This is a contracting questions document for a federal construction project at Seney National Wildlife Refuge in Michigan. The project involves the replacement of a shelter at Show Pool and site restoration work on government-owned land. The document addresses standard acquisition planning considerations through a 15-question checklist.
Key project parameters indicate that work will be performed on government property with no rights of way required and no pre-bid site meeting scheduled. The contractor will not have access to utilities at the project site and will be responsible for obtaining permits as specified in the project specifications. No Government Furnished Property (GFP) will be provided, and standard specifications from GSA or DOD will not apply. The acquisition involves no unusual complexities: no hazardous materials, no archaeological survey requirements, no security considerations, no safety concerns beyond standard construction protocols, and no work in navigable waterways or near airfields. No local cooperative agreements or rights of way are required for project execution.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTING QUESTIONS
Project Location: Seney National Wildlife Refuge
Project Name: Show Pool Shelter Replacement and Site Restoration
1. Will this work be done on Government land? Yes
2. Are Rights of Way required? No
3. Will there be a pre-bid site meeting/inspection? No
4. Will GSA or DOD Standard Specifications be involved? No
5. Will utilities be available for the Contractor to use? No utilities are available at project site.
6. Are there any unusual safety concerns? No
7. Will any hazardous materials be involved? No
8. Are there any security considerations? No
9. Is an archaeological survey required? No.
10. List all required permits and whether or not obtained? See project specifications.
11. Will there be a local cooperative agreement? No
12. Will there be Government furnished property (GFP)? No
13. Will work be done in a navigable waterway? No
14. Will work be done on or very near an airfield? No
15. Are there any other unusual or special aspects to the acquisition that might have an impact on performance or contract format? No