Lake Apopka North Shore Pump Station Remote Control
Solicitation number
ITB-11551
Issued by
Putnam County, Florida

About this file

This is Addendum 2 to Invitation for Bid 40987 from the St. Johns River Water Management District for the Lake Apopka North Shore Pump Station Remote Control project. The submittal deadline has been extended to 2:00 p.m. on March 11, 2025, with a new contract expiration date of December 30, 2025. Key technical changes include: Phase 4 and Interconnect Pump Stations with Campbell Scientific CH200 power regulators will not require LiTime AC-DC battery chargers; Campbell Sci CR1000X has been replaced by model CR1000Xe at specific locations; and ModMAG M2000 flow meters will be provided by the District for Duda and Unit 2 Alum Treatment Systems.

The addendum provides detailed technical specifications including pump station rehabilitation dates, alum injection points, conduit requirements, and programming needs. Each of the six pump station sites will require similar but site-specific programs, as will the two Alum Treatment System sites. The document includes extensive information about current monitoring systems, including requirements for three-leg current monitoring with operating ranges of 80-150A and startup currents of 500-700A for Unit 2 pumps. New 3000-gallon alum tanks (102" diameter, 96" height) will be installed at each site by May 1, 2025. The addendum includes nine photographs showing the interior of the Unit 2 Alum control building and a sample program for the Duda Alum Treatment System.

View the file

Other files

File Type Posted
40987_Add_1.pdf PDF
IFB_40987_Pump Station.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATE: February 27, 2025

TO: Interested Firms

FROM: Breanna Pierce, Procurement Specialist

SUBJECT: Addendum 2 to Invitation for Bid 40987 – Lake Apopka North Shore Pump Station Remote Control

As a result of questions received from potential respondents, please be advised of the following changes to the subject Request for Proposal:

1. The time and date for the submittal of responses is extended to: 2:00 p.m., Tuesday, March 11, 2025

2. The new project/contract expiration date will be extended to December 30, 2025.

3. Phase 4 and Interconnect Pump Stations, which are wired with Campbell Scientific CH200 power regulators, will not use/need LiTime AC-DC battery chargers. The CH200 can now be configured to support both AC and solar inputs to the lithium batteries, which are to be installed as part of this project. The District PM will provide a custom charging profile/operating system update for the CH200 at these sites.

4. Campbell Sci CR1000X has been replaced by the manufacturer with model CR1000Xe. Accordingly, the CR1000Xe will be required at Apopka Marsh Flow-way Pump Station, Duda Pump Station, Duda Alum Treatment System, Unit 2 Pump Station, and Unit 2 Alum Treatment System. CR1000X units (which will not need to be provided by the Contractor in this project) are on-site at Unit 1 Pump Station, Interconnect Pump Station, and Phase 4 Pump Station. These will require programming for operation.

5. Appendix C.2 is a duplicate of C.1—please disregard.

6. Question: When was the last rehab date for each pump station?

Apopka Marsh Flow-way Pump Station, 2020. Duda Pump Station, 2024. Unit 1 Pump Station, 2024.

Unit 2 Pump Station, 2023. Phase 4 and Interconnection pump stations are functionally new and have not been operated other than for testing.

7. Question: Do we have specs for (Alum) Mag Meter?

ModMAG M2000 (or equivalent) flow meters will be procured and provided by the District for Duda and Unit 2 Alum Treatment Systems. The Contract will be responsible for wiring and control of those meters.

8. Question: At Duda Alum site, where is Alum injected?

Alum is injected into the tailwater discharge stream of the Duda Pump Station.

9. Question: Can you provide pictures of the inside of unit 2 Alum control building?

Yes, find photos attached (Figures 1 - 9).

10. Question: Did the same contractor build phase 4 and interconnect sites?

Yes.

11. Question: Are interconnect culverts (their programming) in scope?

No. Although the culverts are wired into the PLC (Campbell Scientific CR1000X), their programming will be added to the program resulting from this project, at a future date.

12. Question: Is there conduit specs?

See sheet E-1 of Appendix C.1 in the IFB.

13. Question: Are Soft Starters/Mod Bus acceptable/expected?

As specified in Appendix C.1, yes.

14. Question: Does the District have a program sample(s)?

A sample program (for the Duda Alum Treatment System) is provided for general guidance, to show one acceptable format for variable names and some acceptable techniques for program comments, code section labeling, etc. To reiterate, the purpose of this project’s program work products is to allow the project manager (or other District with significant Visual Basic programming experience) to readily understand the purpose of each line of code. This will enhance the capacity of the District to maintain and update the codes as needed for future features (outside of the scope of this project).

15. Question: What is the battery size?

See Appendix A on pages 44 and 45 of the IFB.

16. Question: Is there already conduit?

Conduit must be supplied and installed at Duda Alum Treatment System, Unit 2 Pump Station (as needed for the rotation sensors), and Unit 2 Alum Treatment System. Conduit Schedule is provided in Appendix C.1, Sheet E-1, on Page 57 of the IFB.

17. Question: 2 RPM sensors?

Rotation sensors are required as outlined in Appendix A on pages 44 and 45 of the IFB.

18. Question: Are the pumps centrifugal/belt-driven?

Yes

19. Question: Would you please provide additional information on what is required at Unit 1, Interconnect, and Phase 4?

Replacement of the existing (lead-acid) 12V battery with the specific lithium replacement is required.

Additionally, programs are required at each site to operate the site. It is believed that Unit 1 will require a same-brand upgrade from a CR800 series PLC. A CR1000X replacement will be provided by the District and is not required from the Contractor.

20. How many unique programs are required? Can they/should they be similar?

Each of the six Pump Station sites should have similar programs, but each will require modification to accommodate site-specific differences. Each of the two Alum Treatment System sites should also have similar programs (to each other, not to the Pump Station sites), but each will also require modifications to fix existing site-specific differences.

21. Question: Do we have a documented operational philosophy?

Not beyond that which has been provided in Appendices B, C, and C.1.

22. Question: Please advise for alum sites what flow meter is acceptable as none are certified for use in alum?

See above question regarding mag/flow meters.

23. Question: Does the District have complete electrical drawings for the sites to be worked on? We cannot provide modified electrical drawings without having the drawings that need to be modified?

Acceptable drawings are shown on E-2 through E-5 of Appendix C.1.

24. Question: Please confirm the District wants two separate CRBasic programs to be created and installed (One program will be installed into each CR1000Xe at the (6) specified Pump Stations. A second program will be installed into each CR1000Xe at the (2) Alum Treatment Systems).

See above question regarding unique programs.

25. Question: The sample drawing provided shows a current transducer to monitor the pump motor amps. Is the current transducer installed on (1) leg of each pump or all (3) legs? Please confirm if the pumps operate in the 80 – 100-amp range and if not, what is the amp range?

All 3 legs must be monitored independently, to determine if the pump station must be shut down to avoid damaging operation (such as due to inconsistent leg currents). Unit 2 pumps typically operate between 80-150A with startup currents from 500-700A. Apopka Marsh Flow-way pumps’ operating range is also 80-150A, with variation from pump to pump (there are 3 sizes of pumps). Duda and Unit 1 are expected to have the same or a similar operating range, but this will need to be confirmed by the Contractor.

26. Question: The sample drawing provided does not show the rpm sensor for the pumps. The existing Phase 4, Interconnect, and Unit 1 Pump Stations do not have rpm sensors installed. Is an rpm sensor to be installed on each pump for all (6) Pump Stations? If yes, is the sensor to be mounted on the motor side keyway or on the pump sprocket which is belt driven? Note: The amp sensor will provide accurate indication that the pump is working properly under a proper load, provide excellent alarm indication if a belt is thrown or if the intake is blocked.

RPM sensors will not be installed on Phase 4, Interconnect, or Unit 1 Pump Stations as part of this project. These may be added (outside of the scope of this project) at a future date.

27. Question: Please confirm if you want (2) 24”x24” enclosures at each Pump Station, (1) enclosure for wiring terminal panel and (1) enclosure for the CR1000Xe w/ peripherals. This configuration is shown on the sample drawing and installed at the existing Interconnect Pump Station.

Two enclosures of minimum 24” x 18” x 10” is specified on sheet E-5 of Appendix C.1. However, an approved equal may be accepted, which incorporates one larger panel.

28. Question: For the Duda and Unit 2 Alum Treatment Systems, are the alum pumps single- or variable speed?

Both sites have Seepex variable speed pumps, one is 1.5 HP and the other is 2 HP.

29. Question: For the Duda and Unit 2 Alum Treatment Systems, what are the minimum and maximum flow rates during pump operation for both alum systems?

3 gpm – 6 gpm.

