4-Special Conditions.pdf

PDF 2 MB Posted

Attached to
Temporary Traffic Signal - State Route 204 at Old River Road
Solicitation number
26-0013-5
Issued by
Chatham County, Georgia

About this file

This Special Conditions document outlines requirements for the temporary traffic signal installation project at State Route 204 and Old River Road in Georgia. The project involves furnishing materials and labor for installing a temporary traffic signal at the intersection of State Route 204/Fort Argyle Road with Old River Road, including minor grading, traffic signal equipment, striping, and signing. The temporary signal will remain in place until funding is secured for a planned future roundabout at this location.

The Special Conditions document establishes contractual requirements, performance standards, and administrative procedures governing the contractor's obligations throughout the project execution. Key provisions typically address contractor responsibilities, quality assurance standards, safety requirements, insurance and bonding, payment procedures, schedule compliance, and project-specific conditions relevant to the temporary traffic signal installation. The document serves as a binding addendum to the contract specifications and general conditions, ensuring the contractor understands all special requirements unique to this particular state and local transportation improvement project.

View the file

Other files

File Type Posted
7-References 07.15 Fillable.pdf PDF
6-List of Subcontractors (Fillable).pdf PDF
5-Attachments A - I (Fillable) with Notary Fields.pdf PDF
8-Surety Form (Fillable).pdf PDF
3-Bid Design Files.pdf PDF
1-26-0013-5 Bid Sheet.xlsx XLSX spreadsheet
2-Bid 26-0013-5.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .