42404QR26-Little Econ Bridge Rehab.pdf

PDF 799 KB Posted

Attached to
Little Econ South Yarbrough Bridge Rehab
Solicitation number
ITB-16435
Issued by
Putnam County, Florida

About this file

This is a Quote Request (42404QR26) issued by the St. Johns River Water Management District for refurbishment work on the South Yarbrough Bridge located within the Little Big Econ State Forest in Florida. The project scope includes removal and disposal of deteriorated wooden bridge components, rehabilitation of the existing metal support structure, installation of new timber decking and structural elements, reconstruction of timber headwalls and wingwalls, and construction of reinforced concrete approach slabs. The District will furnish all pressure-treated lumber, while the Contractor must provide all labor, equipment, tools, hardware, incidental materials, transportation, and disposal services. No pre-quote meeting is scheduled. The deadline for questions is July 17, 2026, at 5:00 PM, with quotes due by 5:00 PM on Friday, July 24, 2026. All work must be completed by August 31, 2026. The District's Project Manager is Harmanjit Bansil, and questions should be directed to LaDonna Johnson, Procurement Specialist.

The estimated project budget is $40,000, with compensation to be paid on a lump sum basis. Respondents must demonstrate a minimum of three years of experience and provide documentation of at least two successfully completed similar projects within the last five years. The contract will be awarded to the lowest responsive, responsible bidder. Respondents must provide proof of insurability, active registration with the Florida Secretary of State, E-Verify enrollment, applicable licenses or certifications, and comply with the American Iron and Steel Requirement for any iron or steel products incorporated into the project. The District is exempt from Florida sales tax. Submissions must be made electronically through DemandStar, Central Bidding, or by physical delivery on a single pin/thumb/jump drive; email submissions will be rejected as non-responsive.

View the file

Other files

File Type Posted
42404QR26-Addendum 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rev. 6.16.26 42404QR26 | Page 1 of 45

It is the responsibility of Respondents who receive this solicitation from sources other than the portals identified above or St. Johns River Water Management District to contact the District’s Procurement staff prior to the due date to ensure any updates/addenda are received in order to submit a responsible and responsive offer. If you fail to submit a complete and accurate document, the District may deem the offer non-responsive and reject your submittal.

ADDENDA ACKNOWLEDGMENT: Prior to submitting my offer, I have verified that all addenda issued to date are considered as part of my offer:

Addendum No. Date Addendum No. Date Addendum No. Date

RESPONDENT NAME:

STREET ADDRESS:

MAILING ADDRESS (IF DIFFERENT):

PRIMARY E-MAIL ADDRESS (required)

SECONDARY E-MAIL ADDRESS (required)

TELEPHONE: ( ) YEAR COMPANY WAS ESTABLISHED

NAME/TITLE OF PERSON SUBMITTING QUOTE:

SIGNATURE OF PERSON SUBMITTING QUOTE:

This document must be completed and returned with your submittal

THE GOVERNING BOARD OF THE ST. JOHNS RIVER WATER MANAGEMENT DISTRICT

QUOTE REQUEST

42404 LITTLE BIG ECON SOUTH YARBROUGH BRIDGE REHAB

The St. Johns River Water Management District (the “District”) is seeking submittals from qualified Contractors to perform refurbishment work on the South Yarbrough Bridge located within the Little Big Econ State Forest. The project includes removal and disposal of deteriorated wooden bridge components, rehabilitation of the existing metal support structure, and installation of new timber decking and structural elements (the “Work”). The estimated budget for the Work is $40,000. All Work must be completed by August 31, 2026.

Interested and qualified Respondents are invited to submit a complete submittal package in accordance with the requirements and specifications detailed in this solicitation. Submittals must address all elements of the Scope of Work and comply with the terms and conditions set forth herein.

Further information is available through DemandStar at demandstar.com, Central Bidding at centralbidding.com, the state of Florida’s MyFloridaMarketPlace at myfloridamarketplace.com or the District’s website at sjrwmd.com. Solicitation packages may be obtained from the above portals. Respondents may also request the solicitation package directly from the District.

For all requests or questions relating to this solicitation, please contact:

LaDonna Johnson, Procurement Specialist

Phone: 386-329-4592 or E-Mail: LJohnson@sjrwmd.com

PRE-QUOTE MEETING – No Pre-Bid Scheduled

LAST DAY FOR QUESTIONS – July 17, 2026; 5:00PM

QUOTE DUE DATE - 5:00PM Friday, July 24, 2026

*PLEASE NOTE – Submittals must include all required documents and forms that are requested in this solicitation, or the submittal may be deemed non-responsive.

Rev. 6.16.26 42404QR26 | Page 2 of 45

QUOTE REQUEST

42404 LITTLE BIG ECON SOUTH YARBROUGH BRIDGE REHAB

TABLE OF CONTENTS

Cover Sheet Page 1

Table of Contents Page 2

PART 1 – Scope of Work Pages 3-7

Quote Form Page 8

PART 2 – Submittal Requirements & General Information Pages 9-15

PART 3 – Required Documents & Forms Pages 16-23

(NOTE! Additional documents not included in this section may be required)

Draft Agreement Pages 24-45

Rev. 6.16.26 42404QR26 | Page 3 of 45

42404 LITTLE BIG ECON SOUTH YARBROUGH BRIDGE REHAB

PART 1 – SCOPE OF WORK

I. INTRODUCTION/BACKGROUND

The St. Johns River Water Management District (the "District") maintains numerous bridges throughout its properties. These bridges are constructed of various materials, including timber, steel, and concrete.

The South Yarbrough Bridge is located within Little Big Econ State Forest and is accessible through the Brumley Road entrance.

II. OBJECTIVE

The objective of this project is to refurbish the existing bridge by replacing the deteriorated timber components, including structural timbers and deck boards, and performing surface preparation and painting of the existing steel support system. The existing support and decking configuration is shown in Figure 1.

III. SCOPE OF SERVICES

The Contractor shall provide all labor, equipment, tools, hardware, incidental materials, transportation, disposal and supervision necessary to complete the work described herein, except for the lumber, which will be furnished by the District.

The work includes, but is not limited to:

(a) Removal and disposal of all deteriorated wood members and associated hardware.

