This is a bid pricing summary document for Sullivan County, Pennsylvania's Emergency Watershed Protection (EWP) Project for stream stabilization at 1410 Champion Hill Road, Muncy Valley, PA 17758, designated as SU-25-004. The project involves repair and stabilization work to be completed within 22 days of receiving the Notice-to-Proceed. The scope of work encompasses eleven line items including mobilization and demobilization, stream diversion and dewatering, removal of existing wall and riprap, stacked rock wall installation, pinning of existing precast wall, tree removal, grouted R-7 riprap, grouted R-6 riprap, non-grouted R-8 riprap, road berm extension, and topsoiling/seeding/mulching. Five contractors submitted bids: Bluestone Earthworks, LLC ($242,465.00), Daren Thompson Excavating ($106,350.00), Mitchell Knorr Contracting ($99,736.00), Stonewood Landshaping, Inc. ($120,000.00), and Watson Excavating Inc. ($317,425.00). A mandatory pre-bid showing was scheduled for October 26, 2026, with bids due electronically by 4:00 PM on November 2, 2026, and opening at a Sullivan County Board of Commissioners meeting on November 3, 2026.
The pricing summary indicates that individual line items were evaluated and compared across all bidders, with Mitchell Knorr Contracting submitting the lowest overall bid at $99,736.00. Bid bonds equal to 10% of the total bid were required, along with performance and payment bonds at 100% of the contract value due within ten business days of award. The project is subject to Pennsylvania Prevailing Wage Project Rates as established by the Department of Labor and Industry. Funding is provided through the Natural Resources Conservation Service's Emergency Watershed Protection Program. The document notes that Dushore Materials, LLC also submitted pricing on specific riprap items (#1-7, #1-8, #1-9), indicating potential material supplier involvement in the bidding process.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Legend
SU-25-004 EWP Repair Project Pricing (BT-14PQ)
Legend
| The green cells with bolded numbers indicate that this bid was the lowest price. | $ 123 |
| The orange cells indicate that this item from that vendor was selected. | |
| The green cells with orange outline indicate that this item from that vendor was selected, and has the lowest price. |
Sheet 1
| Bluestone Earthworks, LLC | Daren Thompson Excavating | Mitchell Knorr Contracting | Stonewood Landshaping, Inc. | WATSON EXCAVATING INC | |||||||
| Total Cost | $ 242,465.0 | $ 106,350.0 | $ 99,736.0 | $ 120,000.0 | $ 317,425.0 | ||||||
| Selected # | 0 | 0 | 0 | 0 | 0 | ||||||
| Selected ($) | $ 0 | $ 0 | $ 0 | $ 0 | $ 0 | ||||||
| # | Locked | Items | Selected | Lowest | Quantity | ||||||
| Required | Unit | ||||||||||
| Price | Vendor | Total | |||||||||
| Cost | Unit | ||||||||||
| Price | Vendor | Total | |||||||||
| Cost | Unit | ||||||||||
| Price | Vendor | Total | |||||||||
| Cost | Unit | ||||||||||
| Price | Vendor | Total | |||||||||
| Cost | Unit | ||||||||||
| Price | Vendor | Total |
Cost
| 1 | Base Bid (11) | |||||||||||||||||||
| #1-1 | FALSE | Mobilization and Demobilization | $ 0 | $ 2,500.0 | 1 | $ 15,180.0 | Bluestone Earthworks, LLC | $ 15,180.0 | $ 5,800.0 | Daren Thompson Excavating | $ 5,800.0 | $ 2,500.0 | Mitchell Knorr Contracting | $ 2,500.0 | $ 50,000.0 | Stonewood Landshaping, Inc. | $ 50,000.0 | $ 24,000.0 | twenty-four thousand dollars | $ 24,000.0 |
| #1-2 | FALSE | Stream Diversion and Dewatering | $ 0 | $ 3,000.0 | 1 | $ 20,240.0 | Bluestone Earthworks, LLC | $ 20,240.0 | $ 3,500.0 | Daren Thompson Excavating | $ 3,500.0 | $ 3,000.0 | Mitchell Knorr Contracting | $ 3,000.0 | $ 10,000.0 | Stonewood Landshaping, Inc. | $ 10,000.0 | $ 35,000.0 | thirty-five thousand dollars | $ 35,000.0 |
| #1-3 | FALSE | Removal of Existing Wall & Riprap | $ 0 | $ 6,250.0 | 1 | $ 22,770.0 | Bluestone Earthworks, LLC | $ 22,770.0 | $ 8,500.0 | Daren Thompson Excavating | $ 8,500.0 | $ 6,250.0 | Mitchell Knorr Contracting | $ 6,250.0 | $ 10,000.0 | Stonewood Landshaping, Inc. | $ 10,000.0 | $ 34,450.0 | thirty-four thousand four hundred fifty dollars | $ 34,450.0 |
| #1-4 | FALSE | Stacked Rock Wall | $ 0 | $ 3,300.0 | 1 | $ 12,650.0 | Bluestone Earthworks, LLC | $ 12,650.0 | $ 6,500.0 | Daren Thompson Excavating | $ 6,500.0 | $ 3,300.0 | Mitchell Knorr Contracting | $ 3,300.0 | $ 10,000.0 | Stonewood Landshaping, Inc. | $ 10,000.0 | $ 16,750.0 | sixteen thousand seven hundred fifty dollars | $ 16,750.0 |
| #1-5 | FALSE | Pinning Existing Precast Wall | $ 0 | $ 1,000.0 | 1 | $ 6,325.0 | Bluestone Earthworks, LLC | $ 6,325.0 | $ 1,000.0 | Daren Thompson Excavating | $ 1,000.0 | $ 5,000.0 | Mitchell Knorr Contracting | $ 5,000.0 | $ 5,000.0 | Stonewood Landshaping, Inc. | $ 5,000.0 | $ 16,400.0 | sixteen thousdan four hundred dollars | $ 16,400.0 |
| #1-6 | FALSE | Tree Removal | $ 0 | $ 500 | 1 | $ 7,590.0 | Bluestone Earthworks, LLC | $ 7,590.0 | $ 4,500.0 | Daren Thompson Excavating | $ 4,500.0 | $ 6,000.0 | Mitchell Knorr Contracting | $ 6,000.0 | $ 500 | Stonewood Landshaping, Inc. | $ 500 | $ 11,675.0 | eleven thousand six hundred seventy-five dollars | $ 11,675.0 |
| #1-7 | FALSE | Grouted R-7 Riprap | $ 0 | $ 10,000.0 | 1 | $ 78,050.0 | Bluestone Earthworks, LLC | $ 78,050.0 | $ 26,500.0 | Daren Thompson Excavating | $ 26,500.0 | $ 35,062.0 | Dushore Materials, LLC | $ 35,062.0 | $ 10,000.0 | Stonewood Landshaping, Inc. | $ 10,000.0 | $ 89,650.0 | eighty-nine thousand six hundred fifty dollars | $ 89,650.0 |
| #1-8 | FALSE | Grouted R-6 Riprap | $ 0 | $ 10,000.0 | 1 | $ 36,700.0 | Bluestone Earthworks, LLC | $ 36,700.0 | $ 25,300.0 | Daren Thompson Excavating | $ 25,300.0 | $ 10,350.0 | Dushore Materials, LLC | $ 10,350.0 | $ 10,000.0 | Stonewood Landshaping, Inc. | $ 10,000.0 | $ 34,000.0 | thirty-four thousand dollars | $ 34,000.0 |
| #1-9 | FALSE | Non-grouted R-8 Riprap | $ 0 | $ 5,000.0 | 1 | $ 30,300.0 | Bluestone Earthworks, LLC | $ 30,300.0 | $ 20,500.0 | Daren Thompson Excavating | $ 20,500.0 | $ 24,252.0 | Dushore Materials, LLC | $ 24,252.0 | $ 5,000.0 | Stonewood Landshaping, Inc. | $ 5,000.0 | $ 39,350.0 | thirty-nine thousand three hundred fifty dollars | $ 39,350.0 |
| #1-10 | FALSE | Road Berm Extension | $ 0 | $ 2,250.0 | 1 | $ 7,600.0 | Bluestone Earthworks, LLC | $ 7,600.0 | $ 2,250.0 | Daren Thompson Excavating | $ 2,250.0 | $ 3,022.0 | Mitchell Knorr Contracting | $ 3,022.0 | $ 6,500.0 | Stonewood Landshaping, Inc. | $ 6,500.0 | $ 7,750.0 | seven thousand seven hundred fifty dollars | $ 7,750.0 |
| #1-11 | FALSE | Topsoiling / Seeding / Mulching | $ 0 | $ 1,000.0 | 1 | $ 5,060.0 | Bluestone Earthworks, LLC | $ 5,060.0 | $ 2,000.0 | Daren Thompson Excavating | $ 2,000.0 | $ 1,000.0 | Mitchell Knorr Contracting | $ 1,000.0 | $ 3,000.0 | Stonewood Landshaping, Inc. | $ 3,000.0 | $ 8,400.0 | eight thousand four hundred dollars | $ 8,400.0 |