This Addendum 1 to Invitation for Bid (IFB) 42303IFB26 is issued by the St. Johns River Water Management District (District) and addresses questions from potential respondents regarding a Phase I Cultural Resources Assessment Survey of the Pablo Creek Conservation Area (PCCA), a 2,722-acre conservation property in Duval County, Florida. The survey will identify, document, and evaluate archaeological and historical cultural resources to support regulatory compliance, land management, and planned hydrologic restoration activities. The scope includes records review and background research, pedestrian survey with systematic subsurface testing in high and medium probability areas, site evaluation and boundary definition, human remains discovery protocols, Florida Master Site File documentation, and geospatial data management in ArcGIS Pro format. The final deliverable is a Phase I Cultural Resources Assessment Survey report compliant with Florida Administrative Code Chapter 1A-46 standards. Proposals were originally due August 10, 2026, with questions due July 30, 2026. The addendum clarifies critical timeline issues and confirms that all work, including fieldwork, reporting, and approvals, must be completed by March 1, 2027, not the originally stated September 30, 2026 deadline. The contract term runs from the last signature date through the completion deadline with no renewal options.
The estimated budget is $60,000; however, the addendum explicitly encourages offerors to submit proposals representing actual costs necessary to complete the work, inclusive of profit, indicating flexibility on the budget cap. The District will provide property access authorization, mapping and LiDAR data, and identification of known constraints and planned management activities. The contractor must furnish all labor, equipment, materials, transportation, and supplies. A revised Bid Form and Statement of Work are included in the addendum to correct numbering issues from the original solicitation. Award will be made to the lowest responsive and responsible bidder. The addendum also clarifies that respondents may bid as a prime contractor while participating as a subcontractor on another team's proposal, and that the District reserves the right to request additional information from any respondent prior to award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 42303IFB26 Pablo Creek CA - 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ISSUE DATE: July 24, 2026
To: Interested Firms
FROM: Blaine Ashworth, Procurement Director
SUBJECT: Addendum 1 to 42303IFB26 – Pablo Creek Conservation Area Cultural
Resources Assessment Survey
As a result of questions received from potential respondents, please be advised of the following changes to the subject IFB:
Questions/Answers
Q1 May a firm submit a proposal as a Prime Contractor and participate as a Subconsultant on another team's proposal?
A1 Offerors may bid and participate in another bid with another company as a subcontractor. The District has no contract with subcontractors, and we would like to view each offer on its own merits.
Q2 Could you please confirm that the stated budget of $60,000 and the period of performance ending September 30, 2026, are correct?
A2 Offerors are encouraged to provide proposals representing the actual costs necessary to complete the work, inclusive of profit. The District expects all work to be complete no later than March 1, 2027.
Q3 Page 1 (of 42303IFB26) notes that “All Work” must be completed by September
30, 2026. What exactly is included in “All Work”? I am asking because proposals are not due until August 10, 2026, which means that there is only slightly more than a month and a half to get everything finished if “All Work” includes the following tasks: (1) full survey of the 2,722 acres of the Pablo Creek Conservation Area (PCCA), (2) delineation of any sites discovered, (3) analysis of whatever artifacts and other cultural remains are recovered, (4) preparation of a draft report, (5) review of the draft report by the Florida SHPO, (6) revisions to the draft report based on comments received from the SHPO, and (7) preparation and submittal of the final report. Given that the SHPO usually requires at least 30 days to review a draft report, that only leaves less than a month to do everything else. Having conducted thousands of cultural resources investigations over more than 50 years, my experience tells me that it will be impossible to complete “All
Per Addendum 1
Work” by September 30, 2026, if “All Work” includes the seven tasks noted above.
If “All Work” means only the field investigations (i.e., Tasks 1 and 2 of the above), that also will be extremely difficult, if not impossible, to complete by September 30, 2026. Even if only half the survey area is considered to have a high or moderate probability for containing cultural resources, that’s likely thousands of shovel tests spaced at 25-m intervals, each of which needs to be excavated to at least 1 m deep (unless bedrock is hit), screened for cultural material, and with its stratigraphy recorded. The remaining low-probability areas also cannot be ignored, as they will still need to be shovel tested, albeit at greater spacing than 25
m. And that is not counting the unknown number of additional shovel tests that will need to be excavated to delineate the areal extent any sites discovered. I just do not see how even the fieldwork can be completed in by September 30, let alone “All Work.”
A3 The District expects all work to be complete no later than March 1, 2027.
Q4 How firm is the estimated budget of $60,000 that also is mentioned on page 1 of 42303IFB26? Again, in my over 50 years of conducting archaeological research across the U.S. Southeast, including projects in Florida, I don’t see how any firm, or even a university using students, can survey 2,722 acres, excavate thousands of shovel tests, delineate several sites, analyze the recovered material, and prepare both draft and final versions of a report for that amount of money. I would think a survey of this magnitude would require a budget of several hundred thousand dollars, at least.
A4 Offerors are encouraged to provide proposals representing the actual costs believed necessary to complete the work, inclusive of profit.
Q5 The two previously recorded canoes (8DU21513 and 8DU21514) mentioned on page 3 of the RFQ have not been evaluated by the SHPO. Will revisitation and documentation of the canoes be required as part of the survey?
A5 A revisit and site monitoring will be part of this solicitation. The Master Site files can be provided.
Q6 Is there a boat ramp or kayak launch point within the project area to access the two previously recorded canoes (8DU21513 and 8DU21514) and investigate for additional shoreline resources?
A6 There is an area where kayaks can be launched after an approximately 600-foot portage. A dolly can be used; however, the route has many low cypress knees that could pose a problem for vehicles. This area may be mowed by the time of the survey, but that is not certain. The launch is followed by about a 4,000-foot paddle (see highlight in map below). The creek is not significantly tidally influenced. The closest public boat ramp is McCue Park:
https://maps.app.goo.gl/SfrdfsRWoSgcGg448
Q7 The project is on State land and requires obtainment of a 1A-32 permit through the Bureau of Archaeological Research (BAR). It can take the BAR up to 30 days to issue a 1A-32 permit. If the proposals are due on August 10, 2026, and the 1A- 32 permit is not issued until early September, will there be flexibility to extend the September 30, 2026, project completion date?
A7 The District expects all work to be complete no later than March 1, 2027.
Q8 Please clarify if we are to include a cover letter, firm qualifications, technical methodology, and resumes in addition to the required forms and documentation listed on pages 12-13, Part 2, 2.3, How to Assemble Your Submittal section of the RFQ, or is our response only to be comprised of the forms and documentation listed in section 12-13, Part 2, 2.3, How to Assemble Your Submittal section of the RFQ.
A8 Please note that this requirement is solicited as an Invitation for Bid, not a Request for Qualifications. Beginning on Page 12, Part 2, Section 2.3, the cover letter consists of Page 1 of the IFB, completed by the respondent. The Bid Form is Page 11 of the IFB and is listed as Form 2 in the solicitation. The General Qualifications Questionnaire, Similar Projects Form, Certificate as to Respondent's Authority to Do Business in the State of Florida, Affidavit as to Non-Collusion and Certification of Material Conformance with Specifications, Drug-Free Workplace Form, and Submittal Acknowledgement Form are found in Part 3, beginning on Page 19 of the IFB. The respondent-provided documentation described on Page 13, Part 2, Section 2.3, is required as part of each offeror's submittal. Firm qualifications beyond the minimum qualifications stated on Page 12, Part 2, Section 2.1, and illustrated through Pages 20 and 21, Part 3, are not expressly requested. Technical methodology for the Pablo Creek CA CRAS is not expressly requested, but techniques and methodologies may be reviewed if provided as part of an offeror's similar project details. Resumes of key employees are not expressly requested. In all cases, the District reserves the right to request additional information from any respondent prior to award, in accordance with Page 12, Part 2, Section 2.3 of the IFB.
Q9 We wanted to confirm that all work would need to be completed by September
30, 2026. Would this just be for the predictive model, or is that for all fieldwork, reporting, and approvals?
A9 The District expects all work to be complete no later than March 1, 2027.
Q10 We wanted to confirm that the anticipated budget is $60,000. Again, is this just for the predictive model, or for all fieldwork, reporting, and approvals?
A10 Offerors are encouraged to provide proposals representing the actual costs necessary to complete the work, inclusive of profit.
