4 SOI - LITTLE RIO GRANDE BRIDGE REPAIRS AND MAINTENANCE.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
127EAX24Q0010 – Little Rio Grande Timbers Bridge
Solicitation number
127EAX24Q0010
Issued by

About this file

This document is a Schedule of Items (SOI) for the LITTLE RIO GRANDE BRIDGE 439-3.5 REPAIRS AND MAINTENANCE project. The project, which is being solicited by the USDA Forest Service - Carson National Forest, involves repairing and maintaining the Little Rio Grande Timber Bridge. The work includes replacing the wearing surface, removing and replacing the bridge railing/curb, treating the substructure, superstructure, and deck, clearing vegetation, constructing asphalt approaches, removing and replacing signs, and placing a riprap mat. The project is a 100% Small Business Set-Aside with a magnitude between $250,000 and $500,000. The solicitation number is 127EAX24Q0010, and the deadline for responses is May 22, 2024, at 1:00 pm PT. A site visit is scheduled for May 1, 2024, at 10:00 am MT. Davis-Bacon wages apply, and payment and performance bonds are required.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule of Items
Project Title:LITTLE RIO GRANDE BRIDGE 439-3.5 REPAIRS AND MAINTENANCE
Forest:USDA Forest Service - Carson National Forest 208 Cruz Alta Rd, Taos, New Mexico 87571
Item NumberDescriptionMethod of MeasurementUnitQtyUnit PriceAmount
15101MobilizationCQLS1
15701Soil Erosion and Sediment ControlCQLS1
20401Excavation and Embankment: Roadway ExcavationAQCY115
25101-01Geotextile Fabric and Rock Riprap at Bridge Abutments and Wingwalls (Design and Submittal)CQLS1
25101-02Riprap: Placed Riprap at Abutments and Wingwalls (Design and Submittal)AQTON40
30101Untreated Aggregate Courses: Aggregate Base Course, Placement Method 2, Compaction Method DAQTON120
40101Asphalt Concrete Pavement: Roadway Bridge Approaches (14-ft roadway width with 1-ft shoulders and 3-in thickness)AQTON90
55701-01Timber Strutures: Timber Wearing Surface Replacement and Deck TreatmentCQLS1
55701-02Timber Strutures: Superstructure TreatmentCQLS1
55701-03Timber Strutures: Substructure TreatmentCQLS1
55701-04Timber Strutures: Bridge Traffic Safety Features (Design and Submittal)CQLS1
55701-05Timber Strutures: Bridge Traffic Safety Features, TL-1 CurbAQLF28
63301Permanent Traffic Control: Bridge Signage, Type III Object MarkersEACH4
Subtotal
NMGRT
Cumulative Total
Pay Items Notes:
20401: Roadway excavation for preparation of asphalt concrete pavement of approaches. Excess suitable material to be placed on the existing road and spread for road reconditoning under section 303 of the FP-14/FSSS. Excess material not suitable for use must be hauled off site and disposed properly. Payment for road reconditioning will be indirect to this pay item.
25101-02: Geotextile filters in sections 207 of FP-14/FSSS and Clearing and Grubbing in section 201 of FP-14/FSSS will be indirect to this pay item.
30101: Submit aggregate base course as specified in section 703 of the FP-14/FSSS for approval. Use Placement Method 2 from sections 204 of the FP-14/FSSS and Compection Method D from sections 301 of the FP-14/FSSS.
40101: All surface preparation for asphalt pavement will be indirect to construction. Submit mix design for approval. Payment for Asphalt Tack Coat in section 412 of FP-14/FSSS indirect to this pay item.
55701-01: All excess removed bridge material must be hauled off site and properly disposed. All surface cleaning and preparation will be indirect to this pay item.
55701-02: All surface cleaning and preparation will be indirect to this pay item.
55701-03: All surface cleaning and preparation will be indirect to this pay item.
55701-04: All surface cleaning and preparation will be indirect to this pay item.
55701-05: All excess removed bridge material must be hauled off site and properly disposed.
Notes: Traffic Control Plan and implemention in section 635 of the FP-14/FSSS is indirectly associated with the project.
Clean Water Act Permit coordination through USACE is indirectly associated with the project.