40-51600-24-05645_Items-Spreadsheet-Jacks Creek Barrier Final.xlsx.XLSX
XLSX spreadsheet 18 KB Posted
- Attached to
- JACKS CREEK FISH BARRIER
- Solicitation number
- 40-51600-24-05645
- Issued by
- San Miguel County, New Mexico
About this file
This document is a spreadsheet of items for a state and local contract opportunity issued by the New Mexico Department of Game and Fish for the construction of an in-stream fish barrier structure in Jacks Creek. The project includes construction of a channel crossing cast in place concrete structure, upstream and downstream erosion protection, and revegetation of disturbed areas. Key components include mobilization/demobilization, site clearing and grubbing, water management and dewatering, excavation, concrete work for the fish barrier, structural backfill, riprap placement, and final grading and revegetation. The spreadsheet provides an itemized list of required work with estimated quantities and instructions for bidders.
The contract opportunity is located in San Miguel County, New Mexico. The spreadsheet includes line items for pricing such as excavation, concrete work, backfill, testing, access road construction, and final grading and revegetation. Bidders are not permitted to modify the items or quantities, but may provide comments to clarify or provide additional details. Pricing must conform to the specified unit prices. The contract does not appear to include any set-asides, and the funding source is not explicitly stated.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Items
| Bidder Instructions: (Replaces Agency Instructions, prior to ITB release. Be sure to check row height to ensure the entire instruction is displayed.) | |||||
| Items - Bidders do not have the ability to add or delete Items. | |||||
| Approx. Qty. - Quantities provides are estimates, only, and do not establish a definite quantity contract. Actual quantities purchased under a resulting agreement may vary. Bidders may not change the Approx. Qty. | |||||
| UOM (Unit of Measure) - Bidders do not have the ability to change the UOM. Any variation from the UOM identified may be provided in the Comments. | |||||
| Article and Description - Bidder cannot change Article and Description. Any clarification, explanation, brand name identification, etc. must be provided in the Comments. | |||||
| Unit Price - Bidders must provide pricing that conforms with the identified Unit Price. | |||||
| Comments - Bidders may only provide comments to explain or clarify an Item, identify a brand name, or provide information as specifically stated in the corresponding ITB document. Changes and additions to the Items, including variations in pricing for an Item, are not permitted. Any comments that do not conform to the requirements in the ITB or on this form will be disregarded, and will not be included in the resulting award, if Bidder is awarded. | |||||
| Item | Approx. | ||||
| Qty. | UOM | Article and Description | Unit | ||
| Price | Comments | ||||
| Mobilization/ Demobilization | |||||
| 1 | 1 | LS - Lump Sum | Mobilization/ Demoblization | $ | |
| 2 | 1 | LS - Lump Sum | Survey/ Layout | $ | |
| 3 | 1 | LS - Lump Sum | Bonding | $ | |
| Clearing and Grubbing | |||||
| 4 | 1 | AC - Acre | Clearing and Grubbing | $ | |
| Water Management | |||||
| 5 | 1 | LS - Lump Sum | Divert stream flow and maintain diversion | $ | |
| Barrier Construction | |||||
| 6 | 162 | CY - Cubic Yard | Excavation | $ | |
| 7 | 1 | EA - Each | Construct Fish Barrier | $ | |
| 8 | 42 | CY - Cubic Yard | Backfill Structure | $ | |
| 9 | 2 | EA - Each | Concrete Testing | $ | |
| 10 | 1 | LS - Lump Sum | Compaction Testing | $ | |
| 11 | 1 | LS - Lump Sum | Bedrock smoothing/ cleaning | $ | |
| 12 | 1 | LS - Lump Sum | Access Road Construction/ Maintenance | $ | |
| 13 | 147 | CY - Cubic Yard | Install Armor | $ | |
| 14 | 23 | CY - Cubic Yard | Class I Riprap | $ | |
| 15 | 124 | CY - Cubic Yard | Class II Riprap | $ | |
| 16 | 46 | CY - Cubic Yard | Type B Fill | $ | |
| Final Grading and Revegetation | |||||
| 17 | 1 | EA - Each | Final Grading and Coir Fabric | $ | |
| 18 | 1 | AC - Acre | Seeding | $ |
Drop Down
| UnitOfMeasure |
| 10 - Group |
| 12 - Packet |
| 18 - 55 Gallon Drum |
| 23 - Gram per Cubic Centimeter |
| 4D - Curie |
| 4E - 20-Pack |
| 4F - 100-Pack |
| AA - Ball |
| AB - Bulk Pack |
| AC - Acre |
| AD - Bytes |
| AF - Centigram |
| AG - Angstrom |
| AM - Ampoule |
| AR - Suppository |
| AS - Assortment |
| AV - Capsule |
| AW - Powder-Filled Vials |
| AY - Assembly |
| BA - Bale |
| BB - Base Box |
| BC - Bucket |
| BD - Bundle |
| BE - Beam |
| BF - Board Feet |
| BG - Bag |
| BH - Brush |
| BI - Bar |
| BJ - Band |
| BK - Book |
| BL - Block |
| BM - Bolt |
| BN - Bulk |
| BO - Bottle |
| BR - Barrel |
| BS - Basket |
| BT - Belt |
| BU - Bushel |
| BX - Box |
| C3 - Centiliter |
| C8 - Cubic Decimeter |
| CAS - Cassette |
| CC - Cubic Centimeter |
| CE - Centigrade/Celsius |
| CF - Cubic Foot |
| CG - Card |
| CH - Container |
| CI - Cubic Inches |
| CJ - Cone |
| CM - Centimeter |
| CN - Can |
| CP - Crate |
| CQ - Cartridge |
| CR - Cubic Meter |
| CS - Case |
| CT - Carton |
| CU - Cup |
| CW - Hundred Weight |
| CX - Coil |
| CY - Cubic Yard |
| CYL - Cylinder |
| CZ - Combo |
| D3 - Square Decimeter |
| D5 - Kilogram per Square Centimeter |
| DAY - Day |
| DB - Dry Pounds |
| DC - Disk (Disc) |
| DE - Deal |
| DF - Dram |
| DG - Decigram |
| DI - Dispenser |
| DJ - Decagram |
| DL - Deciliter |
| DM - Decimeter |
| DP - Dozen Pair |
| DR - Drum |
| DS - Display |
| DZ - Dozen |
| EA - Each |
| EM - Inches, Decimal-Minimum |
| EV - Envelope |
| F4 - Minim |
| FG - Transdermal Patch |
| FL - Flake Ton |
| FO - Fluid Ounce |
| FT - Foot |
| G - Gram |
| G5 - Gill (Imperial) |
| GAL - Gallon |
| GH - Half Gallon |
| GS - Gross |
| GT - Gross Ton |
| GX - Grain |
| HA - Hank |
| HD - Half Dozen |
| HR - Hour |
| HT - Half Hour |
| HU - Hundred |
| IH - Inhaler |
| IN - Inch |
| JA - Job |
| JG - Joule per Gram |
| JO - Joint |
| JR - Jar |
| JU - Jug |
| KA - Cake |
| KB - Kilocharacters |
| KC - Kilograms per Cubic Meter |
| KD - Kilograms Decimal |
| KE - Keg |
| KG - Kilogram |
| KL - KiloLiter |
| KM - KiloMeter |
| KT - Kit |
| KU - Task |
| L - Liter |
| LB - Pound |
| LF - Linear Foot |
| LG - Long Ton |
| LN - Length |
| LO - Lot |
| LS - Lump Sum |
| M - Meter |
| M3 - Mat |
| MCI - Millicurie |
| MG - Milligram |
| MI - Metric |
| MICROCI - Microcurie |
| MICROG - Microgram |
| MICROL - Microliter |
| MILE - Mile |
| MIN - Minute |
| ML - Milliliter |
| MM - Millimeter |
| MON - Months |
| MP - Metric Ton |
| MS - Square Millimeter |
| NL - Load |
| NT - Trailer |
| NTE - Not to Exceed |
| OP - Two Pack |
| OZ - Ounce |
| P1 - Percent |
| P3 - Three Pack |
| P4 - Four Pack |
| P5 - 5 Pack |
| P6 - 6 Pack |
| P7 - Seven Pack |
| P8 - Eight Pack |
| P9 - Nine Pack |
| PA - Pail |
| PC - Piece |
| PD - Pad |
| PK - Pack |
| PL - Pallet |
| PO - Pounds per Inch of Length |
| PP - Plate |
| PR - Pair |
| PT - Pint |
| PV - Half Pint |
| PY - Peck Dry U.S. |
| QR - Quire |
| QT - Quart |
| QTR - Quarter |
| RA - Rack |
| RD - Rod |
| RE - Reel |
| RG - Ring |
| RL - Roll |
| RM - Ream |
| RO - Round |
| SB - Square Mile |
| SC - Square Centimeter |
| SEC - Second |
| SET - Set |
| SF - Square Feet |
| SH - Sheet |
| SI - Square Inch |
| SJ - Sack |
| SL - Sleeve |
| SM - Square Meter |
| SO - Spool |
| SP - Shelf Package |
| SR - Strip |
| STN - Short Ton |
| SV - Skid |
| SVC - Service |
| SW - Skein |
| SY - Square Yard |
| SZ - Syringe |
| TB - Tube |
| TC - Truckload |
| TH - Thousand |
| TK - Tank |
| TN - Ton |
| TO - Troy Ounce |
| TP - Ten Pack |
| TY - Tray |
| U2 - Tablet |
| UL - Unitless |
| UM - Million Units |
| UN - Unit |
| UP - Troche |
| UQ - Wafer |
| USD - US Dollar |
| UU - Lozenge |
| UX - Dram (Minim) |
| V2 - Pouch |
| VI - Vial |
| WK - Week |
| WP - Pennyweight |
| WR - Wrap |
| Y2 - Tablespoon |
| Y3 - Teaspoon |
| Y4 - Tub |
| YD - Yard |
| YR - Year |
| ZC - Semiannual |
| ZP - Page |
File details come from the government source that posted it. Updated .