Q11 For fieldwork, are there anticipated acreages for high, medium, and low probability currently to aid in general budgeting and assumptions?
A11 A LiDAR map can be provided if that would help with prioritization.
Q12 Can any GIS and archaeological reports be shared at this time?
A12 The District can provide a LiDAR map as well as the files from the Master Site
File
Q13 In addition to the invitation to bid, can the solicitation package be shared with us?
A13 The solicitation package is included within the Invitation for Bid posted on
DemandStar, Central Bidding, and MyFloridaMarketplace. Bidders are welcome to share the solicitation package and the full Invitation for Bid may be provided by emailing a request to the Procurement Director JBAshwor@sjrwmd.com
Q14 We noticed the bid form requests unit prices, but there is not a space to add those unit prices to the current form. How would the District request those prices be added to the submission?
A14 The bid form is page 11 of the Invitation For Bid and is a lump sum total bid. A revised Bid Form is included in this Addendum.
Q15 Are we able to add on to certain forms? For example, the similar projects form leave space for two projects, and elsewhere in the IFB states that the respondent must have successfully completed a minimum of two projects. Could we make a copy of the form so we can include more than two projects?
A15 Yes. Respondents may make a copy of the Similar Projects Form to include more than two projects.
Q16 Does the District need a compliance level CRAS, or is the District looking for more reconnaissance?
A16 More of a reconnaissance level survey with delineation and description of any sites found, bearing in mind that the large ditch north of Pablo Creek itself will be restored by filling it in with spoil from the adjacent berm. We want to prioritize that area with that project in mind.
Q17 Are there any other more specific mapping images that identify where within the acreage the CRAS would need to be performed? And if so, could those maps be shared with respondents?
A17 We would like the entirety of the property to be surveyed, with priority on the canal/ditch north of Pablo Creek itself.
Q18 Is there any chance of the APE being refined based on known project plans?
A18 The highest priority is a survey of the man-made canal/ditch north of Pablo
Creek
Q19 Is site delineation included in the overall budgeted cost?
A19 Yes
Note to Offerors / Bidders:
A revised Statement of Work has been provided below to address numbering issues in the posted solicitation. No information in the Statement of Work has changed other than numbering.
A revised Bid Form has been included below to replace the bid form on page 11 of the Invitation for Bid. The revised Bid Form removes “Unit Price” as a required field.
Five additional maps are included herein and provided below for offeror/bidder information and situational awareness.
END ADDENDUM 1
INVITATION FOR BIDS
42303IFB26 PABLO CREEK CA CULTURAL RESOURCE SURVEY
REVISED PART 1 – SCOPE OF WORK
Phase I Cultural Resources Assessment Survey (CRAS) Pablo Creek Conservation Area (PCCA)
Duval County, Florida
1.0 SCOPE
1.1 Purpose
This Statement of Work (SOW) defines the requirements for conducting a Phase I Cultural Resources Assessment Survey (CRAS) of the Pablo Creek Conservation Area (PCCA), a 2,722-acre conservation property in Duval County, Florida (Figure 1). The survey will identify, document, and evaluate archaeological and historical cultural resources to support regulatory compliance, long-term land management, and planned hydrologic restoration activities.
1.2 Background
The Pablo Creek Conservation Area is managed by the St. Johns River Water Management District (District) for conservation, protection of natural and cultural resources, and compatible public recreation. The Property contains diverse upland and wetland communities, extensive surface waters associated with Pablo Creek, and documented prehistoric and historic resources, including recorded prehistoric canoes.
The District’s 2025-2035 Land Management Plan (LMP) identifies:
1.2.1 Existing documented cultural resources and the need to locate unknown resources
1.2.2 Planned ground-disturbing activities, including potential restoration of a 1-mile constructed drainage ditch (Figure 2)
1.2.3 A management obligation to consult with the Florida Division of Historical Resources (DHR) prior to implementing activities that may affect cultural resources
1.2.4 Completion of a Phase I CRAS is required to:
1.2.4.1 Comply with state and federal cultural resource protection laws
1.2.4.2 Provide baseline data for land management decision-making.
1.2.4.3 Support future environmental permitting and project design efforts
Figure 1 Area Map
Figure 2 LiDAR Map
Ditch
2.0 APPLICABLE DOCUMENTS
The following documents are applicable to the extent specified in Section 3. In the event of conflict, statutory or regulatory requirements shall prevail.
2.1 Federal Statutes and Regulations
2.1.1 National Historic Preservation Act of 1966, as amended (16 U.S.C.
§470 et seq.)
2.1.2 36 CFR Part 800 – Protection of Historic Properties (Section 106)
2.2 State of Florida Statutes and Rules
2.2.1 Chapter 267, Florida Statutes – Historic Preservation
2.2.2 Chapter 373, Florida Statutes – Water Resources
2.2.3 Section 380.06, Florida Statutes – Florida Coastal Management
Program
2.2.4 Chapter 1A-46, Florida Administrative Code – Archaeological and
Historical Report Standards
2.2.5 Chapter 872.05, Florida Statutes – Treatment of Human Remains
2.3 Guidance and Planning Documents
2.3.1 Management Procedures for Archaeological and Historical Sites and Properties on State-Owned or Controlled Lands (DHR, revised June 2021)
2.3.2 Pablo Creek Conservation Area Land Management Plan, 2025–2035
2.3.3 Florida Master Site File (FMSF) recording standards
3.0 REQUIREMENTS
3.1 General Requirements
The Contractor shall conduct a Phase I Cultural Resources Assessment Survey for approximately 2,722 acres, sufficient to meet: Florida Division of Historical Resources (DHR) and SHPO review standards
3.1.1 Section 106 compliance requirements
3.1.2 District land management and project planning needs
3.1.3 The Contractor shall plan and execute the work to minimize disturbance to sensitive natural communities, wetlands, and listed species habitats identified in the Property’s LMP.
3.2 Survey Design and Methods
3.2.1 Records Review and Background Research The Contractor shall:
3.2.1.1 Review existing cultural resource data, including FMSF records, historic aerials, maps, and relevant archival sources
3.2.1.2 Incorporate environmental context from the Land
Management Plan, including hydrology, landform, soils, and historic land use
3.2.1.3 Identify areas of high, medium, and low archaeological probability
3.3 Field Survey
The Contractor shall:
3.3.1 Conduct pedestrian survey and systematic subsurface testing in areas of high and medium archaeological probability, including but not limited to:
3.3.1.1 Uplands adjacent to Pablo Creek, Cedar Swamp Creek, and
Boggy Branch
3.3.1.2 Interior uplands and sandhill landforms areas proximal to known cultural sites or planned hydrologic restoration
3.3.2 Conduct reconnaissance-level survey with reduced subsurface testing in low-probability areas
3.3.3 Follow standard professional archaeological methods consistent with
DHR guidelines
3.3.4 Utilize road system depicted on Figure 2 for vehicle access
3.4 Site Evaluation
For each site identified, the Contractor shall:
3.4.1 Define horizontal and vertical boundaries
3.4.2 Assess site integrity, function, and age
3.4.3 Provide a preliminary assessment of eligibility for the National
Register of Historic Places (NRHP)
3.5 Human Remains Discovery Protocol
If human remains or unmarked burials are encountered, the Contractor shall:
3.5.1 Immediately cease all work in the vicinity
3.5.2 Notify the District Project Manager
3.5.3 Coordinate with the appropriate authority:
3.5.3.1 District Medical Examiner for remains less than 75 years old
3.5.3.2 State Archaeologist for remains older than 75 years
3.5.3.3 Implement all requirements of Chapter 872.05, Florida
Statutes, before resuming work
4.0 Data Management and Documentation
4.1 Florida Master Site File
The Contractor shall:
4.1.1 Prepare and submit FMSF forms for all newly identified or updated sites
4.1.2 Ensure accuracy of spatial data, descriptions, and site boundaries
4.2 Geospatial Data
The Contractor shall provide:
4.2.1 A geodatabase compatible with ArcGIS Pro
4.2.2 Spatial data depicting site locations and extents with
appropriate metadata
4.2.3 Data formatted for integration into District land management systems
4.3 Reporting
4.3.1 Final Report
The Contractor shall prepare a Final Phase I CRAS report that:
4.3.1.1 Meets Chapter 1A-46, F.A.C. standards
4.3.1.2 Documents methods, findings, and results
4.3.1.3 Includes environmental and management context
from the PCCA LMP
4.3.1.4 Provides management and avoidance
recommendations
4.3.1.5 The final report shall be submitted to the District, which will be responsible for forwarding materials to DHR as appropriate.
5.0 Schedule and Coordination
The Contractor shall:
5.1 Coordinate access and logistics with the District
5.2 Provide the District Project Manager with at least 24hours’ notice prior to mobilization and demobilization
5.3 Complete all fieldwork, reporting, and deliverables within the contract performance period specified in the contract
6.0 Recommendations
The Contractor shall:
6.1 Identify potential conflicts between cultural resources and planned management or restoration activities
6.2 Provide avoidance, minimization, or mitigation recommendations appropriate for land management and hydrologic restoration planning
Figure 3 Road Map
7.0 GOVERNMENT-FURNISHED SUPPORT
The District shall provide:
7.1 Property access authorization
7.2 Available mapping and LiDAR data
7.3 Identification of known constraints, sensitive habitats, and planned management activities
8.0 CONTRACTOR-FURNISHED ITEMS
The Contractor shall provide:
8.1 All labor, equipment, materials, transportation, and supplies necessary to perform the work
8.2 Qualified professional staff meeting Secretary of the Interior standards
9.0 DELIVERABLES (SUMMARY)
Deliverable Description
Field Survey Completion Phase I CRAS field investigations
FMSF Forms Completed site forms for new/updated sites
GIS Geodatabase Spatial data compatible with ArcGIS Pro
Final Report 1A-46 compliant Phase I CRAS report
Management Recommendations
Cultural resource protection guidance
INVITATION FOR BIDS
42303IFB26 PABLO CREEK CA CULTURAL RESOURCE SURVEY
BID FORM
DESCRIPTION TOTAL BID
RESPONDENT SHALL COMPLETE A CULTURAL
RESOURCE ASSESSMENT SURVEY FOR THE PABLO
CREEK CONSERVATION AREA PER SCOPE OF WORK
* TOTAL BID SHALL BE ALL INCLUSIVE OF ANY AND ALL COSTS NECESSARY TO COMPLETE THE TASKING AND FINAL
DELIVERABLES BY DELIVERY DATE
PUBLIC RECORDS: Florida Statutes provide that sealed submittals or replies received by the District shall remain exempt from disclosure until an intended decision is announced or until 30 days from the opening, whichever is earlier. This means that Respondents will not be able to obtain a copy of their competitors’ submittals until the statutory time has elapsed.
UNDER PENALTIES OF PERJURY, I, as the Respondent’s authorized officer or representative, hereby declare that I have fully reviewed the Respondent’s submittal, of which this Cost Schedule is a part; that all facts stated in the submittal are true; that I understand all terms and conditions set forth in the District’s solicitation; and that, if awarded, the Respondent shall fully comply with all terms and conditions.
Name of Respondent Company
Authorized Representative Signature Date
Printed Name / Title
This document must be completed and returned with your submittal
DU21513
DU21514
DU24200
0.15 0.150 Miles
Pablo Creek Conservation Area Cultural Resources
1:20,736
Pablo Creek Conservation Area
District Road Paved Road
Secondary Road
PossibleCulturalSites
Sites
Surveys
Image Value
3.12
36.29¹
0.07 0.070 Miles
Pablo Creek Conservation Area Cultural Resources
1:10,000
Pablo Creek Conservation Area
District Road Paved Road
Secondary Road
PossibleCulturalSites
Sites
Surveys
Image Value
0.07 0.070 Miles
Pablo Creek Conservation Area Cultural Resources
1:8,493
Pablo Creek Conservation Area
District Road Paved Road
Secondary Road
PossibleCulturalSites
Sites
Surveys
Image Value
DU21513
DU21514
0.07 0.070 Miles
Pablo Creek Conservation Area Cultural Resources
1:10,000
Pablo Creek Conservation Area
District Road Secondary Road
PossibleCulturalSites
Sites
Surveys
Image Value
DU24200
0.07 0.070 Miles
Pablo Creek Conservation Area Cultural Resources
1:10,000
Pablo Creek Conservation Area
District Road Secondary Road
PossibleCulturalSites
Sites
Surveys