1-Old Black Canyon BID Proposal Packet Final.pdf

PDF 8 MB Posted

Attached to
Old Black Canyon Highway Water Transmission Main Project
Solicitation number
UT261122
Issued by
Yavapai County, Arizona

About this file

Summary

This is a Bid Proposal Packet issued by the Town of Prescott Valley for CIP #CW2513—the Old Black Canyon Highway Water Transmission Main Project, funded through the Water Infrastructure Finance Authority (WIFA) Clean Water or Drinking Water Revolving Fund. The project scope includes installation of approximately 10,900 linear feet of 16-inch water transmission main, 115 linear feet of 12-inch water main, 60 linear feet of 30-inch steel casing sleeve beneath a 42-inch high-pressure natural gas line, three pressure reducing stations, and testing of new water mains within the Old Black Canyon Highway right of way in Prescott Valley, Arizona. The bid proposal contains 77 line items encompassing clearing and grubbing, utility casing work, water main and fitting installations, pressure reducing valve assemblies, and traffic control measures. The non-mandatory pre-bid conference is scheduled for 2:00 PM Arizona MST on Monday, November 30, 2026, in the Town of Prescott Valley Civic Center Room 330. Sealed bids must be submitted electronically through the Town's Bonfire portal by 3:30 PM Arizona MST on Monday, December 21, 2026. The contract award is anticipated for Thursday, January 14, 2027, with a pre-construction conference scheduled for January 28, 2027, and notice to proceed anticipated for February 15, 2027. The total construction duration shall not exceed 200 calendar days from the date of notice to proceed, with the anticipated last day of construction on Friday, September 3, 2027.

Bidders must submit a bid bond or certified check equal to 10 percent of the total bid amount and must be registered in sam.gov with a Unique Entity Identifier (UEI). All bidders must hold a valid Arizona Registrar of Contractors License and appropriate Town of Prescott Valley Business Registration. The project is subject to prevailing wage requirements per General Decision Number AZ20260061, with wage rates varying by classification and ranging from $24.02 to $62.08 per hour plus fringe benefits. The Town reserves the right to accept or reject any and all bid proposals. No set-asides are indicated in the solicitation documents. The contract includes allowance items pre-entered at $100,000 to cover unforeseen changes, liquidated damages provisions for failure to complete on time per MAG specifications, and comprehensive requirements for quality control, traffic management, erosion control, utility protection, and warranty periods of a minimum of two years from final project acceptance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRESCOTT VALLEY

TOWN OF PRESCOTT VALLEY

CIP #CW2513 - Old Black Canyon Highway Water Transmission Main Project

BID PROPOSAL PACKET

Town of Prescott Valley

7501 E. Skoog Blvd Prescott Valley, AZ 86314

CONTRACT DOCUMENTS, SPECIFICATIONS & PLANS

CIP #CW2513 - Old Black Canyon Highway Water Transmission Main Project

PROJECT MANAGER

James Warne, PE Utilities Engineer

Cover Section 1

PROJECT DESIGN ENGINEER

Gordon Bowers, PE Dava & Associates, Inc.

310 E. Union Street Prescott, AZ 86303

November 13, 2026

CIP #CW2513 – Old Black Canyon Highway Water Transmission Main Project

Table of Contents 2 November 13, 2026

TABLE OF CONTENTS

Section # Section Name

1. ....................... Cover

2. ....................... Table of Contents

3. ....................... Notice of Invitation to Bid (Advertisement)

4. ....................... Project Information

5. ....................... Bid Proposal including Bid Schedule(s)

6. ....................... Wage Rate Decision

7. ....................... Bidding Documents

- Affidavit of Non-Collusion

- Surety Bond (a.k.a. Bid Bond)

- Boycott of Israel Form

- Force Labor of Ethic Uyghurs Ban Form

- Executive Order 2009-09

- Executive Order 99-4

- Executive Order 75-5

- DBE Compliance Checklist

- Bidder Compliance Statement/Certification Regarding EEO

- Build America, Buy America (BABA) Initial Certification Statement

- American Iron and Steel (AIS) Initial Certification Statement

- Non-Segregated Facilities Certification Statement

- Byrd Anti-Lobbying Certification

8. ....................... Technical Specifications and/or Special Provisions (under this cover)

9. ....................... Plans (under separate cover)

Appendices Document Title A. ....................... Contract B. ....................... Statutory Performance Bond C........................ Statutory Labor and Materials Payment Bond D........................ Contractor’s Affidavit Regarding Settlement of Claims E. ....................... Vendor Certification Packet F. ....................... WIFA Contract Packet

CIP #CW2513 – Old Black Canyon Highway Water Transmission Main Project

Notice of Invitation to Bid 3 November 13, 2026 Section 3

NOTICE OF INVITATION TO BID

The Town of Prescott Valley is the recipient of a loan financed by the Water Infrastructure Finance Authority (WIFA) through the Clean Water or Drinking Water Revolving Fund and is seeking bids for the construction of the CIP #CW2513 - Old Black Canyon Water Transmission Main Project. In general, the WIFA financed work consists of installation of 10,900 lf of 16-inch water transmission main; installation of 115 lf of 12-inch water main, installation of 60 lf of 30-inch steel casing sleeve below a 42-inch high-pressure natural gas line; three pressure reducing stations, and testing of new water mains within the Old Black Canyon Highway right of way in Prescott Valley.

Contract documents, plans, specifications, and other information about this bid are listed at https://prescottvalleyaz.bonfirehub.com/. Information on how to acquire contract documents, plans, and specifications may also be obtained by calling Prescott Valley Utilities Department at (928) 759-3070.

A non-mandatory pre-bid conference will be held at 2:00 PM Arizona MST on Monday, November 30, 2026 in the Town of Prescott Valley Civic Center Room 330, 7501 E. Skoog Blvd, Prescott Valley, Arizona

SEALED BIDS will be accepted until 3:30 PM Arizona MST on Monday, December 21, 2026 through the Town of Prescott Valley's Bonfire website at https://prescottvalleyaz.bonfirehub.com/. Bids will only be accepted electronically, in-person bids will not be accepted. Shortly thereafter, the bids will be electronically unsealed and read aloud. Bids will not be accepted after the deadline.

All Bidders on this Project will need to have or obtain federal SAM.gov registration. Bidders will need to upload their registration into Bonfire along with all other required Bid information at the time of the Bid.

Each bid shall be accompanied by a certified check, cashier’s check, or surety bond for ten percent of the amount of the bid included in the bid proposal as a guarantee that the contractor will enter into a contract to perform the proposal in accordance with plans and specifications.

• If utilizing a Certified/Cashier’s Check – Please upload a copy of the check alongside your proposal. Bidders will also be required to deliver the original check to the Town, either by mail or drop off, before closing of the solicitation.

• If utilizing a Surety Bond – Please upload a copy of the bond alongside your proposal.

Upon receipt of an Intent to Award notification, the selected vendor will be requested to provide the original surety bond to the Town, either by mail or drop off.

The Town of Prescott Valley reserves the right to accept or reject any and all bid proposals, or any part thereof, to withhold the award, and waive any informality deemed in the best interest of the Town.

s/Fatima Fernandez Town Clerk

2TC PUB November 22, November 29, 2026

CIP #CW2513 – Old Black Canyon Highway Water Transmission Main Project

Project Info 4 November 13, 2026 Section 4

PROJECT INFORMATION

1. CIP No. and Project Name

CIP #CW2513 - Old Black Canyon Highway Water Transmission Main Project

2. Project Scope of Work:

In general, the WIFA financed work consists of installation of 10,900 lf of 16-inch water transmission main; installation of 115 lf of 12-inch water main, installation of 60 lf of 30-inch steel casing sleeve below a 42-inch high-pressure natural gas line; three pressure reducing stations, and testing of new water mains within the Old Black Canyon Highway right of way in Prescott Valley.

3. Applicable Standard Specifications and Details This construction contract shall be completed in accordance with the latest version of the “Uniform Standard Specifications and Details for Public Works Construction” as sponsored and distributed by the Maricopa Associations of Governments (hereinafter referred to as MAG). The MAG is further modified as per the Quad City Standard Details, Town of Prescott Valley Design and Construction Standards and Specifications, Town Code, and these Contract Documents, Specifications, and Special Provisions.

These referenced specifications and details are hereby incorporated into this construction contract by this reference.

4. Project Design Plans and Specifications The Design Plans, Technical Specifications and/or Special Provisions have been prepared by Dava & Associates, Inc. The Technical Specifications are included in this Bid Proposal Packet. By this reference these specifications are incorporated into these contract documents.

5. Bid Schedule Quantities (PV/MAG 102.3) The quantities listed on the bid schedules are approximate. Actual quantities will be field verified for payment. Item quantities may be increased, decreased, or deleted at the discretion of the Town. Items of work not specifically set forth in the bid schedule, or discussed in the Technical Specifications, are incidental to the work and no additional compensation will be made. The unit prices shall be considered as full compensation. Therefore, they must include all state and local taxes required.

6. Compensation for Alteration of Work (MAG 109.4.1) Section 109.4.1 of MAG Specifications is hereby waived. No adjustment in unit price will be made for quantity changes of greater than 20 percent.

7. Question and Answer Process Proposers may utilize the internal chat feature of Bonfire to ask any questions about the Project. Please note that these chats are considered public and will be housed on the Project listing. Questions will not

Project Info 5 November 13, 2026 be accepted via phone or email. In-person questions may only be asked during the Pre-Bid Meeting. In-person questions asked during the Pre-Bid meeting will be compiled and posted to the Project as an Addendum. Any such attempt to directly ask questions of Town staff or employees of firms contracted by the Town through phone, email, or in-person outside of the Pre-Bid Meeting may result in the rejection of the proposal.

Any and all questions regarding the solicitation must be submitted virtually through the Q&A feature of the Town of Prescott Valley’s eProcurement portal (Bonfire). All questions must be submitted no later than the date and time indicated on the Town of Prescott Valley’s eProcurement portal (Bonfire). Any violations of these guidelines by a Proposer may constitute grounds for immediate disqualification from this procurement.

8. Solicitation Contract Restrictions The Town is conducting a competitive solicitation process for this bid, free from improper influence or lobbying. Contact with members of Town staff, Town Council, Town Mayor, or anyone connected to the solicitation regarding this opportunity is strictly prohibited until the conclusion of the associated evaluation period and contract award. Contact includes direct or indirect contact by the Proposer, its employees, attorneys, lobbyists, etc. in an attempt to influence the solicitation process.

9. Pre-Bid Conference A non-mandatory pre-bid conference will be held at 2:00 PM Arizona MST on Monday, November 30, 2026 in the Town of Prescott Valley Civic Center Room 330, 7501 E. Skoog Blvd, Prescott Valley, Arizona. The Bidders shall have the opportunity to ask questions of the PROJECT ENGINEER and applicable Town staff. Any interpretation, clarification, or addition to the Contract Documents will be provided by Addendum.

10. Preparation and Submittal of Bid Proposal (PV/MAG 102.5 & 102.9) The bid proposal is considered to be this ENTIRE BID PROPOSAL PACKET, completed in full. Bidders shall retain copies for their own records.

Bidders acknowledge that they have reviewed and shall comply with the required contract conditions attached and included in this proposal as Appendix F.

Bidders must register in sam.gov to register as an Unique Entity Identifier (UEI) and acquire a unique identity ID.

All bid submittal forms and documents shall be submitted electronically through the Town of Prescott Valley's Bonfire website at https://prescottvalleyaz.bonfirehub.com/. Bids will only be accepted electronically moving forward, not in person.

BID PROPOSALS must be received before the time and date specified in the NOTICE OF INVITATION TO BID (or as modified by addenda/um).

Shortly after the deadline, bid proposals will be electronically unsealed and read aloud. Bid proposals will not be accepted after the deadline. The Town of Prescott Valley reserves the right to accept or reject any and all bid proposals, or any part thereof, and waive any informality deemed in the best interest of the Town.

Project Info 6 November 13, 2026

Bid proposals will be evaluated and awarded based on the total base bid (i.e. all base bid schedules), plus or minus any alternate bid schedules (if any).

11. Subcontractors List (PV/MAG 102.6) A Subcontractors List is not required in the bid proposal submittal.

12. Permits Permits (and any associated inspections) are the responsibility of the contractor. At a minimum, the following permits are likely required to perform the work for this project:

• Yavapai County Right of Way Permit with Traffic Control Plan

• Town of Prescott Valley Right of Way Permit with Traffic Control Plan

13. Licenses

• The Contractor and all Subcontractors shall have a:

1) valid Town of Prescott Valley Business Registration (if required), and

2) valid Arizona Registrar of Contractors License for work required in this project.

3) License appropriate to the work they are performing

14. Project Schedule The total construction duration shall not exceed Two Hundred (200) calendar days from the date of the Notice to Proceed. The following schedule of project dates is anticipated:

1. Advertisement: Sunday, November 22, 2026 and Sunday, November 29, 2026

2. Pre-Bid Meeting: Monday, November 30, 2026

Town of Prescott Valley Civic Center, Room 330 2:00 PM Arizona MST 7501 E. Skoog Blvd, Prescott Valley

3. Bid Proposal Submittal Deadline Monday, December 21, 2026

3:30 PM Arizona MST

4. Contract Award Thursday, January 14, 2027

5. Pre-Construction Conference Thursday, January 28, 2027

6. Notice to Proceed & Monday, February 15, 2027

First Day of Construction Contract

7. Last Day of Construction Contract (200 Days) Friday, September 3, 2027

THIS SCHEDULE IS TENTATIVE AND SUBJECT TO CHANGE WITHOUT NOTICE.

(THIS SCHEDULE IS PROVIDED FOR INFORMATION ONLY.)

Project Info 7 November 13, 2026

15. Liquidated Damages (MAG 108.9) Failure to complete on time shall subject the contract to liquidated damages as specified in Section 108.9 “Failure to Complete on Time” of MAG.

16. Hours of Work Per Town Code 10-01-070, work, to include equipment start up and/or staging of equipment or materials, shall not begin prior to 7:00 AM, nor shall it extend past 7:00 PM.

Any request for changing the work hours shall be submitted to the Project Manager for consideration and approval.

Inspections are to be scheduled during regular working hours, 8:00 AM to 5:00 PM, Monday through Friday, excluding Town recognized holidays, unless otherwise approved by the Project Manager.

All materials, labor, and equipment for each phase of construction must be ready and on site before any portion of that phase of construction shall commence.

17. Subletting of Contract (MAG 108.2) Or The MAG Standard Specification 108.2 (E) is hereby amended. The Contractor shall perform a minimum of 20% of the work by dollar amount for this contract and can sublet up to 80% of work by dollar amount to subcontractor(s).

18. Cooperation Between Contractors This project is to be coordinated with any and all simultaneous and adjacent construction projects. The Contractor of this project shall initiate and establish a line of formal communication with all contractors who are doing simultaneous and adjacent construction projects.

19. Work Site Safety and Security The Contractor is specifically responsible for, and by submission of his/her proposal and/or execution of a contract for this project accepts full and complete responsibility for, work site safety and security for this project. It is recognized that neither the Owner nor the Project Engineer or their representatives have control of or responsibility for work site safety and security.

“In compliance with the Town’s Hazard Communication Program (Loss Control Manual), the Town is hereby notifying the contractor of their rights under the Arizona Hazard Communication Standard. The Town will provide a copy of any Workplace Chemical List, and any existing SDSs the contractor may be exposed to, if any, for the project area. The contractor is responsible for providing SDSs for any hazardous chemicals they will be bringing to the Town of Prescott Valley workplace to which employees will have an exposure.”

20. Contractor Representative The Contractor shall be represented at all times during the work. Neither the Owner nor the Project Engineer will deal directly with Subcontractors. Instructions and information given by the Project Engineer to the Contractor's foreman or other on-site representative shall be considered as given to the Contractor.

Project Info 8 November 13, 2026

21. Pre-Construction and Progress Meetings A Pre-Construction Meeting shall be scheduled prior to start of construction. The Project Manager (Town), Project Engineer, and Contractor shall be present. The sequence of work will be discussed and will be mutually agreed upon to ensure that the work is accomplished and completed within the time specified and to allow for inspection and operations flexibility by the Town. A schedule of work, list of sub-contractors, and a list of contacts including emergency numbers are required and will be established at the Pre-Construction Meeting and maintained throughout the project.

The Contractor shall submit a complete bar chart for the entire project with major material purchases, installation of each of the three pressure reducing stations, the specific road crossings with any road closures anticipated, as well as section for testing. The schedule will also have post construction start-up and balancing activities. The schedule will show the end of the 200 days of the project.

Progress meetings will be held throughout the life of the contract by mutual agreement during the course of construction. The purpose of these meetings is to establish and maintain lines of communication, report on progress, discuss and resolve problem areas, and other such matters as related to the project. At each meeting, the Contractor shall submit, by bar chart or other approved method, an updated schedule of the types and locations of work expected to be performed over the ensuing three week period.

22. Pre-Project and Post-Project Video Records The contractor shall thoroughly video record the project limits, prior to start of construction, and prior to any staging and/or delivery of materials & equipment. Provide a copy of the recording to the Owner. The format of the recording shall be approved by the Owner.

The contractor shall also thoroughly video record the project limits, post construction. Provide a copy of the recording to the Owner. The format of the recording shall be approved by the Owner.

23. Submittals Clean & legible copies of submittals shall be furnished by the Contractor to the Project Engineer and Project Manager. Submittals can be e-mailed to the Project Team or a minimum of four (4) copies of each submittal shall be provided to the Project Engineer. Submittals must be a submitted at least ten

(10) days prior to the commencement of work involving the submittal.

24. Construction Stakes, Lines and Grades Section 105.8 of MAG Specifications shall apply and is noted here for emphasis. The Project Engineer will provide control stakes for the portion of the project, as requested by the Contractor, with a minimum of three (3) working days' (72 hours') notice. To facilitate scheduling, the Contractor shall submit a schedule of anticipated staking requirements for the following four (4) weeks at each bi-weekly coordination meeting. After completion of each element of construction control staking, the Contractor's representative shall walk all staked areas with the Project Engineer for the purpose of accepting the stakes in place. After staking acceptance by the Contractor, the stakes are to be preserved by the Contractor.

Project Info 9 November 13, 2026

Re-staking due to Contractor destruction of stakes, and/or failure to protect in place, will be provided on the above notification schedule at a rate commensurate with the rates charged by the engineering design firm, which will be deducted from Contractor payments:

25. Property to Be Used

The Contractor shall limit operations and equipment to County and/or Town right of way, Town of Prescott Valley Property, rights-of-way, and easements designated by the Owner or obtained by the Contractor for this project. Disturbances or damages to noted areas or other areas shall be restored to pre-construction condition or better, at the Contractor’s expense.

If there is any type of oil spill, the Contractor shall have the spill cleaned up within 24 hours since the incident to the complete satisfaction of the Town of Prescott Valley. If the work is unacceptable, the Town at its sole discretion may require the Contractor to excavate out, and completely rework the section in question at the sole expense of the Contractor.

If any other property is used for staging of equipment or materials, the Contractor must obtain written permission from the property owner and supply a copy of the written agreement to the Town. In addition, written permission shall be obtained from adjacent property owners and owners of property directly across the street.

The staging area application process is as follows:

• Permission letter from the property owner for the property to be used for staging

• Permission letters from adjacent property owners and any owners across the street

• Completed and approved Temporary Storage Yard Permit (obtain from Town Development

Services)

• Site plan showing storage yard details including screened fencing (submitted with application)

26. Operation of Existing Facilities Only Town staff or Town contract operators (JACOBS) shall operate water valves and other water system facilities. Contractor shall give the Town and JACOBS a minimum of 48 hours’ notice prior to the need to operate water facilities.

27. Sanitary Facilities The Contractor shall provide and maintain adequate sanitary facilities for his/her construction forces on the job site throughout the duration of the project.

28. Local Business Access The contractor shall maintain 24-hour access to all businesses and properties during the construction period. Additional "BUSINESS ACCESS" signs may be required as directed by the owner, or ADOT.

29. Residential Access The contractor shall coordinate with and provide access to all residences during the construction period.

Project Info 10 November 13, 2026

30. Construction Water It shall be the responsibility of the contractor to obtain a water source for his/her water usage. No additional payment shall be made for this item. This work shall be considered incidental and shall be included in the unit price for construction of the appropriate contract pay items.

Water withdrawal from a nearby fire hydrant is available via the Town’s “Hydrant Meter Application” process.

Base User Rate: Based on 2” Meter. Volume Rate: Based on 2” meter.

31. Quality Control Quality Control (QC), for this project shall be the responsibility of the Contractor and shall be done at the Contractor's expense. The Contractor shall present its Quality Control Plan at the Pre-Construction Conference meeting. The Contractor shall provide to the Owner a copy of all QC testing. The Owner may also perform "Quality Assurance (QA)", at no cost to the Contractor. In the event that the initial QA test fails, all additional QA retests shall be charged to the Contractor in the form of deductions to Contractor payments at the actual costs.

32. Traffic Control Traffic Control measures shall be performed in accordance with plans and specifications. Contractor shall provide, install and maintain variable highway signs at each end of the work area at least 72 hours before construction starts identifying the Contractor and the time frame of the work to be performed.

Contractor shall submit a traffic control plan for approval by the Town of Prescott Valley and Yavapai County, in accordance with their Right of Way Permit requirements. A traffic control plan submittal is required prior to or concurrent with the pre-construction meeting.

Key elements of this plan are as follows:

• The Contractor shall maintain convenient traffic access to the adjacent and nearby residences for the duration of the project.

• The Contractor shall provide the traffic control signs, markings and devices in accordance with the

Manual of Uniform Traffic Control Devices and ADOT supplements.

• It shall be the Contractor’s responsibility to closely coordinate all road closures, detours, and/or traffic flow alteration with local police, fire, and school officials. Coordination also includes the US Postal Service.

• The Contractor shall have no more than one mile of Old Black Canyon Highway under any type of construction without the prior written consent of the Town of Prescott Valley.

• The Traffic Control Plan shall be submitted to, and approved by, Yavapai County Public Works Department and the Town of Prescott Valley prior to issuance of a Right of Way Permit in each jurisdiction.

• The Notice to Proceed for this project will not be given until the Town’s Right of Way Permit is issued.

33. Protection of Existing Utilities and Property and Project Site Contractor shall be held responsible for any damage to existing utilities and property, both public and private, due to Contractor’s work. Contractor shall repair or replace any such damaged utilities and property according to the requirements of the Project Engineer at no additional cost to the Town. The

Project Info 11 November 13, 2026

Contractor shall be responsible for maintaining and protecting the construction area and shall adequately protect the public, in and around the construction area. This may include, at the Contractor’s discretion, temporary fencing to prevent unauthorized access to the site. Contractor shall conduct the work to ensure the least possible inconvenience to the general public and adequate protection of persons and property in the work vicinity. The Contractor shall correct any hazardous condition immediately.

