Attachment 5 - Performance Requirements Summary
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT 1.doc | DOC document | |
| Attachment2.doc | DOC document | |
| Attachment 6.doc | DOC document | |
| Attachment7 1 .DOC | DOC document | |
| Attachment 11.doc | DOC document | |
| Attachment9 1 .DOC | DOC document | |
| Attachment 3.doc | DOC document | |
| 42-08-064.pdf | ||
| Attachment 10.doc | DOC document | |
| Attachment 4.doc | DOC document | |
| Attachment8 1 .doc | DOC document | |
| Attachment11.xls | XLS spreadsheet | |
| Attachment 1.doc | DOC document | |
| Attachment12 1 .DOC | DOC document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
42-08-064
ATTACHMENT 5
Performance Requirements Summary
| Performance Requirements and Deliverables |
| Standard |
| Method of Review |
| Incentive/Deduction |
| Management Controls |
| A Project Plan shall be established consistent with the NRC licensing review schedule. The format for this Project Plan is provided in Attachment 3. |
Once established, and approved by the TM, the project plan, inclusive of schedule, shall form the basis for accomplishment of the task order and shall be used as a means to assess performance.
The TM or designee will review.
The licensing review schedule will be updated and monitored on a frequent basis. The TM shall assess the performance of the contractor for each task order using the Performance Evaluation Plan provided in Attachment 4.
Full payment for 100% compliance.
Items determined to be missing or incorrect will be corrected by the contractor. Award of subsequent task orders will be based on the assigned contractors ability to meet the schedule, milestones, and deliverable requirements of the preceding orders as documented on Attachment 4.
| Technical Evaluation Report |
| The format will be provided as an Attachment to the task order, upon contract award. The content should address the relevant portion of NUREG-0800, “Standard Review Plan (SRP)” or (NUREG 1555, “Environmental SRP” and any Safety Evaluation Report (SER) writing templates furnished by the NRC. |
| The TM or designee will review the technical letter report to the standards to assure compliance. |
The TM shall assess the performance of the contractor for each task order using the Performance Evaluation Plan provided in Attachment 4.
Full payment for 100% compliance.
Items determined to be missing or incorrect will be corrected by the contractor. Award of subsequent task orders will be based on the assigned contractors ability to meet the schedule, milestones, and deliverable requirements of the preceding orders as documented on Attachment 4.
| Performance Requirements and Deliverables |
| Standard |
| Method of Review |
| Incentive/Deduction |
Request for additional information (RAIs)
| Guidance for writing RAIs is provided in Attachment 1. |
| The TM or designee will review the RAIs to the standards to assure compliance. |
The TM shall assess the performance of the contractor using the Performance Evaluation Plan provided in Attachment 4.
Full payment for 100% compliance.
Items determined to be missing or incorrect will be corrected by the contractor. Award of subsequent task orders will be based on the assigned contractors ability to meet the schedule, milestones, and deliverable requirements of the preceding orders documented on Attachment 4.