4-UT261122 Old Black Canyon Highway Water Transmission Main Project Addendum1.pdf

PDF 210 KB Posted

Attached to
Old Black Canyon Highway Water Transmission Main Project
Solicitation number
UT261122
Issued by
Yavapai County, Arizona

About this file

This document is Addendum #1 to the Old Black Canyon Highway Water Transmission Main Project issued by the Town of Prescott Valley Finance Department in Arizona on November 19, 2026. The addendum provides a critical clarification regarding Arizona Transaction Privilege Tax (TPT) exemptions applicable to the project. Specifically, materials used in the project related to pipes and valves four inches in diameter and greater are exempt from Arizona TPT when used for water and wastewater projects, pursuant to exemptions contained in Arizona Revised Statutes Title 42. The addendum requires all bidders to acknowledge receipt by signing, dating, and printing their name and firm information, with the signed addendum to be uploaded with their proposal submittal in Bonfire in the designated deliverable.

The project, as described in the related contract opportunity, consists of WIFA-financed work including installation of 10,900 linear feet of 16-inch water transmission main, 115 linear feet of 12-inch water main, 60 linear feet of 30-inch steel casing sleeve below a 42-inch high-pressure natural gas line, three pressure reducing stations, and testing of new water mains within the Old Black Canyon Highway right of way in Prescott Valley, Arizona. This addendum serves to clarify tax treatment of materials and does not establish pricing terms, set-asides, or modify the fundamental scope of work for the project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Town of Prescott Valley

Finance

7501 E. Skoog Blvd.

Prescott Valley Arizona 86314

Telephone (928) 759-3010 ▪ prescottvalley-az.gov

Addendum to UT261122 Old Black Canyon Highway Water Transmission Main Project

November 19, 2026

Addendum #1

The Specifications and Documents for the above project are hereby amended as follows:

1. Clarification on Arizona TPT applicable to this project:

• Pursuant to exemptions to the Arizona Transaction Privilege Tax (TPT) contained in Arizona Revised Statutes Title 42, materials used in this project related to pipes and valves four inches in diameter and greater are exempt from Arizona TPT when used for water and wastewater projects.

Receipt of Addendum #1 is hereby acknowledged by:

Signature Date

Printed Name Name of Firm/Business

Sign, date, and Fill-In Name of Person/Firm submitting a Proposal.

Upload this signed Addendum with your submittal in Bonfire in the designated deliverable.

https://protect.checkpoint.com/v2/r01/___https:/www.prescottvalley-az.gov/___.YzJ1OmF6Y3JwdG93bnByZXNjb3R0dmFsbGV5OmM6b2ZmaWNlMzY1X2VtYWlsc19hdHRhY2htZW50OjFiM2Y1YjYzNDU1NzBmYzdhMjZlOGM3ZmIzY2FlMWU2Ojc6Y2I1MDo2ZDZmODUzOGJkN2Y3MTg3YmI3NjZjMzNjYjFiMDMwZDJlMjg5ZDcwYzJhYTBlZDg5MjAzNjNmODEzNzVlNDM1OnA6RjpG

File details come from the government source that posted it. Updated .