34. Dust Control and Trackout/Carryout The Contractor is required to adhere to dust control measures as per the contract specifications. In addition, the Contractor is responsible for controlling Trackout/Carryout of soil, material, and debris from the project site onto sections beyond the confines of the project site or adjacent / nearby properties. Upon observation by the Contractor of Trackout/Carryout, and/or upon notification from Project Manager, or his representatives, the Contractor shall clean up before the end of working day. If Contractor is not responsive to notification, the Owner shall perform clean up or hire a private firm for said services and actual charges based on equipment, fuel, labor, and incidentals shall be charged to the Contractor in the form of deductions to Contractor payments. This work shall be considered incidental and shall be included in the unit price for construction of the appropriate contract pay items.

35. Arizona 811 The Contractor is responsible for:

1.) securing all necessary Bluestake services for the project, and 2.) field verification of all underground utilities prior to commencement of construction.

It’s recommended Blue Stake locations be recorded via photograph or video prior to construction activities in those areas.

36. Water Shutdown The Contractor shall minimize water shutdowns / interruptions. When a water shutdown is required, the Contractor shall provide advanced notice of 72 hours and shall closely coordinate the shutdown with the Town and its representatives. Shutdowns of more than 4 hours will require nighttime work to minimize water service disruption or provide water to residents affected by the shutdown. Any water shutdown will require notification by the Contractor to all entities impacted in accordance with requirements set forth in this Bid Proposal Packet.

37. Notifications The Contractor is required to notify any business, resident, institution, adjacent construction project, school, medical facility, etc. impacted by this project. Notification, for example, could include door knockers, flyers, phone messages, fax messages, emails, and/or personal communication. Notification shall include dates, times, duration, noise impacts, type of construction and/or water interruption, emergency Contractor contact phone numbers, etc. The context of the notifications shall be prepared by the Contractor and provided to the Town for review / modification prior to distribution. Notifications shall be distributed no later than 72 hours in advance of construction, unless otherwise approved by the Town.

No additional payment to the Contractor shall be made for notification services regardless of the measures required. Said services shall be considered incidental and shall be included in the unit price for construction of the appropriate contract pay items.

Project Info 12 November 13, 2026

38. Project Generated Excess The Contractor is responsible for: 1) the removal, transport, permitting, disposal, etc. of all and any excess vegetation, spoils, waste permitting, materials, system infrastructure, salvage items, pavement, debris, etc. generated by the project and 2) any associated costs. No additional payment shall be made for this item. This work shall be considered incidental and shall be included in the unit price for construction of the appropriate contract pay items.

39. Excavation and Spoils The Contractor is responsible for ensuring that trenches, holes, depressions, etc. are not left exposed at the end of a work shift. Traffic plates, or other security measures, must be utilized to ensure safe passage over or around all cavities. Spoils must also be cleared from roadways, pathways, open ground, etc. at the end of a work shift if they inhibit conveyance or if safety within the project limits would be compromised. Excavation and spoil services shall be considered incidental and shall be included in the unit price for construction of the appropriate contract pay items.

40. Potholing The contractor is responsible for contacting Bluestake and locating underground utilities including all costs for exposure of public and private infrastructure to ensure locations, sizes, fittings, depth, alignment, etc. No additional payment shall be made for this item. This work shall be considered incidental and shall be included in the unit price for construction of the appropriate contract pay items.

41. Dewatering

All water encountered during the work shall be disposed of by the Contractor in a manner such that it will 1) not damage public or private property 2) not create a public nuisance and 3) not create a public health problem. This work shall consist of furnishing equipment, materials, and labor necessary for the control and removal of water, the construction or installation of all facilities necessary to accomplish the work, and the subsequent removal of such facilities except when designated on the project plans or in the special provisions to remain in place. No separate measurement or payment shall be made for dewatering. This work shall be considered incidental and included in the unit price bid for construction or installation of the appropriate contract pay items per the bid schedules.

42. Pressure Testing and Disinfection

MAG Specifications, Section 611, WATER, SEWER, AND STORM DRAIN TESTING, is hereby included and made a part of this project. All costs associated with pressure testing, and disinfection testing of the line are considered included in the Quality Control Bid Schedule.

43. Asbestos Cement Pipe, Asbestos Materials, Valves, and Associated Valve Fittings Not Applicable

• Removal of Asbestos Cement Pipe (ACP) shall be completed in accordance with QCSD 395PV.

• The Contractor is responsible for all removal, exposure, handling, containment, transport, disposal, documentation, etc. of Asbestos Cement Pipe (ACP), asbestos materials, valves, and associated fittings.

• The Contractor shall follow all applicable Federal, State, Local laws, rules, and regulations with regard to removal, exposure, handling, containment, transport, disposal, documentation, etc. of ACP

Project Info 13 November 13, 2026 and asbestos materials. These laws, rules and regulations include, but are not limited to, applicable MAG, ANSI, AWWA, EPA and OSHA standards.

• The Contractor shall not direct-bury any of the ACP, asbestos materials, existing valves, or associated valve fittings.

• Each amount for valves listed in the Bid Schedules shall include the costs associated with removal, exposure, handling, containment, transport, disposal, documentation, etc. of ACP, asbestos materials, existing valves, and associated fittings.

• ACP, asbestos materials, valves, and associated valve fittings must be disposed of at a landfill licensed and approved for acceptance of said products.

• The Contractor shall provide documentation and certification to the Town and Project Engineer detailing proper transport and disposal of ACP, asbestos materials, valves, and associated valve fittings.

44. Erosion Control Measures

This project as designed will disturb more than one acre of area within the project limits. Therefore, a Storm Water Pollution Prevention Plan (SWPPP) in binder format, Notice of Intent, and a Notice of Termination is required. The contractor shall be responsible for controlling dust as an integral part of their construction activities as well as preventing water-borne debris and pollutants from entering receiving streams.

Dust control shall be monitored and regulated.

45. Sewer Main and Lateral Inspection Not Applicable

This project shall include sewer main inspections to ensure that work was conducted satisfactorily and that no damage occurred to sewer main during construction. No sewer laterals are being installed part of this project.

See Town Sewer Construction Notes. “All sewer laterals must be inspected by closed-circuit television (CCTV) in color and recorded per DVD format before and after project work. Video content must show 360-degree view of pipe, fittings, etc. DVDs shall be submitted to the Town for review. If sewer lateral indicates damage due to construction, Contractor shall be responsible for rectifying the situation and submitting another DVD of repair to the Town for review.”

No additional payment will be made for this item. This work shall be considered incidental and shall be included in the unit price for construction of the appropriate contract pay items.

46. Warranty Period The contractor shall provide a warranty for the project or any project that will be given to the public per agreement(s). The Town’s definition of a warranty includes any workmanship, labor, materials, equipment, sales tax, etc. required to restore a project to acceptance criteria as defined by the plan. The warranty period lasts for a minimum of two (2) years from the date of Town final acceptance of project completion. All warranty work shall conform to all applicable portions of the Town Design and Construction Standards and these Contract Documents.

Project Info 14 November 13, 2026

47. Contract Allowance Contract allowance items are provided for the purpose of encumbering funds to cover the costs of possible contract amendment work. The amount of the allowance item is determined by the Engineer and is not subject to individual bid pricing. All bidders shall incorporate the amount pre-entered in the proposal and shall reflect the same in the total amount bid for the project.

This allowance Item provides an estimated funding to cover unforeseen changes that may be encountered and corresponding extra work needed to complete the contract per plan, Unforeseen extra work, if any, shall be in accordance with MAG Specification 109.4.

It shall not be utilized without authorization from the Owner. It is further understood that authorized work, if any, may be less than the allowance item. The Contractor, by submittal of a bid, acknowledges that the total bid and individual bid items were prepared without anticipation of use of the contract allowance.

Bid Proposal Section 5 15 November 13, 2026

BID PROPOSAL

Town of Prescott Valley 7501 E. Skoog Blvd.

Prescott Valley, AZ 86314

Date: ___________

Ladies/Gentlemen:

In compliance with your invitation for bids and all conditions of the Contract Documents, the undersigned, __________________________________________________, a corporation organized under the laws of the State of __________________________, a partnership consisting of ________________________________________________ or individual trading as ___________________________________________________ of the Town/City of _______________________________, hereby proposes and agrees to furnish any and all plans, materials, labor, construction equipment, services, transportation, TAXES, AND PERMITS required for performing all work for the construction of the CIP #CW2513 - Old Black Canyon Highway Water Transmission Main Project; and to construct the same and install the material therein for the Owner in a good and workmanlike and substantial manner and to the satisfaction of the Owner, through its Engineers and under the direction and supervision of its Engineers or their properly authorized agents;

and strictly pursuant to, and in conformity with, the Specifications and Plans prepared by the Engineers for the Owner or their properly authorized agents at the following unit price rates included in the bid schedule below.

Section 5 16 November 13, 2026

BID SCHEDULE

Water Transmission Main

Bidder’s Initials:

Item No

Spec No

Description Est.

Quantity Unit

Unit Price

Item Bid Total

1 MAG 201 Clearing and Grubbing 1 LSum

2 MAG 336 Sawcut (Asphalt) 200 LF

3 MAG 336 Sawcut (Concrete) (Cattle Guard) 30 LF

4 MAG 350 Removals (Pvmt & Base) (12-inch) 70 SY

5 MAG 350 Removals (Concrete Cattle Guard) 100 SF

6 MAG 350 Removals (Wtr Misc) (Service, B.O., Vlv) 4 EA

7 MAG 350 Removals (Wtr Line) 30 LF

8 MAG 350 Removals (Fence) 80 LF

9 MAG 602 Utility Casing Bore Pit (Shored 12-ft x 36-ft) 1 EA

10 MAG 602 Utility Casing Receiving Pit (Shored 8-ft x 8-ft) 1 EA

11 MAG 602 Utility Bore Pothole Pit 2 EA

12 MAG 602 Utility Gas Line Cathodic Protection Pit (Shored 5-ft x 5-ft) 1 EA

13 MAG 602 Utility Casing Pipe (QCSD 275Q) (0.375x30-inch Steel) 60 LF

14 MAG 610 Water Main (DIP CL350) (16-inch) 10,900 LF

15 MAG 610 Water Main (DIP CL350) (12-inch) 120 LF

16 MAG 610 Water Main (DIP CL350) (6-inch) 44 LF

17 MAG 610 Bends (Horizontal) (QCSD 303Q-

2) (16-inch) 8 EA

18 MAG 610 Bends (Horizontal) (QCSD 303Q-

2) (12-inch) 2 EA

19 MAG 610 Bends (Vertical) (QCSD 370Q) (16-inch) 6 EA

20 MAG 610 Bends (Vertical) (QCSD 370Q) (12-inch) 4 EA

Section 5 17 November 13, 2026

BID SCHEDULE

Quantity Unit

Unit Price

Item Bid Total

21 MAG 630 Air Release Valve (QCSD 317Q-

1) (1-inch) 1 EA

22 MAG 630 Blow-Off (QCSD 390PV-1) 1 EA

23 MAG 610 Reverse Thrust Block (QCSD

303Q-3) 1 EA

24 MAG 630 Gate Vlv&Rsr (Flng x MJ) (16-inch) 8 EA

25 MAG 630 Gate Vlv&Rsr (Flng x MJ) (12-inch) 2 EA

26 MAG 630 Gate Vlv&Rsr (FlngxMJ) (6-inch) 10 EA

27 MAG 630 Fire Hydrant (QCSD 360Q) 7 EA

28 MAG 610 Tee (16x6-inch) 9 EA

29 MAG 611 Tee (12x6-inch) 1 EA

30 MAG 610 Irrigation Service Connection

(QCSD 310PV-3) 1 EA

31 MAG 610 Irrigation Copper Service Line (1-inch) (QCSD 310PV-3) 20 LF

32 MAG 610 Water Main Reducer (16x12-inch) 1 EA

33 MAG 630 Tapping Sleeve & Valve (12-inch) 2 EA

34 MAG 610 Water Main Transition (New to Exst) 2 EA

35 MAG 630 Gate Vlv (Flange) (16-inch) 4 EA

36 MAG 630 Gate Vlv (Flange) (12-inch) 2 EA

37 MAG 630 Gate Vlv (Flange) (6-inch) 4 EA

38 MAG 630 Gate Vlv (Flange) (4-inch) 2 EA

39 MAG 630 Pressure Reducing Valve (16-inch) 2 EA

40 MAG 630 Pressure Reducing Valve (12-inch) 1 EA

Section 5 18 November 13, 2026

BID SCHEDULE

Quantity Unit

Unit Price

Item Bid Total

41 MAG 630 Pressure Reducing Valve (6-inch) 2 EA

42 MAG 630 Pressure Reducing Valve (4-inch) 1 EA

43 MAG 630 PRV Strainer (16-inch) 2 EA

44 MAG 630 PRV Strainer (12-inch) 1 EA

45 MAG 630 PRV Strainer (6-inch) 2 EA

46 MAG 630 PRV Strainer (4-inch) 1 EA

47 MAG 610 Dressor Coupler Adaptor (16-inch) 4 EA

48 MAG 610 Dressor Coupler Adaptor (12-inch) 2 EA

49 MAG 610 Dressor Coupler Adaptor (6-inch) 2 EA

50 MAG 610 Dressor Coupler Adaptor (4-inch) 1 EA

51 MAG 630 Pressure Release & Sustaining Valve (3-inch) 3 EA

52 MAG 630 Air Release Valve (QCSD 317Q-

1) (1-inch) 2 EA

53 MAG 630 Blow-Off (QCSD 390PV-1) 3 EA

54 MAG 610 Tee (Flange) (16x6-inch) 4 EA

55 MAG 610 Tee (Flange) (12x4-inch) 2 EA

56 MAG 610 Tee (Flange) (6x3-inch) 2 EA

57 MAG 610 Tee (Flange) (4x3-inch) 1 EA

58 MAG 630 Pressure Reducing Fittings & Assembly (16-inch) 2 EA

59 MAG 630 Pressure Reducing Fittings & Assembly (12-inch) 1 EA

60 MAG 505 PR Station (Vault, Hatch, Ladder, Sump Pit) (16-inch) 2 EA

Section 5 19 November 13, 2026

BID SCHEDULE

Quantity Unit

Unit Price

Item Bid Total

61 MAG 505 PR Station (Vault, Hatch, Ladder, Sump Pit) (12-inch) 1 EA

62 MAG 310 Aggregate Base Course (PRV Apron) (6-inch) 90 SY

63 MAG 310 Aggregate Base Course (Driveway) (6-inch) 75 SY

64 MAG 340 Concrete Valley Gutter (QCSD 240Q-1) (6-foot) 72 SF

65 MAG 336 Trench & Surface Replacement (QCSD 200Q-1) (4-inch AC) 70 SY

66 MAG 345 Adjust Water Valve Cover

(QCSD 391Q) 19 EA

67 MAG 345 Adjust Water Meter Box No 2

(BO) (QCSD 390PV) 5 EA

68 MAG 345 Adjust Water Meter Box No 4

(ARV) (QCSD 390PV) 2 EA

69 MAG 345 Adjust ARV Ring & Cover (QCSD

317Q-1) 1.0 EA

70 MAG 430 Revegetation (Disturbed Area & Slopes) 6.5 AC

71 MAG 420 Chain Link Fence, Type 1 (ADOT

C-12.20) 190 LF

72 MAG 420 Chain Link Gate, Single (ADOT C-12.20) (14-foot) 1 EA

73 MAG 106 Quality Control 1 LSum

74 MAG 109 Mobilization 1 LSum

75 MAG 109 Contract Allowance 1 LSum 100,000.00 $100,000.00

76 MAG 401 Traffic Control (165 days) 1 LSum

77 MAG 810 Storm Water Pollution Prevention Plan (SWPPP) 1 LSum

Total Bid Schedule

Section 5 20 November 13, 2026

Total Bid Schedule = $ . (use numbers)

DOLLARS &

CENTS (use words)

The lowest responsible bidder is to be determined per Prescott Valley Town Code. The Town reserves the right to reject any and/or all bid proposals, or to waive any informality in any bid proposal deemed to be for the Town’s best interests.

Per MAG 102.4 as modified by Town Public Works Construction Standards and Town Code, the undersigned hereby declares that they have physically visited the project site and have carefully examined the Project and Contract Documents relating to the work covered by the above bid proposal.

Enclosed herewith is a certified or cashier's check, or bid bond, payable to TOWN OF PRESCOTT VALLEY, in the amount of $_____________________________________ which is ten percent (10%) of the estimated contract quotations for the total amount bid on all bid schedules (A & B). This check or bond is submitted as a guarantee that the undersigned will enter into a contract and furnish the required bond in the event a contract is awarded to the undersigned. The bid security attached, without endorsement, is to become the property of TOWN OF PRESCOTT VALLEY in the event the contract and bonds are not executed within the time set forth as liquidated damages for delay and additional work caused thereby.

Upon receipt of Notice of Award of this bid, the undersigned will execute the formal Contract Documents.

The undersigned agrees to complete all work within Two Hundred (200) calendar days from the date of issuance of the Notice to Proceed. If the project elements noted are not completed within the specified time and dates noted above, liquidated damages as specified in Section 108.9 “Failure to Complete on Time” of the most recent Maricopa Association of Governments (MAG) Uniform Standard Specifications and Details for Public Works Construction will be applied per day thereafter until completion.

The undersigned has carefully checked all the above figures and understands that the Owner will not be responsible for any errors or omissions on the part of the undersigned in making up this bid.

The undersigned is the holder of Arizona State Contractor's License No. ______________ and Classification

Respectfully submitted, ATTEST:

Witness: If bidder is an individual.

CONTRACTOR

(Corporate Seal)

Section 5 21 November 13, 2026

(BIDDER'S FULL ADDRESS)

AGENT PROVIDING BID BOND -

CONTACT INFORMATION

(NAME)

(ADDRESS)

(PHONE NUMBER)

Wage Decision 22 November 13, 2026 Section 6

WAGE RATE DECISIONS:

GENERAL DECISION NUMBER - AZ20260061 05/18/2026 Mod 1

"General Decision Number: AZ20260061 05/18/2026 Superseded General Decision Number: AZ20240061 State: Arizona Construction Types: Heavy County: Yavapai County in Arizona.

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).

If the contract is entered into on or after January 30, 2022, or the contract is renewed or extended (e.g., an option is exercised) on or after January 30, 2022

• Executive Order 14026 generally applies to the contract.

• The contractor must pay all covered workers at least $17.75 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in 2025.

If the contract was awarded on or between January 1, 2015 and January 29, 2022, and the contract is not renewed or extended on or after January 30, 2022:

• Executive Order 13658 generally applies to the contract.

• The contractor must pay all covered workers at least $13.30 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in 2025.

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Wage Decision 23 November 13, 2026

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/02/2026

1 05/18/2026

ELEC0570-014 06/01/2025

Rates Fringes

Electrician......................$ 33.00 13.04

ELEC0769-001 08/04/2025

Rates Fringes

Electrician: Lineperson..........$ 62.08 22.49

ELEC0769-003 08/04/2025

Rates Fringes

Electrician: Groundperson........$ 36.00 16.88

ELEC0769-004 08/04/2025

Rates Fringes

Electrician: Line Equipment Operator.........................$ 46.56 19.15

ENGI0012-035 12/01/2024

POWER EQUIPMENT OPERATOR: Oiler.......................$ 32.29 18.12

ENGI0012-037 12/01/2024

Rates Fringes POWER EQUIPMENT OPERATOR: Field Equipment Serviceperson ...............$ 35.56 18.12

ENGI0012-042 12/01/2024

Wage Decision 24 November 13, 2026

POWER EQUIPMENT OPERATOR: Crane/Derrick...... .........$ 36.64 18.12

ENGI0012-043 12/01/2024

POWER EQUIPMENT OPERATOR: Mechanic....................$ 37.67 18.12

ENGI0012-044 12/01/2024

Rates Fringes

POWER EQUIPMENT OPERATOR: Bobcat/Skid Steer/Skid Loader ......................$ 32.29 18.12

ENGI0012-045 12/01/2024

POWER EQUIPMENT OPERATOR: Backhoe/Backhoe & Loader Combo/Track Backhoe ....$ 35.56 18.12

ENGI0012-046 12/01/2024

Rates Fringes

POWER EQUIPMENT OPERATOR: Bulldozer...................$ 35.56 18.12

ENGI0012-047 12/01/2024

POWER EQUIPMENT OPERATOR: Compactor/Roller............$ 35.56 18.12

ENGI0012-048 12/01/2024

POWER EQUIPMENT OPERATOR: Drill Rig/Auger.............$ 35.56 18.12

ENGI0012-049 12/01/2024

POWER EQUIPMENT OPERATOR: Loader/Front End Loader.....$ 35.56 18.12

Wage Decision 25 November 13, 2026

ENGI0012-054 12/01/2024

Rates Fringes

POWER EQUIPMENT OPERATOR: Trencher....................$ 35.56 18.12

ENGI0012-055 12/01/2024

TRUCK DRIVER Hydrovac ...............$ 35.56 18.12

ENGI0012-058 12/01/2024

Rates Fringes

POWER EQUIPMENT OPERATOR: Excavator/Trackhoe ..$ 36.64 18.12

ENGI0012-059 12/01/2024

POWER EQUIPMENT OPERATOR: Grade Checker ...............$ 36.64 18.12

ENGI0012-061 12/01/2024

POWER EQUIPMENT OPERATOR: Motor Grader/Blade. .........$ 36.64 18.12

LABO1184-013 06/01/2025

Rates Fringes

Laborer: Jackhammer..............$ 29.05 9.26

LABO1184-014 06/01/2025

Rates Fringes

Laborer: Pipelayer...............$ 29.91 9.26

LABO1184-015 06/01/2025

Wage Decision 26 November 13, 2026

Rates Fringes

Power Equipment Operator: Forklift....................$ 30.88 9.26

LABO1184-016 06/01/2025

Power Equipment Operator: Horizontal Directional Drill .......................$ 30.72 8.37

LABO1184-022 06/01/2025

Laborer: Asphalt, Includes Raker, Shoveler, Spreader and Distributor ......................$ 29.05 9.26

LABO1184-028 06/01/2025

Rates Fringes

LABORER: Grade Setter............$ 29.91 9.26

LABO1184-034 06/01/2025

Truck Driver: Concrete................$ 30.88 9.26

LABO1184-035 06/01/2025

Truck Driver: Dump....................$ 30.88 9.26

LABO1184-036 06/01/2025

Truck Driver: Water.......................$ 30.88 9.26

Wage Decision 27 November 13, 2026

LABO1184-042 06/01/2025

Traffic Control.... ......$ 27.41 9.26

LABO1184-050 06/01/2025

Rates Fringes

Carpenter: Formwork Concrete.....$ 31.98 9.26

SUAZ2023-011 11/19/2024

Rates Fringes Power Equipment Operator: Scraper...................$ 32.41 0.00 Laborer: General ............................$ 24.02 3.86

SUUAVG-AZ-0005 01/01/2025

Rates Fringes

Laborer: Mason Tender............$ 27.79 8.87

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis- Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate

Wage Decision 28 November 13, 2026 listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

U…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .