This document is an as-built record drawing for the Sandy River Lane Force Main Emergency Temporary Pipe Protection project located in Clackamas County, Oregon, near Portland. The project involves the installation of temporary protective measures for exposed water pipes crossing the Sandy River, a tributary of the Columbia River. The work includes the construction of two boulder barbs designed to protect the exposed force main pipes from erosion and river scour. The project was designed by Interfluve Engineering, with Michael McAllister, PE, serving as the Engineer of Record. The as-built drawings were certified on September 24, 2026, documenting the work as constructed to meet all performance standards of the design.
The construction scope includes the installation of approximately 125 cubic yards of boulders and 130 cubic yards of cobble fill, with material quantities reflecting work within the ordinary high water area totaling 1,864 square feet of combined cobble and boulder fill. A bulk bag cofferdam measuring 98 feet in length was used to isolate the construction site from the waterway during installation. All work complies with Oregon Department of Forestry in-water work period requirements and applicable permits from the Department of State Lands and Oregon Department of Fish and Wildlife. The contractor was responsible for erosion control, utility location, fish rescue coordination, archaeological discovery protocols, and site restoration, with all non-native materials disposed of off-site and native materials retained on-site. The project required coordination with the owner's representative for construction staking, pre-construction meetings, and adherence to ODOT and local standards, with all disturbed areas restored to original condition or better upon project completion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PORTLAND
OREGON
SANDY RIVER LANE FORCE MAIN
EMERGENCY TEMPORARY PIPE PROTECTION
AS-BUILT 2026
DATEBYNO. REVISION DESCRIPTION
SHEET
PROJECT
CHECKED
APPROVED
DRAWN
DATE
DESIGNED
OF
G :\Q
-T \S an dy
R iv er Fo rc eM ai nC la ck am as
C ou nt y_
\D ra w in gs
\R ef er en ce s\
C iv il 3D
\S an dy
FM
_E G
.d w g
- m ik e m
9/
/2
MM
MM
MM
JULY 2026
MM
CLACKAMAS WES
SANDY RIVER LANE FORCE MAIN
EMERGENCY TEMPORARY PIPE PROTECTION
TITLE SHEET, LOCATION MAPS 1 5
PORTLAND
GRESHAM
SANDY
COORDINATES:
LATITUDE 45°21'57.20"N
LONGITUDE 121°59'55.99"W
WATERBODY: SANDY RIVER
TRIBUTARY OF: COLUMBIA RIVER
VICINITY MAP MILES
SITE MAP
EAST BRIGHTW
OOD LOOP ROAD
EAST W
ILD
FER
N
LAN
E
EAST RIVERSIDE DRIVE
MT HOOD HIGHWAY
SANDY RIVER
PROJECT
LOCATION
FEET
0 500
BRIGHTWOOD
DRAWINGS
1 TITLE SHEET, LOCATION MAPS
2 NOTES
3 SITE OVERVIEW
4 PIPE PROTECTION - BOULDER BARBS
5 DETAILS
501 Portway Avenue, Suite 101 Hood River, OR 97031
541.386.9003 www.interfluve.com
RECORD DRAWING CERTIFICATION
THESE DRAWINGS REFLECT THE WORK AS CONSTRUCTED
AND ALL MODIFICATIONS MEET THE PERFORMANCE
STANDARDS OF THE DESIGN.
ENGINEER OF RECORD: MICHAEL MCALLISTER, PE 64452
SEPTEMBER 24, 2026
DATEBYNO. REVISION DESCRIPTION
SHEET
PROJECT
CHECKED
APPROVED
DRAWN
DATE
DESIGNED
OF
G :\Q
-T \S an dy
R iv er Fo rc eM ai nC la ck am as
C ou nt y_
\D ra w in gs
\R ef er en ce s\
C iv il 3D
\S an dy
FM
_E G
.d w g
- m ik e m
9/
/2
MM
MM
MM
EMERGENCY TEMPORARY PIPE PROTECTION
NOTES 2 5
501 Portway Avenue, Suite 101 Hood River, OR 97031
541.386.9003 www.interfluve.com
THE CONTRACTOR SHALL ATTEND A PRE-CONSTRUCTION MEETING
WITH OWNER AND OWNER'S REPRESENTATIVE PRIOR TO
MOBILIZING TO SITE AND BEGINNING CONSTRUCTION.
ALL WORK SHALL CONFORM TO THE CURRENT EDITIONS OF
STANDARD PLANS AND SPECIFICATIONS OF THE OREGON STATE
DEPARTMENT OF TRANSPORTATION (ODOT) AND LOCAL
STANDARDS UNLESS INDICATED OTHERWISE BY THE CONTRACT
DOCUMENTS. IN CASE OF A CONFLICT BETWEEN THE REGULATORY
STANDARDS OR SPECIFICATIONS, THE MORE STRINGENT WILL
PREVAIL.
ODFW IN-WATER WORK PERIODS
IN-WATER WORK SHALL OCCUR DURING THE ODFW PERMITTED
IN-WATER WORK PERIOD STATED IN THE DSL PERMIT, UNLESS
OTHERWISE COORDINATED WITH ODFW AND APPROVED IN WRITING
BY DSL.
EXISTING DATA
EXISTING TOPOGRAPHY DATA CONSIST OF LIDAR COLLECTED IN
2024. SUPPLEMENTAL TOPOGRAPHY DATA WERE COLLECTED BY
INTER-FLUVE IN 2026. GIS LANDOWNERSHIP DATA WERE PROVIDED
BY CLACKAMAS COUNTY.
SOILS
SURFACE SOILS ARE ASSUMED TO BE SANDY RIVER ALLUVIUM AND
MUDFLOW. NO SUBSURFACE SOIL INVESTIGATIONS WERE
COMPLETED AS PART OF THIS DESIGN.
UTILITIES
THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR HAVING
UTILITIES LOCATED PRIOR TO BEGINNING ANY
GROUND-DISTURBING CONSTRUCTION ACTIVITIES.
THE CONTRACTOR SHALL CALL (800-332-2344) FOR UTILITY LOCATE
PRIOR TO CONSTRUCTION.
THE CONTRACTOR SHALL IMMEDIATELY CONTACT THE AFFECTED
UTILITY SERVICE TO REPORT ANY DAMAGED OR DESTROYED
UTILITIES.
THE CONTRACTOR SHALL PROVIDE EQUIPMENT AND LABOR TO AID
THE AFFECTED UTILITY SERVICE IN REPAIRING DAMAGED OR
DESTROYED UTILITIES AT NO ADDITIONAL COST TO OWNER.
FIRE PROTECTION REQUIREMENTS
DURING THE CLOSED FIRE SEASON, CONTRACTOR COMPLETING
WORK TASKS UNDER THIS CONTRACT SHALL ADHERE TO ALL
OREGON FOREST LAW (ORS) AND OREGON ADMINISTRATIVE RULES
(OAR) FOR FIRE PROTECTION. IN THE EVENT A FIRE WATCH IS
REQUIRED, CONTRACTOR SHALL BE LIMITED TO INVOICING FOR
ONE PERSON AT AN HOURLY LABOR RATE FOR THE HOURS
REQUIRED FOR THE FIRE WATCH. IF A FIRE OCCURS, THE
CONTRACTOR SHALL PROMPTLY REPORT THE FIRE TO 911.
FISH, LAMPREY, & MUSSEL RESCUE
THE OWNER WILL COORDINATE ANY REQUIRED FISH, LAMPREY, &
MUSSEL RESCUE. ALL FISH RESCUE EFFORTS SHALL COMPLY WITH
APPLICABLE REGULATORY STANDARDS AND PERMITS.
CONSTRUCTION MATERIALS
THE CONTRACTOR SHALL DISPOSE OF NON-NATIVE MATERIAL
ENCOUNTERED IN AN APPROVED, LEGAL OFFSITE DISPOSAL
FACILITY AT NO ADDITIONAL COST TO THE OWNER. ALL NATIVE
MATERIALS SHALL BE PLACED ON SITE IN ACCORDANCE WITH
THESE DRAWINGS.
EROSION CONTROL
CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR PROVIDING
AND MAINTAINING ALL NECESSARY EROSION CONTROL FACILITIES
AND COMPLY WITH APPLICABLE EROSION CONTROL REGULATIONS,
AND PERMIT CONDITIONS.
CONSTRUCTION STAKING
CONTRACTOR SHALL MEET WITH THE OWNER'S REPRESENTATIVE
TO DEFINE AND MARK LIMITS OF DISTURBANCE PRIOR TO
MOBILIZATION OF EQUIPMENT OR MATERIALS ONTO THE SITE.
OWNER'S REPRESENTATIVE WILL PROVIDE STAKING OR MARKING
OF PROJECT LIMITS AND ELEVATION CONTROL POINTS. SOME FIELD
ADJUSTMENTS TO LINES AND GRADES ARE TO BE EXPECTED. THE
CONTRACTOR SHALL REPLACE DAMAGED OR DESTROYED
CONSTRUCTION STAKES AT NO ADDITIONAL COST TO THE OWNER.
TRAFFIC CONTROL
THE CONTRACTOR IS SOLELY RESPONSIBLE FOR OBTAINING ANY
REQUIRED TRAFFIC CONTROL OR ACCESS PERMITS AND FOR
PROVIDING TRAFFIC CONTROL IN ACCORDANCE WITH ALL COUNTY
OR STATE DOT SPECIFICATIONS.
CONSTRUCTION ACCESS
ALL SAPLINGS AND TREES TO BE TRANSPLANTED OR REMOVED
SHALL BE CLEARLY MARKED AND APPROVED BY OWNER. ALL
EQUIPMENT, MATERIALS, AND PERSONNEL SHALL REMAIN WITHIN
THE LIMITS OF DISTURBANCE UNLESS OTHERWISE APPROVED BY
OWNER.
THE CONTRACTOR SHALL KEEP THE WORK AREAS IN A NEAT
CONDITION, FREE OF DEBRIS AND LITTER FOR THE DURATION OF
THE PROJECT.
ALL DISTURBED AREAS INCLUDING ROADS, DRIVEWAYS AND
ACCESS ROUTES SHALL BE RESTORED TO ORIGINAL CONDITION OR
BETTER UNLESS OTHERWISE INDICATED IN DRAWINGS, AT NO
ADDITIONAL COST TO THE OWNER.
ARCHEOLOGICAL DISCOVERIES
CONTRACTOR IS RESPONSIBLE FOR ADHERING TO AN
INADVERTENT DISCOVERY PLAN. OWNER, OWNER'S
REPRESENTATIVE, OR QUALIFIED ARCHEOLOGIST MAY HALT OR
DELAY EXCAVATION WORK TO COMPLY WITH CONDITIONS OF
ARCHEOLOGICAL INADVERTENT DISCOVERY AND MONITORING
PLAN.
WETLANDS AND WATERBODIES
THE ORDINARY HIGH WATER (OHW) LINES DEPICTED ON THESE
DRAWINGS ARE BASED ON A COMBINATION OF HYDRAULIC MODEL
RESULTS, FIELD OBSERVATIONS, AND PROFESSIONAL JUDGEMENT.
TURBIDITY MONITORING WILL BE PROVIDED BY THE OWNER.
SECTION
BULK BAG NOTES:
1. BULK BAG COFFERDAM SHALL BE CONSTRUCTED OF SEVERAL UNITS OF BULK BAGS FILLED WITH WASHED COBBLE, AND ABUTTED SIDE BY SIDE TO
CREATE A ROW THAT ISOLATES THE CONSTRUCTION SITE.
2. BULK BAG COFFERDAM SHALL BE SEALED BY COVERING THE COFFERDAM WITH PLASTIC SHEETING HELD IN PLACE BY STANDARD SANDBAGS
PLACED IN ROWS ON TOP OF COFFERDAM, AND AT TOE OF COFFERDAM.
3. THE PLASTIC SHEETING SHALL BE DRAPED ALONG THE CHANNEL BOTTOM ON BOTH SIDES OF THE COFFERDAM WITH OUTWARD EDGE OF SHEETING MINIMUM 4-FEET FROM TOE OF COFFERDAM. THE DRAPED PORTION OF PLASTIC SHEETING SHALL BE PINNED TO THE CHANNEL BED BY MINIMUM TWO ROWS OF STANDARD SANDBAGS. ALL SANDBAGS SHALL BE FILLED WITH WASHED PEA GRAVEL.
4. THE CONSTRUCTION SIDE EDGE OF PLASTIC SHEETING SHALL BE TOED INTO THE CHANNEL BED MINIMUM 1-FT. TOEING IN THE OUTWARD EDGE OF PLASTIC SHEETING SHALL OCCUR AFTER THE COFFERDAM IS CLOSED TO PREVENT TURBIDITY RELEASE TO THE WATERWAY.
5. IF POSSIBLE, THE COFFERDAM SHALL BE EXTENDED ONTO A GRAVEL BAR AND OUT OF THE WATER. IF THE COFFERDAM MUST BE TERMINATED AT THE RIVER BANK, THE TERMINAL END OF THE COFFERDAM, WHERE IT CONNECTS TO CHANNEL BANK OR HIGH GROUND, SHALL BE SEALED TO THE GROUND WITH PLASTIC SHEETING AND STANDARD SANDBAGS. MULTIPLE LAYERS OF PLASTIC SHEETING AND SANDBAGS MAY BE REQUIRED TO
FORM A WATERTIGHT SEAL.
6. BULK BAGS SHALL BE CUBE-SHAPED POLYPROPYLENE WOVEN FABRIC BAGS WITH FULLY OPEN TOP, FLAT BOTTOM, FOUR LOOPS, MINIMUM 2-TON
WEIGHT CAPACITY, MINIMUM 5:1 SAFETY FACTOR.
7. PLASTIC SHEETING SHALL BE MINIMUM 6-MIL THICKNESS. ROLL LENGTH SHALL BE LONG ENOUGH TO ENSURE THAT ENTIRE LENGTH OF COFFERDAM WILL BE COVERED WITHOUT A SEAM. MINIMUM 12-FT WIDE ROLL SHALL BE USED FOR SINGLE LAYER BULK BAG COFFERDAM. MINIMUM 16-FT WIDE
ROLL SHALL BE USED FOR 2-LAYER STACKED BULK BAG COFFERDAM.
8. CONTRACTOR SHALL PROVIDE PUMPING SUFFICIENT FOR A NET INFLOW OF WATER TO THE AREA ENCLOSED BY THE COFFERDAM, AND DISCHARGE
TURBID WATER TO UPLAND FLOODPLAIN.
9. BULK BAG COFFERDAM SHALL BE COMPLETELY REMOVED AFTER CONSTRUCTION IS COMPLETED AND TURBIDITY HAS BEEN REMOVED. BULK BAG FILL (WASHED COBBLE) AND SANDBAG FILL (WASHED PEA GRAVEL) SHALL BE DISPOSED OF ON SITE. BAGS SHALL BE REMOVED FROM THE SITE
ONCE CONSTRUCTION IS COMPLETED.
10. MEASUREMENT AND PAYMENT FOR BULK BAG COFFERDAM, SAND BAGS, PLASTIC SHEETING, WASHED COBBLE PLACEMENT, MAINTENANCE AND REMOVAL OF ALL MATERIALS SHALL BE INCIDENTAL TO THE LUMP SUM ALL INCLUSIVE COST FOR DIVERSION AND DEWATERING.
11. ALTERNATE COFFERDAM MATERIALS AND CONFIGURATIONS MAY BE ALLOWED BUT SHALL NOT BE IMPLEMENTED WITHOUT REVIEW AND APPROVAL BY THE OWNER'S REPRESENTATIVE. CONTRACTOR SHALL PROVIDE SHOP DRAWINGS AND/OR VENDOR CUT SHEETS FOR SUBSTITUTIONS.
WASHED
COBBLE
RIVER SIDE
KEY IN PLASTIC
SHEETING 1'
MIN
PLASTIC SHEETING
CONSTRUCTION
SIDE
SAND BAG
BULK BAG
PUMP FROM
IMPOUNDED AREA
IF NECESSARY
BULK BAG COFFERDAM
NOT TO SCALE
O H
WO
HW O
H W
OHW
OHW
O
HW
O
HW
OHW O
H
W
OHW
OHWOHW
OHW
OHW
OHW OHW OHW
OHW
O H
W O
H W
O
HW
OHW
O H
W
OH
W
OHW
OHW
OHWOHW
OHW
OHW
OHW
OHW
OHW
OHW
O
HW
O H
W
O H
W
OHW
OHW
OHW
OHW
O
HW
OHW
O H
W
OHW
O H
W O
H W
OHW
OHW
O
HW OHW
OHW
OHW
OHW
O H
W
O
HW O
H W
OHW
OHW O
H
W
OHW
OHW
OHW
OHWOHW
OHW
OHW
OHW
OH
W
OHW
OHW
OHWOHW
OHW
OHW
OHW
OHW
OHW
OHWOHWOHW
OHW
OHWOHW
OHW
O H
W
O
HW
O
HW
OHW
O
HW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OH
W
OHW
OHW
O H
W O
HW
O
H W
OHW
OHW
O H
W
O H
W
OHW
OHW
O
HW
O
HW
OHW
OHWOHW O
HW
OHW
OHW
O
HW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
O H
W
O H
W
OHW
OHW
OHW
O H
W
OHW
O
HW
OHW
O H
W O
HW
OHW
OHW
O H
W
OHW
OHW
OHW
OHW
O H
W
O H
W
O
HW
OHW
OHW
O H
W
OHW
O H
W OHW
OHW
O H
W
OHW
O
HW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
O H
W
O H
W
OHWOHW
O H
W
OHW OHW
OHW
OHW
OHW
OHW
OHW
O H
W O H
W
OHW
OHW
OHW OHW
OHW OHW
OHW
OHW
OHW
OHW
OHW OHW
DATEBYNO. REVISION DESCRIPTION
SHEET
PROJECT
CHECKED
APPROVED
DRAWN
DATE
DESIGNED
OF
G :\Q
-T \S an dy
R iv er Fo rc eM ai nC la ck am as
C ou nt y_
\D ra w in gs
\R ef er en ce s\
C iv il 3D
\S an dy
FM
_E G
.d w g
- m ik e m
9/
/2
MM
MM
MM
EMERGENCY TEMPORARY PIPE PROTECTION
SITE OVERVIEW 3 5
501 Portway Avenue, Suite 101 Hood River, OR 97031
541.386.9003 www.interfluve.com
FLOW
SCALE IN
FEET
0 200100
PLAN VIEW - SITE OVERVIEW
ROAD
PROJECT SITE
SANDY RIVER
LEGEND
EXISTING GROUND CONTOUR, 1 FT
ORDINARY HIGH WATEROHW
LIMITS OF DISTURBANCE
100-YR FLOODPLAIN
01558273 00725139
PR
O
PER
TY LIN
E
EAST BRIGHTW
OOD LOOP ROAD
EAST RIVERSIDE DRIVE
2024 RIVER BANK
PARCEL LINES
PIPES
OHW
OHW
OHW
OHW
O H
W
OHW
OHW
O
HW
O
HW
OHW
OHW
O H
W
OHW
OHW
OHW
OHW
OHW
O H
W
OHW
OHW
O H
W
OHW
O H
W
O H
W
O H
W
O
HW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
O