30. Question: Please confirm if the existing pipe from alum pump to its discharge point is 2.0-inch pvc for both systems.

2” PVC is used at both sites, but this is reduced at the discharge end currently to approximately 3/4".

31. Question: What is alum tank dimensions (height & diameter) for both systems?

3000 gallons, 102” diameter, 96” height for new alum tanks which are being installed at each site.

This is scheduled for completion by 5/1/25. Currently installed tanks will not be used for this project.

A spec sheet for the new tanks will be provided to the Contractor upon request.

NOTE: Please acknowledge receipt of this Addendum in your submittal.

If you have any questions regarding this addendum, contact Breanna Pierce at (386) 643-1168 or via email at bpierce@sjrwmd.com.

Attachments:

Figure 1-9 – Unit 2 Alum Interior Attachment A – Program Sample Duda Alum

ATTACHMENT A – PROGRAM SAMPLE DUDA ALUM

Figure 1 – Unit 2 Alum Interior

Figure 2 – Unit 2 Alum Interior

Figure 3 – Unit 2 Alum Interior

Figure 4 – Unit 2 Alum Interior

Figure 5 – Unit 2 Alum Interior

Figure 6 – Unit 2 Alum Interior

Figure 7 - Unit 2 Alum Interior

Figure 8 – Unit 2 Alum Interior

Figure 9 – Unit 2 Alum Interior

ATTACHMENT A – PROGRAM SAMPLE DUDA ALUM

'CR1000 Series Datalogger 'Date: 05/04/2018

' DDDDDDD U U DDDDDDD AA

' D D U U D D A A ' D D U U D D A A

' D D U U D D AAAAAAAA

' DDDDDDD UUUuUUU DDDDDDD A A 'Program Comments 'Use Flag_Cal_SDI1 to read instantaneous stage 1.

'Use Flag_Cal_Batt to read instantaneous battery voltage.

'Wire the SDI-12 sensor into 12v, C1 and G.

Const On = True: Const Off = False: Const YES = True: Const NO = False 'Preserve Public Variables PreserveVariables

' PPPPPP U U BBBBBB L IIIIIII CCCCCC

' P P U U B B L I C

' PPPPPP U U BBBBBB L I C

' P U U B B L I C

' P UUUUUU BBBBBB LLLLLLL IIIIIII CCCCCC

Public Batt_Volt, PTemp_C Public West_P1_Status As Boolean, West_P1_mV, West_P1_OFF_Lvl, West_P1_Meter, Reset_West_P1_Meter As Boolean Public East_P2_Status As Boolean, East_P2_mV, East_P2_OFF_Lvl, East_P2_Meter, Reset_East_P2_Meter As Boolean Public Alum_P3_Status As Boolean, Alum_P3_mv, Alum_P3_OFF_Lvl, Alum_P3_Meter, Reset_Alum_P3_Meter As Boolean Public West_P1_Manual As Boolean, West_P1_ON_Lvl, AUTOMATIC_PUMPING As Boolean, MANUAL_PUMPING As Boolean Public East_P2_Manual As Boolean, East_P2_ON_Lvl, AUTOMATIC_ALUM As Boolean, MANUAL_ALUM As Boolean Public Alum_P3_Manual As Boolean, Alum_P3_Level, Duda_HW_AvgLvl Public Alum1, Alum_1_Level, Alum1_Offset, Alum_P3_Amps, Results_Duda_Levels, Duda_HW1, Use_HW1 As Boolean Public Alum2, Alum_2_Level, Alum2_Offset, element, Duda_Levels(2), Duda_HW2, Use_HW2 As Boolean

Dim mV(25)

Dim East_Element: Dim mV_1(25) Dim West_Element: Dim mV_2(25) Dim Alum_Element: Dim mv_3(25)

' U U NN N IIIIIII TTTTTTT SSSSSS

' U U N N N I T SS

' U U N N N I T SS

' U U N N N I T SS

' UUUUUU N NN IIIIIII T SSSSSS

Units West_P1_OFF_Lvl = NAVD: Units West_P1_Meter = Hrs.: Units West_P1_mV = mV: Units Duda_HW1 = NAVD Units East_P2_OFF_Lvl = NAVD: Units East_P2_Meter = Hrs.: Units East_P2_mV = mV: Units Duda_HW2 = NAVD

Units Duda_HW_AvgLvl = NAVD Units Batt_Volt = dcV Units Alum_P3_OFF_Lvl = ft.: Units Alum_P3_Meter = Hrs.: Units Alum_P3_mv = mV: Units PTemp_C = Deg C Units West_P1_ON_Lvl = NAVD: Units Alum_P3_Amps = Amps Units East_P2_ON_Lvl = NAVD: Units Alum_1_Level = ft.

Units Alum_P3_Level = ft.: Units Alum_2_Level = ft.

'================= CCCCC L OOOOOO CCCCC K K =========================

' C L O O C K K

' C L O O C KK

' C L O O C K K

'================= CCCCC LLLLLL OOOOOO CCCCC K K =========================

Public rTime(9) Alias rTime(1) = Year: Alias rTime(2) = Month: Alias rTime(3) = DOM:

Alias rTime(4) = Hour: Alias rTime(5) = Minute: Alias rTime(6) = Second Alias rTime(7) = uSecond: Alias rTime(8) = WeekDay: Alias rTime(9) = Day_of_Year

Public West_P1_Time_Clock, West_P1_OFF_Time As String * 20 Public East_P2_Time_Clock, East_P2_OFF_Time As String * 20 Public Alum_P3_Time_Clock, Alum_P3_OFF_Time As String * 20 Public West_P1_NewTime, West_P1_ON_Time As String * 20, West_P1_OldTime Public East_P2_NewTime, East_P2_ON_Time As String * 20, East_P2_OldTime Public Alum_P3_NewTime, Alum_P3_ON_Time As String * 20, Alum_P3_OldTime

Dim ST As String * 20

Sub StampTime Dim rt(7) As String Alias rt(1) = YR: Alias rt(2) = MO: Alias rt(3) = D: Alias rt(4) = H: Alias rt(5) = MM: Alias rt(6) = SS 'Have to pad the zeros or they get stripped out.

Dim n

For n = 1 To 6 rt(n) = rTime(n) If rTime(5) < 10 Then rt(5) = "0" + rTime(5) Else rt(5) = rTime(5) EndIf If rTime(6) < 10 Then rt(6) = "0" + rTime(6) Else rt(6) = rTime(6) EndIf Next n

ST = MO + "-" + D + " " + H + ":" + MM + ":" + SS

EndSub

' TTTTTTTT AA BBBBBBB L EEEEEEEE SSSSSS

' T A A B B L E SS

' T A A BBBBBBB L EEEE SS

' T AAAAAAAA B B L E SS

' T A A BBBBBBB LLLLLLL EEEEEEEE SSSSSS

DataTable (Duda_15min,true,-1) DataInterval (0,15,Min,10) Minimum (1,Batt_volt,FP2,False,False) EndTable '=================== BBBBBB EEEEEE GGGGG IIIIIII N N ====================================

' B B E G I NN N

BeginProg' BBBBB EEE G GG I N N N P R O G R A M

' B B E G GG I N N N

'=================== BBBBBB EEEEEE GGGGG IIIIIII N NN ==================================== Alum_P3_OFF_Lvl = 0.5 West_P1_ON_Lvl = 62.5: West_P1_OFF_Lvl = 60.5: AUTOMATIC_PUMPING = False: MANUAL_PUMPING = True East_P2_ON_Lvl = 63.5: East_P2_OFF_Lvl = 61.5: AUTOMATIC_ALUM = False: MANUAL_ALUM = True '================ SSSSS CCCCC AA N N =============================================

' S C A A NN N

Scan (5,Sec,3,0)' S C A A N N N S T A R T S C A N N I N G H E R E

' S C AAAAAAAA N N N

'================ SSSSS CCCCC A A N NN ============================================= PanelTemp(PTemp_C,_60Hz) 'Default CR1000 Datalogger Wiring Panel Temperature measurement 'PTemp_C'

GetVariables (Results_Duda_Levels,ComSDC7,0,2,0000,500,"Public","LANSDP_HW1",Duda_Levels(1),1) ' Primary Headwater GetVariables (Results_Duda_Levels,ComSDC7,0,2,0000,500,"Public","LANSDP_HW2",Duda_Levels(2),1) ' Redundant Headwater Duda_HW1 = Duda_Levels(1) Duda_HW2 = Duda_Levels(2)

' Alum pump Amp Measurment Element=1 SubScan(0,mSec,25) VoltSe(mV(element),1,mV2500,3,1,0,250,1,0) element=element+1 NextSubScan RMSSpa(Alum_P3_Amps,25,mV()) Alum_P3_Amps = Alum_P3_Amps * 0.2

' AA U U TTTTTTTTT OOOOOOO

' A A U U T O O ' A A U U T O O

' AAAAAAAA U U T O O

' A A UUUUUUU T OOOOOOO

If AUTOMATIC_PUMPING = True Then MANUAL_PUMPING = False: West_P1_Manual = OFF: East_P2_Manual = Off Else MANUAL_PUMPING = True EndIf

If AUTOMATIC_ALUM = True Then MANUAL_ALUM = False: Alum_P3_Manual = Off Else MANUAL_ALUM = True EndIf If AUTOMATIC_PUMPING = True Then If Duda_HW_AvgLvl > West_P1_ON_Lvl Then West_P1_Status = True: West_P1_Time_Clock = 1 EndIf If Duda_HW_AvgLvl < West_P1_OFF_Lvl Then West_P1_Status = False: West_P1_Time_Clock = 0 EndIf If Duda_HW_AvgLvl > East_P2_ON_Lvl Then East_P2_Status = True: East_P2_Time_Clock = 1 EndIf If Duda_HW_AvgLvl < East_P2_OFF_Lvl Then East_P2_Status = False: East_P2_Time_Clock = 0

EndIf

If AUTOMATIC_ALUM = True Then If Alum_P3_Level > Alum_P3_OFF_Lvl Then If West_P1_Status = True OR East_P2_Status = True Then Alum_P3_Status = True: Alum_P3_Time_Clock = 1 Else Alum_P3_Status = False: Alum_P3_Time_Clock = 0 EndIf Else Alum_P3_Status = False: Alum_P3_Time_Clock = 0 West_P1_Status = False: East_P2_Status = False AUTOMATIC_PUMPING = False: AUTOMATIC_ALUM = False EndIf EndIf

' MM MM A NN N U U A L

' M M M M A A N N N U U A A L

' M MM M A A N N N U U A A L

' M M AAAAAAA N N N U U AAAAAAA L

' M M A A N NN UUUUUUU A A LLLLLLL

If MANUAL_PUMPING = True Then If West_P1_Manual = On Then West_P1_Status = True: West_P1_Time_Clock = 1 Else West_P1_Status = False: West_P1_Time_Clock = 0 EndIf If East_P2_Manual = On Then East_P2_Status = True: East_P2_Time_Clock = 1 Else East_P2_Status = False: East_P2_Time_Clock = 0 EndIf EndIf If MANUAL_ALUM = True Then If Alum_P3_Manual = On Alum_P3_Status = True: Alum_P3_Time_Clock = 1 Else Alum_P3_Manual = Off Alum_P3_Status = False: Alum_P3_Time_Clock = 0 EndIf EndIf VoltDiff (Alum1,1,mv5000,7,True,0,60,.0075,-3)' Measure Alum1 Sensor. Diff Volt Channels 7 and 8 Alum_1_Level = Alum1 + Alum1_Offset

VoltDiff (Alum2,1,mV5000,8,True ,0,60,.0075,-3)' Measure Alum2 Sensor. Diff Volt Channels 7 and 8 Alum_2_Level = Alum2 + Alum2_Offset

' PPPPP U U MM M PPPPP

' P P U U M MM M P P OOOO NN N

' PPPP U U M M PPPP O O N NN N

' P UUUU M M P OOOO N NN

' TTTTTT IIIII MM M EEEEE RRRRR OOOO FFFF FFFF

' T I M MM M E R R O O FF FF

' T I M M EEE RRRRR OOOO F F

' T IIIII M M EEEEE R R

If West_P1_Status = On Then PortSet (8,1): West_P1_Meter = Timer (21,Sec,0) / 3600' START West Pump Meter EndIf If East_P2_Status = On Then PortSet (4,1): East_P2_Meter = Timer (22,Sec,0) / 3600' START East Pump Meter EndIf If Alum_P3_Status = On Then PortSet (9,1): Alum_P3_Meter = Timer (23,Sec,0) / 3600' START Alum Pump Meter EndIf

If West_P1_Status = Off Then PortSet (8,0): West_P1_Meter = Timer (21,Sec,1) / 3600' STOP West Pump Meter EndIf If East_P2_Status = Off Then PortSet (4,0): East_P2_Meter = Timer (22,Sec,1) /3600' STOP East Pump Meter EndIf If Alum_P3_Status = Off Then PortSet (9,0): Alum_P3_Meter = Timer (23,Sec,1) / 3600' STOP Alum Pump Meter EndIf

If Reset_West_P1_Meter = YES Then West_P1_Meter = Timer (21,Sec,3): Reset_West_P1_Meter = NO' RESET West Pump Meter EndIf If Reset_East_P2_Meter = YES Then East_P2_Meter = Timer (22,Sec,3): Reset_East_P2_Meter = NO' RESET East Pump Meter EndIf If Reset_Alum_P3_Meter = YES Then Alum_P3_Meter = Timer (23,Sec,3): Reset_Alum_P3_Meter = NO' RESET Alum Pump Meter EndIf '~~~~~~~~~~~~ PROGRAM SECTION FOR AMP SENSORS ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ West_Element = 1 'CS10 Current Transformer measurement 'West_P1_mV' SubScan(0,mSec,25)

VoltSe(mV_1(West_Element),1,mV2500,1,1,0,250,1,0) West_Element = West_Element + 1 NextSubScan RMSSpa(West_P1_mV,25,mV_1()) West_P1_mV = West_P1_mV * 0.2

East_Element = 1 'CS10 Current Transformer measurement 'East_P2_mV' SubScan(0,mSec,25) VoltSe(mV_2(East_Element),1,mV2500,2,1,0,250,1,0) East_Element = East_Element + 1 NextSubScan RMSSpa(East_P2_mV,25,mV_2()) East_P2_mV = East_P2_mV * 0.2

Alum_Element = 1 'CS10 Current Transformer measurement 'Alum_P3_mV' SubScan(0,mSec,25) VoltSe(mv_3(Alum_Element),1,mV2500,3,1,0,250,1,0) Alum_Element = Alum_Element + 1 NextSubScan RMSSpa(Alum_P3_mv,25,mV_2()) Alum_P3_mv = Alum_P3_mv * 0.2

' TTTTTTT IIIIIII MM MM EEEEEEE

' T I M M M M E

' T I M M M M EEE

' T I M M M E

' T IIIIIII M M EEEEEEE

RealTime (rTime)

West_P1_NewTime = West_P1_Time_Clock If West_P1_NewTime <> West_P1_OldTime Then If West_P1_NewTime = 1 Call StampTime: West_P1_ON_Time = ST Else Call StampTime: West_P1_OFF_Time = ST EndIf EndIf West_P1_OldTime = West_P1_NewTime

East_P2_NewTime = East_P2_Time_Clock If East_P2_NewTime <> East_P2_OldTime Then If East_P2_NewTime = 1 Call StampTime: East_P2_ON_Time = ST Else Call StampTime: East_P2_OFF_Time = ST

East_P2_OldTime = East_P2_NewTime

Alum_P3_NewTime = Alum_P3_Time_Clock If Alum_P3_NewTime <> Alum_P3_OldTime Then If Alum_P3_NewTime = 1 Call StampTime: Alum_P3_ON_Time = ST Else Call StampTime: Alum_P3_OFF_Time = ST EndIf EndIf Alum_P3_OldTime = Alum_P3_NewTime

' HH HH WW WW 111 22222 OOOO NN N

' HH HH WW WW 1111 22 22 O O N NN N

' HH HH WW WW 11 11 22 OOOO N NN

' HHHHHHHHHHHHH == WW WW WW 11 == 22

' HH HH WW WW WW WW 11 22 OOOO FFFF FFFF

' HH HH WW WW WW WW 11 22 O O FF FF

' HH HH WW WW 11111111 222222222 OOOO F F

If Use_HW1 = True AND Use_HW2 = True Then Duda_HW_AvgLvl = (Duda_HW1 + Duda_HW2) / 2 Else If Use_HW1 = True AND Use_HW2 = False Then Duda_HW_AvgLvl = Duda_HW1 Else If Use_HW1 = False AND Use_HW2 = True Then Duda_HW_AvgLvl = Duda_HW2 EndIf EndIf EndIf

' CCCCCC A L L TTTTTTTT AA BBBBBBB L EEEEEEEE SSSSSSS

' C A A L L T A A B B L E SS S

' C A A L L T A A BBBBBBB L EEEE SS

' C AAAAAAA L L T AAAAAAAA B B L E S SS

' CCCCCC A A LLLLLLL LLLLLLL T A A BBBBBBB LLLLLLL EEEEEEEE SSSSSSS

CallTable Duda_15min

NextScan EndProg h

File details come from the government source that posted it. Updated .