40-80500-24-17090_40-80500-24-17090 Anton Chico Items.xlsx.XLSX

XLSX spreadsheet 21 KB Posted

Attached to
ANTON CHICO WATER AND WASTEWATER IMPROVEMENTS
Solicitation number
40-80500-24-17090
Issued by
Guadalupe County, New Mexico

About this file

This document contains a detailed items list and bidder instructions for a state and local government contract opportunity. The contract involves the construction of water and sewer system improvements for the eastbound and westbound rest areas along a state highway. The items list covers mobilization, site work, waterline installation, storage tanks, booster pumps, water treatment systems, sewer lines, septic tanks, leach fields, fencing, electrical work, and other related components. Estimated quantities are provided, though actual quantities may vary. Bidders are instructed to provide pricing that conforms to the listed items and are not permitted to modify the items or quantities. The bid includes a base bid and a bid alternate. The contract appears to be awarded to a single contractor, with a contract period not specified.

The pricing terms require bidders to provide unit pricing for each line item. The contract does not mention any set-asides or incumbents. Funding sources are not detailed, though the contract is for a state government project. Bidders must comply with the stated requirements in order to be considered for award.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Items

Bidder Instructions: (Replaces Agency Instructions, prior to ITB release. Be sure to check row height to ensure the entire instruction is displayed.)
Items - Bidders do not have the ability to add or delete Items.
Approx. Qty. - Quantities provides are estimates, only, and do not establish a definite quantity contract. Actual quantities purchased under a resulting agreement may vary. Bidders may not change the Approx. Qty.
UOM (Unit of Measure) - Bidders do not have the ability to change the UOM. Any variation from the UOM identified may be provided in the Comments.
Article and Description - Bidder cannot change Article and Description. Any clarification, explanation, brand name identification, etc. must be provided in the Comments.
Unit Price - Bidders must provide pricing that conforms with the identified Unit Price.
Comments - Bidders may only provide comments to explain or clarify an Item, identify a brand name, or provide information as specifically stated in the corresponding ITB document. Changes and additions to the Items, including variations in pricing for an Item, are not permitted. Any comments that do not conform to the requirements in the ITB or on this form will be disregarded, and will not be included in the resulting award, if Bidder is awarded.
Base Bid
Miscellaneous and Site Work
ItemApprox.
Qty.UOMArticle and DescriptionUnit
PriceExtended PriceComments
11LSMobilization and demobilization (not to exceed 8% of total construction cost)$__________$__________
21LSConstruction staking$__________$__________
31LSClear and grub, include tree removal$__________$__________
41LSTrench drain collection system for runoff at the Eastbound rest area, per DWG C-8, CIP$__________$__________
50.5ACSeeding$__________$__________
Eastbound Water System
6930LF4-inch PVC C900 DR25 waterline, including appurtenances, trenching and backfill, CIP$__________$__________
73EA4-inch gate valve and valve box, including appurtenances, excavation, backfill, and compaction, CIP$__________$__________
81EAConnection to existing restroom facility piping, including appurtenances, saw cutting, trenching, and backfill, and site restoration, CIP$__________$__________
91LSSteel welded 5,000-gallon water storage tank, including foundation, piping, valves, and appurtenances, CIP$__________$__________
101LSPackaged booster pump station, skid mounted, CIP$__________$__________
111LSPackaged water treatment system for Nitrate removal, skid mounted, including water softener, CIP$__________$__________
121LSWell building improvements and expansion, CIP$__________$__________
13270SYRemove and replace existing asphalt within trench limits$__________$__________
141LSDifinfection equipment, including dosing pump, storage container, spill containment, and appurtenances, CIP$__________$__________
151LSExposed piping in well building, 2-inch PVC, including meters, valves, fittings, and all appurtenances, CIP$__________$__________
161LSElectrical improvements including controls, alarm, recircuiting, panelboard and feeder, grounding,materials, and labor, CIP$__________$__________
171LSEvaporation pond for treatment backwash water, including HPDE lined 60-mil, CIP$__________$__________
18235LFSecurity fencing installed around the well buildings and tank, 6 feet tall, CIP$__________$__________
19275LFPerimeter fencing installed around evaporation pond, 4 feet tall, CIP$__________$__________
201EAPedestrian gate with barbed wire, 4 feet wide, CIP$__________$__________
211EAPedestrian gate, 4 feet wide, CIP$__________$__________
221EADouble swing gate with barbed wire, 16 feet wide, CIP$__________$__________
231EADouble swing gate, 16 feet wide, CIP$__________$__________
Eastbound Sewer System
24170LF4-inch PVC SCH 40 gravity sewer line, including appurtenances, trenching, and backfill, CIP$__________$__________
251EAConnection to existing restroom facility piping, including appurtenances, saw cutting, trenching, and backfill, and site restoration, CIP$__________$__________
261EAUltrasonic flow meter, installed in new fiberglass vault, CIP$__________$__________
271LSFurnish and install two concrete septic tanks, one 3,500-gallon and one 4,000-gallon including piping connections and excavation, CIP$__________$__________
28400LF2-inch PVC SCH 40 Force Main, including trenching and backfill, CIP$__________$__________
291,200LF1¼-inch PVC SCH 40 low pressure perforated pipe for leach field lines, including trenching and backfill, CIP$__________$__________
3089CYGravel for leach field trenches, CIP$__________$__________
311,800SFGeotextile fabric for leach field, CIP$__________$__________
321LSLeach field completion, including monitoring tubes and cleanouts, CIP$__________$__________
3390SYRemove and replace existing asphalt within trench limits$__________$__________
34355LFPerimeter fencing for leach field, 4 feet high, CIP$__________$__________
351EADouble swing gate, 16 feet wide, CIP$__________$__________
361EAPedestrian gate, 4 feet wide, CIP$__________$__________
371,869CYRemove and dispose of existing leach mound$__________$__________
381LSElectrical improvements including flow meter feeder, materials, and labor, CIP$__________$__________
391LSRemove and dispose of existing septic tanks and leach field$__________$__________
Westbound Water System
401,200LF4-inch PVC C900 DR25 waterline, including appurtenances, trenching and backfill, CIP$__________$__________
413EA4-inch gate valve and valve box, including appurtenances, excavation, backfill, and compaction, CIP$__________$__________
421EAConnection to existing restroom facility piping, including appurtenances, saw cutting, trenching, and backfill, and site restoration, CIP$__________$__________
431LSSteel welded water storage tank, 5,000-gallon, including foundation, piping, valves, and appurtenances, CIP$__________$__________
441LSPackaged booster pump station, skid mounted, CIP$__________$__________
451LSPackaged water treatment system for Nitrate removal, skid mounted, including water softener, CIP$__________$__________
461LSWell building improvements and expansion, CIP$__________$__________
47220SYRemove and replace existing asphalt within trench limits$__________$__________
481LSDifinfection equipment, including dosing pump, storage container, spill containment, and appurtenances, CIP$__________$__________
491LSExposed piping in well building, 2-inch PVC, including meters, valves, fittings, and all appurtenances, CIP$__________$__________
501LSElectrical improvements including controls, alarm, recircuiting, panelboard and feeder, grounding,materials, and labor, CIP$__________$__________
511LSEvaporation pond for reject RO water, including HPDE lined 60-mil, CIP$__________$__________
52230LFSecurity fencing installed around the well buildings and tank, 6 feet tall, CIP$__________$__________
53320LFPerimeter fencing installed around evaporation pond, 4 feet tall, CIP$__________$__________
541EAPedestrian gate with barbed wire, 4 feet wide, CIP$__________$__________
551EAPedestrian gate, 4 feet wide, CIP$__________$__________
561EADouble swing gate with barbed wire, 16 feet wide, CIP$__________$__________
571EADouble swing gate, 16 feet wide, CIP$__________$__________
Westbound Sewer System
58850LF4-inch PVC SCH 40 sewer line, including appurtenances, trenching, and backfill, CIP$__________$__________
591EAConnection to existing restroom facility piping, including appurtenances, saw cutting, trenching, and backfill, and site restoration, CIP$__________$__________
601LSFurnish and install two concrete septic tanks, one 3,500-gallon and one 4,000-gallon including piping connections and excavation, CIP$__________$__________
61880LF4-inch PVC SDR 35 perforated pipe for leach field lines, including trenching and backfill, CIP$__________$__________
621LSPackaged metering manhole, including fiberglass manhole, ultrasonic flow meter, Parshall Flume, CIP$__________$__________
63196CYGravel for leach field trenches, CIP$__________$__________
642,640SFGeotextile fabric for leach field, CIP$__________$__________
651LSLeach field completion, including monitoring tubes and cleanouts, CIP$__________$__________
6690SYRemove and replace existing asphalt within trench limits$__________$__________
67550LFPerimeter fencing for leach field, 4 feet high, CIP$__________$__________
681EADouble swing gate, 16 feet wide, CIP$__________$__________
691EAPedestrian gate, 4 feet wide, CIP$__________$__________
701LSElectrical improvments including flow meter feeder, electrical rack, materials, and labor, CIP$__________$__________
711LSRemove and dispose of existing septic tanks and leach field$__________$__________
Base Bid Subtotal$__________
NMGRT 6.3125%$__________
Total Base Bid$__________
Bid Alternate
A.1.12LSWell inspection and test pumping, including pulling pumps, video survey, cleaning, and resetting the pumps, CIP
Bid Alternate 1 Subtotal$__________
NMGRT 6.3125%$__________
Total Bid Alternate 1$__________
Total Base Bid + Bid Alternate 1$__________

Drop Down

UnitOfMeasure
10 - Group
12 - Packet
18 - 55 Gallon Drum
23 - Gram per Cubic Centimeter
4D - Curie
4E - 20-Pack
4F - 100-Pack
AA - Ball
AB - Bulk Pack
AC - Acre
AD - Bytes
AF - Centigram
AG - Angstrom
AM - Ampoule
AR - Suppository
AS - Assortment
AV - Capsule
AW - Powder-Filled Vials
AY - Assembly
BA - Bale
BB - Base Box
BC - Bucket
BD - Bundle
BE - Beam
BF - Board Feet
BG - Bag
BH - Brush
BI - Bar
BJ - Band
BK - Book
BL - Block
BM - Bolt
BN - Bulk
BO - Bottle
BR - Barrel
BS - Basket
BT - Belt
BU - Bushel
BX - Box
C3 - Centiliter
C8 - Cubic Decimeter
CAS - Cassette
CC - Cubic Centimeter
CE - Centigrade/Celsius
CF - Cubic Foot
CG - Card
CH - Container
CI - Cubic Inches
CJ - Cone
CM - Centimeter
CN - Can
CP - Crate
CQ - Cartridge
CR - Cubic Meter
CS - Case
CT - Carton
CU - Cup
CW - Hundred Weight
CX - Coil
CY - Cubic Yard
CYL - Cylinder
CZ - Combo
D3 - Square Decimeter
D5 - Kilogram per Square Centimeter
DAY - Day
DB - Dry Pounds
DC - Disk (Disc)
DE - Deal
DF - Dram
DG - Decigram
DI - Dispenser
DJ - Decagram
DL - Deciliter
DM - Decimeter
DP - Dozen Pair
DR - Drum
DS - Display
DZ - Dozen
EA - Each
EM - Inches, Decimal-Minimum
EV - Envelope
F4 - Minim
FG - Transdermal Patch
FL - Flake Ton
FO - Fluid Ounce
FT - Foot
G - Gram
G5 - Gill (Imperial)
GAL - Gallon
GH - Half Gallon
GS - Gross
GT - Gross Ton
GX - Grain
HA - Hank
HD - Half Dozen
HR - Hour
HT - Half Hour
HU - Hundred
IH - Inhaler
IN - Inch
JA - Job
JG - Joule per Gram
JO - Joint
JR - Jar
JU - Jug
KA - Cake
KB - Kilocharacters
KC - Kilograms per Cubic Meter
KD - Kilograms Decimal
KE - Keg
KG - Kilogram
KL - KiloLiter
KM - KiloMeter
KT - Kit
KU - Task
L - Liter
LB - Pound
LF - Linear Foot
LG - Long Ton
LN - Length
LO - Lot
LS - Lump Sum
M - Meter
M3 - Mat
MCI - Millicurie
MG - Milligram
MI - Metric
MICROCI - Microcurie
MICROG - Microgram
MICROL - Microliter
MILE - Mile
MIN - Minute
ML - Milliliter
MM - Millimeter
MON - Months
MP - Metric Ton
MS - Square Millimeter
NL - Load
NT - Trailer
NTE - Not to Exceed
OP - Two Pack
OZ - Ounce
P1 - Percent
P3 - Three Pack
P4 - Four Pack
P5 - 5 Pack
P6 - 6 Pack
P7 - Seven Pack
P8 - Eight Pack
P9 - Nine Pack
PA - Pail
PC - Piece
PD - Pad
PK - Pack
PL - Pallet
PO - Pounds per Inch of Length
PP - Plate
PR - Pair
PT - Pint
PV - Half Pint
PY - Peck Dry U.S.
QR - Quire
QT - Quart
QTR - Quarter
RA - Rack
RD - Rod
RE - Reel
RG - Ring
RL - Roll
RM - Ream
RO - Round
SB - Square Mile
SC - Square Centimeter
SEC - Second
SET - Set
SF - Square Feet
SH - Sheet
SI - Square Inch
SJ - Sack
SL - Sleeve
SM - Square Meter
SO - Spool
SP - Shelf Package
SR - Strip
STN - Short Ton
SV - Skid
SVC - Service
SW - Skein
SY - Square Yard
SZ - Syringe
TB - Tube
TC - Truckload
TH - Thousand
TK - Tank
TN - Ton
TO - Troy Ounce
TP - Ten Pack
TY - Tray
U2 - Tablet
UL - Unitless
UM - Million Units
UN - Unit
UP - Troche
UQ - Wafer
USD - US Dollar
UU - Lozenge
UX - Dram (Minim)
V2 - Pouch
VI - Vial
WK - Week
WP - Pennyweight
WR - Wrap
Y2 - Tablespoon
Y3 - Teaspoon
Y4 - Tub
YD - Yard
YR - Year
ZC - Semiannual
ZP - Page

File details come from the government source that posted it. Updated .