HW
OHW
OHW
OHW
OHW
OHW
O
HW
O H
W
OHW
O H
W
O
HW
O
HW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
O
HW
OHW
OHW
O H
W
OHW
OHW
OHW
OHW
OHW
OHW
O H
W
O H
W
O H
W
OHW
O H
W
OHW
OHW
O H
W
O H
W
OHW
O
HW
O H
W
O H
W
OHW
OHW
OHW
OHW
OHW
O H
W
OHW
O H
W
OHW
OHW
OHW
OHW
OHW
O H
W
OHW
O
HW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
O H
W
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
O H
W
OHW
OHW
OHW
O H
W
OHW
OHW
OHW
O H
W
OHW
OHW
OHW
OHWO
HW
O H
W
OHW
OHW
OHW
1145 1144
0+00 0+10 0+20 0+30 0+400+41
0+00 0+10 0+20 0+30 0+400+43
0+00 0+10 0+20 0+30 0+400+40
STA:0+15
ELEV:1148.0 STA:0+28
ELEV:1145.0
STA:0+15
ELEV:1147.9
STA:0+27
ELEV:1145.0
OHW OHW OHW OHW
OHW OHW OHW OHW OHW
OHW OHW OHW OHW OHW
25 FT
25 FT
21 FT
DATEBYNO. REVISION DESCRIPTION
SHEET
PROJECT
CHECKED
APPROVED
DRAWN
DATE
DESIGNED
OF
G :\Q
-T \S an dy
R iv er Fo rc eM ai nC la ck am as
C ou nt y_
\D ra w in gs
\R ef er en ce s\
C iv il 3D
\S an dy
FM
_E G
.d w g
- m ik e m
9/
/2
MM
MM
MM
7/24/26
MM LOWER COLUMBIA FISH ENHANCEMENT GROUP
MULLHOLLAND CREEK RESTORATION
60% DESIGN DRAWINGS
PIPE PROTECTION -
BOULDER BARBS 4 13
501 Portway Avenue, Suite 101
Hood River, OR 97031 541.386.9003 www.interfluve.com
FLOW
SCALE IN
FEET
0 4020
PLAN VIEW - BARBS
ROAD
CROSS SECTION4
1 DOWNSTREAM BARB
CROSS SECTION4
2 BETWEEN BARBS
CROSS SECTION4
3 UPSTREAM BARB
DOWNSTREAM BARB
(BOULDERS)
UPSTREAM BARB
(BOULDERS)
COBBLE FILL
COBBLE FILL
SAN. SEWER
KEY BOULDERS INTO BANK 4 FT
BACKFILL WITH COBBLE
KEY BOULDERS INTO BANK 4 FT
BACKFILL WITH COBBLE
MATERIAL QUANTITY VOLUME WITHIN OHW AREA WITHIN OHW
COFFERDAM
SANDY RIVER
BOULDERS 125 CY 90 CY 990 SQ FT
COBBLE 130 CY 110 CY 720 SQ FT
COFFERDAM 98 FT
CONSTRUCTION QUANTITIES AND JURISDICTIONAL IMPACTS
LEGEND
EXISTING GROUND CONTOUR, 1 FT
DESIGN CONTOUR, 1 FT
ORDINARY HIGH WATEROHW
LIMITS OF DISTURBANCE
COFFERDAM
EXISTING CONIFER TREEBOULDERS
COBBLE
EXPOSED PIPES
01558273 00725139
PR
O
PER
TY LIN
E
WATER PIPE
2024 RIVER BANK
2024 TOP OF BANK
2024 TOE OF BANK
2024 RIVER BANK
EXISTING DECIDUOUS TREE
SEE SHEET 5 FOR ADDITIONAL DETAILS
SEE SHEET 5 FOR RECOMMENDED SEQUENCE
EXPOSED PIPES
AS-BUILT EXTENTS OF BARB FILL
AS-BUILT CONTOUR, 1 FT
AS-BUILT BARB
AS-BUILT COBBLE
AS-BUILT BARB
AS-BUILT COMBINED COBBLE AND BOULDER FILL WITHIN OHW = 1,864 SQ FT
6B
8A
6A
# PHOTO POINT
8B
Alexandra Danielsen Oval
Alexandra Danielsen Oval
Alexandra Danielsen Oval
DATEBYNO. REVISION DESCRIPTION
SHEET
PROJECT
CHECKED
APPROVED
DRAWN
DATE
DESIGNED
OF
G :\Q
-T \S an dy
R iv er Fo rc eM ai nC la ck am as
C ou nt y_
\D ra w in gs
\R ef er en ce s\
C iv il 3D
\S an dy
FM
_E G
.d w g
- m ik e m
9/
/2
MM
MM
MM
EMERGENCY TEMPORARY PIPE PROTECTION
DETAILS 5 5
501 Portway Avenue, Suite 101 Hood River, OR 97031
541.386.9003 www.interfluve.com
FLOW
4-6 FT BOULDERS ON TIP AND UPSTREAM FACE ALONG OUTER 1/3
3-4 FT BOULDERS ON UPSTREAM SIDE LANDWARD OF TIP ROCKS
2-3 FT BOULDERS ON TOP AND DOWNSTREAM SIDE
BANK LINE
5 FT
2H:1V SIDE SLOPES
4 FT
FLOW
BANK LINE
60°
BA
RB
3-4 FT BOULDERS
FLOW
2-3 FT BOULDERS
COBBLE FILL
PIPES
CROSS SECTION5
1 TYPICAL FILL ZONES TYPICAL PLAN VIEW
PIPES
RECOMMENDED SEQUENCE
1. ACCESS SITE, INSTALL EROSION AND SEDIMENT
CONTROL PLAN, AND PROTECT TREES AND OTHER
EXISTING VEGETATION,AS PER 1200CAINSTALL
COFFERDAM TO ISOLATE IN-STREAM WORK FROM
THE WATERWAY.
2. COORDINATE WITH OWNER'S REPRESENTATIVE TO
DE-FISH ISOLATED WORK AREA, FOLLOWING
PERMITTING GUIDELINES.
3. WORKING FROM THE EDGE OF THE BANK, INSTALL
TIP BOULDERS.
4. EXCAVATE KEY TRENCH.
5. INSTALL LARGE BODY BOULDERS ALONG
UPSTREAM FACE.
6. INSTALL COBBLE FILL AROUND PIPES TO PROVIDE
PROTECTION DURING BOULDER PLACEMENT.
7. INSTALL BODY BOULDERS TO FORM TOP AND
DOWNSTREAM FACE. TAKE CARE TO NOT CONTACT
PIPES WITH BOULDERS OR EQUIPMENT.
8. REPEAT FOR SECOND BARB.
9. FILL BETWEEN BARBS USING 8" MINUS COBBLE FILL.
10. RESTORE WORK, ACCESS, AND STAGING AREAS BY
REMOVING COFFERDAM, DECOMPACTING SOILS
AND REGRADING TO ORIGINAL CONDITION. APPLY
SEED MIX AND SPREAD CERTIFIED WEED-FREE
MULCH ON ALL BARE GROUND PRIOR TO
DEMOBILIZING.
COFFERDAM
KEY BARB INTO BANK
5 FT
VARIES
* DENSITY OF STONE SHALL BE GREATER THAN 165 PCF
** VOLUMES AND PERCENTAGE RATIOS ARE APPROXIMATE
PROFILE - BANK TO TIP5
2 TYPICAL FILL ZONES
4 FT
COBBLE FILL
3-4 FT BOULDERS
2-3 FT BOULDERS
AutoCAD SHX Text
AS PER 1200CA. INSTALL
File details come from the government source that posted it. Updated .