA 4 4
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
RH 12-23
CB 11-23
RH 12-23
BRIDGE NO. 484299
JV 11-23
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
ROAD NO. COUNTY FINANCIAL PROJECT ID
REVISIONS
5chambm 3/5/2024 9:56:58 AM c:\pw_work\american-pw-01\dms03975\B1GeneralNotes01.DGN
PACE, FL 32571
4489 WOODBINE ROAD
CONSOR ENGINEERS, LLC
P.E. LICENSE NUMBER 70045
B-3
GENERAL NOTES
UNO - UNLESS NOTED OTHERWISE
TCE - TEMPORARY CONSTRUCTION EASEMENT
PMVC - POINT OF MINIMUM VERTICAL CLEARANCE
MVC - MINIMUM VERTICAL CLEARANCE
EJ - EXPANSION JOINT
EF - EACH FACE
SEE FDOT STANDARD PLANS FOR COMMON ABBREVIATIONS. THE FOLLOWING ARE ADDITIONAL ABBREVIATIONS:
ABBREVIATIONS:
STANDARD PLANS NO. 630-010
CONDUIT TERMINATION: CONDUITS WILL TERMINATE USING A DRIVEN STEEL PIPE MARKER AS SHOWN IN FDOT
FITTINGS: EXPANSION FITTINGS
EMBEDDED JUNCTION BOXES (EJB): EJB "A" MULTIPLE RACEWAYS
TRAFFIC RAILING CONDUIT:
IN THE ROADWAY PLANS AND FDOT STANDARD PLANS NO. 102-600.
WORK PHASING AND PROGRESSION OF THE WORK SHALL CONFORM WITH THE TRAFFIC CONTROL PLANS LOCATED
TRAFFIC CONTROL PLANS AND PHASING OF WORK:
CONSTRUCTION JOINTS OR ALTERATIONS TO THOSE SHOWN SHALL REQUIRE APPROVAL OF THE ENGINEER.
CONSTRUCTION JOINTS WILL BE PERMITTED ONLY AT THE LOCATIONS INDICATED IN THE PLANS. ADDITIONAL
JOINTS IN CONCRETE:
AS REQUIRED.
CASTING SEQUENCE, DECK FORMING SYSTEMS, CONSTRUCTION LOADS, OVERLAYS AND TEMPORARY SHORING, ETC.
ELEVATIONS SHOWN IN THE PLANS. ACCOUNT FOR THEORETICAL DEFLECTIONS DUE TO SELF WEIGHT, DECK
SCREED THE RIDING SURFACE OF THE BRIDGE DECK AND APPROACH SLABS TO ACHIEVE THE FINISH GRADE
SCREEDING DECK SLABS:
484299 BRUSHY CREEK
STANDARD PLANS NO. 521-427:
PLACE THE FOLLOWING BRIDGE NAME AND NUMBER ON THE TRAFFIC RAILINGS IN ACCORDANCE WITH FDOT
BRIDGE NAME AND NUMBER:
PLANS.
ARE APPROXIMATE. FOR DISPOSITION OF UTILITIES, SEE THE UTILITY ADJUSTMENT SHEET(S) IN THE ROADWAY
FOR PLAN LOCATIONS OF EXISTING UTILITIES, SEE SHEET B1-1. LOCATION OF UTILITIES SHOWN IN THE PLANS
UTILITIES:
UNLESS OTHERWISE NOTED.
ALL DIMENSIONS IN THESE PLANS ARE MEASURED IN FEET AND INCHES EITHER HORIZONTALLY OR VERTICALLY
PLAN DIMENSIONS:
CLEAR DIMENSION IS NOTED TO FACE OF CONCRETE.
DIMENSIONS PERTAINING TO THE LOCATION OF REINFORCING STEEL ARE TO CENTERLINE OF BAR EXCEPT WHERE
UNLESS SHOWN AS "MINIMUM COVER". SEE FDOT SPECIFICATIONS SECTION 415 FOR ALLOWABLE TOLERANCES. ALL
CONCRETE COVER DIMENSIONS SHOWN IN THE PLANS DO NOT INCLUDE PLACEMENT AND FABRICATION TOLERANCES
EXTERIOR FORMED SURFACES: 4"
EXTERNAL SURFACES CAST AGAINST EARTH OR SURFACES IN CONTACT WITH WATER: 4½"
C.I.P. SUBSTRUCTURE:
PRECAST PRESTRESSED BEAMS: 2"
TOP OF DECK: 2½"'
C.I.P. SUPERSTRUCTURE:
CONCRETE COVER:
GRADE 60 CARBON STEEL PER FDOT SPECIFICATIONS SECTION 931.
REINFORCING STEEL:
400 REQUIREMENTS FOR BRIDGE DECKS.
TO PLACING THE C.I.P. TOPPING. CURE THE C.I.P. TOPPING IN ACCORDANCE WITH FDOT SPECIFICATIONS SECTION
SECTION 400 FOR 12 HOURS IMMEDIATELY PRIOR TO PLACING THE C.I.P. TOPPING. REMOVE STANDING WATER PRIOR
THOROUGHLY SATURATE THE TOP SURFACE OF THE FSB'S WITH WATER IN ACCORDANCE WITH FDOT SPECIFICATIONS
C.I.P. TOPPING:
C.I.P. TOPPING SHALL UTILIZE SHRINKAGE REDUCING ADMIXTURE.
PRESTRESSED CONCRETE BEAMSF'C = 8500 VI
PRESTRESSED CONCRETE PILESF'C = 6000 V (SPECIAL)
C.I.P. SUBSTRUCTUREF'C = 5500 IV
C.I.P. SUPERSTRUCTUREF'C = 4500 II (BRIDGE DECK)
C.I.P. APPROACH SLABSF'C = 4500 II (BRIDGE DECK)
C.I.P. TRAFFIC RAILINGF'C = 3400 II
STRUCTURESTRENGTH (PSI)
CONCRETE INCOMPRESSIVE CLASS
LOCATION OFMIN. 28-DAY CONCRETE
ALL CONCRETE SHALL BE IN ACCORDANCE WITH FDOT SPECIFICATIONS SECTION 346.
CONCRETE:
UTILITIES: NO ALLOWANCE FOR UTILITY LOADS HAS BEEN INCLUDED IN THE DESIGN.
DESIGN DOES NOT INCLUDE AN ALLOWANCE OF 15 PSF FOR FUTURE WEARING SURFACE.
OF THE DECK BUT OMITTED FROM THE SECTION PROPERTIES USED FOR DESIGN.
THE DECK THICKNESS INCLUDES A ONE-HALF INCH SACRIFICIAL THICKNESS INCLUDED IN THE DEAD LOAD
150 PCF REINFORCED CONCRETE
430 PLF 36" SINGLE-SLOPE TRAFFIC RAILING
DEAD LOADS:
LIVE LOADS: HL-93 WITH DYNAMIC LOAD ALLOWANCE
DESIGN LOADINGS:
MATHCAD 15.0
LEAP CONCRETE - VERSION 22.00.04.34
FB MULTIPIER - VERSION 5.9.0
STRUCTURAL ANALYSIS PROGRAM:
3. OPERATIONAL IMPORTANCE FACTOR = 1.0
2. REDUNDANCY FACTOR = 1.0
LIMIT STATES.
1. LOAD AND RESISTANCE FACTOR DESIGN METHOD USING STRENGTH, SERVICE, EXTREME EVENT AND FATIGUE
DESIGN METHODOLOGY:
SUBSTRUCTURE - CONCRETE & STEEL: EXTREMELY AGGRESSIVE (pH = 4.6)
SUPERSTRUCTURE - SLIGHTLY AGGRESSIVE
ENVIRONMENT:
VERTICAL DATUM IN PLANS IS BASED ON NAVD 88.
VERTICAL DATUM:
AMENDED BY CONTRACT DOCUMENTS.
APPENDED HEREIN, AND FY 2024-25 STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, AS
1. FLORIDA DEPARTMENT OF TRANSPORTATION, FY 2024-25 STANDARD PLANS AND REVISED INDEX DRAWINGS AS
GOVERNING STANDARDS AND CONSTRUCTION SPECIFICATIONS:
4. AASHTO GUIDE DESIGN SPECIFICATIONS FOR BRIDGE TEMPORARY WORKS, 2ND EDITION.
3. FDOT DESIGN MANUAL DATED JANUARY 2024.
BRIDGE DESIGN SPECIFICATIONS, 9TH EDITION.
2. AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS LOAD AND RESISTANCE FACTOR
1. FDOT STRUCTURES MANUAL DATED JANUARY 2024.
DESIGN SPECIFICATIONS:
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
¡ CONST. & PGL
(TYP.)
TOE OF SLOPE
BERM3'-
0"
MI
N.
SHORE PROTECTION
LIMITS OF BANK &
SHORE PROTECTION
LIMITS OF BANK &
(TYP.)
TOE OF SLOPE
RIPRAP (TYP.)
SAND-CEMENT
SHOULDER LINE (TYP.)
(T Y P
M I N
"2 1150'-4
(T Y P
M I N
WING (TYP.)
END BENT
(TO BE RELOCATED BY OTHERS)
EXISTING W
BY OTHERS)RELOCATED
(TO BEEXISTING BT
11'-8"
(TYP.)
15'-0" MIN.
1'-0" (TYP.)
CB 11-23
RH 12-23
BRIDGE NO. 484299
JV 11-23
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
ROAD NO. COUNTY FINANCIAL PROJECT ID
REVISIONS
5chambm 3/5/2024 9:57:01 AM c:\pw_work\american-pw-01\dms03975\B1RiprapRubble01.dgn
PACE, FL 32571
4489 WOODBINE ROAD
CONSOR ENGINEERS, LLC
P.E. LICENSE NUMBER 70045
B-4
RUBBLE RIPRAP DETAILS (1 OF 4)
P T
S
T A
.1
S 80°17'36" E
STA. 20+94.68
BEGIN APP. SLAB
STA. 21+15.96
BEGIN BRIDGE
STA. 21+54.38
¡ INT. BENT 2
OF STATIONING
DIRECTION
A
A
C
C
DD
B
B
(T Y P
:2
1:2 (T
YP
PLAN
3. FOR SECTION C-C, SECTION D-D AND PARTIAL SIDE ELEVATION, SEE SHEET B-7.
2. FOR SECTION A-A AND SECTION B-B, SEE SHEET B-6.
1. FOR BANK AND SHORE PROTECTION AT END BRIDGE, SEE SHEET B-5.
CROSS REFERENCE:
PROPOSED R/W LINE
PROPOSED R/W LINE
(T Y P
:2
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
SHORE PROTECTION
LIMITS OF BANK &
(TYP.)
TOE OF SLOPE
¡ CONST. & PGL BERM3'-
0"
MI
N.
SHOULDER LINE (TYP.)
(TYP.)
15'-0" MIN.
"2 111'-3
22'-0"
(TYP.)
1'-0"
RIPRAP (TYP.)
SAND-CEMENT
WING (TYP.)
END BENT
(T Y P
M I N
(T Y P
M I N
SHORE PROTECTION
LIMITS OF BANK &
(TO BE RELOCATED BY OTHERS)
EXISTING BT
BY OTHERS)
(TO BE RELOCATED
EXISTING W
BY OTHERS)
(TO BE RELOCATED
EXISTING BT
RH 12-23
CB 11-23
RH 12-23
BRIDGE NO. 484299
JV 11-23
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
ROAD NO. COUNTY FINANCIAL PROJECT ID
REVISIONS
5chambm 3/5/2024 9:57:03 AM c:\pw_work\american-pw-01\dms03975\B1RiprapRubble02.dgn
PACE, FL 32571
4489 WOODBINE ROAD
CONSOR ENGINEERS, LLC
P.E. LICENSE NUMBER 70045
B-5
RUBBLE RIPRAP DETAILS (2 OF 4)
STA. 22+52.42
END APP. SLAB
STA. 22+31.13
END BRIDGE
OF STATIONING
DIRECTION
STA. 21+92.71
¡ INT. BENT 3
S 80°17'36" E
1:2 (T
YP
(T Y P
:2
(T Y P
:2
C
CPLAN
A
A
D D
ELEVATION, SEE SHEET B-7.
3. FOR SECTION C-C, SECTION D-D AND PARTIAL SIDE
2. FOR SECTION A-A AND SECTION B-B, SEE SHEET B-6.
SEE SHEET B-4.
1. FOR BANK AND SHORE PROTECTION AT BEGIN BRIDGE,
CROSS REFERENCE:
B
B
END BENT CAP
6" TO TOP OF
SAND-CEMENT RIPRAP
SAND-CEMENT RIPRAP (TYP.)
1'-0" MIN. TRENCH BELOW
BEDDING STONE
EMBED REBAR
2'-0" MIN.
APPROACH SLAB
6" TO TOP OF
SAND-CEMENT RIPRAP
END BENT WINGWALL
1'-0" MIN. TRENCH BELOW
BEDDING STONE
EMBED REBAR
2'-0" MIN.
3'-0" MIN.
BERM
3'-0"
MIN.
1'-0"
MIN.
FILTER FABRIC
SPLICE
#4 REBAR @ 1'-6" CIC DRIVEN
THROUGH SAND-CEMENT RIPRAP
RUBBLE RIPRAP
(BANK & SHORE)
FILTER FABRIC
(TYP.)
RUBBLE RIPRAP
(BANK & SHORE)
FILTER FABRIC
SPLICE
FILTER FABRIC
(TYP.)
SECTION B-B
1'-0" MIN.
BEDDING STONE
SECTION A-A
-ATE-�-.y-�-----
-ES-CRJ
PT
IO
N
___ R_E_V'_ls�•=-
BY
-ES-CR-,PT- ,0-.--------1 ��t_Htf'c � ls/�'ff:, fiR pli045
DRAWN BY:
CB 12-19
CONSOR ENGINEERS, LLC
4489 WOODBINE ROAD
CHECKED BY:
RH 12-23
10'-0" MIN.
TOE OF SLOPE
r----
I
INT. BENT CAP
5'-0"
I I
-5l.F NHW EL. 92.0
1'-0" MIN.
BEDDING STONE
*1'-0" MIN.; COAT AREA BETWEEN END BENT CAP AND FILTER FABRIC WITH BITUMINOUS COATING
IMMEDIATELY PRIOR TO INSTALLATION OF THE FILTER FABRIC
**COAT AREA BETWEEN WINGWALL AND FILTER FABRIC WITH BITUMINOUS COATING IMMEDIATELY
PRIOR TO INSTALLATION OF THE FILTER FABRIC
NOTE:
FILTER FABRIC SHALL BE TYPE D-2 IN ACCORDANCE WITH FOOT SPECIFICATIONS SECTION 985.
SPLICE LENGTH SHALL BE IN ACCORDANCE WITH FOOT SPECIFICATIONS SECTION 514.
CROSS REFERENCE:
FOR LOCATION OF SECTION A-A AND SECTION 8-8, SEE SHEETS 8-4 AND 8-5.
Ll..
BRIDGE NO. 484299 �
SHEETTln.E:
REF. DWG. NO.
ESCAMBIA COUNTY RUBBLE RIPRAP DETAILS (3 OF 4)
PACE, FL 32571 DESIGNED BY: ,__
R_0A D_No_. ___ cou_N_TY __ ,___FIN_AN_CIAL_PR _OJ_ECT_ I _D
__,PROJECT NAME:
SHEET NO. PHONE: (850) 289-1000
FAX: (850) 289-1001 CB 11-23
CHECKED BY:
RH 2-2
NIA ESCAMBIA 430468-1-58-01
5chambm
OCCIE (O.C.) PHILLIPS ROAD OVER BRUSHY CREEK 8-6
3/5/2024 9:57:04 AM c:\pw _ work\american-pw-0 J \dms0397 5\81 Ri pr apRubble03.dgn
5powell Rectangle
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
BEDDING STONE
1'-0" MIN. TRENCH BELOW
2'-0" MIN.
EMBED REBAR
MIN.
1'-0"
(TO ¡ SPLICE)
6'-0" MIN.
SPLICE
FILTER FABRIC 10'-0" MIN.
5'-0"
TOE OF SLOPE
BEDDING STONE
1'-0" MIN.
(TYP.)
FILTER FABRIC
SAND-CEMENT RIPRAP (TYP.)
(BANK & SHORE)
RUBBLE RIPRAP
THROUGH SAND-CEMENT RIPRAP
#4 REBAR @ 1'-6" C/C DRIVEN
(BANK & SHORE)
RUBBLE RIPRAP
RIPRAP (TYP.)
SAND-CEMENT
M I N
APPROACH SLAB
SAND-CEMENT RIPRAP
6" TO TOP OF
MIN.
3'-0"
BERM
3'-0" MIN.
CAP
END BENT
FILTER FABRIC
5'-0"
BEDDING STONE
1'-0" MIN.
M I N
MIN.
"2 11'-2
WINGWALL
RH 12-23
CB 11-23
RH 12-23
BRIDGE NO. 484299
JV 11-23
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
ROAD NO. COUNTY FINANCIAL PROJECT ID
REVISIONS
5chambm 3/5/2024 9:57:06 AM c:\pw_work\american-pw-01\dms03975\B1RiprapRubble04.dgn
PACE, FL 32571
4489 WOODBINE ROAD
CONSOR ENGINEERS, LLC
P.E. LICENSE NUMBER 70045
B-7
RUBBLE RIPRAP DETAILS (4 OF 4)
CB 12-19
1:2
SECTION C-C
1:
PARTIAL SIDE ELEVATION SECTION D-D
B-4 AND B-5.
FOR LOCATION OF SECTION C-C AND SECTION D-D, SEE SHEETS
CROSS REFERENCE:
ACCORDANCE WITH FDOT SPECIFICATIONS SECTION 514.
SPECIFICATIONS SECTION 985. SPLICE LENGTH SHALL BE IN
FILTER FABRIC SHALL BE TYPE D-2 IN ACCORDANCE WITH FDOT
NOTE:
END BENT CAP AS SHOWN
**EXTEND SAND-CEMENT RIPRAP 3'-0" MIN. BEYOND BACK FACE OF
*1'-0" MIN.
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
R A I L I N
G
R A I L I N
G
LINE (TYP.)
WETLAND
PLANS NO. 536-001 (TYP.)
PLANS AND FDOT STANDARD
GUARDRAIL, SEE ROADWAY
(TYP.)
GUARDRAIL
EL. 92.00
NHW
PMVC
BEGIN BRIDGE END BRIDGE
B-2
B-4
CONCRETE PILE (TYP.)
24" SQ. PRESTRESSED
¡ INT. BENT 2 ¡ INT. BENT 3
¡ CONST. & PGL
GROUND LINE AT
APPROX. EXISTING
EL. 101.28
DHW
¡ CONST. & PGL
B-3
B-1
(TYP
.)3'-
0"
BERM
(T O
B
E
R
E M
O V
E D
E X I S
T
B R I D
G E
(FDOT STD. PLANS NO. 521-427)
(36" SINGLE-SLOPE)
TRAFFIC RAILING
(8
½
T O
½
V A
R I E
S
£ SURVEY
(T O
T
C E
M I N
(SPAN 3)
38'-5"
(SPAN 2)
38'-4"
(SPAN 1)
38'-5"
115'-2" (OVERALL LENGTH OF BRIDGE ALONG ¡ CONST. & PGL)
(APPROACH SLAB)
"8 321'-3
(APPROACH SLAB)
"8 321'-3
(T O
P
R O
P
R
W
L I N
E
M I N
BY OTHERS)
(TO BE RELOCATED
EXISTING W
BY OTHERS) RELOCATED
(TO BEEXISTING BT
SHORE) (TYP.)
RIPRAP (BANK &
LIMITS OF RUBBLE
O U
T T
O
O U
T
S H
L D
R
A N
S H
L D
R
(T O
P
R O
P
R
W
L I N
E
M I N (T
O
PLANS NO. D400-092) (TYP.)
(FDOT DEVELOPMENTAL STANDARD
(FLEXIBLE PAVEMENT APPROACHES)
APPROACH SLAB (20 FT.)
SHORELINE
EXISTING
SHORELINE
EXISTING
M V
C
RH 12-23
CB 11-23
RH 12-23
BRIDGE NO. 484299
JV 11-23
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
ROAD NO. COUNTY FINANCIAL PROJECT ID
REVISIONS
5chambm 3/5/2024 9:57:08 AM c:\pw_work\american-pw-01\dms03975\B1PlanElev01.dgn
PACE, FL 32571
4489 WOODBINE ROAD
CONSOR ENGINEERS, LLC
P.E. LICENSE NUMBER 70045
LEAHANN E. POWELL, P.E.
21 22
PLAN
ELEVATION
OF STATIONING
DIRECTION
STA. 20+94.68
BEGIN APP. SLAB
STA. 21+54.38
¡ INT. BENT 2 STA. 22+52.41
END APP. SLAB
(TYP.)
70°00'00"
BRIDGE NO. 484299
B1-1
PLAN AND ELEVATION
EJ EJ EJ
E EE E E
E
S 80°17'36" E
1:2 1:
DENOTES APPROXIMATE SOIL BORING LOCATION
LEGEND:
CREEK
BRUSHY
STA. 21+15.96
BEGIN BRIDGE
STA. 21+92.71
¡ INT. BENT 3
STA. 22+31.13
END BRIDGE
EJ
P T
S
T A
.1
S 83°08'00" E S 80°48'09" E
P I
S
T A
.5
SEE SHEET B2-2.
3. FOR LOCATION OF TEMPORARY DETOUR BRIDGE,
2. FOR PROFILE GRADE, SEE SHEET B1-2.
B-4 THRU B-7.
1. FOR RUBBLE RIPRAP DETAILS, SEE SHEETS
CROSS REFERENCE:
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
300' V.C.
304.34' V.C.
RH 12-23
CB 11-23
RH 12-23
BRIDGE NO. 484299
JV 11-23
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
ROAD NO. COUNTY FINANCIAL PROJECT ID
REVISIONS
5chambm 3/5/2024 9:57:09 AM c:\pw_work\american-pw-01\dms03975\B1VertCurveSuperEL01.dgn
PACE, FL 32571
4489 WOODBINE ROAD
CONSOR ENGINEERS, LLC
P.E. LICENSE NUMBER 70045
B1-2
PROFILE GRADE
PROFILE GRADE DATA
STA. 21+15.96
BEGIN BRIDGE
EL. 112.31
PT STA. 25+99.63
STA. 22+31.13
END BRIDGE
(ALONG ¡ CONST. & PGL)
EL. 104.19
PC STA. 14+22.21
EL. 100.94
PI STA. 15+76.75
EL. 105.76
PI STA. 24+49.63
EL. 102.43
PT STA. 17+26.75
(-) 2.200% (+) 1
.000%
EL. 106.00
STA. 20+88.04
(-) 0.400%
4.
2%
(+) 0.300%
EL. 106.36
PC STA. 22+99.63
EL. 106.53
STA. 22+59.05
e l v e r s o n r
P
P
P
P
P
P
P
P
Buck eye B r.
R ee d d y
B r.
N ar ro w Ga p Br
Ch.
Springs
Bay
S P ineville R d.
P in e
F or es t
R d.
20 21 22
31 32 33 34 35 36
C. Phillips Rd.O.
N
R 33 W
T N c:\pw_work\american-pw-01\dms03938\BRHYRD01.dgn5chambm 3/5/2024 9:57:11 AM Default
ESCAMBIA
DATE BY DESCRIPTION DATE BY DESCRIPTION
REVISIONS
ROAD NO. COUNTY FINANCIAL PROJECT ID
REF. DWG. NO.
SHEET NO.
N/A
B1-3
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
SHEET TITLE:
PROJECT NAME:
BRIDGE HYDRAULIC RECOMMENDATIONS
STRUCTURE
PROPOSED
( 1 ) ( 2 ) ( 3 ) ( 4 )
NOTE:
STAGE ELEV. NAVD (ft)
FLOOD DATA:
DISCHARGE (cfs)
AVERAGE VELOCITY (f/s)
EXCEEDANCE PROB. (%)
FREQUENCY (yr.)
MAX. EVENT OF RECORD GREATEST FLOOD
OVERTOPPING or
TOTAL SCOUR ELEVATION
PIER INFORMATION LONG TERM
SCOUR ELEV.
WORST CASE < 100 yr.
FREQ. (yr.) FREQ. (yr.)
HYDRAULIC RECOMMENDATIONS
BEGIN BRIDGE STATION1.
2.
3.
4.
CLEARANCE PROVIDED:
MINIMUM CLEARANCE:
ABUTMENTS:
NAV: HORIZ.
NAV: HORIZ.
VERT.
VERT.
END BRIDGE STATION
ABOVE EL.
ABOVE EL.
DRIFT: HORIZ.
DRIFT: HORIZ.
VERT.
VERT.
ABOVE EL.
ABOVE EL.
END BRIDGEBEGIN BRIDGE
RUBBLE GRADE:
SLOPE:
BURIED OR NON-BURIED HORIZ. TOE:
TOE HORIZ. DISTANCE:
LIMIT OF PROTECTION:
DECK DRAINAGE:5.
REMARKS:
SCOUR PREDICTIONS FOR PROPOSED STRUCTURE DESCRIBED ABOVE:
AREA OF OPENING@D.F.
HYDRAULIC DESIGN DATA
EXISTING STRUCTURES
SKEW ANGLE
SIZE AND TYPENUMBERS
ELEV. LOW MEMBER
BRIDGE WIDTH
TYPE CONSTRUCTION
SPAN LENGTH
OVERALL LENGTH
FOUNDATION
(REFERENCE)
WORST CASE < 500 yr.
design stages, feet-NAVD 1988.
cautioned against the assumption of precision for the discharge rates, units are in cubic feet per second and the
This hydraulic data is a summary of design calculations and is provided for informational purposes only. The user is
TERMS:
Greatest Flood: The most severe that can be predicted where overtopping is not practicable.
Overtopping Flood: Causes flow over the highway, over a watershed divide, or thru emergency relief structures.
Base Flood: Has a 1% chance of being exceeded in any given year (100 year frequency)
Design Flood: Utilized to assure a desired level of hydraulic performance.
WATER SURFACE ELEVATIONS: N.H.W. (Non-Tidal)
CONTROL (Non-Tidal)
M.H.W. (Tidal)
M.L.W. (Tidal)
25 YEAR
DO NOT USE FOR CONSTRUCTION PURPOSES.
This sheet has been included in the plans for documentation.
O.C. PHILLIPS RD.
484299BRIDGE NO.
0.30%
DESIGN/BASE FLOOD
EL. 101.28
100 YR DHW
EL. 92.0
NHW
S 80°17'36" E
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
430468-1-58-01
PROJECT LOCATION
PROFILE GRADE
PROFILE
EXISTING
STA. 22+31.13
END BRIDGE
STA. 21+15.96
BEGIN BRIDGE
NO. 484029
EXISTING BRIDGE
STA. 22+31.13
END BRIDGE
GRADE
PROFILE
GRADE
PROPOSED
GRADE
PROPOSED
LIMITS OF PROPOSED RIPRAP
LIMITS OF PROPOSED RIPRAP
¡ CONST. & PGL
STA. 21+15.96
BEGIN BRIDGE
21 22 23
21+00 22+00 23+00
1" = 10' VERT.
SCALE: 1" = 30' HORIZ.
TIMBER
725 SF
23'-7"
98.58'
5 @ 15'
75'-4"
TIMBER
NO RECORD
NO RECORD
NO RECORD
NO RECORD
NO RECORD
N/AN/A
6.34
4.0
25 100
1.0
101.28
6.76
103.33
0.2
21+15.96 22+31.13 20°
83.74 84.57
36.33' 36.33'
N/A 10' 2'
RIPRAP (BANK & SHORE)
10'
1V:2H
RIPRAP (BANK & SHORE)
10'
1V:2H
800 SF
36'-8"
NOT TO SCALE
BRUSH
Y CREEK
EKN 09-19
EKN 09-19
WLA 09-19
WLA 09-19
E L
.0
DRAINS TO WEST END OF BRIDGE
NON-BURRIED NON-BURRIED
N/A
92.0
92.0
500100
N/A
X
92.0
CONCRETE
CONCRETE
99.66
2 & 3 24" CONCRETE PILES
101.28
45.4' LT, 47.4' RT 44.4' LT, 47.4' RT
12.21'
E L
.4
104.13'
I N
T
B E
N T
I N
T
B E
N T
115'-2"
38'-5", 38'-4", 38'-5"
2.93
101.28
103.33
7.36
ESCAMBIA COUNTY
FAX: (813) 435-2601
PHONE: (813) 435-2600
WESLEY CHAPEL, FL 33544
2818 CYPRESS RIDGE BLVD. SUITE 200
CONSOR ENGINEERS, LLC
P.E. LICENSE NUMBER 79361
ERIC K. NELSON, P.E.
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
2 LANES @ 10'-11" = 21'-10"
CURB
" ±4 11'-1
CURB
" ±4 11'-1
£ SURVEY
PHASE I CONSTRUCTION
28'-6"
£ SURVEY
2'-3"2 LANES @ 12'-0" = 24'-0"2'-3"
28'-6" OUT-TO-OUT
T E
M P
C O
N S
T
E A
S E
M E
N T
T E
M P
C O
N S
T
E A
S E
M E
N T
¡ DETOUR
¡ DETOUR
40'-0" MIN.VARIES (61'-0½" TO 61'-8½")
40'-0" MIN.VARIES (61'-0½" TO 61'-8½")
30'-3"25'-5" ± OUT-TO-OUT
30'-3"
PHASE II DEMOLITION
25'-5" ±
(20'-10" MIN.)
VARIES
(20'-10" MIN.)
VARIES
(TO PROP. R/W LINE)
64'-9½" MIN.
(TO PROP. R/W LINE)
75'-1½" MIN.
(TO PROP. R/W LINE)
64'-9½" MIN.
(TO PROP. R/W LINE)
75'-1½" MIN.
RAILING
1'-4"
RAILING
1'-4"
15'-0"36'-8" OUT-TO-OUT 28'-6"
£ SURVEY ¡ CONST. & PGL
2'-3"2 LANES @ 12'-0" = 24'-0"2'-3"
T E
M P
C O
N S
T
E A
S E
M E
N T
(8'-8½" TO 9'-4½")
VARIES ¡ DETOUR
(TO PROP. R/W LINE)
74'-2" MIN.
(TO PROP. R/W LINE)
66'-5" MIN.
40'-0" MIN.52'-4" MIN.
(20'-10" MIN.)
VARIES
SHLDR.
5'-0"
2 LANES @ 12'-0" = 24'-0"
SHLDR.
5'-0"
RH 12-23
CB 11-23
RH 12-23
BRIDGE NO. 484299
JV 11-23
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
ROAD NO. COUNTY FINANCIAL PROJECT ID
REVISIONS
5chambm 3/5/2024 9:57:14 AM c:\pw_work\american-pw-01\dms03975\B1ConstSeq01.dgn
PACE, FL 32571
4489 WOODBINE ROAD
CONSOR ENGINEERS, LLC
P.E. LICENSE NUMBER 70045
B1-6
CONSTRUCTION SEQUENCE
(BRIDGE AND APPROACH SLABS)
PHASE I CONSTRUCTION
(BRIDGE AND APPROACH SLABS)
PHASE II DEMOLITION PHASE II TRAFFIC
(TEMPORARY BRIDGE AND APPROACH SLABS)
(TEMPORARY BRIDGE AND APPROACH SLABS)
EXISTING BRIDGE AND PHASE I TRAFFIC
2. CONSTRUCT TEMPORARY BRIDGE.
BRIDGE.
1. MAINTAIN TRAFFIC ON EXISTING
PHASE I TRAFFIC & CONSTRUCTION:
2. DEMOLISH EXISTING BRIDGE.
BRIDGE.
1. SHIFT TRAFFIC ONTO TEMPORARY
PHASE II TRAFFIC & DEMOLITION:
PHASE II TRAFFIC
(BRIDGE AND APPROACH SLABS)
PHASE II CONSTRUCTION AND FINAL CONFIGURATION
(TEMPORARY BRIDGE AND APPROACH SLABS)
4. REMOVE TEMPORARY BRIDGE.
3. SHIFT TRAFFIC TO NEW BRIDGE.
2. CONSTRUCT NEW BRIDGE.
BRIDGE.
1. MAINTAIN TRAFFIC ON TEMPORARY
FINAL CONFIGURATION:
PHASE II TRAFFIC, CONSTRUCTION &SLOPE: 0.02 FT/FT SLOPE: 0.02 FT/FT
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
(TYP.)
4'-6"(T Y P
(TYP.)
COPING
(TYP.)
PLANS NO. 630-010)
(FDOT STANDARD
3-2" � CONDUITS
(TYP.)
FSB 12 X 54
OF FLANGES
GAP AT TOP
MIN.
"4
M A
X
M I N
(TYP.)
TOP OF FLANGE
(TYP.)
FSB FLANGE
(SEE NOTES)
BACKER ROD
C .I .P
T O
P P I N
G
M I N
C.I.P. TOPPING
"4
(TYP.)
WORKING POINT
SEE SHEET B1-20
FOR DETAIL AT COPING,
ROD DETAILS, THIS SHEET
SEE GAP AND BACKER
36'-8" OUT-TO-OUT
18'-4"18'-4"
RAILING
1'-4"
SHOULDER
5'-0"
RAILING
1'-4"
66'-5" MIN. (TO PROPOSED R/W LINE)74'-2" MIN. (TO PROPOSED R/W LINE)
¡ CONST. & PGL
(TYP.)
(FDOT STANDARD PLANS NO. 521-427)
TRAFFIC RAILING (36" SINGLE-SLOPE)
NO. 450-451) (TYP.)
(FDOT STD. PLANS
FSB 12 X 54
RH 12-23
CB 11-23
RH 12-23
BRIDGE NO. 484299
JV 11-23
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
ROAD NO. COUNTY FINANCIAL PROJECT ID
REVISIONS
5chambm 3/5/2024 9:57:15 AM c:\pw_work\american-pw-01\dms03975\B1TypicalSection01.DGN
PACE, FL 32571
4489 WOODBINE ROAD
CONSOR ENGINEERS, LLC
P.E. LICENSE NUMBER 70045
LEAHANN E. POWELL, P.E.
B1-7
TYPICAL SECTION
SECTION THROUGH BRIDGE
GAP DETAIL BACKER ROD DETAIL
PLACEMENT.
4. THE BACKER ROD MAY REMAIN IN PLACE AFTER TOPPING CONCRETE
COMPATIBLE CONSTRUCTION ADHESIVE.
TOPPING CONCRETE PLACEMENT AND TO BE MORTAR TIGHT USING A
3. SECURE THE BACKER ROD TO PREVENT DISPLACEMENT DURING
SHOWN IN THE BACKER ROD DETAIL.
2. INSTALL THE BACKER ROD FROM THE TOP DOWN TO THE POSITION
FLANGES AS SHOWN IN THE BACKER ROD DETAIL.
BETWEEN ADJACENT FSB'S. MEASURE GAP AT THE TOP OF THE
LARGER THAN THE FIELD VERIFIED MAXIMUM WIDTH OF THE GAP
TYPES 1 OR 3, WITH A MINIMUM UNCOMPRESSED DIAMETER 50%
ROD MEETING THE REQUIREMENTS OF ASTM C1330 OR ASTM D5249,
TOPPING AT THE GAP BETWEEN ADJACENT FSB'S. USE A BACKER
1. USE A BACKER ROD TO FORM THE BOTTOM OF THE CAST-IN-PLACE
BACKER ROD NOTES:
SLOPE: 0.02 FT/FTSLOPE: 0.02 FT/FT
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
SHORELINE
SHORELINE
(TYP.)
WETLAND LINE
P I L E
S
P A
C I N
G
T
Y P I C
A L
A
T
E
N D
B
E N
T S
¡ CONST. & PGL
B-1
B-2
CONCRETE PILE (TYP.)
24" SQ. PRESTRESSED
P I L E
S
P A
C I N
G
T
Y P I C
A L
A
T
I N
T
B E
N T S
9"
9"
(T O
P
R O
P
R
W
L I N
E
M I N
(T O
T
C E
M I
(T
P
R O
P
R
W
L I N
E
M I N
BY OTHERS)
(TO BE RELOCATED
EXISTING W
BY OTHERS)
(TO BE RELOCATED
EXISTING BT
"2
S
P A
"2
S
P A
S
P A
S
P A
RH 12-23
CB 11-23
RH 12-23
BRIDGE NO. 484299
JV 11-23
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
ROAD NO. COUNTY FINANCIAL PROJECT ID
REVISIONS
5chambm 3/5/2024 9:57:17 AM c:\pw_work\american-pw-01\dms03975\B1FoundLay01.dgn
PACE, FL 32571
4489 WOODBINE ROAD
CONSOR ENGINEERS, LLC
P.E. LICENSE NUMBER 70045
B1-8
FOUNDATION LAYOUT
21 22
OF STATIONING
DIRECTION
(TYP.)
70°00'00"
S 80°17'36" E
STA. 21+15.96
BEGIN BRIDGE
STA. 22+31.13
END BRIDGE
DENOTES APPROXIMATE SOIL BORING LOCATION
DENOTES EXISTING PILE
DENOTES TEST PILE
DENOTES PILE
LEGEND:
STA. 21+54.38
¡ INT. BENT 2
STA. 21+92.71
¡ INT. BENT 3
PLAN
FOR PILE DATA TABLE AND NOTES, SEE SHEET B1-9.
CROSS REFERENCE:
EXPENSE AND AT NO ADDITIONAL COST TO THE DEPARTMENT.
LOCATION. ANY COST TO REVISE THE CAP SHALL BE AT THE CONTRACTOR'S
BE COMPLETELY EXTRACTED THE CONTRACTOR MAY SUBMIT A REVISED PILE
PILES SHALL BE COMPLETELY REMOVED. IF PILES ARE BROKEN AND CANNOT
TO 2'-0" BELOW EXISTING GROUND. ANY PILE IN CONFLICT WITH PROPOSED
EXISTING PILES NOT IN CONFLICT WITH PROPOSED PILES SHALL BE REMOVED
NOTE:
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
RH 12-23
CB 11-23
RH 12-23
BRIDGE NO. 484299
JV 11-23
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
ROAD NO. COUNTY FINANCIAL PROJECT ID
REVISIONS
5chambm 3/5/2024 9:57:19 AM c:\pw_work\american-pw-01\dms03975\B1PileData01.DGN
PACE, FL 32571
4489 WOODBINE ROAD
CONSOR ENGINEERS, LLC
P.E. LICENSE NUMBER 70045
LEAHANN E. POWELL, P.E.
PILE DATA TABLE
B1-9
DESIGN CRITERIAINSTALLATION CRITERIA
(IN.)
SIZE
PILE
(TONS)
RESISTANCE
BEARING
NOMINAL
(FT.)
ELEVATION
TIP
MINIMUM
(FT.)
ELEVATION
JET
REQUIRED
(FT.)
ELEVATION
PREFORM
REQUIRED
(TONS)
LOAD
DESIGN
FACTORED
(TONS)
DRAG
DOWN
(TONS)
RESISTANCE
SCOUR
TOTAL
(TONS)
RESISTANCE
SCOUR
NET
(FT.)
ELEVATION
SCOUR
100-YEAR
(TONS)
LOAD
UPLIFT
DESIGN
FACTORED
Ø
M P
R E
S S I O
N
(TONS)
RESISTANCE
UPLIFT
NOMINAL
Ø
P
L I F
T
NUMBER
BENT
or
PIER
24"
TABLE DATE 01/01/16
N/A N/A N/A N/A 0.75
PILE DATA TABLE
PILE CUT-OFF ELEVATIONS
END BENT 1 N/A
24" N/A 0.75N/A N/A
ALL PILES
202INT. BENT 2
N/A
N/A
N/A
N/A
24" N/A 0.75 N/AN/A N/A202INT. BENT 3 N/A N/A
24" N/A N/A N/A N/A 0.75 N/AN/A155 N/A N/AEND BENT 4
83.74
83.74
102.2
102.0
102.3
102.4
N/A
N/A24
PILE INSTALLATION NOTES:
(FT.)
LENGTH
PILE
TEST
Ø
≤ NOMINAL BEARING RESISTANCE
FACTORED DESIGN LOAD + NET SCOUR RESISTANCE + DOWN DRAG
100-YEAR SCOUR ELEVATION: ESTIMATED ELEVATION OF SCOUR DUE TO THE 100 YEAR STORM EVENT.
ELEVATION.
PROVIDED BY THE SOIL FROM THE REQUIRED PREFORMED OR JETTING ELEVATION TO THE SCOUR
NET SCOUR RESISTANCE: AN ESTIMATE OF THE ULTIMATE STATIC SIDE FRICTION RESISTANCE
PROVIDED BY THE SCOURABLE SOIL.
TOTAL SCOUR RESISTANCE: AN ESTIMATE OF THE ULTIMATE STATIC SIDE FRICTION RESISTANCE
100 YEAR SCOUR ELEVATION TO RESIST PULLOUT OF THE PILE.
UPLIFT RESISTANCE: THE ULTIMATE SIDE FRICTION CAPACITY THAT MUST BE OBTAINED BELOW THE
FOR FOUNDATION LAYOUT, SEE SHEET B1-8.
CROSS REFERENCE:
9. FOR PILE GROUPS, PILE DRIVING IS TO COMMENCE AT THE CENTER OF THE GROUP AND PROCEED OUTWARD.
CHECKS. END BENT PILES SHALL NOT BE DRIVEN BELOW EL. 56.00 TO AVOID PENETRATION OF THE ARTESIAN LAYER.
8. END BENT PILES SHALL BE DRIVEN PRIOR TO INTERMEDIATE BENT PILES TO ALLOW PILES TO SET BEFORE ANTICIPATED SET
SHALL BE PERFORMED AT LEAST SEVEN (7) DAYS AFTER INITIAL DRIVING.
SET CHECKS SET CHECKS AND RESTRIKES MAY BE NEEDED TO ACHIEVE THE REQUIRED NBR AND SHOULD BE ANTICIPATED.
RESISTANCE POTENTIAL (BLOW COUNTS) DURING INITIAL DRIVING DUE TO INCREASES IN PORE PRESSURES DURING DRIVING.
7. BECAUSE OF THE CLAY SOILS ENCOUNTERED IN THE BORINGS, ALL PILES MAY NOT OBTAIN THEIR FULL DYNAMIC
MINIMUM 1 PER BENT.
ADDITIONAL COST. WHEN USING EMBEDDED GAUGES FOR DYNAMIC TESTING, TIP GAUGES ARE REQUIRED IN 10% OF THE PILES, CONDITIONS ENCOUNTERED ARE ANALYZED. DYNAMIC TESTING OF PRODUCTION PILES AS SPECIFIED SHALL BE PROVIDED AT NO
6. ALL PILES SHALL BE DYNAMICALLY TESTED IN ACCORDANCE WITH FDOT SPECIFICATIONS SECTION 455. ENSURE ALL SOIL
THE PILES FULL DEPTH.
. BORING LOGS AND REQUIRED NBR VALUES SHALL BE REVIEWED IN ORDER TO SELECT AN APPROPRIATE HAMMER THAT CAN DRIVE 5
4. NO JETTING WILL BE ALLOWED WITHOUT APPROVAL OF THE ENGINEER.
3. MINIMUM TIP ELEVATION IS REQUIRED FOR LATERAL STABILITY.
2. CONTRACTOR TO VERIFY LOCATION OF ALL UTILITIES PRIOR TO ANY PILE INSTALLATION ACTIVITIES.
455-002, 455-003 AND 455-024).
1. ALL PILES SHALL BE 24" SQ. PRESTRESSED CONCRETE PILES AND SHALL BE DRIVEN PLUMB (FDOT STANDARD PLANS NO. 455-001, F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
4-8E3 2-8E82-8E7
4-8E2
B/W PILES)
2-8E6 (TYP.
"8 71'-0"8
711-6E1 @ 4'-0" MAX. = 37'-3"2
(W I N
G
"A
(W I N
G
"B
"4 139'-1
"8 140'-2
"2 119'-8"8
520'-5
"4 32'-10"2
18'-6"4 18'-3
"4
PILE SPACING
(TYP.)
70°00'00"
STA. 21+15.96
BEGIN BRIDGE
¡ CONST. & PGL
BEAM SPACING
APPROACH SLAB
OUTLINE OF
¡ CONST. & PGL
MATERIAL (TYP.)
½" PREMOLDED EXP.
EL. 104.432 EL. 105.697
(TYP.)
6E1 DOWELS
PILE (TYP.)
24" CONC.
EL. 105.737
EL. 104.085
6E1 DOWELS
¡ CAP & ¡ PILES
¡ BRG.
"8 52'-11"8
73 SPACES @ 4'-10"4
12'-0"8
52'-10"8
73 SPACES @ 4'-10"8
32'-10
EL. 104.045
OR 6E11
1'-6"
"8
1'-6"
(TYP. B/W PILES)
" MAX.2
18-6E9 @ 10
1'-6" 9"9"
6E11 or 6E12
1'-6"
1-8E4 (EF)
1-5E5 (EF)
1'-0"
1'-0"
"2
"2
"2
12 SPACES @ 8'-6"8
33'-1
RH 12-23
CB 11-23
RH 12-23
BRIDGE NO. 484299
JV 11-23
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
ROAD NO. COUNTY FINANCIAL PROJECT ID
REVISIONS
5chambm 3/5/2024 9:57:21 AM c:\pw_work\american-pw-01\dms03975\B1EndBent01.DGN
PACE, FL 32571
4489 WOODBINE ROAD
CONSOR ENGINEERS, LLC
P.E. LICENSE NUMBER 70045
B1-10
END BENT 1
F
S B
PLAN
STATIONING
DIRECTION OF
B
B
(LEVEL)
EL. 101.045
A
A
F
S B
F
S B
F
S B
F
S B
F
S B
F
S B
F
S B
ELEVATION
***8-6E10 @ 10½" MAX. (LAP WITH 6E9) (TYP. BETWEEN PILES)
WITHIN LIMITS OF BARS 8E2)
**3-6E13 @ 9" (TYP. OVER PILES) AND 3-6E10 @ 9" (ONLY REQUIRED
*FOR CORNER REINFORCEMENT DETAILS, SEE SHEETS B1-13 AND B1-14
5. FOR REINFORCING BAR LIST, SEE SHEET B1-26.
4. FOR WING "B" DETAILS, SEE SHEET B1-14.
3. FOR WING "A" DETAILS, SEE SHEET B1-13.
2. FOR SECTIONS A-A AND B-B, SEE SHEET B1-12.
1. FOR FOUNDATION LAYOUT, SEE SHEET B1-8.
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
"8 71'-0"8
711-6E1 @ 4'-0" MAX. = 37'-3"2
"4 139'-1
"8 140'-2
"2 119'-8"8
520'-5
"4 32'-10"2
18'-6"4 18'-3
"4
PILE SPACING
(TYP.)
70°00'00"
¡ CONST. & PGL
BEAM SPACING
6E1 DOWELS
¡ CAP & ¡ PILES
¡ BRG.
"8 52'-11"8
73 SPACES @ 4'-10"4
12'-0"8
52'-10"8
73 SPACES @ 4'-10"8
32'-10
STA. 22+31.13
END BRIDGE
4-8E3 2-8E82-8E7
4-8E2
B/W PILES)
2-8E6 (TYP.
APPROACH SLAB
OUTLINE OF
¡ CONST. & PGL
MATERIAL (TYP.)
½" PREMOLDED EXP.
EL. 104.777 EL. 106.083
(TYP.)
6E1 DOWELS
PILE (TYP.)
24" CONC.
EL. 106.043
EL. 104.390 EL. 104.431
OR 6E11
1'-6"
" MAX.2
18-6E9 @ 10
6E11 or 6E12
1'-6"
1-8E4 (EF)
1-5E5 (EF)
(W I N
G
"A
1'-0"
"2
(W I N
G
"B
"2
1'-0"
"2
12 SPACES @ 8'-6"8
33'-1
RH 12-23
CB 11-23
RH 12-23
BRIDGE NO. 484299
JV 11-23
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
ROAD NO. COUNTY FINANCIAL PROJECT ID
REVISIONS
5chambm 3/5/2024 9:57:23 AM c:\pw_work\american-pw-01\dms03975\B1EndBent02.DGN
PACE, FL 32571
4489 WOODBINE ROAD
CONSOR ENGINEERS, LLC
P.E. LICENSE NUMBER 70045
B1-11
END BENT 4
F
S B
PLAN
F
S B
F
S B
F
S B
F
S B
F
S B
F
S B
F
S B
ELEVATION
***8-6E10 @ 10½" MAX. (LAP WITH 6E9) (TYP. BETWEEN PILES)
WITHIN LIMITS OF BARS 8E2)
**3-6E13 @ 9" (TYP. OVER PILES) AND 3-6E10 @ 9" (ONLY REQUIRED
*FOR CORNER REINFORCEMENT DETAILS, SEE SHEETS B1-13 AND B1-14
5. FOR REINFORCING BAR LIST, SEE SHEET B1-26.
4. FOR WING "B" DETAILS, SEE SHEET B1-14.
3. FOR WING "A" DETAILS, SEE SHEET B1-13.
2. FOR SECTIONS A-A AND B-B, SEE SHEET B1-12.
1. FOR FOUNDATION LAYOUT, SEE SHEET B1-8.
CROSS REFERENCE:
STATIONING
DIRECTION OF
B
B
(LEVEL)
EL. 101.387
A
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
2'-6"1'-0"
"2 11'-3"2
11'-2"8 15"8
EXP. JT.
2"
BRIDGE
BEGIN/END
(T Y P
¡ BRG.
APPROACH SLAB
FSB 12 X 54
C.I.P. TOPPING
V
A R I E
S
T O
(B O
T T
O M
C
L
(TOP & SIDES)
4" CL.
"4 15"2
12'-7"4
3'-6"
9"2'-0"9"
¡ PILES
¡ CAP &
8E2 (TYP. TOP ROW)
8E3 (TYP. UNO)
DOWELS
6E1
2'-6"1'-0"
"2 11'-3"2
11'-2"8 15"8
BRIDGE
BEGIN/END
C.I.P. TOPPING
FSB 12 X 54
APPROACH SLAB
V
A R I E
S
T O
(B O
T T
O M
C
L
3'-6"
¡ PILES
¡ CAP &
6E13
(TOP & SIDES)
4" CL.
EXP. JT.
2"
6E1 DOWELS
8E4 (EF)
¡ BRG.
5E5 (EF)
OR 8E8
8E6, 8E7
WITH 6E9)
#6E10 (LAP
WITH 6E9)
#6E10 (LAP
M I N
5¼"
6"
3 SPACES @ 10½"
3 SPACES @ 10"
5¼"
6"
5E5 (EF)
6E13
8E4 (EF)
8E2 (TYP. TOP ROW)
8E3 (TYP. UNO)
RH 12-23
CB 11-23
RH 12-23
BRIDGE NO. 484299
JV 11-23
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
ROAD NO. COUNTY FINANCIAL PROJECT ID
REVISIONS
5chambm 3/5/2024 9:57:25 AM c:\pw_work\american-pw-01\dms03975\B1EndBentDet01.DGN
PACE, FL 32571
4489 WOODBINE ROAD
CONSOR ENGINEERS, LLC
P.E. LICENSE NUMBER 70045
B1-12
END BENT DETAILS (1 OF 3)
SECTION A-A
SECTION B-B
BARS 8E4, 8E6, 8E7 & 8E8
BARS 8E2 & 8E3
2. FOR REINFORCING BAR LIST, SEE SHEET B1-26.
1. FOR LOCATIONS OF SECTIONS A-A AND B-B, SEE SHEETS B1-10 AND B1-11.
CROSS REFERENCE:
#BARS 6E10 ARE ONLY REQUIRED WITHIN LIMITS OF BARS 8E2
***VARIES (1¼" TO 5Ɔ")
**PREMOLDED EXPANSION MATERIAL TO BE PLACED ON BOTH SIDES OF THE BEARING PAD
*BEARING PAD, SEE SHEET B1-21
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
1'-0"
4W2
*4W3
4W1 (EF)
W
(E
F
W
M A
X (E
F
(B O
T T
O M
C
L
4W1
(TOP & SIDES)
4" CL.
6'-6"
PILE
BRIDGE
BEGIN/END
END BENT CAP
"4
147-4W1 @ 1'-0" MAX. (EF)"4
4W2
(TYP.)
"2
(TYP.)
"8
WING "A"
8E4
8E4
E
(T Y P
C L
6'-6"
(LEVEL)
EL. "A"
6E11
6E9
6E11
(T Y P
C L
"8 72'-7"4
31'-0"8 32'-9
¾ (E
N D
B
E N
T
(E
N D
B
E N
T
¾ (E
N D
B
E N
T
(E
N D
B
E N
T
RH 12-23
CB 11-23
RH 12-23
BRIDGE NO. 484299
JV 11-23
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
ROAD NO. COUNTY FINANCIAL PROJECT ID
REVISIONS
5chambm 3/5/2024 9:57:27 AM c:\pw_work\american-pw-01\dms03975\B1EndBentDet02.DGN
PACE, FL 32571
4489 WOODBINE ROAD
CONSOR ENGINEERS, LLC
P.E. LICENSE NUMBER 70045
B1-13
END BENT DETAILS (2 OF 3)
C
WING "A" ELEVATION
SECTION C-C
(TYP.)
70°00'00"
WING "A" LAYOUT
WING "A" PLAN
(SEE WING "A" LAYOUT FOR GENERAL DIMENSIONS)
(SEE WING "A" LAYOUT FOR GENERAL DIMENSIONS)
CORNER REINFORCEMENT DETAIL (WING "A")
LOCATION "A" "B"
TABLE OF ELEVATIONS
END BENT 1
END BENT 4
105.737 101.045
106.043 101.387
(LEVEL)
EL. "B"
2. FOR REINFORCING BAR LIST, SEE SHEET B1-26.
1. FOR LOCATION OF WING "A", SEE SHEETS B1-10 AND B1-11.
CROSS REFERENCE:
*LAP WITH 8E3, 8E4 AND 5E5
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
1'-0"
4W4
4W1 (EF)
W
(E
F
W
M A
X (E
F
(B O
T T
O M
C
L
4W1
(TOP & SIDES)
4" CL.
"4 32'-9"4
31'-0"2 12'-3
6'-2"
PILE
END BENT CAP
"4
14 7-4W1 @ 1'-0" MAX. (EF) "4
4W4
(T Y P
C L
(TYP.)
"8
(TYP.)
"2
WING "B"
8E4
E
(T Y P
C L
6'-2"
BRIDGE
BEGIN/END
6E12
6E9
8E4
*4W5
(LEVEL)
EL. "A"
6E11
¼ (E
N D
B
E N
T
(E
N D
B
E N
T
¼ (E
N D
B
E N
T
(E
N D
B
E N
T
RH 12-23
CB 11-23
RH 12-23
BRIDGE NO. 484299
JV 11-23
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
ROAD NO. COUNTY FINANCIAL PROJECT ID
REVISIONS
5chambm 3/5/2024 9:57:28 AM c:\pw_work\american-pw-01\dms03975\B1EndBentDet03.DGN
PACE, FL 32571
4489 WOODBINE ROAD
CONSOR ENGINEERS, LLC
P.E. LICENSE NUMBER 70045
B1-14
END BENT DETAILS (3 OF 3)
WING "B" ELEVATION
SECTION D-D
WING "B" LAYOUT
WING "B" PLAN
(SEE WING "B" LAYOUT FOR GENERAL DIMENSIONS)
(SEE WING "B" LAYOUT FOR GENERAL DIMENSIONS)
CORNER REINFORCEMENT DETAIL (WING "B")
D
LOCATION "A" "B"
TABLE OF ELEVATIONS
END BENT 1
END BENT 4
105.697 101.045
106.083 101.387
(TYP.)
70°00'00"
2. FOR REINFORCING BAR LIST, SEE SHEET B1-26.
1. FOR LOCATION OF WING "B", SEE SHEETS B1-10 AND B1-11.
CROSS REFERENCE:
*LAP WITH 8E3, 8E4 AND 5E5
(LEVEL)
EL. "B"
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
¡ INT. BENT 3 STA. 21+92.71
¡ INT. BENT 2 STA. 21+54.38
¡ CONST. & PGL
4-8C1
4-8C2
2-8C6
EL. "A"
2-8C6
EL. "C"
PILE SPACING
BEAM SPACING
20'-3"20'-3"
40'-6"
BEAM SPACING
¡ BRG.
¡ BRG.
¡ PILES
¡ CAP &
¡ CONST. & PGLEL. "B"
3'-9"2 SPACES @ 8'-3"2 SPACES @ 8'-3"3'-9"
(EF)1-8C3
PILE (TYP.)
24" CONC.B/W PILES)
2-8C5 (TYP.
"4 14 "4
11" MAX.
4-5C7 @
11" MAX.
4-5C7 @
7-5C7 @ 11" MAX.
1-5C4 (EF)
2'-8""8
73 SPACES @ 4'-10"8
32'-10"2 12'-0"8
73 SPACES @ 4'-10"8
73'-5
"8 73'-5"8
73 SPACES @ 4'-10"2
12'-0"8
32'-10"8
73 SPACES @ 4'-102'-8"
RH 12-23
CB 11-23
RH 12-23
BRIDGE NO. 484299
JV 11-23
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
ROAD NO. COUNTY FINANCIAL PROJECT ID
REVISIONS
5chambm 3/5/2024 9:57:30 AM c:\pw_work\american-pw-01\dms03975\B1IntBent01.DGN
PACE, FL 32571
4489 WOODBINE ROAD
CONSOR ENGINEERS, LLC
P.E. LICENSE NUMBER 70045
LEAHANN E. POWELL, P.E.
PLAN
STATIONING
DIRECTION OF
(LEVEL)
EL. "D"
TABLE OF ELEVATIONS
EL. "A" EL. "B" EL. "C"BENT NO.
EL. "D"
F
S B
F
S B
F
S B
F
S B
F
S B
F
S B
F
S B
F
S B
F
S B
F
S B
F
S B
F
S B
F
S B
F
S B
F
S B
F
S B
ELEVATION
3. FOR REINFORCING BAR LIST, SEE SHEET B1-26.
2. FOR SECTIONS A-A AND B-B, SEE SHEET B1-16.
1. FOR FOUNDATION LAYOUT, SEE SHEET B1-8.
CROSS REFERENCE:
***7-5C8 @ 11" MAX. (LAP WITH 5C7) (TYP. BETWEEN PILES)
3-5C9 @ 9" (TYP. OVER PILES)
**3-5C8 (ONLY REQUIRED WITHIN LIMITS OF BARS 8C1) AND
*70°00'00" (TYP.)
B1-15
INTERMEDIATE BENTS 2 AND 3
104.161
104.276
104.547
104.662
104.201
104.316
101.157
101.272
A
B
BA
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
"8 15"4
32'-10"8
3'-9"
"2 1102'-0""2
¡ PILES
¡ CAP &
5C4 (EF)
8C1 (TYP. TOP ROW)
8C2 (TYP. UNO)
3'-9"
¡ PILES
¡ CAP &
(TYP.)
4" CL.
5C9
EXP. JT.
2"
"2 11'-1"2
11'-1
¡ BRG.
¡ BRG.
C.I.P. TOPPING (TYP.)
(TYP.)
FSB 12 X 54
8C3 (EF)
8C6
8C5 OR
EXP. JT.
2"
"2 11'-1"2
11'-1
¡ BRG.
¡ BRG.
C.I.P. TOPPING (TYP.)
(TYP.)
FSB 12 X 54
M I N
WITH 5C7)
#5C8 (LAP
WITH 5C7)
#5C8 (LAP
V
A R I E
S
T O
V
A R I E
S
T O
(TYP.)
4" CL.
5C4 (EF)
8C1 (TYP. TOP ROW)
8C2 (TYP. UNO)
5C9
8C3 (EF)
5ƃ"
5Ɔ"
3 SPACES @ 11ƅ" (-)
3 SPACES @ 11ƃ" (-)
5ƃ"
5Ɔ"
RH 12-23
CB 11-23
RH 12-23
BRIDGE NO. 484299
JV 11-23
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
ROAD NO. COUNTY FINANCIAL PROJECT ID
REVISIONS
5chambm 3/5/2024 9:57:32 AM c:\pw_work\american-pw-01\dms03975\B1IntBentDet01.DGN
PACE, FL 32571
4489 WOODBINE ROAD
CONSOR ENGINEERS, LLC
P.E. LICENSE NUMBER 70045
B1-16
INTERMEDIATE BENT DETAILS
SECTION A-A
SECTION B-B
BARS 8C3, 8C5 & 8C6
BARS 8C1 & 8C2
2. FOR REINFORCING BAR LIST, SEE SHEET B1-26.
1. FOR LOCATIONS OF SECTIONS A-A AND B-B, SEE SHEET B1-15.
CROSS REFERENCE:
#BARS 5C8 ARE ONLY REQUIRED WITHIN LIMITS OF BARS 8C1
***VARIES (½" TO 5ƃ")
**PREMOLDED EXPANSION MATERIAL TO BE PLACED ON BOTH SIDES OF THE BEARING PAD
*BEARING PAD, SEE SHEET B1-21
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
4'-6"
"STRANDS (TYP.)
COLUMN OF
¡ OUTERMOST
9"
@ 2"
3 SPA.
6"
6 SPA. @ 2"
6"
@ 2"
3 SPA.
9"
CB 11-23
RH 12-23
BRIDGE NO. 484299
JV 11-23
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
ROAD NO. COUNTY FINANCIAL PROJECT ID
REVISIONS
$USER$ $DATE$ $TIME$ $FILE$
PACE, FL 32571
4489 WOODBINE ROAD
CONSOR ENGINEERS, LLC
P.E. LICENSE NUMBER 70045
B1-17
FLORIDA SLAB BEAM TABLE OF BEAM VARIABLES
CLASS
CONCRETE PROPERTIES
(psi)
STRENGTHS
28 Day Release
TYPE
PTRN.
STND.
END
CASE
PLAN VIEW
END
END 1 END 2 DIM. W
REINFORCING STEEL
ANGLE Ø
TABLE DATE 01-01-16
VI 8500 6000 1 2 2 70° 70°
NO.
SPAN
LOCATION
VI 8500 6000 1 2 2 70° 70°
1 & 8
2 - 7
NO.
BEAM
FLORIDA SLAB BEAM - TABLE OF BEAM VARIABLES
BEAM TYPE
DIM. L DIM. R
*BEAM DIMENSIONS
4D1 4D2
DIM. D DIM. DDIM. C
3C
NO. DIM. DNO.
4D3
4'-4"
DIM. ENO.
5E1
DIM. ENO.
5E2 6Y1 6Y2
3'-4" 3'-4"
3'-4"3'-4"
DIM. YDIM. Y
4K
NO.
SPACES
NO. OF BAR
S1 S2 V1 V2
*BAR SPACING
1 - 3
1 - 3 FSB 12 X 54
FSB 12 X 54
4'-6"
4'-6"
"8
"8
"2 14'-1
"2 14'-1
32 74
74 "2 14'-2 11
TYPE 1 19 STRANDS
STRAND PATTERN
44.00 KIPS EACH. AREA PER STRAND EQUALS 0.217 SQ. IN.
LOW RELAXATION CARBON STEEL STRANDS STRESSED AT
STRAND DESCRIPTION: USE 0.6" DIAMETER, GRADE 270,
TYPE 1 STRAND DEBONDING LEGEND:
- FULLY BONDED STRANDS
"4 137'-1
"4 137'-1
9"
9"
STANDARD PLANS NOS. 450-450 AND 450-451.
3. FOR FLORIDA SLAB BEAM TYPICAL DETAILS AND NOTES, SEE FDOT
2. FOR BEARING PAD DETAILS AND NOTES, SEE SHEET B1-21.
1. FOR CAMBER, DEFLECTION AND TOPPING DETAILS, SEE SHEET B1-18.
CROSS REFERENCE:
¡ BEAM. DIM. "R" IS CALCULATED AT MID-HEIGHT OF THE BEAM.
SINGLE ASTERISK (*) ARE MEASURED ALONG THE TOP OF THE BEAM AT
*ALL LONGITUDINAL BEAM DIMENSIONS SHOWN ON THIS SHEET WITH A
"8 32'-1
"8 32'-1
"8 32'-1
"8 32'-1
2'-3"
2'-3"
"8
"8
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
(TYP.)
BARS 4V
(TYP.)
BARS 4S
(TYP.)
4'-6"
3" 3"51-5S1 @ 9" MAX.
(T O
P
C
L
(SIDES)
2" CL.
¡ SPAN
D I
M
F
D I
M
B
D I
M
D
D I
M
C
TOP OF C.I.P. TOPPING
FINISH GRADE AND
TOP OF FSB ¡ SPAN
SPAN
BEGIN
SPAN
END
SEE SHEET B1-20
FOR DETAIL AT POCKETS,
(T Y P
(TYP.)
COPING
(TYP.)
PLANS NO. 630-010)
(FDOT STANDARD
3-2" � CONDUITS
C .I .P
T O
P P I N
G
M I N
SEE SHEET B1-20
FOR DETAIL AT COPING,
36'-8" OUT-TO-OUT
18'-4"18'-4"
RAILING
1'-4"
5'-0"
RAILING
1'-4"
¡ CONST. & PGL
(TYP.)
(FDOT STANDARD PLANS NO. 521-427)
TRAFFIC RAILING (36" SINGLE-SLOPE)
NO. 450-451) (TYP.)
(FDOT STD. PLANS
FSB 12 X 54
OR 5S4
5S2, 5S3
RH 12-23
CB 11-23
RH 12-23
BRIDGE NO. 484299
JV 11-23
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
ROAD NO. COUNTY FINANCIAL PROJECT ID
REVISIONS
5chambm 3/5/2024 9:57:36 AM c:\pw_work\american-pw-01\dms03975\B1TypicalSection02.DGN
PACE, FL 32571
4489 WOODBINE ROAD
CONSOR ENGINEERS, LLC
P.E. LICENSE NUMBER 70045
LEAHANN E. POWELL, P.E.
B1-18
TYPICAL SECTION
TYPICAL SECTION THROUGH BRIDGE DECK
3. FOR REINFORCING BAR LIST, SEE SHEET B1-25.
2. FOR BACKER ROD DETAIL, SEE SHEET B1-7.
1. FOR BARS 4S AND 4V, SEE FDOT STANDARD PLANS NO. 521-427.
CROSS REFERENCE:
FOR FLORIDA SLAB BEAMS
CAMBER AND DEFLECTION DATA TABLE
TABLE DATE 01-01-16
LOCATION
SPAN NO. BEAM NO.
(IN.)
OF BEAM) @ 120 DAYS
(PRESTRESS - DEAD LOAD
NET BEAM CAMBER
@ 120 DAYS (IN.)
DUE TO TOPPING CASTING
DEAD LOAD DEFLECTION
DIM. F
1 - 3 1 & 8
1 - 3 2 - 7
DEAD LOAD DEFLECTION DIAGRAM
B E
G I N
S
P A
N
B
E A
R I N
G
E N
D
S
P A
N
B
E A
R I N
G
TO CASTING TOPPING CONCRETE.
REQUIRED AND SUBMIT TO THE ENGINEER FOR APPROVAL A MINIMUM OF 21 DAYS PRIOR
BEAM CAMBER @ 120 DAYS" SHOWN IN THE TABLE, PROPOSE MODIFIED DIMENSIONS AS
BASED ON FIELD MEASUREMENTS DIFFER MORE THAN ± ½" FROM THE THEORETICAL "NET
CAMBER VALUES AT THE TIME OF THE TOPPING CASTING. IF THE PREDICTED CAMBERS
THE CONTRACTOR SHALL MONITOR BEAM CAMBERS FOR THE PURPOSE OF PREDICTING
THE VALUES GIVEN IN THE TABLE ABOVE ARE BASED ON THEORETICAL BEAM CAMBERS.
CAMBER NOTE:
TOPPING DIAGRAM
LOCATION
TOPPING THICKNESS TABLE
INTERIOR BEAMS
EXTERIOR BEAMS
DIM. B (IN.) DIM. C (IN.)
"2
DIM. D (IN.)
"2
"16
"16
"16
"16
"8
"8
"16
"16
SLOPE: 0.02 FT/FTSLOPE: 0.02 FT/FT
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
B1-18 FOR SPACING)
*5S1 (SEE SHEET
B1-18 FOR SPACING)
*5S1 (SEE SHEET
S 80°17'36" E
(MIDSPAN) (TYP.)
½" V-GROOVE
O U
T T
O
O U
T
(ALONG LEFT & RIGHT COPING FROM END OF SLAB TO END OF SLAB)
38'-2"
(SPACING FROM END TO END OF TRAFFIC RAILINGS) (TYP.)
"8 38 "4
LEFT COPING
LEFT GUTTER
115'-2" (OVERALL LENGTH OF BRIDGE ALONG ¡ CONST. & PGL)
6"
6" "8
"8
"8
DI
AP
HRAGM6"
DI
AP
HRAGM6"
(FDOT STD. PLANS NO. 521-427) (TYP.)
BARS 4S IN TRAFFIC RAILING RIGHT COPING
RIGHT GUTTER
¡ CONST. & PGL
¡ FSB 2
¡ FSB 3
¡ FSB 4
¡ FSB 5
¡ FSB 6
¡ FSB 7
¡ FSB 8
¡ FSB 1
NO. 450-451) (TYP.)
(FDOT STANDARD PLANS
¡ FSB 12 X 54
2"
(TYP
. E
ACH
END)
3- 5S
4 @ 6"
38'-4" (SPAN 2) (ALONG ¡ CONST. & PGL)
38'-5" (SPANS 1 AND 3) (ALONG ¡ CONST. & PGL)
EXP.
JT
EXP.
JT
RH 12-23
CB 11-23
RH 12-23
BRIDGE NO. 484299
JV 11-23
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
ROAD NO. COUNTY FINANCIAL PROJECT ID
REVISIONS
5chambm 3/5/2024 9:57:37 AM c:\pw_work\american-pw-01\dms03975\B1Superst01.dgn
PACE, FL 32571
4489 WOODBINE ROAD
CONSOR ENGINEERS, LLC
P.E. LICENSE NUMBER 70045
B1-19
SUPERSTRUCTURE
TABLE OF STATIONS
SPAN STA. "A" STA. "B"
21+15.96 21+54.38
21+54.38 21+92.71
3 21+92.71 22+31.13
STA. "A"
OR ¡ INT. BENT
BEGIN BRIDGE
STA. "B"
OR END BRIDGE
¡ INT. BENT
(TYP.)
70°00'00"
OF STATIONING
DIRECTION
PLAN (SPANS 1 THRU 3)
3. FOR REINFORCING BAR LIST, SEE SHEET B1-25.
2. FOR SUPERSTRUCTURE DETAILS, SEE SHEETS B1-20 AND B1-21.
1. FOR TYPICAL SECTION THROUGH BRIDGE DECK, SEE SHEET B1-18.
CROSS REFERENCE:
CUT BARS 5S4 AS NEEDED TO MAINTAIN 2" COVER.
REBAR NOTE:
#1" AT � INT. BENT; 2" AT END BENT
***SEE FDOT STANDARD PLANS NO. 521-427 FOR DETAILS
**BEAM SPACING ALONG BEGIN/END BRIDGE AND ¡ INT. BENT
*SHIFT AS REQUIRED TO CLEAR FSB BARS 4K (PAIR WITH 4S5)
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
COPING
CL.
2"
*BARS 4V
*BARS 4S
CL. (TYP.)
" MIN.4
BAR 5S7
C L
2"
EXP. JT.
2"
CL.
2"
POLYSTYRENE
EXPANDED
JOINT FILLER
PREFORMED
BARS 5S1
(TYP.)
BARS 5S6
WITH BARS 5S1
BARS 4S8, PAIR
2-5S6 @ 6¾" (BOTTOM)
2-5S6 @ 5½" (TOP)
C L
EXP.
JT
2"
(TYP.)
PLANS NO. 521-427)
(FDOT STANDARD
(36" SINGLE-SLOPE)
TRAFFIC RAILING
(TYP.)
GUTTER LINE
(TYP.)
APPROACH SLAB
C.I.P. TOPPING OR
COPING (TYP.)
EXP. JT.
"8
(TYP.)
2" CL.
BLOCKOUT
POLYSTYRENE
¾" EXPANDED
OR APPROACH SLAB
TOP OF C.I.P. TOPPING
COVER
REINFORCEMENT TO PROVIDE
FIELD CUT TRAFFIC RAILING
(TYP.)
REINFORCEMENT
TRAFFIC RAILING
END BENT CAP
***BACKER ROD
OR 5S3
BARS 5S2
PAIRED WITH
BARS 4S5
BLOCKOUT
POLYSTYRENE
¾" EXPANDED
BARS 5S2 OR 5S3(TYP.)
BARS 5S1
(TYP.)
BARS 5E
"4 11'-1
"2
WORKING POINT
BARS 5S2 OR 5S3
(TYP.)
BARS 5S1
(TYP.)
WITH BARS 5E
BARS 5S7, PAIR
(TYP.)
BARS 5E
(TYP. UNO)
BARS 5S2 OR 5S3
BARS 5S4
NOS. 450-450 AND 450-451)
(FDOT STANDARD PLANS
FSB REINFORCEMENT
NOS. 450-450 AND 450-451)
(FDOT STANDARD PLANS
FSB REINFORCEMENT
"2
M I N
.I .P
T O
P
½
M I
B
X
5S4
BAR
B
C .I .P
T O
P
½
M I N
BAR 5S7
RH 12-23
C…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .