410133_OMD_MPMG_IFC_Drawings_v02.pdf
PDF 35 MB Posted
- Solicitation number
- S-24800-00016543
- Issued by
- Oregon
About this file
This is a comprehensive set of construction drawings and specifications for the Automated Multipurpose Machine Gun (MPMG) Range Project for the Oregon Military Department at Northwest Forestal Boardman in Boardman, Oregon. The project encompasses the design of a full training range facility including support buildings, firing positions, target systems, and associated infrastructure across approximately 82 acres. The scope includes an ammunition breakdown building, classroom building, operations and storage building, covered mess shelter, latrine building, bleacher enclosure, and control tower, along with multiple firing lanes, range markings, maintenance trails, power distribution centers, and erosion control measures. The project is issued for construction with drawings dated November 22, 2024, and includes detailed architectural plans, structural specifications, civil site plans, mechanical systems, electrical systems, and telecommunications infrastructure.
The construction drawings include comprehensive details for foundations, building sections, interior and exterior elevations, material specifications, door and window schedules, mechanical and electrical plans, and site grading and drainage systems. Design requirements incorporate geotechnical recommendations, seismic design criteria per ASCE 7, wind loads of 100 miles per hour, snow loads appropriate to Oregon's climate, and compliance with the 2022 Oregon Specialty Structural Code. The project specifies pre-finished metal buildings, concrete masonry unit construction with insulation, precast concrete structural elements, and safety systems including pipe rail gates and range markers. Contract documents reference separate specifications for construction materials and methods, with coordination required among multiple design disciplines. The facility is designed to accommodate future operational requirements with provision for expansion and includes comprehensive stormwater management, sediment control, and site restoration provisions consistent with environmental regulations for the Six Mile Canyon watershed.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TOE OF BERM
D
IR
EC
TI
O N
O F
FI
R
E
3:
(T
YP
3:1
(TYP.)
3:1
(TYP.)
3:
(T
YP
2%
SL
O
PE
2%
SL
O
PE
HORIZONTAL AND VERTICAL
CONTROL POINT (CP-1)
HORIZONTAL AND VERTICAL
CONTROL POINT (CP-2)
TOE OF BERM
BE
R
M T
H
IC
KN
ES
S 6'
-0 " M
IN
BERM EXTENSION
2'-0" MIN.
'-0
10'-0"
14'-0"
GENERAL NOTES:
1. CONCRETE SHALL DEVELOP A MINIMUM COMPRESSIVE STRENGTH OF 28MPa
(4000psi) IN 28 DAYS.
2. EMPLACEMENTS SHALL BE CONSTRUCTED OF REINFORCED CONCRETE;
CONCRETE STRUCTURES SHALL BE PRECAST OR CAST-IN-PLACE. PRECAST
STRUCTURE WILL HAVE LIFTING EYES CUT FLUSH.
3. ALL REINFORCING STEEL SHALL BE PER ASTM A615, GRADE 60.
4. AREAS DISTURBED BY CONSTRUCTION ACTIVITIES SHALL BE REVEGETATED OR
RESURFACED CONSISTENT WITH THE NATURAL SURROUNDINGS. GROUND
COVER SHALL NOT REDUCE TARGET VISIBILITY.
5. PLACE TREATED TIMBERS AGAINST CONCRETE WALL ON L4" x 4" x 1/2" x 4" STEEL
ANGLES SPACED A MAXIMUM OF 3' ON CENTER. ATTACH ANGLE TO CONCRETE
WITH CONCRETE ANCHORS.
6. HORIZONTAL CONTROL POINT (CP-1) IS LOCATED ON THE LEFT SIDE OF TARGET
AS VIEWED FROM THE FIRING POSITION.
7. PROVIDE 1/2" CHAMFER ON ALL EXPOSED CONCRETE SURFACES.
8. LABEL EACH EMPLACEMENT. COORDINATE WITH RANGE CONTROL FOR
NUMBERING SCHEME.
SECTION
SCALE: 1" = 2'
GRANULAR DRAINAGE MATERIAL
PRECAST WALL BLOCKS
STACKED BOND
FILTER FABRIC
GRANULAR DRAINAGE MATERIAL
2% SLOPE
10' x 10' x 6" CONCRETE PAD
WITH #4 REBAR @ 12" O.C.E.W.
CENTERED IN SLAB
GRANULAR DRAINAGE MATERIAL
ENTIRE FOOTPRINT OF EMPLACEMENT
COMPACTED SUBGRADE
6"
6"
1'-0"
6" 2% SLOPE
COMPACTED FILL
FILTER FABRIC
3"
CONCRETE BLOCKS - STACKED
BOND
PRECAST WALL BLOCKS
STACKED BOND
10'-6"
CONTROL POINT
HORIZONTAL AND VERTICAL
2'-6"
2% SLOPE
BERM
THICKNESS
6'-0" MIN.
ANGLE OF FIRE
OF FIRE
DIRECTION
3'-6" FOR TANK GUNNERY
4' 8'0 2'
SCALE:1"=2'
GRAPHIC SCALE:
A
CS505
A
CS505
SURFACE / FILL EMPLACEMENT
PLAN
STATIONARY ARMOR TARGET EMPLACEMENT
SCALE: 1" = 2'
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
O R
EG
O
N M
IL
IT
AR
Y
D
EP
AR
TM
EN
T
M
IL
IT
IA
W
AY
S E
SA
LE
M , O
R
EG
O N
-5
C
.0 2.
AN
SI
D
C
N W
ST
F
BO
AR
D M
AN
, O
R
EG
O N
M U
LT
I-P
U R
PO
SE
M
AC
H
IN
E G
U N
(M
PM
G ) R
AN
G
E
PN
, P
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
/2 2/
O
PT
IO
N
AL
V
AL
U E
1%
O
PT
IO
N
AL
V
AL
U E
2%
D .W
EI
ER
BA
C
H
M .K
EN
N
A
B.
R
H O
D
ES
A.
W
ES
T
ST
AT
IO
N
AR
Y
AR
M
O R
T
AR
G
ET
E M
PL
AC
EM
EN
T
CS505
JUNE 30, 2026
GENERAL NOTES:
1. ALL CAPS, PIPES, PLATES, CHAINS, LATCHES, COLLARS TO BE WELDED
CONNECTIONS W/ E70XX 5/16" ROOT WELDS MINIMUM.
2. ALL EXPOSED SURFACES OF THE GATE AND POSTS SHALL BE PRIMED
AND PAINTED SAFETY YELLOW.
ELEVATION
PLAN
PLAN
ELEVATION
26'-0"
1'-0" 4'-0" 7'-0" 7'-0" 4'-0" 1'-0"
26'-0"
COORDINATE
POINT 2 (CP-2)
COORDINATE
POINT
2'-0"
6" SCH. 40 STEEL PIPE
1"
4"
3"
2 1/2" SCH.40
STEEL PIPE RAIL
(TYP.) WELDED SOLID
CAP ON 6"
SCH.40 PIPE
SWIVEL COLLAR
SUPPORT
COLLAR
WELD BOTTOM
EDGE ONLY
6" SCH.40
PIPE (TYP.)
SWIVEL RING
5/16" THICK
SWIVEL
COLLAR
WELD
6"Ø SCH.40
STEEL PIPE
3 LINKS OF 5/16" STEEL CHAIN -
WELD END LINK TO 6" SCHEDULE
40 PIPE - REF DETAIL 3 FOR
ADDITIONAL INFORMATION
4' -0
6"
1'-6"
GRANULAR DRAINAGE
MATERIALS (TYP.)
4' -0
" 6"Ø SCH.40
STEEL PIPE
CONCRETE
FILLED AND
CAPPED
(TYP.)
'-0
COORDINATE
POINT 1 (CP-1)
PIECE OF CHAIN
WELDED TO POST
CONCRETE FOOTING
3000 PSI (TYP.)
COORDINATE POINT
CONCRETE
FILLED AND
CAPPED
(TYP.)
RETENTION COLLAR
TACK WELD TOP EDGE ONLY
TO 6" PIPE (TO PREVENT
UNAUTHORIZED GATE REMOVAL)
PIPE RAIL GATE
GATE POST-RETENTION AND SUPPORT COLLARS
CHAIN LATCH DETAIL
LATCH POST DETAIL LATCH POST DETAIL
6" SCH 40
STEEL PIPE
2 1/2" SCH 40
STEEL PIPE RAILS (TYP.)
1"
3' -0
6"
4' -0
SCALE: NOT TO SCALE
SCALE: NOT TO SCALE
SCALE: NOT TO SCALE
SCALE: NOT TO SCALE
SCALE: NOT TO SCALE
CS506 CS506
CS506 CS506
CS506
CS506
CS506
CS506 CS506
CS506
CS506
8" 8" 8"
LOCK FURNISHED
BY OWNER
8" CLEAR TO OPPOSING GATE LEAF
16" WELDED GALVANIZED GRADE 30
CHAIN x 1'-0" LONG (McMASTER-CARR
3592T46 (OR EQUAL)
2" SCHEDULE 40 PIPE (TYP.)
PL 3 8" x 27
8" OD
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
O R
EG
O
N M
IL
IT
AR
Y
D
EP
AR
TM
EN
T
M
IL
IT
IA
W
AY
S E
SA
LE
M , O
R
EG
O N
-5
C
.0 2.
AN
SI
D
C
N W
ST
F
BO
AR
D M
AN
, O
R
EG
O N
M U
LT
I-P
U R
PO
SE
M
AC
H
IN
E G
U N
(M
PM
G ) R
AN
G
E
PN
, P
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
/2 2/
O
PT
IO
N
AL
V
AL
U E
1%
O
PT
IO
N
AL
V
AL
U E
2%
+J . C
H
EC
KE
R
+J . D
R
AW
ER
+J . D
ES
IG
N
ER
+J . S
U
BM
IT
TE
R
PI
PE
R
AI
L
G
AT
E
CS506
1/ 2"
CONCRETE
FILLED AND CAPPED
6" DIA. STD STEEL PIPE
FILLED WITH CONCRETE.
ENTIRE LENGTH OF POST
ABOVE GROUND SHALL BE
PAINTED SAFETY YELLOW
FINISHED GRADE
CONCRETE FOOTING
(MIN. 3000 PSI)
6" GRADED CRUSHED
AGGREGATE PER ODOT
STANDARD SPECIFICATION
SECTION 02056
1'-6"
6"
3' -6
3'
-8
NOTES:
1. REFER TO ELECTRICAL
DRAWING E-504 FOR FLAG
POLE INFORMATION.
2. ADJUST POLE FOUNDATION
DIMENSIONS PER THE POLE
MANUFACTURER'S
RECOMMENDATIONS.
3. USE MIN. 3000 PSI
CONCRETE FOR BASE.
PLAN
13"
1'-6"
PIPE BOLLARD DETAIL
SCALE: NOT TO SCALE
1 FLAG POLE FOUNDATION
SCALE: NOT TO SCALE
5 EA.#4
REBAR
COORDINATE
POINT
5' -6
1'
-0
1 1/2"
CHAMFER COORDINATE EMBEDDED
BOLTS AND CONDUITS W/ ELECTRICAL
CONTRACTOR (ELECTRICAL SERVICE
TO WARNING LIGHT)
#4 SPIRAL REBAR W/4"
PITCH
CS507 CS507
SCALE: 1/2" = 1'
2' 4' 6'0
GRAPHIC SCALES:
CONCRETE
COUNTERBALANCE
BRASS PIN w/S.S.
CLIP
3" x 3" x 1/4" PLATE
BRASS OR NYLON
PULLEY
1/4"
PULLEY
3/32" STAINLESS
STEEL WIRE ROPE
6 x 19
FORM(2) TWO EYES
w/ WIRE ROPE CLIP
(GALVANIZED)
H
EI
G H
T O
F
FL
AG
N.T.S.
ROD (10'-0" LONG)
GALVANIZED GROUND
COUNTERBALANCE
CONCRETE
(1) 4" x 2'-0" x 6"
(2) 2" x 2" x 1/4"
ANGLE WELD TO
EA. PIPE
CONCRETE BASE
WITH ROUNDED TOP
PULLEY
HOOK
STEEL FLAG
3" CAP
PULLEY
HALYARD
5"
0.5"
2'-6"
6"
4' -0
'-6
'-0
2' -0
3'
-0
FLAGPOLE ELEVATIONS AND DETAILS4
CS507 SCALE: 1/2" = 1'
3" Ø GALVANIZED
PIPE, SCH. 40
3" Ø GALVANIZED PIPE
10'-0" LONG, SCH. 40
3/4" Ø BOLT
LIGHT (SEE ELECTRICAL
PLATES FOR DETAILS)
(2) 5/8" Ø
BOLTS & NUTS
W/ WASHERS
N.T.S.
1.
2.
3.
4.
5.
6.
7.
8.
NOTES:
DIAGONALS SHALL BE PAINTED LUMINOUS INTERNATIONAL ORANGE.
ALL HARDWARE SHALL BE GALVANIZED.
ALL WOOD TO BE PRESERVATIVE TREATED.
CARRIAGE BOLTS SHALL BE EQUIPPED WITH WASHER, LOCKWASHER, AND NUT.
LAG BOLTS SHALL BE 1/4" DIAMETER AND EQUIPPED WITH WASHER.
LEFT SIDE MARKER IS SHOWN; RIGHT SIDE MARKER OPPOSITE HAND.
HORIZONTAL CONTROL POINT (CP-1) IS LOCATED ON THE BEACON SIDE OF THE MARKER.
THE STANDARD POST MATERIAL IS TREATED WOOD, HOWEVER, INSTALLATION
APPROVED MATERIAL IS ACCEPTABLE.
RANGE OUTER LIMIT MARKER2
CS507 SCALE: 1/2" = 1'
HORIZONTAL
CONTROL
POINT (CP-2)
HORIZONTAL
CONTROL
POINT (CP-1)
HEIGHT, H
(SEE EXTERIOR LIMIT MARKER
HEIGHTS TABLE)
8' -0
4' -0
6'-0"
11"
4' -0
4' -0
RED LIGHT (TYP. 3) WITH
SUFFICIENT CABLE TO REACH
RECEPTACLE AND GROUNDED PLUG.
1/2" CARRIAGE BOLTS (TYP.
ALL DIAGONALS)
1/2" CARRIAGE BOLTS
2" x 12"
8'-0"
MIN.
6" x 6"
POST
1/2" CARRIAGE
BOLTS
2" x 12"
6"
EXTERIOR LIMIT
MARKER HEIGHTS
DESCRIPTION HEIGHT, H
4'-0"400M LEFT (LANE 1)
400M RIGHT (LANE 10)
800M LEFT (LANE 1)
800M RIGHT (LANE 10)
1100M LEFT (LANE 4)
1100M RIGHT (LANE 7)
4'-0"
6'-0"
4'-0"
6'-0"
4'-0"
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
O R
EG
O
N M
IL
IT
AR
Y
D
EP
AR
TM
EN
T
M
IL
IT
IA
W
AY
S E
SA
LE
M , O
R
EG
O N
-5
C
.0 2.
AN
SI
D
C
N W
ST
F
BO
AR
D M
AN
, O
R
EG
O N
M U
LT
I-P
U R
PO
SE
M
AC
H
IN
E G
U N
(M
PM
G ) R
AN
G
E
PN
, P
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
/2 2/
O
PT
IO
N
AL
V
AL
U E
1%
O
PT
IO
N
AL
V
AL
U E
2%
D .W
EI
ER
BA
C
H
M .K
EN
N
A
B.
R
H O
D
ES
A.
W
ES
T
CS507
PI
PE
B O
LL
AR
D 〳
R
AN
G E
LI
M
IT
M
AR
KE
R 〳
FP
F
O U
N D
AT
IO
N 〳
FP
E
LE
VA
TI
O
N S
HORIZONTAL AND VERTICAL
CONTROL POINT (CP-1)
6" COMPACTED BASE COURSE - 100% COMPACTION
CONCRETE PAD (SEE NOTES)
HORIZONTAL AND VERTICAL
CONTROL POINT (CP-2)
2%
D
IR
EC
TI
O N
3:
(T
YP
2%
S
LO
PE
SCALE: 1" = 4'
DOWNRANGE POWER CENTER
PLAN
O F
FI
R
E
2' x 2' x 6' (TYP.) PRECAST
WALL BLOCKS - STACK
USING STAGGERED BOND
(TYP.)
SL
O
PE
TOE OF SLOPE
(VARIES)
TOE OF SLOPE
(VARIES)
NOTES
3. ALL REINFORCING STEEL SHALL BE PER ASTM A615, GRADE 60.
4. ALL CONCRETE SHALL BE 3,000 PSI IN 28 DAYS.
1. BERMS SHALL BE CONSTRUCTED OF COMMON FILL MATERIALS (SEE
SPECS.) COMPACTED @ 95% (PER ASTM D1557)
5. HORIZONTAL AND VERTICAL CONTROL POINT (CP-1) IS LOCATED ON THE
NORTHERN MOST SIDE OF TARGET.
2. FILTER FABRIC SHALL BE INSTALLED THE FULL HEIGHT OF ALL OF THE
BLOCKS THAT MAKE UP THE EMPLACEMENT.
6. CONTRACTOR SHALL SIZE TRANSFORMER PAD BASED ON TRANSFORMER
TO BE PROVIDED.
7. CONTRACTOR SHALL ENSURE TRANSFORMER IS ADEQUATELY PROTECTED
BY POWER CENTER EMPLACEMENT.
GRAPHIC SCALES
SCALE: 1" = 2'
40 22
SCALE: 1" = 4'
80 44
FILTER FABRIC
2% SLOPE
2' x 2' x 6' (TYP.)
PRECAST WALL
BLOCKS - STACKED
BOND
2' x 2' x 6'
CONCRETE BLOCKS
STACKED BOND
CONCRETE PAD w/ #4 @ 12" O.C.E.W.
CENTERED IN SLAB
(SEE NOTE 6)
3 1
HORIZONTAL AND VERTICAL
GRANULAR DRAINAGE METERIAL
COMPACTED SUBGRADE ENTIRE
FOOTPRINT OF EMPLACEMENT
1'-0"
4"
2'-0"
25'-0"
6' -0
2'-0"
'-0
6' -0
3'-0"
2'-6"
6'-0"
14'-0" 2'-0" R
2% SLOPE
6" 2% SLOPE
BERM
THICKNESS
6'-0" MIN.
SECTION
SCALE: 1" = 2'
A
CS508
A
CS508
CONTROL POINTS
COMPACTED FILL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
O R
EG
O
N M
IL
IT
AR
Y
D
EP
AR
TM
EN
T
M
IL
IT
IA
W
AY
S E
SA
LE
M , O
R
EG
O N
-5
C
.0 2.
AN
SI
D
C
N W
ST
F
BO
AR
D M
AN
, O
R
EG
O N
M U
LT
I-P
U R
PO
SE
M
AC
H
IN
E G
U N
(M
PM
G ) R
AN
G
E
PN
, P
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
/2 2/
O
PT
IO
N
AL
V
AL
U E
1%
O
PT
IO
N
AL
V
AL
U E
2%
D .W
EI
ER
BA
C
H
M .K
EN
N
A
B.
R
H O
D
ES
A.
W
ES
T
PO
W
ER
C
O N
TR
O
L C
EN
TE
R
CS508
SIDE VIEW NOTES:
1. THE STANDARD POST MATERIAL IS TREATED
WOOD. HOWEVER, INSTALLATION APPROVED
MATERIAL IS ACCEPTABLE.
DESIGNER NOTES:
1. POST SIZE AND FOOTINGS SHOWN ARE FOR
REFERENCE ONLY. DESIGNER TO PROVIDE SITE
SPECIFIC POST SIZE AND FOOTING DESIGN.
4'-0"
4' -0
3'
-0
3' -0
3' -0
3' -0
3'
-0
2' -0
2'-0"
1' -6
6"
SIDE VIEW
INTERIOR LIMIT MARKERS
SCALE: 1" = 2'
CS509
RANGE LANE MARKERS
SCALE: 1" = 2'
CS509
LA
N
E
ED
G E
LA
N
E
ED
G E
SINGLE MARKER
3'-10" 3'-10"
DOUBLE MARKERSINGLE MARKER
LA
N
E
ED
G E
LA
N
E
ED
G E
DOUBLE MARKER
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
O R
EG
O
N M
IL
IT
AR
Y
D
EP
AR
TM
EN
T
M
IL
IT
IA
W
AY
S E
SA
LE
M , O
R
EG
O N
-5
C
.0 2.
AN
SI
D
C
N W
ST
F
BO
AR
D M
AN
, O
R
EG
O N
M U
LT
I-P
U R
PO
SE
M
AC
H
IN
E G
U N
(M
PM
G ) R
AN
G
E
PN
, P
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
/2 2/
O
PT
IO
N
AL
V
AL
U E
1%
O
PT
IO
N
AL
V
AL
U E
2%
D .W
EI
ER
BA
C
H
M .K
EN
N
A
B.
R
H O
D
ES
A.
W
ES
T
R
AN
G E
LA
N
E M
AR
KE
R S
CS509
JUNE 30, 2026
AutoCAD SHX Text 3'-6" x 12" DIA. CONCRETE FOOTING @ 0.03 YD (ROUND TOP FOR DRAINAGE)
AutoCAD SHX Text
GRANULAR DRAINAGE MATERIAL (TYP.)
AutoCAD SHX Text
RANGE INTERIOR LIMIT MARKER BEYOND 300 METERS PER TC 25-8
AutoCAD SHX Text
RANGE INTERIOR LIMIT MARKER UP TO 300 METERS PER TC 25-8
AutoCAD SHX Text
GRANULAR DRAINAGE MATERIAL (TYP.)
AutoCAD SHX Text
GRANULAR DRAINAGE MATERIAL (TYP.)
AutoCAD SHX Text
POST SLEEVE SET IN CONCRETE (TYP.)
AutoCAD SHX Text 3'-6" x 12" DIA. CONCRETE FOOTING @ 0.03 YD (ROUND TOP FOR DRAINAGE)
AutoCAD SHX Text
EXISTING GROUND
AutoCAD SHX Text
HORIZONTAL CONTROL POINT
AutoCAD SHX Text PANELS TO HAVE 2" x 4" FOR FRAME
AutoCAD SHX Text
TREATED TIMBER POST 4" (MIN.) DIA.
AutoCAD SHX Text
RANGE INTERIOR LIMIT MARKER UP TO 300 METERS PER TC 25-8
AutoCAD SHX Text
HORIZONTAL CONTROL POINT (CP-1)
AutoCAD SHX Text
HORIZONTAL CONTROL POINT (CP-2)
AutoCAD SHX Text
GRADE
AutoCAD SHX Text
POST SLEEVE SET IN CONCRETE (TYP.)
AutoCAD SHX Text 3'-6" x 12" DIA. CONCRETE FOOTING @ 0.03 YD (ROUND TOP FOR DRAINAGE)
AutoCAD SHX Text
GRANULAR DRAINAGE MATERIAL (TYP.)
AutoCAD SHX Text
RANGE INTERIOR LIMIT MARKER BEYOND 300 METERS PER TC 25-8
AutoCAD SHX Text
HORIZONTAL CONTROL POINT (CP-1)
AutoCAD SHX Text
HORIZONTAL CONTROL POINT (CP-2)
AutoCAD SHX Text
MARKER BASE
AutoCAD SHX Text
GRADE
AutoCAD SHX Text 4"x4" TREATED WOOD POST (TYP.)
AutoCAD SHX Text 3/4"x4'-0"x4'-0" TREATED PLYWOOD
AutoCAD SHX Text
HORIZONTAL CONTROL POINT (CP-2)
AutoCAD SHX Text
GRADE
AutoCAD SHX Text 1/2"x2'-0"x2'-0" TREATED PLYWOOD
AutoCAD SHX Text
HORIZONTAL CONTROL POINT (CP-1)
AutoCAD SHX Text 4"x4" TREATED WOOD POST (TYP.)
6' -0
3'
-0
3" 2'
-6
COORDINATE
POINT #2
4"x4" TREATED POST
COORDINATE
POINT #1
6"
1'-6"
GRADED CRUSHED AGGREGATE
PER ODOT STANDARD
SPECIFICATION SECTION 02056
FINISHED
GRADE
CONCRETE FOOTING
(MIN 3000 PSI CONCRETE)
ELEVATION
OMD MPMG
Range ###
3"
RANGE IDENTIFICATION SIGN
SCALE: NOT TO SCALE
RANGE IDENTIFICATION SIGN DETAIL
SCALE: NOT TO SCALE
3'-4"
3'-6"
5"
2' -6
3" 2" 6"
2" 2"
2"
3"2"
3"
INFORMATION
ON BOTH SIDES
6' -0
3'
-0
3" 2'
-6
4"x4" TREATED POST
6"
1'-6"
GRADED CRUSHED AGGREGATE
PER ODOT STANDARD
SPECIFICATION SECTION 02056
CONCRETE FOOTING
(MIN 3000 PSI CONCRETE)
ELEVATION
3"
UPPER CASE HELVETICA MEDIUM, 2"
CAPITAL LETTER HEIGHT, CENTERED
1 1/2" WHITE SPACE BETWEEN LINES
3/4" x 2'-0" x 2'-0"
TREATED PLYWOOD
WARNING SIGN
SCALE: NOT TO SCALE
NO OUTLET
BEYOND
10 METER
ZERO RANGE
COORDINATE
POINT
FINISHED
GRADE
CS510
CS510
CS510
MULTI-PURPOSE
MACHINE GUN RANGE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
O R
EG
O
N M
IL
IT
AR
Y
D
EP
AR
TM
EN
T
M
IL
IT
IA
W
AY
S E
SA
LE
M , O
R
EG
O N
-5
C
.0 2.
AN
SI
D
C
N W
ST
F
BO
AR
D M
AN
, O
R
EG
O N
M U
LT
I-P
U R
PO
SE
M
AC
H
IN
E G
U N
(M
PM
G ) R
AN
G
E
PN
, P
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
/2 2/
O
PT
IO
N
AL
V
AL
U E
1%
O
PT
IO
N
AL
V
AL
U E
2%
+J . C
H
EC
KE
R
+J . D
R
AW
ER
+J . D
ES
IG
N
ER
+J . S
U
BM
IT
TE
R R
AN
G
E
ID
S
IG
N S
CS510
OREGON DOT TYPE "F" BARRIER
SCALE: NOT TO SCALE
CS511
PRECAST CONCRETE BARRIER
6'-0"
(TYP.)
12'-6"
(TYP.)
(T
YP
3/4" 6X19 CLASS WIRE ROPE
WITH 6" SAG MAX.
FINISHED
GRADE
12" TURNBACK LOOP
WITH CABLE CLAMP
AT EACH END
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
O R
EG
O
N M
IL
IT
AR
Y
D
EP
AR
TM
EN
T
M
IL
IT
IA
W
AY
S E
SA
LE
M , O
R
EG
O N
-5
C
.0 2.
AN
SI
D
C
N W
ST
F
BO
AR
D M
AN
, O
R
EG
O N
M U
LT
I-P
U R
PO
SE
M
AC
H
IN
E G
U N
(M
PM
G ) R
AN
G
E
PN
, P
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
/2 2/
O
PT
IO
N
AL
V
AL
U E
1%
O
PT
IO
N
AL
V
AL
U E
2%
+J . C
H
EC
KE
R
+J . D
R
AW
ER
+J . D
ES
IG
N
ER
+J . S
U
BM
IT
TE
R O
R
EG
O N
D O
T
TY
PE
''F
'' B
AR
R
IE
R
CS511
(M
IN
1'-6" 6'-0"
1'-6"
LIFTING EYE
RE: DETAIL
2' -0
6" 6" x 6" KEY.
MATCH LOCATION
TOP AND BOTTOM
TO ENSURE BLOCKS
STACK IN SUCH
A WAY TO ENSURE
THE FACE OF THE
WALL IS FLUSH.
BOTTOM KEY WITHIN
RE: BLOCK DETAIL, END VIEW
SIDE VIEWTOP VIEW
LIFTING EYE
RE: DETAIL
6'-0" 10"
2' -0
6" 3'-0"
1'-6"
LIFTING EYE
RE: DETAIL 4
6" x 6" KEY.
MATCH LOCATION
TOP AND BOTTOM
TO ENSURE BLOCKS
STACK IN SUCH
A WAY TO ENSURE
THE FACE OF THE
WALL IS FLUSH.
BOTTOM KEY WITHIN.
RE: BLOCK DETAIL, END VIEW
2' -0
6"
3'-0" 10"
6"
LIFTING EYE
RE: DETAIL
SIDE VIEWTOP VIEW
2' -0
END VIEW
6" x 6" KEY. MATCH
LOCATION TOP AND
BOTTOM TO ENSURE
BLOCKS STACK IN SUCH A
WAY TO ENSURE THE FACE
OF THE WALL IS FLUSH. NO
TOP KEY IS REQUIRED FOR
TOP BLOCK APPLICATIONS.
BLANK KEY OFF WHEN
FORMED.
2' -0
6"
2'-0"
7" 1" CHAMFER (TYP.)
ALL SIDES
SIDE VIEW
2' -0
6'-0"
LIFTING EYE
RE: BLOCK DETAIL
1'-11"
4" 6"
BOTTOM KEY WITHIN
2' -0
6"
1'-0" 1'-0"
4" (M
IN
)#6 REBAR
BEND TO
SHAPE
TOP OF
BLOCK KEY
PRECAST WALL SLOPED END BLOCK
SCALE: NOT TO SCALE
LIFTING EYE DETAIL
PRECAST WALL HALF BLOCK
SCALE: NOT TO SCALE
PRECAST WALL BLOCK
SCALE: NOT TO SCALE
CS512
SCALE: NOT TO SCALE
SCALE: NOT TO SCALE
CS512
CS512 CS512
NOTES:
1. CONCRETE TO BE 3,000 PSI & 28 DAYS MIN.
5% BY VOLUME, AIR ENTRAINED
2. ALL BLOCKS TO HAVE 1" CHAMFER ALONG
ALL SIDES.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
O R
EG
O
N M
IL
IT
AR
Y
D
EP
AR
TM
EN
T
M
IL
IT
IA
W
AY
S E
SA
LE
M , O
R
EG
O N
-5
C
.0 2.
AN
SI
D
C
N W
ST
F
BO
AR
D M
AN
, O
R
EG
O N
M U
LT
I-P
U R
PO
SE
M
AC
H
IN
E G
U N
(M
PM
G ) R
AN
G
E
PN
, P
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
/2 2/
O
PT
IO
N
AL
V
AL
U E
1%
O
PT
IO
N
AL
V
AL
U E
2%
+J . C
H
EC
KE
R
+J . D
R
AW
ER
+J . D
ES
IG
N
ER
+J . S
U
BM
IT
TE
R C
O N
C R
ET
E
BL
O
C
KS
CS512
TARGET BOOT
SCALE: NOT TO SCALE
CS513
3" 4'
-0
6"
9"
4'-0"
6'- 0"
1'-6"
2x44x4
PT POST
1/2" THICK BALLISTIC
RUBBER PANEL
TWO 3/4"
PLYWOOD
4x4
PT POST
2x4
FINISHED
GRADE
2x4
4x4
PT POST
CONCRETE
FOOTING
(MIN 3000psi
CONCRETE)
GRADED CRUSHED
AGGREGATE PER
ODOT STANDARD
SPECIFICATION
SECTION 02056
5" STD
PVC PIPE
CP-1 CP-2
4x4
PT POST
1'- 0"
D
IR
EC
TI
O N
O F
FI
R
E
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
O R
EG
O
N M
IL
IT
AR
Y
D
EP
AR
TM
EN
T
M
IL
IT
IA
W
AY
S E
SA
LE
M , O
R
EG
O N
-5
C
.0 2.
AN
SI
D
C
N W
ST
F
BO
AR
D M
AN
, O
R
EG
O N
M U
LT
I-P
U R
PO
SE
M
AC
H
IN
E G
U N
(M
PM
G ) R
AN
G
E
PN
, P
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
/2 2/
O
PT
IO
N
AL
V
AL
U E
1%
O
PT
IO
N
AL
V
AL
U E
2%
+J . C
H
EC
KE
R
+J . D
R
AW
ER
+J . D
ES
IG
N
ER
+J . S
U
BM
IT
TE
R
TA
R G
ET
B
O O
T
CS513
16.75'
4.64'
40.00'
16.14'
R25.0'
23.86'
13.99'
22.52'
R25.0'
20.85'
8.79'
17.48'
40.00'
16.90'
R25.0'
17.96'
12.93'
30.06' 9.94'
40.00'
14.05'
R25.0'
21.10'
16.03'
17.53' 22.56'
40.08'
17.14'
20.00'
92.00'
12.00'
R25' R25
15.00' 15.00'
755756
757 758
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
O R
EG
O
N M
IL
IT
AR
Y
D
EP
AR
TM
EN
T
M
IL
IT
IA
W
AY
S E
SA
LE
M , O
R
EG
O N
-5
C
.0 2.
AN
SI
D
C
N W
ST
F
BO
AR
D M
AN
, O
R
EG
O N
M U
LT
I-P
U R
PO
SE
M
AC
H
IN
E G
U N
(M
PM
G ) R
AN
G
E
PN
, P
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
/2 2/
O
PT
IO
N
AL
V
AL
U E
1%
O
PT
IO
N
AL
V
AL
U E
2%
+J . C
H
EC
KE
R
+J . D
R
AW
ER
+J . D
ES
IG
N
ER
+J . S
U
BM
IT
TE
R M
AI
N
TE
N
AN
C
E
TR
AI
L
IN
TE
R
SE
C
TI
O N
D
ET
AI
LS
CS514
SIGN DETOUR - 100M1
CS514 SCALE: 1" = 10'
SIGN DETOUR - 400M2
CS514 SCALE: 1" = 10'
SIGN DETOUR - 800M3
CS514 SCALE: 1" = 10'
SIGN DETOUR - 1100M4
CS514 SCALE: 1" = 10'
MAINTENANCE ROAD TURNAROUND5
CS514 SCALE: 1" = 10'
JUNE 30, 2026
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6-P1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FINISHED GRADE
4" PERFORATED
PVC PIPE
NON-WOVEN DRAINAGE GEOTEXTILE
4" SCH80 PVC PIPE
SPECIAL FILTER MATERIAL
SPECIAL FILTER MATERIAL
A
A
INFILTRATION TRENCH
SCALE: NOT TO SCALE
CS515
SECTION A-A
4" PERFORATED
PVC PIPE CAP
COUPLING
1. SPECIAL FILTER MATERIAL SHALL BE IN ACCORDANCE
WITH ODOT SSC 02610 - SPECIAL FILTER MATERIAL.
2. PERFORATED PVC PIPE SHALL BE IN ACCORDANCE WITH
ODOT SSC 02415.50 - POLYVINYL CHOLORIDE PIPE.
3. NON-WOVEN DRAINAGE GEOTEXTILE SHALL BE IN
ACCORDANCE WITH ODOT SSC 0035 - GEOSYNTHETIC
INSTALLATION AND 02320 - GEOSYNTHETICS.
NOTES:
GEOTEXTILE
OVERLAP
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
O R
EG
O
N M
IL
IT
AR
Y
D
EP
AR
TM
EN
T
M
IL
IT
IA
W
AY
S E
SA
LE
M , O
R
EG
O N
-5
C
.0 2.
AN
SI
D
C
N W
ST
F
BO
AR
D M
AN
, O
R
EG
O N
M U
LT
I-P
U R
PO
SE
M
AC
H
IN
E G
U N
(M
PM
G ) R
AN
G
E
PN
, P
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
/2 2/
O
PT
IO
N
AL
V
AL
U E
1%
O
PT
IO
N
AL
V
AL
U E
2%
+J . C
H
EC
KE
R
+J . D
R
AW
ER
+J . D
ES
IG
N
ER
+J . S
U
BM
IT
TE
R
IN
FI
LT
R
AT
IO
N
T R
EN
C
H
CS515
WATER TANK SLAB
SCALE: 1" = 1'
CS516
3000 PSI CONCRETE SLAB, SSD #6 @ 12" O.C.E.W.
(TYP.)
8" CRUSHED ROCK
COMPACTED
SUBGRADE
3/4" CHAMFER
(TYP.)
T/GRADE
REF. PLAN
NOTES:
1. FOR SUBGRADE PREPARATION, REFER TO
NOTE #4 UNDER FOUNDATION NOTES ON S-001.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
O R
EG
O
N M
IL
IT
AR
Y
D
EP
AR
TM
EN
T
M
IL
IT
IA
W
AY
S E
SA
LE
M , O
R
EG
O N
-5
C
.0 2.
AN
SI
D
C
N W
ST
F
BO
AR
D M
AN
, O
R
EG
O N
M U
LT
I-P
U R
PO
SE
M
AC
H
IN
E G
U N
(M
PM
G ) R
AN
G
E
PN
, P
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
/2 2/
O
PT
IO
N
AL
V
AL
U E
1%
O
PT
IO
N
AL
V
AL
U E
2%
+J . C
H
EC
KE
R
+J . D
R
AW
ER
+J . D
ES
IG
N
ER
+J . S
U
BM
IT
TE
R W
AT
ER
T
AN
K
SL
AB
D
ET
AI
L
CS516
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
O R
EG
O
N M
IL
IT
AR
Y
D
EP
AR
TM
EN
T
M
IL
IT
IA
W
AY
S E
SA
LE
M , O
R
EG
O N
-5
C
.0 2.
AN
SI
D
C
N W
ST
F
BO
AR
D M
AN
, O
R
EG
O N
M U
LT
I-P
U R
PO
SE
M
AC
H
IN
E G
U N
(M
PM
G ) R
AN
G
E
PN
, P
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
/2 2/
O
PT
IO
N
AL
V
AL
U E
1%
O
PT
IO
N
AL
V
AL
U E
2%
+J . C
H
EC
KE
R
+J . D
R
AW
ER
+J . D
ES
IG
N
ER
+J . S
U
BM
IT
TE
R
ER
O
SI
O N
A N
D S
ED
IM
EN
T
C O
N
TR
O L
N O
TE
S
CE501
1. AREA DISTURBED BY IMPROVEMENTS IS APPROXIMATELY 82 ACRES.
2. CONTRACTOR SHALL OBTAIN ALL GRADING PERMITS FROM THE APPROPRIATE
AUTHORITIES HAVING JURISDICTION. CONTRACTOR SHALL ALSO FILE THE
NOTICE OF INTENT (NOI) PREPARE THE STORMWATER POLLUTION
PREVENTION PLAN (SWPPP) IN ACCORDANCE WITH OREGON DEPARTMENT OF
ENVIRONMENTAL QUALITY REQUIREMENTS.
3. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED BY THE
CONTRACTOR PRIOR TO ANY LAND DISTURBANCE AND SHALL FOLLOW THE
CONSTRUCTION SEQUENCE AS DESCRIBED ON THIS SHEET. IN ADDITION, THE
FOLLOWING MEASURES ARE NEEDED TO SATISFY THE REQUIREMENTS OF
THE OR-DEQ:
A. THE CONTRACTOR WILL PROVIDE A DUST MANAGEMENT PLAN TO
OREGON MILITARY DEPARTMENT FOR APPROVAL.
B. CONTRACTOR SHALL KEEP VEHICLE TRACKING OF SEDIMENT TO A
MINIMUM AND SHALL CLEAN HAUL ROUTES IF TRACKING BECOMES
EXCESSIVE AS DETERMINED BY THE LOCAL GOVERNMENT OR
PROJECT REPRESENTATIVE.
4. ANTICIPATED PROJECT SCHEDULE IS FOR CONSTRUCTION TO BEGIN AFTER
SELECTION OF CONTRACTOR AND RECEIPT OF REGULATORY APPROVALS.
INSTALLATION OF PERMANENT VEGETATION COVER WILL BEGIN IMMEDIATELY
UPON COMPLETION OF CONSTRUCTION ACTIVITIES.
RECEIVING STREAM INFORMATION: SIX MILE CANYON.
NOTE:
DISTURBED AREAS SHALL BE SEEDED FOR SILT AND EROSION PROTECTION WITH
SEED SPECIES APPROPRIATE FOR THE SEASON AS PROVIDED BY THE OREGON
MILITARY DEPARTMENT.
SF
JUNE 30, 2026
AutoCAD SHX Text
SILT FENCE
AutoCAD SHX Text PHASE A: CONSTRUCTION OF SUPPORT AREA AND SUPPORT AREA ACCESS DRIVE, FIRING LINE AND FIRING LINE ACCESS DRIVE. 1. CLEAR AND GRUB FOR AND INSTALL STABILIZED CONSTRUCTION ENTRANCE CE-01 (SOIL CLEAR AND GRUB FOR AND INSTALL STABILIZED CONSTRUCTION ENTRANCE CE-01 (SOIL TRACKING PREVENTION DEVICE). 2. INSTALL FILTER TUBE/SOCK DIVERSION FSD-01, FSD-02, FSD-03 & FSD-04. INSTALL FILTER TUBE/SOCK DIVERSION FSD-01, FSD-02, FSD-03 & FSD-04. 3. CLEAR AND GRUB PROPOSED SUPPORT AREA, AND SUPPORT AREA ACCESS DRIVE WITHIN THE CLEAR AND GRUB PROPOSED SUPPORT AREA, AND SUPPORT AREA ACCESS DRIVE WITHIN THE DISTURBANCE LIMITS SHOWN. LIMIT DISTURBED AREAS TO THAT WHICH CAN BE STABILIZED WITHIN ONE WORKING DAY FOLLOWING THE DISTURBANCE. 4. MAKE CUTS AND FILLS AS REQUIRED TO ESTABLISH SUBGRADE FOR THE SUPPORT AREA, MAKE CUTS AND FILLS AS REQUIRED TO ESTABLISH SUBGRADE FOR THE SUPPORT AREA, SUPPORT AREA ACCESS DRIVE, AND INSTALL FILTER TUBE/SOCK CHECK DAM FSCD-01 AND FSCD-02 IMMEDIATELY FOLLOWING GRADING OF SWALE IN WHICH THEY ARE LOCATED. 5. CONSTRUCT ELECTRICAL UTILITIES, BUILDING FOUNDATIONS AND RETAINING WALLS AS EARTHWORK CONSTRUCT ELECTRICAL UTILITIES, BUILDING FOUNDATIONS AND RETAINING WALLS AS EARTHWORK OPERATIONS PROGRESS. 6. PLACE GRADED CRUSHED AGGREGATE SURFACE COURSE AS SHOWN ON PLANS. PLACE GRADED CRUSHED AGGREGATE SURFACE COURSE AS SHOWN ON PLANS. 7. COMPLETE CONSTRUCTION OF BUILDINGS AND OTHER STRUCTURES WITHIN THE SUPPORT AREA, COMPLETE CONSTRUCTION OF BUILDINGS AND OTHER STRUCTURES WITHIN THE SUPPORT AREA, AND STABILIZE REMAINING DISTURBED EARTH. 8. UPON COMPLETION OF WORK IN ANY ONE AREA, PERMANENT EROSION CONTROL PROTECTION UPON COMPLETION OF WORK IN ANY ONE AREA, PERMANENT EROSION CONTROL PROTECTION SHALL BE PLACED ON ALL DISTURBED AND/OR EXPOSED AREAS UNLESS NOTED OTHERWISE ON DRAWINGS. 9. CLEAR AND GRUB PROPOSED FIRING LINE AND FIRING LINE ACCESS DRIVE WITHIN THE CLEAR AND GRUB PROPOSED FIRING LINE AND FIRING LINE ACCESS DRIVE WITHIN THE DISTURBANCE LIMITS SHOWN. LIMIT DISTURBED AREAS TO THAT WHICH CAN BE STABILIZED WITHIN ONE WORKING DAY FOLLOWING THE DISTURBANCE. 10. MAKE CUTS AND FILLS AS REQUIRED TO ESTABLISH SUBGRADE FOR THE FIRING LANE ACCESS MAKE CUTS AND FILLS AS REQUIRED TO ESTABLISH SUBGRADE FOR THE FIRING LANE ACCESS DRIVE AND FIRING RANGE EMPLACEMENTS. 11. CONSTRUCT ELECTRICAL UTILITIES, RETAINING WALLS AND FIGHTING POSITIONS AS EARTHWORK CONSTRUCT ELECTRICAL UTILITIES, RETAINING WALLS AND FIGHTING POSITIONS AS EARTHWORK OPERATIONS PROGRESS. 12. PLACE GRADED CRUSHED AGGREGATE SURFACE COURSE. PLACE GRADED CRUSHED AGGREGATE SURFACE COURSE. 13. COMPLETE CONSTRUCTION OF FIRING POSITIONS AND OTHER STRUCTURES WITHIN THE FIRING COMPLETE CONSTRUCTION OF FIRING POSITIONS AND OTHER STRUCTURES WITHIN THE FIRING LANE AND FIRING LANE ACCESS DRIVE, AND STABILIZE REMAINING DISTURBED EARTH. 14. UPON COMPLETION OF WORK IN ANY ONE AREA, PERMANENT EROSION CONTROL PROTECTION UPON COMPLETION OF WORK IN ANY ONE AREA, PERMANENT EROSION CONTROL PROTECTION SHALL BE PLACED ON ALL DISTURBED AND/OR EXPOSED AREAS UNLESS NOTED OTHERWISE ON DRAWINGS.
AutoCAD SHX Text CONSTRUCTION SEQUENCE: SEQUENCE DESCRIBING STORM WATER QUALITY MEASURE IMPLEMENTATION RELATIVE TO LAND DISTURBING ACTIVITIES. ALL EARTH DISTURBANCE ACTIVITIES WITHIN EACH OF THE FOLLOWING TWO AREAS SHALL PROCEED IN ACCORDANCE WITH THE SPECIFIED STAGING OF EARTHMOVING ACTIVITIES WITHIN THAT AREA. EACH STAGE WITHIN AN AREA SHALL BE COMPLETED BEFORE A SUBSEQUENT STAGE IS INITIATED. PHASES OF CONSTRUCTION INCLUDE: A. CONSTRUCTION OF SUPPORT AREA AND SUPPORT AREA ACCESS DRIVE, FIRING LINE AND FIRING LINE CONSTRUCTION OF SUPPORT AREA AND SUPPORT AREA ACCESS DRIVE, FIRING LINE AND FIRING LINE ACCESS DRIVE. B. CONSTRUCTION OF FIRING RANGE EMPLACEMENTS AND MAINTENANCE TRAILS.CONSTRUCTION OF FIRING RANGE EMPLACEMENTS AND MAINTENANCE TRAILS.
AutoCAD SHX Text PHASE B: CONSTRUCTION OF FIRING RANGE EMPLACEMENTS AND MAINTENANCE TRAILS. 1. MAKE CUTS AND FILLS AS REQUIRED TO ESTABLISH SUBGRADE FOR THE MAINTENANCE TRAILS AND MAKE CUTS AND FILLS AS REQUIRED TO ESTABLISH SUBGRADE FOR THE MAINTENANCE TRAILS AND PLACE MAINTENANCE TRAIL GRAVEL SURFACE COURSE. SUBGRADE WORK TO BE LIMITED TO AREA THAT CAN BE STABILIZED IMMEDIATELY AND PRIOR TO PRECIPITATION EVENT. 2. CONSTRUCT TARGET EMPLACEMENT BERMS AND INSTALL ADDITIONAL SILT FENCE, FILTER SOCK CONSTRUCT TARGET EMPLACEMENT BERMS AND INSTALL ADDITIONAL SILT FENCE, FILTER SOCK DIVERSIONS, DIVERSION CHANNELS, DIVERSION SWALES, AS WORK PROGRESSES. PLACE TEMPORARY EROSION CONTROL PROTECTION ON ALL DISTURBED AND/OR EXPOSED AREAS IMMEDIATELY AFTER COMPLETING WORK. SEE SHEET CE503 FOR TYPICAL TARGET BERM EROSION CONTROL DETAILS. CE503 FOR TYPICAL TARGET BERM EROSION CONTROL DETAILS. FOR TYPICAL TARGET BERM EROSION CONTROL DETAILS. FOR TYPICAL TARGET BERM EROSION CONTROL DETAILS. 3. CONSTRUCT DOWNRANGE UTILITY LINES IN ACCORDANCE WITH GENERAL NOTE 8 ON THIS SHEET. CONSTRUCT DOWNRANGE UTILITY LINES IN ACCORDANCE WITH GENERAL NOTE 8 ON THIS SHEET. 8 ON THIS SHEET. 4. UPON COMPLETION OF WORK IN ANY ONE AREA, PERMANENT EROSION CONTROL PROTECTION SHALL UPON COMPLETION OF WORK IN ANY ONE AREA, PERMANENT EROSION CONTROL PROTECTION SHALL BE PLACED ON ALL DISTURBED AND/OR EXPOSED AREAS UNLESS NOTED OTHERWISE ON THE DRAWINGS. 5. UPON COMPLETION OF WORK, AND AFTER SITE STABILIZATION, REMOVE ALL SILT FENCES, TEMPORARY UPON COMPLETION OF WORK, AND AFTER SITE STABILIZATION, REMOVE ALL SILT FENCES, TEMPORARY FILTER SOCK, AND THE STABILIZED CONSTRUCTION ENTRANCES UNLESS OTHERWISE DIRECTED BY THE ENGINEER. PERMANENTLY STABILIZE ALL AREAS DISTURBED BY REMOVAL. 6. UPON COMPLETION OF WORK, SITE STABILIZATION AND THE REMOVAL OF THE TEMPORARY CONTROLS UPON COMPLETION OF WORK, SITE STABILIZATION AND THE REMOVAL OF THE TEMPORARY CONTROLS LISTED IN STEP 5 ABOVE, CONVERT ALL TEMPORARY DIVERSION AND CHANNELS TO PERMANENT GRADE. PERMANENTLY STABILIZE ALL AREAS DISTURBED BY THESE CONVERSIONS.
AutoCAD SHX Text GENERAL NOTES: 1. ONLY LIMITED DISTURBANCE WILL BE PERMITTED. ONLY LIMITED DISTURBANCE WILL BE PERMITTED. 2. EROSION AND SEDIMENT CONTROL DEVICES MUST BE CONSTRUCTED, STABILIZED AND FUNCTIONAL EROSION AND SEDIMENT CONTROL DEVICES MUST BE CONSTRUCTED, STABILIZED AND FUNCTIONAL BEFORE SITE DISTURBANCE BEGINS WITHIN THE TRIBUTARY AREAS OF THOSE DEVICES. 3. UPON COMPLETION OF AN EARTH DISTURBANCE ACTIVITY OR ANY STAGE OR PHASE OF AN UPON COMPLETION OF AN EARTH DISTURBANCE ACTIVITY OR ANY STAGE OR PHASE OF AN ACTIVITY, THE SITE SHALL BE IMMEDIATELY SEEDED, MULCHED OR OTHERWISE PROTECTED FROM ACCELERATED EROSION AND SEDIMENTATION. EROSION AND SEDIMENT CONTROL BMP'S SHALL BE IMPLEMENTED AND MAINTAINED UNTIL THE PERMANENT STABILIZATION IS COMPLETED. FOR AN EARTH DISTURBANCE ACTIVITY OR ANY STAGE OR PHASE OF AN ACTIVITY TO BE CONSIDERED PERMANENTLY STABILIZED, THE DISTURBED AREAS SHALL BE COVERED WITH ONE OF THE FOLLOWING: (1) A MINIMUM UNIFORM 70% PERENNIAL VEGETATIVE COVER, WITH A DENSITY CAPABLE OF RESISTING ACCELERATED EROSION AND SEDIMENTATION. (2) AN ACCEPTABLE BMP WHICH PERMANENTLY MINIMIZES ACCELERATED EROSION AND SEDIMENTATION. 4. AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND SEDIMENT AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES MUST BE REMOVED. AREAS DISTURBED DURING REMOVAL OF THE DEVICE MUST BE STABILIZED IMMEDIATELY. 5. VEHICLES AND EQUIPMENT MAY NEITHER ENTER DIRECTLY NOR EXIT DIRECTLY FROM THE PROJECT VEHICLES AND EQUIPMENT MAY NEITHER ENTER DIRECTLY NOR EXIT DIRECTLY FROM THE PROJECT BOUNDARY EXCEPT AT ROCK CONSTRUCTION ENTRANCES OR GRAVEL ROADS. WHERE GRAVEL ROADS ARE USED, CONTRACTOR SHALL CONTINUALLY MAINTAIN THEM FOR THE DURATION OF THE PROJECT TO PREVENT INCREASED EROSION OR DEGRADATION OF THE ROAD. 6. STOCKPILE HEIGHTS MUST NOT EXCEED 35 FEET. STOCKPILE SLOPES MUST BE 2:1 OR FLATTER. STOCKPILE HEIGHTS MUST NOT EXCEED 35 FEET. STOCKPILE SLOPES MUST BE 2:1 OR FLATTER. 7. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT CONTROL DEVICES MUST BE UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT CONTROL DEVICES MUST BE MAINTAINED PROPERLY. MAINTENANCE SHALL INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT CONTROL DEVICES AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, RE-GRADING, RE-SEEDING, RE-MULCHING AND RE-NETTING MUST BE PERFORMED IMMEDIATELY. IF THE EROSION AND SEDIMENT CONTROL DEVICES FAIL TO PERFORM AS EXPECTED, REPLACEMENT DEVICES OR MODIFICATIONS OF THOSE INSTALLED WILL BE REQUIRED. 8. EROSION CONTROL MEASURES FOR UTILITY LINE CONSTRUCTION SHALL CONSIST OF THE EROSION CONTROL MEASURES FOR UTILITY LINE CONSTRUCTION SHALL CONSIST OF THE FOLLOWING: (1) THE TOTAL LENGTH OF TRENCH OPEN AT ANY ONE TIME SHALL NOT BE GREATER THAN THE TOTAL LENGTH OF UTILITY LINE THAT CAN BE PLACED IN THE TRENCH AND BACK-FILLED IN ONE WORKING DAY. (2) NO MORE THAN 50 LINEAL FEET OF OPEN TRENCH SHOULD EXIST WHEN THE UTILITY LINE CEASES AT THE END OF THE WORKDAY. (3) SOIL SUPPLEMENTS, SEED AND MULCH SHALL BE APPLIED WITHIN SEVEN DAYS AFTER THE UTILITY LINE IS INSTALLED. 9. EROSION CONTROL MEASURES FOR CONSTRUCTION OF RANGE MAINTENANCE TRAILS SHALL CONSIST EROSION CONTROL MEASURES FOR CONSTRUCTION OF RANGE MAINTENANCE TRAILS SHALL CONSIST OF THE FOLLOWING: (1) THE TOTAL LENGTH OF GRADED AREA FOR TRAILS SHALL BE NO GREATER THAN THAT WHICH CAN BE STABILIZED WITHIN ONE WORKING DAY FOLLOWING GRADING. (2) STABILIZATION SHALL BE ACHIEVED BY PLACEMENT OF ROCK PER THE SPECIFICATIONS. (3) BY THE END OF EACH WORK WEEK, ANY DISTURBED AREAS NOT COVERED WITH GRAVEL SHALL BE STABILIZED. 10. THE CONTRACTOR SHALL REMOVE ALL TREE STUMPS WITHIN AREAS TO BE GRADED OR EXCAVATED. THE CONTRACTOR SHALL REMOVE ALL TREE STUMPS WITHIN AREAS TO BE GRADED OR EXCAVATED. 11. TOPSOIL SHALL BE SALVAGED FOR USE IN STABILIZING AND SEEDING GRADED AREAS IN TOPSOIL SHALL BE SALVAGED FOR USE IN STABILIZING AND SEEDING GRADED AREAS IN ACCORDANCE WITH SPECIFICATION 31 10 00. ALL AREAS TO BE SEEDED SHALL HAVE A MINIMUM 4" OF TOPSOIL.
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
STORM WATER POLLUTION PREVENTION NOTES:
AutoCAD SHX Text
FILTER SOCK DIVERSION OR DIVERSION DIKE
AutoCAD SHX Text
FSD-XX
AutoCAD SHX Text
FILTER TUBE/SOCK DIVERSION RE: CE502CE502
AutoCAD SHX Text
CE-XX
AutoCAD SHX Text
CONSTRUCTION ENTRANCE RE: CE502CE502
AutoCAD SHX Text
CLA-XX
AutoCAD SHX Text
CONSTRUCTION LAYDOWN AREA
AutoCAD SHX Text
CW-XX
AutoCAD SHX Text
CONCRETE WASHOUT RE: CE502CE502
AutoCAD SHX Text
FSCD-XX
AutoCAD SHX Text
FILTER TUBE/SOCK CHECK DAM RE: CE502CE502
AutoCAD SHX Text
BP-XX
BORROW PIT
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
O R
EG
O
N M
IL
IT
AR
Y
D
EP
AR
TM
EN
T
M
IL
IT
IA
W
AY
S E
SA
LE
M , O
R
EG
O N
-5
C
.0 2.
AN
SI
D
C
N W
ST
F
BO
AR
D M
AN
, O
R
EG
O N
M U
LT
I-P
U R
PO
SE
M
AC
H
IN
E G
U N
(M
PM
G ) R
AN
G
E
PN
, P
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
/2 2/
O
PT
IO
N
AL
V
AL
U E
1%
O
PT
IO
N
AL
V
AL
U E
2%
+J . C
H
EC
KE
R
+J . D
R
AW
ER
+J . D
ES
IG
N
ER
+J . S
U
BM
IT
TE
R C
O N
ST
R
U C
TI
O
N E
N
TR
AN
C
E
CE502
GENERAL NOTES:
1. BMP:
SILT FENCE SHALL BE INSTALLED ALONG THE CONTOUR
APPROXIMATELY 8 FT. AWAY FROM THE TOE OF THE TARGET BERM.
EXTEND THE SILT FENCE LENGTH SLIGHTLY BEYOND THE FLOWLINE
FROM EITHER SIDE OF THE BERM IN ORDER TO CAPTURE EROSION
FROM THE BERM. THE SLOPE LENGTHS SHALL INCLUDE THE SLOPE
DISTANCES TO THE TOP OF THE SLOPE FACING THE SILT
FENCE. THE TOP OF THE BERM AND THE SLOPE THAT FACES HIGHER
GRADE ARE ADDRESSED IN NOTE 2.
2. CLEAN WATER DIVERSION:
CLEAN WATER DIVERSION WILL BE INCORPORATED INTO THE THE
BERM CONSTRUCTION. DUE TO THE SMALL AREA OF DISTURBANCE
AND THE NATURE OF THE TARGET BERMS, THEY WILL BE
CONSIDERED TO ACT AS A CLEAN WATER DIVERSION. THE UPHILL
TOE OF THE BERM WILL ACT AS CLEAN WATER DIVERSION. A SMALL
CLEAN WATER SWALE OR DIKE SHALL BE EXTENDED TO DRAIN
OUTSIDE OF THE SILT FENCE ON BOTH SIDES OF THE BERM.
3. STABILIZATION:
THE AREA THAT DRAINS TOWARD THE DIVERSION SWALE MUST BE
STABILIZED WITHIN 7 DAYS FROM THE BEGINNING OF DISTURBANCE.
METHOD OF STABILIZATION TO BE SELECTED BY THE
CONTRACTOR AND INCLUDED IN THE PERMIT APPLICATION.
4. DIVERSION SWALE CALCULATIONS:
WHERE SEPARATE DIVERSION SWALES ARE NOT SHOWN ON THE
PLANS, CLEAN WATER DIVERSION CALCULATIONS HAVE NOT BEEN
PERFORMED. THE DRAINAGE AREAS ARE SMALL AND THE DISTANCE
ALONG THE CLEANWATER FLOWLINES ARE SHORT AND IT IS
REASONABLY ASSUMED THAT THE BERMS WILL SUFFICIENTLY
DIVERT THE CLEAN WATER.
45°
SILT
FE
NCE
8'-0"TYP.
8'-0"MIN
TYPICAL BERM CONSTRUCTION SEQUENCE:
1. INSTALL SILT FENCE.
2. CREATE FILL FOR BERM AND DIVERSION SWALE.
3. STABILIZE THE PORTION OF THE BERM THAT DRAINS TO THE CLEAN
WATER FLOWLINE WITHIN 7 DAYS OF THE BEGINNING OF GROUND
DISTURBANCE.
4. COMPLETE TARGET EMPLACEMENT AND UTILITY INSTALLATION.
5. STABILIZE REMAINDER OF GROUND SURFACE.
6. REMOVE SILT FENCE AFTER STABILIZATION IS COMPLETE.
STABILIZATION AREA
(RE: NOTE 3)
EXTEND CLEAN WATER SWALE OR
DIKE TO FLOW OUTSIDE OF THE
WATTLE COIR. (RE: NOTE 2)
HIGH POINT OF
DIVERSION SWALE
(RE: NOTE 2)
TYPICAL LIMIT
OF DISTURBANCE
EXTEND SWALE OR DIKE TO FLOW
OUTSIDE OF THE SILT FENCE (RE: NOTE 2)
SF
SF
SF
SF
SF
TYPICAL TARGET BERM
SCALE: NOT TO SCALE
CE503
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
O R
EG
O
N M
IL
IT
AR
Y
D
EP
AR
TM
EN
T
M
IL
IT
IA
W
AY
S E
SA
LE
M , O
R
EG
O N
-5
C
.0 2.
AN
SI
D
C
N W
ST
F
BO
AR
D M
AN
, O
R
EG
O N
M U
LT
I-P
U R
PO
SE
M
AC
H
IN
E G
U N
(M
PM
G ) R
AN
G
E
PN
, P
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
/2 2/
O
PT
IO
N
AL
V
AL
U E
1%
O
PT
IO
N
AL
V
AL
U E
2%
+J . C
H
EC
KE
R
+J . D
R
AW
ER
+J . D
ES
IG
N
ER
+J . S
U
BM
IT
TE
R
ER
O
SI
O N
A N
D S
ED
IM
EN
T
C O
N
TR
O L
D
ET
AI
LS
CE503
JUNE 30, 2026
AutoCAD SHX Text 3:1
AutoCAD SHX Text 3:1
AutoCAD SHX Text 3:1
AutoCAD SHX Text 3:1
AutoCAD SHX Text 3:1
AutoCAD SHX Text
LEGEND
TYPICAL AREA TO BE STABILIZED IMMEDIATELY (RE: NOTE 3)
1' -6
6' MAX.
2' -6
SILT FENCE
SCALE: NOT TO SCALE
CE504
SF-XX
5'-0"
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
O R
EG
O
N M
IL
IT
AR
Y
D
EP
AR
TM
EN
T
M
IL
IT
IA
W
AY
S E
SA
LE
M , O
R
EG
O N
-5
C
.0 2.
AN
SI
D
C
N W
ST
F
BO
AR
D M
AN
, O
R
EG
O N
M U
LT
I-P
U R
PO
SE
M
AC
H
IN
E G
U N
(M
PM
G ) R
AN
G
E
PN
, P
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
/2 2/
O
PT
IO
N
AL
V
AL
U E
1%
O
PT
IO
N
AL
V
AL
U E
2%
+J . C
H
EC
KE
R
+J . D
R
AW
ER
+J . D
ES
IG
N
ER
+J . S
U
BM
IT
TE
R
ER
O
SI
O N
A N
D S
ED
IM
EN
T
C O
N
TR
O L
D
ET
AI
LS
CE504
JUNE 30, 2026
AutoCAD SHX Text
DO NOT DISTURB GROUND ON BACKSIDE OF SILT FENCE
AutoCAD SHX Text
SHEET FLOW
AutoCAD SHX Text
PERSPECTIVE VIEW
AutoCAD SHX Text
SECTION
AutoCAD SHX Text
2" SQUARE BY 4' MINIMUM WOOD POST
AutoCAD SHX Text
SILT FENCE INSTALLATIONS
AutoCAD SHX Text
TOE OF FILL
AutoCAD SHX Text
SLOPE
AutoCAD SHX Text
SLOPE
AutoCAD SHX Text
RE: NOTE #1
AutoCAD SHX Text
RE: NOTE #5
AutoCAD SHX Text
TOE OF FILL
AutoCAD SHX Text
SLOPE
AutoCAD SHX Text
RE: NOTE #4
AutoCAD SHX Text
SILT FENCE
AutoCAD SHX Text
RE: NOTE #6
AutoCAD SHX Text NOTES FOR SILT FENCE: 1. WHERE PERMITTED, POSITION THE SILT FENCE 5' BEYOND THE TOE OF SLOPE. WHERE PERMITTED, POSITION THE SILT FENCE 5' BEYOND THE TOE OF SLOPE. 2. TO AVOID CREATING LOW POINTS ALONG THE SILT FENCE, ALIGN THE FENCE ALONG THE TO AVOID CREATING LOW POINTS ALONG THE SILT FENCE, ALIGN THE FENCE ALONG THE CONTOUR AS MUCH AS POSSIBLE. WHERE EXCESSIVE RUNOFF WILL ACCUMULATE AT A LOW POINT, PROVIDE AN OPENING IN THE FENCE AND INSTALL A SEDIMENT TRAP. 3. WHEN EXCAVATING THE APPROXIMATE 6 IN WIDE AND 6 IN DEEP TRENCH, USE MACHINERY THAT WHEN EXCAVATING THE APPROXIMATE 6 IN WIDE AND 6 IN DEEP TRENCH, USE MACHINERY THAT WILL MINIMIZE DISTURBANCE. 4. TO PREVENT RUNOFF FROM FLOWING AROUND THE ENDS OF THE SILT FENCE, RUN THE ENDS TO PREVENT RUNOFF FROM FLOWING AROUND THE ENDS OF THE SILT FENCE, RUN THE ENDS OF THE FENCE UP SLOPE. 5. DO NOT PLACE SILT FENCE ACROSS POTENTIAL CONCENTRATED FLOWS (e.g., PIPE OUTLETS, DO NOT PLACE SILT FENCE ACROSS POTENTIAL CONCENTRATED FLOWS (e.g., PIPE OUTLETS, DRAINAGE CHANNELS, CUT DITCHES). 6. AVOID USING SPLICES ALONG THE FENCE AS MUCH AS POSSIBLE. IF A SPLICE IS NECESSARY, AVOID USING SPLICES ALONG THE FENCE AS MUCH AS POSSIBLE. IF A SPLICE IS NECESSARY, BEFORE POUNDING IN THE END POSTS, OVERLAP THE END POSTS WITH A MIN. 6" OVERLAP AND TWIST 180 DEGREES. 7. MAINTAIN A PROPERLY FUNCTIONING SILT FENCE THROUGHOUT THE DURATION OF THE PROJECT MAINTAIN A PROPERLY FUNCTIONING SILT FENCE THROUGHOUT THE DURATION OF THE PROJECT OR UNTIL DISTURBED AREAS HAVE BEEN VEGETATED. 8. WHEN A STORM EVENT DEPOSITS SEDIMENT BEHIND THE FENCE, REMOVE THE SEDIMENT AND WHEN A STORM EVENT DEPOSITS SEDIMENT BEHIND THE FENCE, REMOVE THE SEDIMENT AND PLACE IT IN A STABLE AREA APPROVED BY THE ENGINEER. 9. IN AREAS THAT HAVE BEEN SEEDED AND MULCHED, REMOVE SILT FENCE UNLESS THEY ARE IN AREAS THAT HAVE BEEN SEEDED AND MULCHED, REMOVE SILT FENCE UNLESS THEY ARE PROTECTING A WETLAND OR WATER BODY.
AutoCAD SHX Text ENTRENCH THE BOTTOM 12" OF SILT FENCE SECURELY IN THE GROUND. AFTER INSTALLATION, FIRMLY PULLING UPWARD ON THE TOP OF THE FENCE SHOULD NOT DISLODGE IT.
AutoCAD SHX Text
MIN. 3' WIDE FILTER FABRIC FASTENED TO POST
AutoCAD SHX Text
SHEET FLOW FROM CONSTRUCTION SITE
AutoCAD SHX Text
AROUND A PIPE OUTLET
AutoCAD SHX Text
AT END OF SILT FENCE
AutoCAD SHX Text
AT TOE OF FILL SLOPE
SPLICES (TOP VIEW)
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
O R
EG
O
N M
IL
IT
AR
Y
D
EP
AR
TM
EN
T
M
IL
IT
IA
W
AY
S E
SA
LE
M , O
R
EG
O N
-5
C
.0 2.
AN
SI
D
C
N W
ST
F
BO
AR
D M
AN
, O
R
EG
O N
M U
LT
I-P
U R
PO
SE
M
AC
H
IN
E G
U N
(M
PM
G ) R
AN
G
E
PN
, P
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
/2 2/
O
PT
IO
N
AL
V
AL
U E
1%
O
PT
IO
N
AL
V
AL
U E
2%
+J . C
H
EC
KE
R
+J . D
R
AW
ER
+J . D
ES
IG
N
ER
+J . S
U
BM
IT
TE
R C
H
EC
K D
AM
S
CE505
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
O R
EG
O
N M
IL
IT
AR
Y
D
EP
AR
TM
EN
T
M
IL
IT
IA
W
AY
S E
SA
LE
M , O
R
EG
O N
-5
C
.0 2.
AN
SI
D
C
N W
ST
F
BO
AR
D M
AN
, O
R
EG
O N
M U
LT
I-P
U R
PO
SE
M
AC
H
IN
E G
U N
(M
PM
G ) R
AN
G
E
PN
, P
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
/2 2/
O
PT
IO
N
AL
V
AL
U E
1%
O
PT
IO
N
AL
V
AL
U E
2%
+J . C
H
EC
KE
R
+J . D
R
AW
ER
+J . D
ES
IG
N
ER
+J . S
U
BM
IT
TE
R C
H
EC
K D
AM
S
CE506
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
O R
EG
O
N M
IL
IT
AR
Y
D
EP
AR
TM
EN
T
M
IL
IT
IA
W
AY
S E
SA
LE
M , O
R
EG
O N
-5
C
.0 2.
AN
SI
D
C
N W
ST
F
BO
AR
D M
AN
, O
R
EG
O N
M U
LT
I-P
U R
PO
SE
M
AC
H
IN
E G
U N
(M
PM
G ) R
AN
G
E
PN
, P
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
/2 2/
O
PT
IO
N
AL
V
AL
U E
1%
O
PT
IO
N
AL
V
AL
U E
2%
+J . C
H
EC
KE
R
+J . D
R
AW
ER
+J . D
ES
IG
N
ER
+J . S
U
BM
IT
TE
R
SE
D
IM
EN
T
BA
R
R
IE
R
CE507
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
O R
EG
O
N M
IL
IT
AR
Y
D
EP
AR
TM
EN
T
M
IL
IT
IA
W
AY
S E
SA
LE
M , O
R
EG
O N
-5
C
.0 2.
AN
SI
D
C
N W
ST
F
BO
AR
D M
AN
, O
R
EG
O N
M U
LT
I-P
U R
PO
SE
M
AC
H
IN
E G
U N
(M
PM
G ) R
AN
G
E
PN
, P
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
/2 2/
O
PT
IO
N
AL
V
AL
U E
1%
O
PT
IO
N
AL
V
AL
U E
2%
+J . C
H
EC
KE
R
+J . D
R
AW
ER
+J . D
ES
IG
N
ER
+J . S
U
BM
IT
TE
R
SE
D
IM
EN
T
BA
R
R
IE
R
CE508
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
O R
EG
O
N M
IL
IT
AR
Y
D
EP
AR
TM
EN
T
M
IL
IT
IA
W
AY
S E
SA
LE
M , O
R
EG
O N
-5
C
.0 2.
AN
SI
D
C
N W
ST
F
BO
AR
D M
AN
, O
R
EG
O N
M U
LT
I-P
U R
PO
SE
M
AC
H
IN
E G
U N
(M
PM
G ) R
AN
G
E
PN
, P
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
/2 2/
O
PT
IO
N
AL
V
AL
U E
1%
O
PT
IO
N
AL
V
AL
U E
2%
+J . C
H
EC
KE
R
+J . D
R
AW
ER
+J . D
ES
IG
N
ER
+J . S
U
BM
IT
TE
R
SE
D
IM
EN
T
BA
R
R
IE
R
CE509
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
O R
EG
O
N M
IL
IT
AR
Y
D
EP
AR
TM
EN
T
M
IL
IT
IA
W
AY
S E
SA
LE
M , O
R
EG
O N
-5
C
.0 2.
AN
SI
D
C
N W
ST
F
BO
AR
D M
AN
, O
R
EG
O N
M U
LT
I-P
U R
PO
SE
M
AC
H
IN
E G
U N
(M
PM
G ) R
AN
G
E
PN
, P
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
/2 2/
O
PT
IO
N
AL
V
AL
U E
1%
O
PT
IO
N
AL
V
AL
U E
2%
+J . C
H
EC
KE
R
+J . D
R
AW
ER
+J . D
ES
IG
N
ER
+J . S
U
BM
IT
TE
R
SE
D
IM
EN
T
FE
N
C E
CE510
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
O R
EG
O
N M
IL
IT
AR
Y
D
EP
AR
TM
EN
T
M
IL
IT
IA
W
AY
S E
SA
LE
M , O
R
EG
O N
-5
C
.0 2.
AN
SI
D
C
N W
ST
F
BO
AR
D M
AN
, O
R
EG
O N
M U
LT
I-P
U R
PO
SE
M
AC
H
IN
E G
U N
(M
PM
G ) R
AN
G
E
PN
, P
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
/2 2/
O
PT
IO
N
AL
V
AL
U E
1%
O
PT
IO
N
AL
V
AL
U E
2%
+J . C
H
EC
KE
R
+J . D
R
AW
ER
+J . D
ES
IG
N
ER
+J . S
U
BM
IT
TE
R
SL
O
PE
A N
D C
H
AN
N
EL
M
AT
TI
N
G
CE511
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
O R
EG
O
N M
IL
IT
AR
Y
D
EP
AR
TM
EN
T
M
IL
IT
IA
W
AY
S E
SA
LE
M , O
R
EG
O N
-5
C
.0 2.
AN
SI
D
C
N W
ST
F
BO
AR
D M
AN
, O
R
EG
O N
M U
LT
I-P
U R
PO
SE
M
AC
H
IN
E G
U N
(M
PM
G ) R
AN
G
E
PN
, P
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
/2 2/
O
PT
IO
N
AL
V
AL
U E
1%
O
PT
IO
N
AL
V
AL
U E
2%
+J . C
H
EC
KE
R
+J . D
R
AW
ER
+J . D
ES
IG
N
ER
+J . S
U
BM
IT
TE
R
TI
R E
W
AS
H F
AC
IL
IT
Y
CE512
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
O R
EG
O
N M
IL
IT
AR
Y
D
EP
AR
TM
EN
T
M
IL
IT
IA
W
AY
S E
SA
LE
M , O
R
EG
O N
-5
C
.0 2.
AN
SI
D
C
N W
ST
F
BO
AR
D M
AN
, O
R
EG
O N
M U
LT
I-P
U R
PO
SE
M
AC
H
IN
E G
U N
(M
PM
G ) R
AN
G
E
PN
, P
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
/2 2/
O
PT
IO
N
AL
V
AL
U E
1%
O
PT
IO
N
AL
V
AL
U E
2%
+J . C
H
EC
KE
R
+J . D
R
AW
ER
+J . D
ES
IG
N
ER
+J . S
U
BM
IT
TE
R
SE
D
IM
EN
T
TR
AP
CE513
205+00
210+00
POB: 200+00.00
POE: 211+58.51
PCC: 204+66.98
255+00 260+00
POB: 250+00.00
POE: 264+66.08
PCC: 255+90.07
305+00
310+00
315+00
POB: 300+00.00
POE: 317+73.65
PCC: 307+13.16
355+00
360+00
365+00
370+00POB: 350+00.00
POE: 370+90.60
PCC: 358+40.01
+0
+0
+0
175+00
180+00
185+00
190+00
POB: 400+00.00
POE: 423+90.67
15+00
20+00POB: 10+00.00
POE: 21+67.08
PC: 10+67.50
PT: 19+97.45
PCC: 19+07.91
POB: 50+00.00 POE: 191+51.78
STA. 191+39.01
STA. 211+32.63
STA. 263+59.89
STA. 316+88.41
STA. 317+31.13
STA. 300+42.52
STA. 250+71.40
STA. 251+06.19
STA. 200+25.88
STA. 50+12
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
O R
EG
O
N M
IL
IT
AR
Y
D
EP
AR
TM
EN
T
M
IL
IT
IA
W
AY
S E
SA
LE
M , O
R
EG
O N
-5
C
.0 2.
AN
SI
D
C
N W
ST
F
BO
AR
D M
AN
, O
R
EG
O N
M U
LT
I-P
U R
PO
SE
M
AC
H
IN
E G
U N
(M
PM
G ) R
AN
G
E
PN
, P
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
/2 2/
+J . C
H
EC
KE
R
+J . D
R
AW
ER
+J . D
ES
IG
N
ER
+J . S
U
BM
IT
TE
R G
EO
M
ET
R
IC
D
AT
A
SH
EE
T
O F
CP101
100' 200'0
2 3
KEY PLAN
JUNE 30, 2026
AutoCAD SHX Text
LANE 1LANE 1
AutoCAD SHX Text
LANE 2LANE 2
AutoCAD SHX Text
LANE 3LANE 3
AutoCAD SHX Text
LANE 4LANE 4
AutoCAD SHX Text
LANE 5LANE 5
AutoCAD SHX Text
LANE 6LANE 6
AutoCAD SHX Text
LANE 7LANE 7
AutoCAD SHX Text
LANE 8LANE 8
AutoCAD SHX Text
LANE 9LANE 9
AutoCAD SHX Text
LANE 10LANE 10
AutoCAD SHX Text 1-P1
AutoCAD SHX Text 2-P1
AutoCAD SHX Text 3-P1
AutoCAD SHX Text 4-P1
AutoCAD SHX Text 5-P1
AutoCAD SHX Text 6-P1
AutoCAD SHX Text 7-P1
AutoCAD SHX Text 8-P1
AutoCAD SHX Text 9-P1
AutoCAD SHX Text 10-P1
AutoCAD SHX Text 1-P2
AutoCAD SHX Text 3-P2
AutoCAD SHX Text 2-P2
AutoCAD SHX Text 4-P2
AutoCAD SHX Text 5-P2
AutoCAD SHX Text 6-P2
AutoCAD SHX Text 7-P2
AutoCAD SHX Text 8-P2
AutoCAD SHX Text 9-P2
AutoCAD SHX Text 10-P2
AutoCAD SHX Text 1-P3
AutoCAD SHX Text 2-P3
AutoCAD SHX Text 3-P3
AutoCAD SHX Text 4-P3
AutoCAD SHX Text 5-P3
AutoCAD SHX Text 6-P3
AutoCAD SHX Text 7-P3
AutoCAD SHX Text 8-P3
AutoCAD SHX Text 9-P3
AutoCAD SHX Text 10-P3
AutoCAD SHX Text 1-P4
AutoCAD SHX Text 2-P4
AutoCAD SHX Text 3-P4
AutoCAD SHX Text 4-P4
AutoCAD SHX Text 5-P4
AutoCAD SHX Text 6-P4
AutoCAD SHX Text 7-P4
AutoCAD SHX Text 8-P4
AutoCAD SHX Text 9-P4
AutoCAD SHX Text 10-P4
AutoCAD SHX Text 1-P5
AutoCAD SHX Text 10-P5
AutoCAD SHX Text 7-V4
AutoCAD SHX Text 6-V4
AutoCAD SHX Text 5-V4
AutoCAD SHX Text 4-V4
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING GRAVEL PARKING LOT
AutoCAD SHX Text
EXISTING RANGE ROAD
AutoCAD SHX Text
FIRING LINE ACCESS ROAD
AutoCAD SHX Text
MATCH LINE-SHEET CG102CG102
AutoCAD SHX Text
MATCH LINE-SHEET CP103CP103
AutoCAD SHX Text
ALTERNATE BID ITEMS:
AutoCAD SHX Text ALTERNATE BID ITEM 1: 5" GRADED CRUSHED AGGREGATE, SEE DETAIL 2 ON SHEET CP501CP501
AutoCAD SHX Text
ABI-1
AutoCAD SHX Text
ABI-1
AutoCAD SHX Text
ABI-1
AutoCAD SHX Text
5" AGGREGATE SURFACE (ALT. BID ITEM #1)
AutoCAD SHX Text
EXISTING GRAVEL
AutoCAD SHX Text
5" AGGREGATE SURFACE
AutoCAD SHX Text
12" AGGREGATE SURFACE
GRAVEL PAVEMENT LEGEND
405+00
410+00
PO
B:
+0
PCC: 409+60.09
455+00
460+00
POB: 450+00.00
PCC: 460+88.84
505+00
510+00
515+00
POB: 500+00.00
PCC: 512+12.29
550+00
555+00
POB: 550+00.00
PCC: 553+40.47
+0
+0
80+00
85+00
+0
+0
PC: 76+68.57
PT: 86+84.04
PCC: 77+25.42
STA. 401+71.45
STA. 451+28.03
STA. 500+68.31
STA. 79+35
STA. 86+90.04
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
O R
EG
O
N M
IL
IT
AR
Y
D
EP
AR
TM
EN
T
M
IL
IT
IA
W
AY
S E
SA
LE
M , O
R
EG
O N
-5
C
.0 2.
AN
SI
D
C
N W
ST
F
BO
AR
D M
AN
, O
R
EG
O N
M U
LT
I-P
U R
PO
SE
M
AC
H
IN
E G
U N
(M
PM
G ) R
AN
G
E
PN
, P
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
/2 2/
+J . C
H
EC
KE
R
+J . D
R
AW
ER
+J . D
ES
IG
N
ER
+J . S
U
BM
IT
TE
R G
EO
M
ET
R
IC
D
AT
A
SH
EE
T
O F
CP102
100' 200'0
2 3
KEY PLAN
JUNE 30, 2026
AutoCAD SHX Text 6-P5
AutoCAD SHX Text 7-P5
AutoCAD SHX Text 8-P5
AutoCAD SHX Text 9-P5
AutoCAD SHX Text 10-P5
AutoCAD SHX Text 6-P6B
AutoCAD SHX Text 7-P6B
AutoCAD SHX Text 8-P6
AutoCAD SHX Text 9-P6
AutoCAD SHX Text 10-P6
AutoCAD SHX Text 6-P7
AutoCAD SHX Text 7-P7
AutoCAD SHX Text 8-P7
AutoCAD SHX Text 9-P7
AutoCAD SHX Text 10-P7
AutoCAD SHX Text 6-P8B
AutoCAD SHX Text 7-P8B
AutoCAD SHX Text 8-P8
AutoCAD SHX Text 9-P8
AutoCAD SHX Text 10-P8
AutoCAD SHX Text 6-P6C
AutoCAD SHX Text 6-P6A
AutoCAD SHX Text 7-P6C
AutoCAD SHX Text 7-P6A
AutoCAD SHX Text 7-P8C
AutoCAD SHX Text 7-P8A
AutoCAD SHX Text 6-P8C
AutoCAD SHX Text 6-P8A
AutoCAD SHX Text 7-V6
AutoCAD SHX Text 7-V8
AutoCAD SHX Text 6-V6
AutoCAD SHX Text 6-V8
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MATCH LINE-SHEET CP104CP104
AutoCAD SHX Text
MATCH LINE-SHEET CP101CP101
AutoCAD SHX Text
MATCH LINE-SHEET CP103CP103
AutoCAD SHX Text
ABI-1
AutoCAD SHX Text
ABI-1
AutoCAD SHX Text
ALTERNATE BID ITEMS:
AutoCAD SHX Text ALTERNATE BID ITEM 1: 5" GRADED CRUSHED AGGREGATE, SEE DETAIL 2 ON SHEET CP501CP501
AutoCAD SHX Text
ABI-1
AutoCAD SHX Text
5" AGGREGATE SURFACE (ALT. BID ITEM #1)
AutoCAD SHX Text
EXISTING GRAVEL
AutoCAD SHX Text
5" AGGREGATE SURFACE
AutoCAD SHX Text
12" AGGREGATE SURFACE
415+00
420+00
: 423+90.67
465+00
470+00
475+00
POE: 477+12.32
515+00
520+00
525+00
530+00
POE: 530+20.82
563+38.57
560+00
POE: 563+38.57
0+
155+00
160+00
165+00
170+00
175+00
PC: 154+62.44
PT: 164+77.91
PCC: 164+21.06
STA. 422+19.21
STA. 475+84.30
STA. 529+52.82
STA. 162+11.48
STA. 154+56.44
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
O R
EG
O
N M
IL
IT
AR
Y
D
EP
AR
TM
EN
T
M
IL
IT
IA
W
AY
S E
SA
LE
M , O
R
EG
O N
-5
C
.0 2.
AN
SI
D
C
N W
ST
F
BO
AR
D M
AN
, O
R
EG
O N
M U
LT
I-P
U R
PO
SE
M
AC
H
IN
E G
U N
(M
PM
G ) R
AN
G
E
PN
, P
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
/2 2/
+J . C
H
EC
KE
R
+J . D
R
AW
ER
+J . D
ES
IG
N
ER
+J . S
U
BM
IT
TE
R G
EO
M
ET
R
IC
D
AT
A
SH
EE
T
O F
CP103
100' 200'0
2 3
KEY PLAN
JUNE 30, 2026
AutoCAD SHX Text 1-P5
AutoCAD SHX Text 2-P5
AutoCAD SHX Text 3-P5
AutoCAD SHX Text 4-P5
AutoCAD SHX Text 5-P5
AutoCAD SHX Text 1-P6
AutoCAD SHX Text 2-P6
AutoCAD SHX Text 3-P6
AutoCAD SHX Text 4-P6B
AutoCAD SHX Text 5-P6B
AutoCAD SHX Text 1-P7
AutoCAD SHX Text 2-P7
AutoCAD SHX Text 3-P7
AutoCAD SHX Text 4-P7
AutoCAD SHX Text 5-P7
AutoCAD SHX Text 1-P8
AutoCAD SHX Text 2-P8
AutoCAD SHX Text 3-P8
AutoCAD SHX Text 4-P8B
AutoCAD SHX Text 5-P8B
AutoCAD SHX Text 4-P6A
AutoCAD SHX Text 4-P6C
AutoCAD SHX Text 5-P6C
AutoCAD SHX Text 5-P6A
AutoCAD SHX Text 5-P8C
AutoCAD SHX Text 5-P8A
AutoCAD SHX Text 4-P8C
AutoCAD SHX Text 4-P8A
AutoCAD SHX Text 6-V6
AutoCAD SHX Text 5-V8
AutoCAD SHX Text 5-V6
AutoCAD SHX Text 4-V6
AutoCAD SHX Text 4-V8
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MATCH LINE-SHEET CP104CP104
AutoCAD SHX Text
MATCH LINE-SHEET CP101CP101
AutoCAD SHX Text
MATCH LINE-SHEET CP102CP102
AutoCAD SHX Text
ABI-1
AutoCAD SHX Text
ABI-1
AutoCAD SHX Text
ALTERNATE BID ITEMS:
AutoCAD SHX Text ALTERNATE BID ITEM 1: 5" GRADED CRUSHED AGGREGATE, SEE DETAIL 2 ON SHEET CP501CP501
AutoCAD SHX Text
ABI-1
AutoCAD SHX Text
5" AGGREGATE SURFACE (ALT. BID ITEM #1)
AutoCAD SHX Text
EXISTING GRAVEL
AutoCAD SHX Text
5" AGGREGATE SURFACE
AutoCAD SHX Text
12" AGGREGATE SURFACE
+0
0+
5+
110+00
115+00
120+00 125+00
130+00
5+
0+
5+
PC: 109+51.49 PT: 131+94.98
PCC: 110+08.23
PCC: 115+28.92
PCC: 131+38.25
605+00 610+00
615+00POB: 600+00.00
POE: 617+10.27
STA. 127+79.30STA. 113+68.25
STA. 616+18.92
STA. 600+91.64
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
O R
EG
O
N M
IL
IT
AR
Y
D
EP
AR
TM
EN
T
M
IL
IT
IA
W
AY
S E
SA
LE
M , O
R
EG
O N
-5
C
.0 2.
AN
SI
D
C
N W
ST
F
BO
AR
D M
AN
, O
R
EG
O N
M U
LT
I-P
U R
PO
SE
M
AC
H
IN
E G
U N
(M
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .