Questions_and_Answers_Amendment_4_0004.pdf

PDF 221 KB Posted

Attached to
Seney NWR Show Pool Shelter Replacement and Site R
Solicitation number
140FGA26Q0052
Issued by

About this file

This is a Questions and Answers document (Amendment 4) for Solicitation #140FGA26Q0052 regarding the Seney National Wildlife Refuge Show Pool Shelter Replacement and Site Restoration project.

The document addresses a single technical inquiry regarding the specifications for tongue and groove (T&G) ceiling material, specifically clarifying whether structural T&G was intended and how metal paneling should be fastened to it given the span dimensions. The response directs contractors to refer to the revised drawing sheet SNY523A0 for roof timber spacing revisions, which supersedes all previous versions of that drawing sheet. Additionally, the response requires contractors to submit a deferred design submittal per specification 133000 1.03.B that must include assembly dimensions, locations of structural members, connections, roof panel layout, general construction details, anchors and anchorage methods, framing anchor bolt settings with sizes and locations from datum, foundation loads, welded connections per AWS A2.4 standards with welding symbols and net weld lengths, and must be sealed and signed by a licensed professional. The accompanying drawing sheets illustrate the show pool shelter floor plan, reflected ceiling plan, and various elevations showing the structure's configuration including timber columns, metal roof components, and concrete footings.

View the file

Other files

File Type Posted
Sol_140FGA26Q0052_Amd_0004.pdf PDF
Sol_140FGA26Q0052_Amd_0003.pdf PDF
Revised_Drawings_0003.pdf PDF
Revised_Specs_0003.pdf PDF
Pre-Bid_Site_Visit_Sign_In_0003.pdf PDF
Sol_140FGA26Q0052_Amd_0002.pdf PDF
Sol_140FGA26Q0052_Amd_0001.pdf PDF
Sol_140FGA26Q0052.pdf PDF
1__Notice_to_Offerors.pdf PDF
2__SOW.pdf PDF
3__Drawings.pdf PDF
5__DOL_Wage_Determination.pdf PDF
4__Specs_Additional_Info.pdf PDF
6__Price_Schedule.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions & Answers - Amendment 4

Seney NWR Show Pool Shelter Replacement and Site Restoration

Solicitation # 140FGA26Q0052 Questions and Answers

1. The specifications for the tongue and groove (T&G) on the ceiling do not indicate a size.

I believe the span is greater than what typical T&G would recommend. Could you please clarify if this is structural T&G? If it is not, how should we fasten the metal paneling to it?

Response: Refer to attached revised drawing sheet SNY523A0 for roof timber spacing revisions.

This drawing sheet supersedes previous SNY523A0 drawing sheets.

In addition, the contractor shall provide a deferred design submittal “indicating assembly dimensions, locations of structural members, connections, roof panel layout, general construction details, anchors and methods of anchorage and installation; framing anchor bolt settings, sizes, locations from datum, and foundation loads,; indicate welded connections with AWS A2.4, welding symbols; indicate net weld lengths,; provide professional seal and signature” per specification 133000 1.03.B.