(b) Surface preparation and painting of the bridge's existing steel support system.

(c) Installation of new pressure-treated timber framing and decking using District-furnished lumber.

(d) Reconstruction of the timber headwall and wingwalls.

(e) Construction of reinforced concrete approach slabs.

IV. TASK IDENTIFICATION

(a) Contractor’s Responsibility

The Contractor shall:

(1) Conduct a pre-construction meeting with the District Project Manager (DPM) at least twenty-four

(24) hours prior to beginning work.

(2) Coordinate all work activities with the DPM to ensure a District representative is present during construction.

(3) Mobilize to the project site and provide all labor, equipment, materials other than District-furnished lumber, hardware, tools, and incidentals necessary to complete the project in accordance with this Statement of Work.

(4) Install appropriate barricades and signage indicating the bridge is closed prior to removal of any decking.

(5) Field verify all existing bridge dimensions and confirm that the lumber furnished by the District is suitable prior to installation. The Contractor shall be solely responsible for verifying all field measurements and quantities necessary to complete the Work .

(6) Determine the sequence and methods for removal of the existing bridge components.

Rev. 6.16.26 42404QR26 | Page 4 of 45

(7) Remove and properly dispose of all existing timber decking, support members, fasteners, and miscellaneous hardware generated by the Work.

(8) Remove and dispose of all timber associated with the northern headwall (approximately 15 feet long by 8 feet deep), both wingwalls (approximately 10 feet long by 5 feet deep each), and wingwall caps (approximately 20 feet total). Existing construction consists of 2-inch by 12-inch boards with filter fabric installed behind the boards to prevent soil migration.

(9) Excavate behind the headwall and wingwalls as necessary to remove and replace the existing timber members.

(10) Install new 3-inch by 12-inch pressure-treated lumber matching the existing configuration.

(11) Install 10-ounce, non-woven geotextile fabric behind all replaced headwall and wingwall boards.

(12) Secure the headwall and wingwall lumber to the existing piles using ½-inch by 6-inch stainless steel lag screws, with two (2) lag screws per board at each pile.

(13) Backfill all excavated areas with the original material after timber replacement and compact the material in maximum one-foot lifts.

(14) Pressure wash the entire steel support structure, including all I-beams, truss members, and turnbuckles.

(15) Perform surface preparation in accordance with SSPC-SP 3 (Power Tool Cleaning) on all areas exhibiting surface rust, as directed by the DPM. The Contractor shall contain and collect all paint chips, rust scale, and debris generated during surface preparation.

(16) Paint all five (5) steel I-beams and associated steel cross bracing supporting the bridge in accordance with the attached protective coating specification.

(17) Install five (5) new 3-inch by 6-inch by approximately 37-foot pressure-treated runner timbers directly above the existing steel I-beams.

(18) Secure each runner timber to both sides of the steel I-beams using ½-inch by 4-inch galvanized bolts with washers and nuts through the existing bolt holes spaced approximately 24 inches on center. Drill timber members as necessary. Bolt heads shall be flush with the top of the timber.

(19) Install new 3-inch by 6-inch by 14-foot pressure-treated floor joists perpendicular to the runner timbers at 12 inches on center.

(20) Secure each floor joist using two (2) ½-inch by 4-inch galvanized lag screws at each runner timber, for a total of ten (10) lag screws per joist . Countersink lag screw heads approximately ½ inch below the timber surface.

(21) Install new 2-inch by 12-inch by approximately 37-foot pressure-treated deck boards running the length of the bridge.

(22) Space deck boards uniformly at ¼ inch to facilitate drainage.

(23) Secure deck boards using ½-inch by 3-inch stainless steel deck screws countersunk approximately ¼ inch below the finished deck surface.

(24) Excavate both bridge approaches to dimensions of approximately 12 feet long by 3 feet wide and 6 inches deep. Excavation shall extend to the bridge edge.

(25) Mechanically compact the subgrade to provide a stable foundation for the concrete.

(26) Form, reinforce, place, finish, and cure reinforced concrete approach slabs on both ends of the bridge. Each slab shall measure approximately 12 feet long, 3 feet wide, and 6 inches thick.

(27) Install No. 5 reinforcing bars 12 inches on center, each way, each face.

(28) Use concrete with a minimum compressive strength of 4,000 psi.

(29) Apply a broom finish to all concrete surfaces.

Rev. 6.16.26 42404QR26 | Page 5 of 45

(30) Demobilize from the site upon completion.

(31) Remove all construction debris, excess materials, and equipment from the project site.

(32) Repair or restore any property damaged during construction to its original condition or better at no additional cost to the District.

(b) District’s Responsibility

The District shall:

(1) Provide access to the project site.

(2) Provide all lumber for support beams, decking, headwalls, wingwalls, and wingwall caps.

(3) Provide direction regarding the steel beams and related steel components to receive surface prep and paint.

(4) Provide on-site observation and coordination of construction.

(5) Conduct a final walk-through with Contractor.

V. DELIVERABLE

The project shall not be considered complete until:

(a) All work has been completed in accordance with this Scope of Work.

(b) Final inspection has been performed by the District.

(c) All deficiencies have been corrected.

(d) The project site has been cleaned and restored to the satisfaction of the District.

VI. PROJECT MANAGER

Harmanjit Bansil Operations and Maintenance Email: hbansil@sjrwmd.com Cell: 321-978-1917

Exhibits Exhibit 1: Existing Support And Decking Configuration Exhibit 2: Specification – Section 09900 Protective Coatings

Rev. 6.16.26 42404QR26 | Page 6 of 45

Exhibit 1: Existing Support And Decking Configuration

Rev. 6.16.26 42404QR26 | Page 7 of 45

SPECIFICATION – SECTION 09900 PROTECTIVE COATINGS

EXHIBIT 2

[Continues on next page]

SECTION 09900 PROTECTIVE COATINGS

PART 1 - GENERAL

1.01 SCOPE:

A. Summary of Work: The CONTRACTOR shall provide coating on exterior and interior surfaces throughout the Project and which are listed in PART 2, with systems specified on "coating system" sheets at the end of this SECTION.

B. Regulatory Requirements: In addition to requirements specified elsewhere for environmental protection, provide coating materials that conform to the restrictions of the local and regional jurisdiction. Notify the DISTRICT of any coating specified herein that fails to conform to the requirements for the location of the Project or location of application.

1. Lead Content: Use only coatings that are totally lead free.

2. Chromate Content: Do not use coatings containing zinc-chromate or strontium chromate.

3. Asbestos Content: Materials shall not contain asbestos.

4. Mercury Content: Materials shall not contain mercury or mercury compounds.

5. The specified maximum volatile organic compounds (VOC) content shall apply to the unthinned product.

1.02 APPLICABLE STANDARDS AND PUBLICATIONS:

A. Standards or Codes: The edition of the publications of the organizations listed below in effect at the time of the advertisement for bids form a part of this specification to the extent referenced. See the various paragraphs for the specified standard. In the case of a conflict between the requirements of this SECTION and those of the listed document, the requirements of this SECTION shall prevail.

1. American National Standards Institute (ANSI):

a. A13.1 - Scheme for the Identification of Piping Systems

b. Z535.1 - Safety Colors

2. American Society for Testing and Materials (ASTM):

a. C267 - Standard Test Methods for Chemical Resistance of Mortars, Grouts, and Monolithic

Surfacings and Polymer Concretes

b. D3960 - Standard Practice for Determining Volatile Organic Compound (VOC) Content of

Paints and Related Coatings

c. D4258 - Standard Practice for Surface Cleaning Concrete for Coating

d. D4259 - Standard Practice for Abrading Concrete

e. D4260 - Standard Practice for Acid Etching Concrete

f. D4261 - Standard Practice for Surface Cleaning Concrete Unit Masonry for Coating

g. D5201 - Standard Practice for Calculating Formulation Physical Constants of Paints and

Coatings

h. E84 - Standard Test Method for Surface Burning Characteristics of Building Materials

3. Society for Protective Coatings (SSPC) Surface Preparation Specifications:

a. SP1 - Solvent Cleaning: Removes oil, grease, soil, drawing and cutting compounds, and other soluble contaminants.

b. SP2 - Hand Tool Cleaning: Removes loose mill scale, loose rust, loose paint and other loose foreign matter.

c. SP3 - Power Tool Cleaning: Removes loose material. Not intended to remove all scale or rust.

d. SP5 - White Metal Blast Cleaning: Removes all scale, rust, foreign matter. Leaves surface gray-white uniform metallic color.

e. SP6 - Commercial Blast Cleaning: Two-thirds of each square inch free of all visible residues; remainder only light discoloration.

f. SP7 - Brush-Off Blast Cleaning: Removes only loose material, remaining surface tight and abraded to give anchor pattern.

g. SP10 - Near-White Blast Cleaning: At least 95% of each square inch shall be free of all visible residues.

h. SP11 - Power Tool Cleaning to Bare Metal

4. International Concrete Repair Institute (ICRI)

a. Guideline #03732: Surface preparation should comply with ICRI technical guideline number 03732 (selecting and specifying concrete surface preparation for sealers, coatings and polymer overlays).

5. United States Army Corps of Engineers (USACE)

a. CRD-C 48 - Standard Test Method for Water Permeability of Concrete

b. CRD C163 Test Method for Water Permeability of Concrete Using Triaxial Cell

1.03 DEFINITIONS:

A. Coating systems include surface preparation, prime coat (first coat), finish coats (second and third coats), inspection, cleaning, and touch-up of surfaces and equipment. Shop preparation, prime coat, and finish coats to be shop-applied may be specified elsewhere or referenced to this SECTION so that a complete system is specified and coordinated.

1. Where surface preparation and first (prime) coat are specified in other SECTIONS to be shop-applied, such as for structural steel, hollow metal doors or equipment, only the touch-up and finish coats are a part of field painting. Surface preparation is the required degree of preparation prior to application of first (prime) coat regardless if done in shop or field.

2. If materials are provided without shop primer such as miscellaneous steel or sheet metal, then surface preparation, first, second, and third coats are a part of field painting.

3. Concealed surfaces are generally not required to have finish-coats unless otherwise specified, but prime coat should be applied and touched up prior to concealment.

4. Where equipment and materials are provided with shop-applied finished coating system, only touch-up is a part of field painting.

5. Refer to applicable SECTIONs to determine whether surface preparation and first coat, or complete coating system, is to be shop-applied.

6. The term "DFT" means minimum dry film thickness, with no tolerance for thinner films.

1.04 SUBMITTALS:

A. Submittals include, but are not limited to, the following:

1. Schedule of products and paint systems to be used. Schedule shall include the following information:

a. Surfaces for system to be applied

b. Surface preparation method and degree of cleanliness

c. Product MANUFACTURER, name, and number

d. Method of application

e. Dry film thickness per coat of coating to be applied

2. Color charts for selection and acceptance

3. Product information

a. MANUFACTURER's data sheet for each product proposed

b. Technical and performance information that demonstrates compliance with the system performance and material requirements

c. MANUFACTURER's instructions and recommendations on surface preparation and application

d. Compatibility of shop and field applied coatings (where applicable)

e. Material Safety Data Sheet (MSDS) filled out completely according to the Florida Right-to-Know Law, Chapter 442, Florida Statutes, clearly identifying each product used.

4. Certification signed by coating MANUFACTURERs stating that each coating is suitable for service intended as stated on each coating system sheet, and that the materials to be installed comply in all respects with the requirements of this SECTION.

5. The CONTRACTOR shall certify in writing to the DISTRICT that applicators have previously applied all the systems in this SECTION and have the ability and equipment to prepare the surfaces and apply the coatings correctly.

1.05 RESPONSIBILITIES: (Not Used)

1.06 WARRANTY:

A. The MANUFACTURER shall warrant the MATERIALS, and PRODUCTS specified in this SECTION against defective materials and workmanship with the MANUFACTURER’s extended warranty, for no less than five (5) years. The extended warranty period will start after the CONTRACTOR’s one (1) year warranty expires. The MANUFACTURER shall provide a special MANUFACTURER’s extended warranty for the stipulated period, or a Warranty Bond, to extend the MANUFACTURER’s warranty period for the stipulated period.

B. The CONTRACTOR shall warranty the WORK against defects for one (1) year from the date of Substantial Completion.

PART 2 - PRODUCTS

2.01 ACCEPTABLE MANUFACTURERS:

A. Proprietary names and product numbers are specified in most systems for material identification from these MANUFACTURERs.

1. PPG (Pittsburg Plate Glass Co.)

2. Carboline Company, Inc.

3. ICI Devoe Coating Company

4. Tnemec Company, Inc.

5. Sherwin-Williams

2.02 GENERAL:

A. Materials furnished for each coating system must be compatible with the substrate.

B. Single Manufacturer: All materials in each coating system shall be by the same coating MANUFACTURER to assure compatibility of coatings.

C. Compatibility: When shop-painted surfaces are to be field coated, the CONTRACTOR shall ascertain whether finish materials will be compatible with shop coating. Coatings of uncertain composition shall be removed completely before applying new coatings.

D. Colors:

1. Color of finish coatings shall match accepted color samples.

2. When second and finish coats of a system are of same type, CONTRACTOR shall tint or use an easy distinguishable alternate color on second coat to enable visual coverage inspection of the third coat. When first and second coats only are specified and are of same or different types, tint or use an easy distinguishable alternate color on first coat to enable visual coverage inspection of the second coat.

E. Include on label of material containers:

1. MANUFACTURER’s name, product name, and number

2. Type of paint and generic name

3. Color name and number

4. Storage and temperature limits

5. Mixing and application instructions, including requirements for precautions which must be taken

6. Drying, recoat, or curing time

2.03 COATING SYSTEMS: Specified on the "Coating System" sheets at the end of this SECTION.

2.04 SURFACES TO BE COATED:

Generic Description Specific Surfaces System Steel, mild exposure, non-immersion, Interior 1. Hollow metal doors and frames

2. Miscellaneous steel S-1

Steel, severe exposure, non-immersion, exterior or interior, where only marginal cleaning can be performed

1. Miscellaneous exposed steel surfaces

S-2

Steel equipment, prime coated, severe exposure, non-immersion, interior and exterior

1. Carbon steel in fabricated equipment for gate hoists and machinery

S-3

Steel and non-ferrous metal, severe exposure, buried and immersed, interior of tank, and piping and equipment immersed in tank or basin

1. Roller gates and associated steel

2. Steel Sheet Piling, Walls

S-4

Steel, surface temperatures between 350 and 1000 degrees F continuous

1. Exhaust piping and silencer S-5

Steel tank exterior, severe UV exposure 1. Steel Tanks S-6

Steel, severe Exposure, Non-Immersion. Exterior or Interior. DTM Acrylic. Safety Yellow.

1. Bollards, guard posts

2. Natural gas lines, diesel fuel lines

3. Crane Bridge

S-7

Aluminum in contact with concrete or any other metal except galvanized steel

1. Conduits, pipes and plates A-1

2.05 SURFACES NOT TO BE COATED:

A. Factory finished equipment, except for touch-up or noted otherwise

B. Metal surfaces of stainless steel, bronze, aluminum, and fiberglass

C. Concrete, unless listed on specific surfaces above

D. Machined surfaces

E. Grease fittings

F. Glass

G. Equipment nameplates

H. Platform gratings, stair treads, door thresholds, and other walking surfaces unless listed on specific surfaces above

I. Concrete Floors unless listed above

PART 3 - EXECUTION

3.01 DELIVERY, STORAGE, AND HANDLING:

A. Manufacturer Recommendations: Unless this specification requires otherwise, CONTRACTOR shall strictly follow the MANUFACTURER’s printed recommendations and instructions for storing and handling coating system materials.

B. Delivery of Materials:

1. Deliver in sealed containers with labels and information legible and intact. Containers shall also have correct labels with required information.

2. CONTRACTOR shall allow sufficient time for testing, if required.

C. Storage of Materials: CONTRACTOR shall store under conditions recommended by the Material Safety Data Sheets:

1. All protective coating materials shall be used within the MANUFACTURER’s recommended shelf life.

2. Store only acceptable materials on Project Site.

3. Store tightly sealed materials off ground and away from moisture, direct sunlight, extreme heat, and freezing temperatures. Provide separate area and suitable containers for storage of coatings and related coating equipment.

4. Dispose of used or leftover containers, thinners, rags, brushes, and rollers in accordance with applicable regulations.

3.02 PREPARATION FOR COATING:

A. General: All surfaces to receive protective coatings shall be clean prior to application of coatings. The CONTRACTOR shall examine all surfaces to be coated, and shall correct all surface defects before application of any coating material. All marred or abraded spots on shop-primed and on factory-finished surfaces shall receive touch-up restoration prior to any coating application. Surfaces to be coated shall be dry and free of visible dust.

B. Protection of surfaces not to be coated: Surfaces that are not to receive protective coatings shall be protected during surface preparation, cleaning, and coating operations.

C. Hardware, lighting fixtures, switch plates, machined surfaces, couplings, shafts, bearings, nameplates on machinery, and other surfaces not to be painted shall be removed, masked, or otherwise protected. Drop cloths shall be provided to prevent coating materials from falling on or marring adjacent surfaces. The working parts of mechanical and electrical equipment shall be protected from damage during surface preparation and coating operations. Openings in motors shall be masked to prevent entry of coating or other materials.

D. Care shall be exercised not to damage adjacent work during blast cleaning operations. Spray painting shall be conducted under carefully controlled conditions. The CONTRACTOR shall be fully responsible for and shall promptly repair any and all damage to adjacent work or adjoining property occurring from blast cleaning or coating operations.

E. Protection of painted surfaces: Cleaning and coating shall be coordinated so that dust and other contaminants from the cleaning process will not fall on wet, newly coated surfaces.

3.03 SURFACE PREPARATION:

A. General

1. Prepare surfaces for each coating system conforming to SSPC or ASTM surface preparation specifications listed.

a. If grease or oils are present, SSPC-SP1 must precede any other method specified.

b. Remove surface irregularities such as weld spatter, burrs, or sharp edges, prior to specified surface preparation.

2. Depth of profile shall be as specified for each system, but in no instance shall it exceed one-third of the total dry-film thickness of complete system.

3. Prepare only those areas which will receive the first coat of the system on the same day.

B. Metals

1. The minimum abrasive blasting surface preparation shall be as indicated in the coating system sheets included at the end of this Section. Where there is a conflict between these specifications and the coating MANUFACTURER’s printed recommendations for the intended service, the higher degree of cleaning shall apply.

2. All sharp edges shall be rounded or chamfered, and all burrs, surface defects, and weld splatter shall be ground smooth prior to blast cleaning.

3. The type and size of abrasive shall be selected to produce a surface profile that meets the system sheet requirements for the particular coating and service conditions. Abrasives for submerged and severe service coating systems shall be clean, hard, sharp cutting crushed slag. Automated blasting systems shall not be used for surfaces that will be in submerged service. Metal shot or grit shall not be used for surfaces that will be in submerged service, even if subsequent abrasive blasting is planned to be one with hard, sharp cutting crushed slag.

4. Abrasive shall not be reused unless an automated blasting system is used for surfaces that will be in non-submerged service. For automated blasting systems, clean oil-free abrasives shall be maintained. The abrasive mix shall include at least 50 percent grit.

5. The CONTRACTOR shall comply with the applicable federal, state, and local air pollution control regulations for blast cleaning.

6. Compressed air for air blast cleaning shall be supplied at adequate pressure from well maintained compressors equipped with oil and moisture separators that remove at least 95 percent of the contaminants.

7. Surfaces shall be cleaned of all dust and residual particles of the cleaning operation by dry air blast cleaning, vacuuming, or another method prior to painting.

8. Enclosed areas and other areas where dust settling is a problem shall be vacuum cleaned and wiped with a tack cloth.

9. Damaged or defective coating shall be removed by the blast cleaning to meet the clean surface requirements before recoating.

10. If the required abrasive blast cleaning will damage adjacent work, the area to be cleaned is less than 100 square feet, and the coated surface will not be submerged in service, then SSPC SP2 or SSPC SP3 may be used.

11. Shop applied coatings of unknown composition shall be completely removed before the indicated coatings are applied. Valves, castings, ductile iron pipe, and fabricated pipe or equipment shall be examined for the presence of shop-applied temporary coatings. Temporary coatings shall be completely removed by solvent cleaning per SSPC SP1 before the abrasive blast cleaning work is started.

12. Shop primed equipment shall be solvent cleaned in the field before finish coats are applied.

3.04 APPLICATION:

A. CONTRACTOR shall apply coatings in accordance with coating MANUFACTURER’s recommendations. Materials shall be thoroughly stirred, strained, and kept at uniform consistency during application. Coatings from different MANUFACTURERs shall not be mixed together.

B. Use properly designed brushes, rollers, and spray equipment for all applications.

C. On unprimed surfaces apply first coat of the system the same day as surface preparation.

D. Cleaned surfaces and all coats shall be inspected prior to each succeeding coat. The CONTRACTOR shall schedule such inspection with the DISTRICT in advance.

E. Blast cleaned ferrous metal surfaces shall be painted before any rusting or other deterioration of the surface occurs. Blast cleaning shall be limited to only those surfaces that can be coated in the same working day.

F. Special attention shall be given to edges, angles, weld seams, flanges, nuts and bolts, and other places where insufficient film thicknesses are likely to be present. Use stripe painting for these areas.

G. Dry-film thickness of each system shall be at least as thick as the minimum specified. Maximum dry-film thickness shall not exceed the minimum more than 20% or coating MANUFACTURER’s requirements, whichever is less. Where a dry-film thickness range is specified, the thickness shall not be shall not be outside the range.

H. Shop and field painting shall not be applied within three (3) inches of unprepared surface of any substrate such as areas to be welded or bolted.

I. Environmental Conditions:

1. Atmospheric temperature must be 50 degrees Fahrenheit or higher during application, unless approved in writing by coating MANUFACTURER. Do not apply coatings when inclement weather or freezing temperature may occur during the curing time interval.

2. Wind velocities for exterior applications shall be at a minimum to prevent overspray or fallout and not greater than coating MANUFACTURER’s limits.

3. Relative humidity must be less than 85% and the temperature of the surface to be painted must be at least five (5) degrees above the dew point.

4. Provide adequate ventilation in all areas of application to ensure that at no time does the content of air exceed the Threshold Limit Value given on the MANUFACTURER’s Material Safety Data Sheets for the specific coatings being applied.

J. Recoat Time: In the event a coating, such as an epoxy, has exceeded its recoat time limit, prepare the previously applied coating in accordance with MANUFACTURER’s recommendations.

K. Protection:

1. Cover or otherwise protect surfaces not to be painted. Remove protective materials when appropriate.

2. Mask, remove, or otherwise protect finish hardware, machined surfaces, grilles, lighting fixtures, and prefinished units as necessary.

3. Provide cover or shields to prevent surface preparation media and coatings from entering orifices in electrical or mechanical equipment. Where ventilation systems must be kept in operation at time of surface preparation, take precautions to shield intakes and exhausts to prevent the materials from entering system or being dispersed.

4. Provide signs to indicate fresh paint areas.

5. Provide daily cleanup of both storage and working areas and removal of all paint refuse, trash, rags, and thinners. Dispose of leftover containers, thinners, rags, brushes, and rollers that cannot be reused in accordance with applicable regulations.

6. Do not remove or paint over equipment data plates, code stamps on piping, or UL fire-rating labels.

3.05 INSPECTION:

A. CONTRACTOR shall provide and use a wet-film gauge to check each application approximately every fifteen (15) minutes in order to immediately correct film thickness under or over that specified.

B. On ferrous surfaces, measurements shall be made with one of the thickness gauges listed below. The gauge shall be calibrated on metal practically identical in composition and surface preparation to that being coated and be of substantially the same thickness, except that for measurements on metal thicker than 1/4 inch, the instrument may be calibrated on metal with a minimum thickness of 1/4 inch. When calibrating any of the gauges for making film measurements of over three (3) mils, the calibrating thickness standards (shims) shall be of non-metallic composition. Where only one thickness criterion is specified, the calibrating shim thickness shall closely approximate the specified thickness, but where both thicknesses are specified, the shim's thickness shall closely approximate an average of the two.

Calibrating instructions, thickness standards and, in the case of the Mikrotest gauge, a calibrating tool, should obtained from the MANUFACTURER or supplier of the gauge. Authorized thickness gauges are:

1. General Electric, Type B, General Electric Company

2. Mikrotest, Elektrophysik - Koln

3. Elcometer, Elcometer Instruments, Ltd.

4. Inspector Gage, Elcometer Instruments, Ltd.

5. Minitector, Elcometer Instruments, Ltd.

C. Use holiday or pinhole detector on systems over metal substrates to detect and correct voids when indicated on system sheet.

D. Furnish a sling psychrometer and perform periodic checks on both relative humidity and temperature limits.

E. Check temperature of the substrate at regular intervals to be certain surface is five (5) degrees Fahrenheit or more above the dew point.

3.06 CLEANING AND REPAIRS:

A. Remove spilled, dripped, or splattered paint from surfaces.

B. Touch up and restore damaged finishes to original condition. This includes surface preparation and application of coatings specified.

END OF SECTION

PROTECTIVE COATING SYSTEM

System S-1

SERVICE: Steel, Mild Exposure, Non-Immersion, Interior

Surface Preparation: Field: SSPC-SP1 and SP6. Clean and dry.

First Coat: High solids polyamine or polyamide epoxy with minimum 67% solids by volume. Spray Applications; apply at 5.0 - 8.0 mils DFT. Brush applications, apply at 4.0 mils DFT.

Second Coat: Same as first coat.

Note: Second coat required only for brush applications.

Third Coat (Exterior): Not required.

System Total: Minimum 8.0 mils dry film thickness.

Volatile Organic Content: Maximum 3.5 lbs/gal (425 g/l).

COATING

MANUFACTURER PRODUCT DESIGNATION

PPGCarboline ICI Devoe Tnemec Sherwin-Williams

FIRST COAT SECOND COAT

Amerlock 2/400 Same as first coat Carboguard 890 Same as first coat Devran 224HS Same as first coat Hi-Build Epoxoline II N69 Same as first coat Macropoxy 646 FC(5-8mils DFT) Same as first coat

System S-2

SERVICE: Steel, Severe Exposure, Non-Immersion, Exterior or Interior, where only marginal cleaning can be performed

Surface Preparation: Field: SSPC-SP1 and SP3. Clean and dry.

First (prime) Coat: Polyamidoamine epoxy with wetting and penetrating properties and with 98% solids by volume. Apply at 1.5 to 2.0 mils dry film thickness.

Second Coat: High build polyamide epoxy with minimum 65% solids by volume.

Apply at 5.0 mils dry film thickness.

Third Coat (Exterior): High solids aliphatic or acrylic polyurethane gloss enamel with minimum 65% solids by volume. Apply at 2.0 mils dry film thickness.

System Total: Minimum 8.5 mils dry film thickness, Exterior. Minimum 6.5 mils dry film thickness, Interior.

Volatile Organic Content: Maximum 2.8 lbs/gal (340 g/l).

MANUFACTURER

PRODUCT DESIGNATION

Carboline ICI Devoe Tnemec

PPG

Sherwin-Williams

FIRST COAT SECOND COAT THIRD COAT

Carboguard 890 Same as first coat Carboline 133HB Bar-Rust 231 Devran 224HS Devthane 379H Chembuild 135 Not Applicable Endura-Shield 1074 Amerlock 2/400 or Sealer Amerlock 2/400 Amercoat 450H Macropoxy 646 FC Same as first coat Acrolon 218 HS Polyurethane

System S-3

SERVICE: Equipment, Factory Coated, Severe Exposure, Non-Immersion, Exterior or Interior

Surface Preparation: Field or Shop (if applicable) First Coat: SSPC-SP1 and SP6. Clean and dry.

First Coat: (Field) Modified vinyl-alkyd or epoxy-mastic, compatible with existing and new finish. Apply at 1.5 to 2.0 mils dry film thickness.

Second Coat Interior: High build polyamide epoxy with minimum 50% solids by volume.

Apply at 5.0 mils dry film thickness.

Second Coat Exterior: High solids aliphatic or acrylic polyurethane gloss enamel with minimum 52% solids by volume. Apply at 2.0 mils dry film thickness.

System Total: Interior: 6.5 mils dry film thickness in addition to existing coating.

Exterior: 3.5 mils dry film thickness in addition to existing coating.

Check for voids with holiday or pinhole detector.

Volatile Organic Content: Maximum 3.5 lbs/gal (425 g/l).

ICI Devoe Tnemec

FIRST COAT SECOND COAT (INT) SECOND COAT (EXT)

Amercoat 385 or 2/400 Same as first coat Amercoat 450H Carbomastic 15 Carboguard 890 Carboline 134 HG Bar-Rust 231 Devran 224 HS Devthane 379H Omnithane 1 Hi-Build Epoxoline II N69 Endura-Shield 1074 Kem Kromlik Primer Macropoxy 646C Acrolon 218 HS Polyurethane

System S-4

SERVICE: Steel and Non-Ferrous Metals, Severe Exposure. Buried and Immersed, Interior of Tank, Piping or Equipment Immersed in Tank or Basin.

Surface Preparation: SSPC-1 to remove all grease and oils, soluble salt removal (if necessary) SSPC-5 (white metal) to achieve a surface profile of 1.0 – 2.0 mils

First Coat: Moisture Cured Urethane Zinc Primer without MIO minimum 80% Zinc

Second Coat: Moisture Cured Urethane Coal Tar

Third Coat: Same as second coat.

System Total: Minimum 15.00 mils dry film thickness. Check for voids with holiday or pinhole detector.

Volatile Organic Content: Maximum 2.8 lbs/gal (340 g/l).

PRODUCT DESIGNATION

Wasser Coatings Tnemec Xymax

FIRST COAT SECOND COAT THIRD COAT

MC-Zinc MC-Tar Same as second coat Tneme-Zinc 90-1K97 Omnithane Hydrocarb X 546 Same as second coat Mono Zinc Ultra 2401 Mono Guard 6201 Same as second coat

System S-5

SERVICE: Steel, Surface Temperatures 350 to 1000 degrees F, Continuous

Surface Preparation: Shop or Field First Coat: SSPC-1, SP10, and profile depth 1 mil.

Field Touch-Up: SSPC-6 and profile depth 1 mil.

First Coat: Silicone aluminum. Aluminum or grey color. Apply at 1.0 to 1.5 mils dry film thickness, or greater as required by manufacturer.

Second Coat: Same as first coat.

Third Coat: Not required.

System Total: Minimum 2.0 to 3.0 mils dry film thickness.

Volatile Organic Content: Maximum 5.2 lbs/gal (623 g/l).

COATING MANUFACTURER PRODUCT DESIGNATION

Devoe Tnemec

FIRST COAT SECOND COAT

Amercoat 878 Amercoat 873878 Carbozinc 11 Thermaline 4700 Aluminum HT-12 Same as first coat Silicone Aluminum 39-1261 Same as first coat TemperKote 1000 Same as first coat

System S-6

SERVICE: Steel tank exterior, severe UV exposure

Surface Preparation: SSPC-SP-6, commercial blast clean

First Coat: single component, zinc rich moisture cure urethane, 4 mils

Second Coat: single component moisture cure urethane, 4 mils

Third Coat: single component moisture cure urethane, gloss, 2 mils

System Total: 10 mils

Volatile Organic Content: 2.8 lb per gal (340 g/L)

Wasser Coatings Sherwin Williams

PPG

FIRST COAT SECOND COAT THIRD COAT

MC-Zinc MC-CR MC-Shieldcoat Corothane I Zinc Primer Corothane I HS Aliphatic Same as 2nd coat Durathane MCZ Amerlock 2/400 Amercoate 450H

System S-7

SERVICE: Steel; Severe Exposure, Non-Immersion. Exterior or Interior. DTM Acrylic. Safety Yellow.

Surface Preparation: SSPC-SP1 and SP6. Clean and dry.

First Coat: Direct to Metal Acrylic Safety Yellow. Apply a minimum of 2.5 mils dry film thickness, or greater as required by MANUFACTURER.

Second Coat: Same as first coat.

Third Coat: Not required.

System Total: 5.0 mils dry film thickness.

Volatile Organic Content: Maximum 2.08 lb per gal (< 250 g/L)

Benjamin Moore & Co.

FIRST COAT SECOND COAT

DTM Acrylic Gloss Enamel P28-15 Same as 1st coat B66Y37 DTM Acrylic Gloss Same as 1st coat

System A-1

SERVICE: Aluminum in contact with concrete or any other metal except galvanized steel

Surface Preparation: Field: SSPC-SP1. Clean and dry

First Coat: High solids polyamine or polyamide epoxy with minimum 67 % solids by volume. Brush apply to surfaces to be in contact at 4.0 mils DFT

Second Coat: Same as first coat

Third Coat: Not required

System Total: Minimum 8 mils DFT

Volatile Organic Content: Maximum 3.5 lbs/gal (425 g/l)

ICI Devoe Tnemec

Wasser Corporation

FIRST COAT SECOND COAT

Amerlock 2/400 Same as first coat Carboguard 890 Same as first coat Devran 224HS Same as first coat Hi-Build Epoxoline II N69 Same as first coat Macropoxy 646 FC Expoxy Same as first coat MC-Prepbond 100 Same as first coat

Rev. 6.16.26 42404QR26 | Page 8 of 45

42404 LITTLE BIG ECON SOUTH YARBROUGH BRIDGE REHAB

QUOTE FORM

DESCRIPTION TOTAL LUMP SUM BID*

Provide all labor, equipment, tools, hardware, incidental materials, transportation, supervision, disposal, and all other items necessary to complete the South Yarbrough Bridge refurbishment, except for District-furnished lumber, per scope.

*The Total Lump Sum Bid shall include all labor, equipment, hardware, paint, concrete, reinforcing steel, disposal, mobilization, demobilization, and incidentals necessary to provide a fully completed project. The District will furnish only the pressure-treated lumber identified in the Scope of Work.

PUBLIC RECORDS: Florida Statutes provide that sealed submittals or replies received by the District shall remain exempt from disclosure until an intended decision is announced or until 30 days from the opening, whichever is earlier.

This means that Respondents will not be able to obtain a copy of their competitors’ submittals until the statutory time has elapsed.

UNIT PRICES: Unit prices on the Quote Form may be used to correct any extensions, and if adjusted, will be identified on the detailed tabulation as corrected. Unit costs will not be changed. If Respondent fails to include a unit price and only includes the total, the District reserves the right to mathematically calculate the unit cost and enter to establish a price for the Agreement and potential additional purchases of affected line items.

AIS REQUIREMENT: If the solicitation concerns a public works project or involves the procurement of materials for use in a public works project as defined in §255.0993, Fla. Stat., the Respondent hereby acknowledges that it is obligated to comply with the American Iron and Steel Requirement (the “AIS Requirement”) set forth therein and Respondent hereby certifies that any iron or steel product contained in this Cost Schedule that is to be permanently incorporated into the subject project will be produced in the United States in accordance with the AIS Requirement. Respondent agrees that it shall be responsible for any penalty imposed as a result of Respondent’s failure to comply with the AIS Requirement. In addition, Respondent has included any costs associated with the AIS Requirement into this cost schedule.

UNDER PENALTIES OF PERJURY, I, as the Respondent’s authorized officer or representative, hereby declare that I have fully reviewed the Respondent’s submittal, of which this Cost Schedule is a part; that all facts stated in the submittal are true; that I understand all terms and conditions set forth in the District’s solicitation; and that, if awarded, the Respondent shall fully comply with all terms and conditions.

Name of Respondent Company

Authorized Representative Signature Date

Printed Name/Title

This document must be completed and returned with your submittal

Rev. 6.16.26 42404QR26 | Page 9 of 45

42404 LITTLE BIG ECON SOUTH YARBROUGH BRIDGE REHAB

PART 2 – SUBMITTAL REQUIREMENTS & GENERAL INFORMATION

Thank you for your interest in working with the St. Johns River Water Management District. Please direct questions regarding the submittal documents and specifications to the District’s Procurement Staff member listed on the first page of this solicitation, in writing. We look forward to working with you. Pertinent information and required documents regarding this solicitation as part of a responsive submittal are listed below.

The District will publish notice of specifications and criteria, including addenda, intended District decisions, or other matters pertinent to this solicitation on portals identified on the first page of this document.

2.1 MINIMUM QUALIFICATIONS

Respondent must satisfy the following minimum qualifications. Instructions for providing this documentation are provided herein. Failure to provide required documentation as instructed may result in a submittal being rejected as non-responsive.

a. Experience: A minimum of three (3) years of experience

b. Similar projects: Respondents must have successfully completed at least two (2) projects of a similar nature as set forth on the SIMILAR PROJECTS FORM. The District reserves right to determine whether a project shall be considered “similar.” Any similar project submitted by Respondent must have been performed for a project owner/administrator that is independent of Respondent. For purposes of this solicitation, “independent” means a project owner/administrator that is not: (i) the Respondent; (ii) a relative of Respondent; (iii) an employee, officer, director, agent, or representative of Respondent; or (iv) a parent, subsidiary, affiliate, commonly owned entity, joint venture partner, or other entity under common control with the Respondent.

Irrespective of the minimum qualifications stated above, the District may make such investigations as it deems necessary to determine the ability of the Respondent to perform the Work. The District reserves the right to reject any submittal if the evidence submitted by such Respondent and/or the District’s independent investigation of such Respondent fails to satisfy the District that such Respondent is properly qualified to carry out the obligations of the Agreement and complete the Work in a manner acceptable to the District within the time period specified.

2.2 BUDGET ESTIMATE

The estimated budget is an estimate only and does not limit the District in awarding the Agreement.

Respondents are cautioned to not make any assumptions from the Project Manager’s construction estimate about the total funds available for the Work. The District retains the right to adjust the estimate in awarding the Agreement. The District also reserves the right to reject all Bids if subsequent negotiations with qualified Respondents result in costs over the engineer's construction estimate. In addition, the District reserves the right to increase, decrease, or delete any class, item, or part of the Work in order to reduce costs for any reason. The District may discuss alternatives for reducing the cost of the Work with Respondents and make such modifications as it determines to be in its best interest.

2.3 HOW TO ASSEMBLE YOUR SUBMITTAL

The following documents and forms must accompany any submittal in the order identified. Please do not include items not requested. A submittal returned without these documents may deem the submittal non-responsive. The District reserves the right to request additional information from any Respondent prior to award.

Forms included in this solicitation Cover Page/Addendum Acknowledgement Bid Form General Qualifications Questionnaire Similar Projects Form Certificate as to Respondent’s Authority to do Business in the State of Florida Affidavit as to Non-collusion and Certification of Material Conformance with Specifications Drug-Free Workplace Form (not required unless there is a tie bid) Submittal Acknowledgement Form

Respondent provided documentation

Rev. 6.16.26 42404QR26 | Page 10 of 45

Certificate of Insurability - as noted in Section titled PROOF OF INSURABILITY, herein Proof of Respondent’s active registration on www.sunbiz.org Proof of Respondent’s active registration with the U.S. Department of Homeland Security’s E-Verify system

(Answers to questions regarding E-Verify as well as instructions on enrollment may be found at the E-Verify website: www.e-verify.gov).

Copy of any applicable and current license or certification required by the City/County/State/this solicitation.

NOTE! A Respondent’s submittal may be rejected as non-responsive for:

(1) Failing to complete all forms;

(2) Failure to provide all required materials; or

(3) Otherwise failing to comply with instructions for preparation and organization of submittal.

2.4 PROOF OF INSURABILITY

The submittal shall contain proof of insurability issued by a company authorized to do business in the State of Florida, and with an A.M. Best Company rating of at least A- for the required insurance(s) listed in the attached Agreement.

NOTE! The successful Respondent shall be required to obtain and provide a Certificate of Insurance, submitted concurrently with the executed Agreement, that meets all specified requirements, references the applicable Agreement number, and names the St. Johns River Water Management District as an additional insured.

2.5 HOW TO SUBMIT ON THIS SOLICITATION

(a) Respondent’s submittal must be in electronic format (no paper copies) either by uploading to DemandStar directly at www.demandstar.com OR to Central Bidding directly at www.centralbidding.com (NOT BOTH);

OR by delivering all files on a single pin/thumb/jump drive either by mail or hand delivery in a sealed envelope.

Label all sealed envelopes as follows:

SEALED SUBMITTAL – DO NOT OPEN

Respondent’s Name: ___________________________________________ Quote Request: 42404, Little Big Econ South Yarbrough Bridge Rehab Opening Time: 5:00 PM Opening Date: July 28, 2026

LaDonna Johnson, Procurement Specialist St. Johns River Water Management District District Headquarters 4049 Reid Street Palatka, FL 32177

**Please note that the U.S. Postal Service does not deliver regular mail or express mail to the above address. The District’s experience is that Federal Express and United Parcel Service will. The District is not responsible for and will not accept or consider late submittals due to delays caused by any mail, package or courier service, including the U.S. mail, or caused by any other occurrence.

DO NOT SUBMIT VIA EMAIL — THIS WILL RESULT IN THE SUBMITTAL BEING REJECTED AS

NON-RESPONSIVE.

(b) All blank spaces on the solicitation documents must be typewritten or legibly printed in ink. In the event you decline to submit a response, the District would appreciate submittal of the “No Response Form” provided in this solicitation to describe the reason for not submitting a response.

(c) Please do not password protect files saved to a pin/thumb/jump drive. The District recommends that Respondents confirm their submittal documents will open correctly on a non-Respondent-owned computer. Any electronic submittal received by the District that does not open on a District-owned computer is subject to rejection as a defective response. The file naming conventions for the solicitation must clearly identify specific information, such as the solicitation number and Respondent’s name (Example: 12345QR78, ABC Company).

http://www.demandstar.com/ http://www.centralbidding.com/

Rev. 6.16.26 42404QR26 | Page 11 of 45

2.6 SIGNATURE AND CERTIFICATION REQUIREMENTS

If…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .