Project Manual for 2026 Street Rehabilitation, Contract B
This is a Project Manual and Request for Bids (RFB) document from the City of Westerville, Ohio Planning & Development Department for the 2026 Street Rehabilitation, Contract B (Project No. 2026-002). The project encompasses pavement reconstruction including concrete curbing and underdrain replacement, concrete curb ramps and sidewalk construction, storm drainage structure replacement, and waterline installation with services on Monroe Lane and Ash Court. The Engineer's Estimate for the project is $1,293,000.00. Electronic bids must be submitted through the City's Bonfire Procurement Portal by 3:00 PM local time on Wednesday, January 21, 2026, with a Q&A period ending January 14, 2026. The project completion date is August 7, 2026, with work to commence on or after the Notice to Proceed date. The contract includes 157 line items spanning roadway improvements, drainage work, water line distribution, communication conduits and utility boxes, traffic control, landscaping, and associated incidentals. A mandatory preconstruction conference will be required after contract execution, with the contractor required to submit a baseline construction schedule one week prior to the conference.
The contract requires a bid guaranty equal to the full amount of the bid including all alternates, with performance and payment bonds at 100 percent of the contract price required within ten days of notice of award. All work is subject to Ohio Revised Code Chapter 4115 prevailing wage requirements, with rates provided on the City's Bonfire portal. The City reserves the right to award the contract to the lowest and best bidder, reject any or all bids, and waive minor defects. Liquidated damages apply at $500.00 per calendar day for failure to meet interim completion dates and $2,000.00 per calendar day for the final project completion date. The contract incorporates the 2018 City of Columbus Construction and Material Specifications (COLS) and Ohio Department of Transportation specifications where referenced. A digital video recording of existing conditions must be submitted by the contractor one week prior to construction commencement. The project is subject to special provisions regarding construction schedule constraints, maintenance of services and access, utility coordination, haul routes, contractor coordination, use of City water, and temporary sediment and erosion controls. Retainage of ten percent applies until 50 percent work completion, then reduces to five percent until 90 percent completion, and further to 2.5 percent thereafter.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 5-Plans.pdf | ||
| 3-Bid Schedule formatted for Portal.xlsx | XLSX spreadsheet | |
| 2-Original Construction Plans - Ash Ct.pdf | ||
| 1-Prevailing Wage Rates - FRA County.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF WESTERVILLE
PLANNING & DEVELOPMENT DEPARTMENT
Project Manual for the
2026 STREET REHABILITATION
CONTRACT B
Project No. 2026-002
Project Type: Request for Bids (RFB)
Bid Closing Date and Time Wednesday, January 21, 2026
3:00 PM
Submit To:
Electronic Submissions https://westerville.bonfirehub.com/opportunities/212782
The Q&A period for this opportunity ends: 3:00 pm (local time) on Wednesday, January 14,2026
Point of Contact for Written Questions:
Jeff Kessler Project Manager Planning & Development Department Bids@westerville.org
PLANNING & DEVELOPMENT DEPARTMENT
2026 STREET REHABILITATION, CONTRACT B
PROJECT NO. 2026-002
ADMINISTRATIVE OFFICIALS
Monica Dupee City Manager Matt Yoder Director of Finance Andrew Winkel Director of Law Dave Efland Director of Planning &
Development Grant Crawford Director of Public Service
MEMBERS OF COUNCIL
Michael Heyeck Council Chair Megan Reamsnyder Vice-Chair Kenneth L. Wright Mayor Coutanya Coombs Vice-Mayor Aaron Glasgow Member David Grimes Member Jeff Washburn Member
December 10, 2025
DEPARTMENT OF PLANNING & DEVELOPMENT
64 E WALNUT STREET
WESTERVILLE, OHIO 43081
TABLE OF CONTENTS
BIDDING REQUIREMENTS AND FORMS PAGE
Bidders Checklist Notice to Bidders Information to Bidders Prevailing Wage Rates Experience Record Subcontractors Bid Guaranty ……. ............................................................................................................................... … 20 Recommended Bid Guaranty Form Bid Schedule
CONTRACT FORMS PAGE
Noncollusion Affidavit Personal Property Tax Affidavit Agreement Fiscal Officer’s Statement Performance Bond and Payment Bond
GENERAL PROVISIONS PAGE
101 Definitions and Terms 102 Bidding Requirements and Conditions 103 Award and Execution of Contract 104 Scope of Work/Changes 105 Control of Work 106 Control of Material 107 Legal Relations and Responsibility to Public 108 Prosecution and Progress of Work 109 Acceptance, Measurement, and Payment
SPECIAL PROVISIONS PAGE
SP 1 Construction Schedule Constraints SP 2 Digital Video Recording SP 3 Maintenance of Services and Access SP 4 Utility Coordination SP 5 Haul Routes SP 6 Contractor Coordination SP 7 Use of City Water SP 8 Liquidated Damages
SUPPLEMENTAL SPECIFICATIONS PAGE
12000 Supplemental Notes 120001 Ash Court Drainage Improvements 12007 Street Reconstruction 12203 Disposal of Excavated Material 12401 Hot Mix Asphalt 12452 Non-reinforced Portland Cement Concrete 12604 Manholes, Catch Basins, Inlets 12608 Walks and Curb Ramps 12609 Curbing 12614 Maintaining Traffic 12653 Processed Topsoil Furnished and Placed 12659 Seeding and Mulching 12661 Planting Tres, Shrubs, and Vines 12705 Concrete Incidentals 12800 Water Line Distribution 12832 Temporary Sediment and Erosion Controls 13120 Communication Utility Box 13200 Communication Conduit Stubs
APPENDIX PAGE
Functional Class Plan
Plans
• Ash Court Additional Drainage Improvements
Standard Construction Details
• Westerville Standard Details
• COLS Standard Details
Bidding Requirements and Forms
BIDDING REQUIREMENTS
AND FORMS
BIDDERS CHECKLIST
BIDDERS are urged to complete this checklist to confirm that all required documents are included with their BID. Failure to submit the listed documents may result in disqualification of the BID.
Name Type # Files Requirement Included with BID
Provide Later
Bid Guaranty (Surety Company signature required)
File Type:
PDF (.pdf)
1 Required
Bid Schedule
(BIDDER
signature required)
File Type:
PDF (.pdf)
1 Required
Experience Record
File Type:
PDF (.pdf)
1 Optional (needed within two (2) business days of the closing time)
Subcontractors Form
File Type:
PDF (.pdf)
1 Optional (needed within two (2) business days of the closing time)
Noncollusion Affidavit
File Type:
PDF (.pdf)
1 Optional (needed prior to the issuance of the NOTICE
TO PROCEED)
Personal Property Tax Affidavit
File Type:
PDF (.pdf)
1 Optional (needed prior to the issuance of the NOTICE
TO PROCEED)
NOTICE TO BIDDERS
Bids for the construction of the 2026 Street Rehabilitation, Contract B (Project No. 2026-002), will be received by the City of Westerville, Ohio until the closing date and time of 3:00 p.m. (local time) on Wednesday, January 21, 2026 and will be publicly opened and read immediately thereafter.
The WORK in accordance with the CONTRACT DOCUMENTS, dated December 10, 2025, and any addenda thereto, includes pavement reconstruction including concrete curbing and underdrain replacement, concrete curb ramps and sidewalk, storm drainage structure replacement, waterline and services and other appurtenant WORK.
ENGINEER’S ESTIMATE for this PROJECT: $1,293,000.00
Electronic CONTRACT DOCUMENTS are available at no cost via the CITY’s Bonfire Procurement Portal at: https://westerville.bonfirehub.com/opportunities/212782. Vendors new to the CITY’s Bonfire Procurement Portal will need to create a FREE Bonfire account.
All bids must be accompanied by a BID GUARANTY. The recommended form of BID GUARANTY is a BID GUARANTY and CONTRACT Bond in the full amount of the bid, including all add alternates, as prescribed by Section 153.571 of the Ohio Revised Code. Other acceptable forms of BID GUARANTY include a bid bond equal to ten percent (10%) of the bid plus all add alternates. Bid security issued in bond form, shall be issued by a Surety Company or Corporation licensed in the State of Ohio to provide said surety.
If the BID is accepted, a CONTRACT must be executed and a satisfactory Performance/Payment Bond furnished, conditioned according to law in the amount of one hundred percent (100%) of the CONTRACT price, within ten (10) days after notice of award. Sureties on all bonds must be satisfactory to the CITY.
The PROJECT is subject to Chapter 4115 of the Ohio Revised Code regarding Prevailing Rates of Wages.
No BIDDER may withdraw their BID for a period of 60 days after the actual BID closing date and time.
The CITY reserves the right not to award a contract and to reject any or all BIDS and to waive any informalities and irregularities. Subject to the right of the CITY not to award a contract and to reject any or all BIDS, the CITY will award a Contract to the BIDDER submitting the lowest and best BID, taking into consideration accepted alternates.
Point of Contact for Written Questions:
Jeff Kessler Project Manager Planning & Development Department Bids@westerville.org
Advertise: 12/10/2025 mailto:Bids@westerville.org
INFORMATION TO BIDDERS
PREPARATION AND DELIVERY OF BIDS
BIDS will be received by the CITY of Westerville, Ohio herein called the OWNER, until the closing date and time of 3:00 p.m. (local time), Wednesday, January 21, 2026.
BIDS must be submitted in electronic format only in accordance with the below submission instructions.
Submission Instructions for Electronic BIDS
Electronic BIDS must be uploaded at:
https://westerville.bonfirehub.com/opportunities/212782
Please review the BIDDERS CHECKLIST and note the type and number of files allowed. The maximum upload file size is 1000 MB.
Please do not embed any documents within your uploaded files, as they will not be accessible or evaluated.
You will not be able to prepare a submission unless you submit ‘Yes’ for your intent to Bid.
As uploading large documents may take significant time, depending on the size of the file(s) and Internet connection speed, it is recommended that the BIDDER allow sufficient time before closing time to begin the upload process and finalize their submission.
Each item of requested information will only be visible to the OWNER after the closing time.
The BIDDER will receive an email confirmation receipt with a unique confirmation number once they finalize their submission.
Minimum system requirements: Microsoft Edge, Google Chrome, or Mozilla Firefox. Javascript must be enabled. Browser cookies must be enabled.
Need Help with an Electronic Submission?
The City of Westerville uses a Bonfire portal for accepting BIDS digitally. Please contact Bonfire at Support@GoBonfire.com for technical questions related to your submission or contact the CITY’s Procurement Manager at Thomas.Patterson@westerville.org for general questions related to your submission.
General Instructions for Electronic BIDS
All BIDS must be submitted on the BID forms provided and receipt of any addenda should be indicated.
All blank spaces shall be filled in, in ink or typed, in figures. The BIDDER shall provide unit prices and/or lump sum prices on the BID SCHEDULE form. Each BIDDER must bid on all items and Alternates mailto:support@gobonfire.com mailto:Thomas.Patterson@westerville.org contained in the BID SCHEDULE. BIDDERS may download an electronic copy of the BID SCHEDULE in MS Excel format from the Project Portal. All BIDS not in conformity with this notice may be considered informal and may be rejected. Failure to furnish all information requested on the BID SCHEDULE or other documents requested may result in disqualification of the bid.
It is the sole responsibility of the BIDDER to see that their BID is received by the proper time.
BIDDERS are urged to submit with their BID a completed Experience Record form and completed Subcontractors form.
INTERPRETATION OF QUANTITIES
When Unit Prices are requested on the BID SCHEDULE, the quantities listed are to be considered approximate and are to be used only for the comparison of the BIDS and as a basis for computing amounts of security of penal sums of BONDS to be furnished. The unit prices to be tendered by the BIDDERS are to be tendered expressly for the scheduled quantities and they may be increased or decreased by duly authorized CHANGE ORDER.
Unless otherwise specified in the CONTRACT DOCUMENTS, the Lump Sum Prices and Unit Prices set forth shall include all materials, equipment, labor, delivery, installation, overhead, profit, and any other cost or expense, in connection with or incidental to, the performance of that portion of the WORK to which the prices apply.
Where there is a conflict between the Unit Price and the extension thereof, the Unit Price shall govern and the correct extension of such Unit Price shall be made and such corrected extension shall be used in comparing BIDS.
It is understood that the scheduled quantities of WORK to be done and materials to be furnished may increase, decrease or be deleted entirely after execution of the Agreement.
Payments, except for lump sum BIDS, and except for lump sum items in unit price BIDS, will be made to the CONTRACTOR for the actual quantities only of WORK performed or materials furnished in accordance with the CONTRACT DOCUMENTS.
The successful BIDDER will be further required to furnish the OWNER with a complete breakdown of the labor and material costs associated with unit prices and/or lump sum BID items, to the satisfaction of the ENGINEER, before beginning construction. The unit price and/or lump sum breakdown shall be in sufficient detail to provide a check of claims for partial payment requests.
EXAMINATION OF CONTRACT DOCUMENTS AND WORK SITE
The BIDDER is required to examine carefully the site of the WORK, the BID SCHEDULE, PLANS and SPECIFICATIONS, and to read and acquaint oneself with the Agreement form for the WORK contemplated. The BIDDER, in submitting a BID, warrants that the BIDDER has investigated and is acquainted with the conditions to be encountered for performing the WORK including the character, quality, and quantities of WORK to be performed and materials to be furnished, and the requirements of the CONTRACT DOCUMENTS hereinafter defined. It is mutually agreed that submission of a BID shall be considered satisfied as to all the conditions which will affect the WORK.
CONSTRUCTION AND MATERIAL SPECIFICATIONS
The City of Westerville requirements, as adopted by Ordinance 2023-05, the 2018 edition of the City of Columbus Construction and Materials Specifications (COLS) and the 2023 edition of the State of Ohio Department of Transportation Construction and Material Specifications (ODOT), where referenced, including all supplements, shall govern all materials and workmanship involved in the improvements shown on this plan. Notwithstanding the foregoing, the General Provisions, Section 100 of these COLS specifications, are not applicable to this PROJECT except where specifically referenced.
INTERPRETATION
The CONTRACT DOCUMENTS contain the provisions required for the construction of the PROJECT.
Information obtained from an officer, agent, or employee of the OWNER or any other person shall not affect the risks or obligations assumed by the CONTRACTOR or relieve the CONTRACTOR from fulfilling any of the conditions of the CONTRACT.
If any person contemplating submitting a BID for the proposed PROJECT is in doubt as to the true meaning of any part of the CONTRACT DOCUMENTS, they may submit a written request for an interpretation thereof to either the Point of Contact identified in the CONTRACT DOCUMENTS or the Project Portal.
The Q&A period for this opportunity ends 3:00 p.m. (local time) on Wednesday, January 14, 2026.
The person submitting the request will be responsible for its prompt delivery. Any interpretation of the CONTRACT DOCUMENTS will be made only by ADDENDUM duly issued, a minimum of 72 hours prior to the BID closing date and time. The CITY will endeavor to have a copy of such ADDENDUM delivered to each person receiving a set of CONTRACT DOCUMENTS; however, it is ultimately the BIDDER’s responsibility to check the CITY’s Bonfire Procurement Portal (https://westerville.bonfirehub.com/opportunities/212782) for verification of any issued addenda. The awarding authority will not be responsible for any other explanations or interpretations of the
CONTRACT DOCUMENTS.
DUTY TO NOTIFY THE CITY OF ERRORS
BIDDERS shall promptly notify the CITY of errors and omissions in the CONTRACT DOCUMENTS which the BIDDER discovers in the exercise of ordinary and reasonable care. The BIDDER’s notification shall be made by submitting a written request for interpretation in accordance with the above paragraph.
The BIDDER’s duty to disclose errors and omissions is not only a bidding requirement but is also a legal requirement that cannot be ignored.
Failure to provide the required notification prior to the BID closing date and time shall constitute a waiver by the CONTRACTOR and shall not obligate the CITY for any costs based upon any apparent or patent ambiguity arising from insufficient data or obvious errors in the CONTRACT DOCUMENTS.
Knowingly withholding information regarding an error or omission in the CONTRACT DOCUMENTS, or intentionally misrepresenting an item of WORK for financial or competitive gain, may result in civil or criminal penalties.
REJECTION OF UNBALANCED BID
The BIDDER is required to BID each item as indicated in THE CONTRACT DOCUMENTS. The CITY reserves the right to reject any materially unbalanced BID. A “materially unbalanced bid” is a BID that contains lump sum or unit prices that do not reflect reasonable labor, equipment, and material costs plus a reasonable proportionate share of overhead and other indirect costs and anticipated profit, and the CITY determines that the Bid may not be in the best interest of its citizens.
BID GUARANTY
All bids must be accompanied by a BID GUARANTY. The recommended form of BID GUARANTY is a BID GUARANTY and CONTRACT Bond in the full amount of the bid, including all add alternates, as prescribed by Section 153.571 of the Ohio Revised Code. Other acceptable forms of BID GUARANTY include a bid bond equal to ten percent (10%) of the bid plus all add alternates. Bid security issued in bond form, shall be issued by a Surety Company or Corporation licensed in the State of Ohio to provide said surety.
WITHDRAWAL OF BIDS PRIOR TO CLOSING DATE AND TIME
Any BID may be withdrawn prior to the above scheduled closing date and time for the submission of BIDS or authorized postponement hereof. Any BID received after the time and date specified shall not be considered.
WITHDRAWAL OF BIDS AFTER CLOSING DATE AND TIME
If for any reason, other than as authorized by the Ohio Revised Code, the BIDDER fails to enter into a CONTRACT, and the CITY awards the CONTRACT to the next lowest BIDDER, the BIDDER and the surety on the BIDDER’s bond are liable to the CITY for the difference between the bid and that of the next lowest bidder, or for a penal sum not to exceed ten percent (10%) of the amount of the bond, whichever is less. If the CITY does not award the CONTRACT to the next lowest BIDDER but resubmits the PROJECT for bidding, the BIDDER failing to enter into the CONTRACT and the surety on the BIDDER’s bond, except as provided in the Ohio Revised Code, are liable to the CITY for a penal sum not to exceed ten percent (10%) of the amount of the BID or the costs in connection with the resubmission of printing new CONTRACT DOCUMENTS, required advertising, and printing and mailing notices to prospective bidders, whichever is less.
PUBLIC OPENING OF BIDS
BIDS will be publicly opened and read immediately after the deadline for the submission of BIDS.
BIDDERS, their authorized agents, other interested parties, and the general public are invited to be present. The public opening of bids will be held at the City’s Walnut Street administrative offices, located at 64 E. Walnut Street, Westerville, Ohio 43081. The public opening will also be shared online via Google Meet. Instructions for joining the Google Meet session will be posted to the City’s website in advance of the public opening.
CONSIDERATION OF BIDS AND AWARD OF CONTRACT
The OWNER shall make such investigations as the OWNER deems necessary to determine the lowest and best BIDDER to perform the WORK. The BIDDER shall furnish to the OWNER all such information and data for this purpose as the OWNER may request. In determining the award, consideration, among other items, will be given to (a) whether BIDDER maintains a permanent place of business, (b) suitability of the BIDDER’S plant and equipment for the WORK, including the amount of subcontracted WORK, (c) BIDDER’S financial status and organization, (d) BIDDER’S record of experience and performance in constructing improvements of this type and (e) lowest BID. The OWNER, in its discretion, may consider and give such weight to these criteria as it deems appropriate. The OWNER reserves the right to reject any BID if the evidence submitted by, or investigation of, such BIDDER fails to satisfy the OWNER that such BIDDER is properly qualified to carry out the obligations of the Agreement and to complete the WORK contemplated therein.
As part of the OWNER’S investigation, the OWNER requires that the BIDDER submit a completed Experience Record form and Subcontractors form. BIDDERS are urged to include a completed Experience Record form and Subcontractors form with their BID. If not included with the BID, a completed Experience Record form and Subcontractors form shall be submitted to the CITY within two (2) business days of the BID Closing Date and Time.
As part of the OWNER’s investigation, the OWNER may require that the BIDDER submit a complete breakdown of the labor and material costs associated with unit prices and/or lump sum BID items.
If alternative bid items are listed in the BID SCHEDULE, the OWNER shall determine the Alternate Items so selected by the OWNER in determining the lowest and best BID. The OWNER reserves the right not to award a contract and to reject any and all BIDS.
In the event that only one (1) lowest and best BID is received, the OWNER reserves the right to establish a fair and reasonable price with the lowest and best BIDDER.
In the event that two (2) or more identical low BIDS are received from potential BIDDERS, the OWNER reserves the right to award the CONTRACT in any manner deemed in the best interest of its citizens or the OWNER may request the submission of a Best and Final Offer from the identical BIDDERS to determine the lowest and best BIDDER.
The OWNER may waive any informalities or minor defects or reject any and all BIDS. The OWNER may hold the BIDS for 60 days after the actual BID Closing Date and Time, and may award the CONTRACT at any time during that period. Should there be reasons why the CONTRACT cannot be awarded within the specified period; the time may be extended by mutual agreement between the OWNER and the
BIDDER.
CANCELLATION OF AWARD
The CITY may cancel a CONTRACT award at any time before all parties sign the CONTRACT without liability to the CITY.
RETURN OF BID GUARANTY
The CITY will retain all bid securities until the CONTRACT has been executed by all parties and the NOTICE TO PROCEED has been issued.
CONTRACT PERFORMANCE BOND AND PAYMENT BOND
A Performance Bond and Payment Bond, each meeting the requirements of Sections 153.54, 153.57, and 153.571 of the Ohio Revised Code, with a Surety qualified to do business in the State of Ohio will be required for the faithful performance of the WORK.
EXECUTION OF CONTRACT
The BIDDER to whom the CONTRACT shall be awarded will be required to execute 2 copies of the CONTRACT on the form included in the CONTRACT DOCUMENTS and to furnish insurance certificates and Workers Compensation certificates as required.
The successful BIDDER will be required to execute and submit the following completed forms, as included in the CONTRACT DOCUMENTS, prior to the issuance of the NOTICE TO PROCEED:
Noncollusion Affidavit and Personal Property Tax Affidavit. BIDDERS are urged to include these documents in their BID.
The NOTICE TO PROCEED shall be issued within 60 days of the execution of the Agreement by the OWNER. Should there be reasons why the NOTICE TO PROCEED cannot be issued within such period;
the time may be extended by mutual agreement between the OWNER and CONTRACTOR. If the NOTICE TO PROCEED has not been issued within a 60-day period or within the period mutually agreed upon, the CONTRACTOR may terminate the Agreement, by duly executed WRITTEN NOTICE without further liability on the part of either party.
FAILURE TO EXECUTE CONTRACT
In case of the BIDDER’s refusal or failure to execute the Contact within ten (10) days after its receipt of formal notice of award, BIDDER may be considered to have abandoned all rights and interests in the award, and the BIDDERS’s BID GUARANTY may be declared forfeited to the OWNER. The award may then be made to the next lowest and best BIDDER or the work re-advertised for BIDS as the OWNER may elect.
RESPONSIBILITY TO GENERAL PUBLIC
To the extent authorized by law, CONTRACTOR shall indemnify and hold harmless the CITY, its officers, elected officials, agents and employees from and against all claims, damages, losses and expenses including attorney’s fees arising out of or resulting from the CONTRACTOR’s performance, provided that any such claims, damage, loss or expense is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property, including the loss of use resulting therefrom;
and is caused in whole or in part by any negligent or willful act or omission of the CONTRACTOR, subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable.
CONTRACTOR agrees that in the hiring of employees for the performance of work under this CONTRACT or any subcontract, no CONTRACTOR, subcontractor, or any person acting on their behalf shall, by reason of race, color, religion, sex, national origin, age, familial status, military status, disability, pregnancy, sexual orientation, gender identity, or gender expression, or any prohibition provided by federal or state law, discriminate against any citizen of the State in the employment of labor or workers who are qualified and available to perform the work to which the employment relates, nor shall the CONTRACTOR, subcontractor, or any person acting on their behalf, in any manner, discriminate against or intimidate any employee hired for the performance of work under the CITY’s CONTRACT on account of race, color, religion, sex, national origin, age, familial status, military status, disability, pregnancy, sexual orientation, gender identity, or gender expression, or any prohibition provided by federal or state law.
INSURANCE
The CONTRACTOR and the CONTRACTOR’S subcontractors shall secure and maintain Liability and Property Damage Insurance (1) in an amount not less than One Million Dollars ($1,000,000) for bodily injuries, including wrongful death, to any one person, subject to the same limit for each person, in an amount not less than Two Million Dollars ($2,000,000) for bodily injury damages for any one accident;
and (2) in an amount not less than One Million Dollars ($1,000,000) for property damages on account of one accident and in an amount not less than Two Million Dollars ($2,000,000) for damages for all accidents. Greater amounts shall apply, where required by law. If the CONTRACTOR and the CONTRACTOR’S subcontractors maintain higher limits than the minimums shown above, the CITY shall be entitled to coverage for the higher limits.
The Insurance policies secured in compliance with the above requirements shall be with acceptable insurance companies authorized to do business in the State of Ohio and shall bear endorsements extending automatic coverage on all operations of the CONTRACTOR incidental to the performance of the WORK to be done under this CONTRACT, whether such operations are listed in the insurance contracts or not, and whether the WORK is being done at the site of the project or not. The OWNER shall be named as an additional insured. The CONTRACTOR will be required to submit a Certificate of Insurance and a current Worker’s Compensation Certificate to the OWNER prior to the execution of the Agreement.
COMPLIANCE WITH APPLICABLE LAWS
All applicable laws, ordinances, and the rules and regulations of all authorities having jurisdiction over construction of the PROJECT shall apply to the CONTRACT throughout.
In performing the WORK, CONTRACTOR shall comply with all applicable laws, rules, regulations, codes and ordinances, including but not limited to the U.S. Department of Labor “Safety and Health Regulations for Construction” identified as Chapter XVII of Title 29, Code of Federal Regulations (CFR) Part 1926 (formerly Part 1518) and subsequent amendments.
The CONTRACTOR agrees that it is currently in compliance and will continue to adhere to the requirements of the Ohio Ethics Law as provided in Section 102.03 and 102.04 of the Ohio Revised Code.
SALES AND INCOME TAXES
Materials to be incorporated in the WORK may be purchased by the CONTRACTOR free of Ohio State sales tax.
The successful BIDDER will be required to withhold all CITY income taxes due or payable under the provisions of the Income Tax Ordinance, for wages, salaries, and commissions paid to its employees and further agrees that any of its subcontractors shall be required to agree to withhold any such CITY income taxes due under said chapter for services performed under this CONTRACT.
WORK SCHEDULES
All work schedules must be presented to the ENGINEER’S office a minimum of one week prior to the pre-construction meeting. Any deviations from the work schedule submitted to the ENGINEER’S office must be acceptable to the ENGINEER.
PUBLIC RECORDS
In entering into a contract with the CITY of Westerville, Ohio (or responding to a CITY solicitation), all BIDDERS are hereby notified that all BIDs, proposals, quotations, RFI responses, agreements, invoices, correspondence and any other documents submitted to the CITY become public property and are subject to public disclosure in accordance with Ohio Public Records Law. All public records will be made available upon request, at the earliest time permitted by law.
PREVAILING WAGES
Attention is called to the prevailing rate of wages to be paid labor on public improvements as ascertained by the Department of Industrial Relations, State of Ohio.
PREVAILING WAGE RATES
The CONTRACTOR, all SUBCONTRACTORS and all applicable Suppliers shall comply with the requirements of the Ohio Revised Code Chapter 4115 and the Ohio Administrative Rules and regulations 4101:9-4 and shall pay each laborer, worker and mechanic employed by the CONTRACTOR not less than the prevailing rate of wages as determined by the Ohio Department of Commerce.
The CONTRACTOR shall coordinate, compile and submit to the OWNER all documentation as and when required to comply with the requirements of the Ohio revised Code Chapter 4115 and the Ohio Administrative Rules and regulations 4101:9-4 for the CONTRACTOR and all SUBCONTRACTORS.
If a CONTRACTOR or SUBCONTRACTOR sublets the CONTRACT, it shall notify the OWNER at the time the CONTRACT is sublet. The CONTRACTOR or SUBCONTRACTOR shall require the contracting party to pay not less than the prevailing rate of wages and to comply with the requirements of the Ohio Revised Code Chapter 4115 and the Ohio Administrative Rules and Regulations 4101:9-4. Such contracting party shall not further sublet the CONTRACT without requiring its SUBCONTRACTORS to meet the same requirements.
The OWNER shall notify only the CONTRACTOR under a CONTRACT with the OWNER for a public improvement of any changes in the Prevailing Wage Rates. The CONTRACTOR shall then notify all SUBCONTRACTORS of changes in the Prevailing Wage Rates within seven business days of receipt from the OWNER.
The CONTRACTOR, all SUBCONTRACTORS and all applicable suppliers shall provide the OWNER with its address, phone number, fax number, contact person, and e-mail address prior to the commencement of WORK on the project.
Failure to comply with these requirements may delay progress payments to the CONTRACTOR. Final payment to the CONTRACTOR will be held until full compliance with the Ohio Revised Code Chapter 4115 and the Ohio Administrative Rules and Regulations 4101:9-4 has been met.
Please reference the project listing on the City’s Bonfire portal for the prevailing wage rates. These rates are provided in PDF format.
EXPERIENCE RECORD
As part of the OWNER’S investigation to determine the lowest and best BID, the BIDDER is required to provide detailed information on the forms herein, or on a sheet attached to this page, evidence of the BIDDER’S responsibility, experience, skill, and financial standing to complete this CONTRACT in the time allotted. The OWNER may make other such investigations to determine the ability of the BIDDER to perform the WORK. BIDDERS are urged to include a completed Experience Record form with their BID. If not included with the BID, a completed Experience Record form shall be submitted to the CITY within two (2) business days of the BID Closing Date and Time.
1. List similar projects (a minimum of 3) completed in the last 5 years including the following:
Name of Project #1:
Project Location:
Project Description:
Original Completion Date:
Final Completion Date:
Original Contract Amount:
Final Contract Amount:
Project Owner:
Owner’s Contact Name:
Owner’s Contact Phone:
Owner’s Email Address:
Name of Project #2:
Original Contract Amount:
Final Contract Amount:
Project Owner:
Owner’s Contact Name:
Name of Project #3:
Original Contract Amount:
Final Contract Amount:
Project Owner:
Owner’s Contact Name:
Owner’s Contact Phone:
EXPERIENCE RECORD CONTINUED
2. List all current and uncompleted private and public work including the following information:
Name of Project:
Proposed Completion Date:
Original Contract Amount:
Estimated Final Contract Amount:
Project Owner:
Owner’s Contact Name:
Original Contract Amount:
Estimated Final Contract Amount:
Project Owner:
Owner’s Contact Name:
Original Contract Amount:
Estimated Final Contract Amount:
Project Owner:
Owner’s Contact Name:
SUBCONTRACTORS
As part of the OWNER’S investigation to determine the lowest and best BID, the BIDDER is required to state the proposed SUBCONTRACTORS to be utilized in the WORK. BIDDERS are urged to include a completed Subcontractors form with their BID. If not included with the BID, a completed Subcontractors form shall be submitted to the CITY within two (2) business days of the BID Closing Date and Time.
Any changes from the listed SUBCONTRACTORS should be communicated to the OWNER in writing.
The OWNER reserves the right, in its sole discretion, to reject a proposed SUBCONTRACTOR. The following information shall be provided:
Name of Firm:
Proposed Subcontracted Work:
Subcontractor Owner’s Name:
Subcontractor Address:
Subcontractor Telephone:
Subcontracted Dollar Amount:
Subcontracted Percentage:
Subcontractor Owner’s Name:
Subcontractor Address:
Subcontractor Telephone:
Subcontractor Owner’s Name:
Subcontractor Address:
Subcontractor Telephone:
BID GUARANTY
All bids must be accompanied by a BID GUARANTY. The recommended form of BID GUARANTY is a BID GUARANTY and CONTRACT Bond in the full amount of the bid, including all add alternates, as prescribed by Section 153.571 of the Ohio Revised Code. Other acceptable forms of BID GUARANTY include a bid bond equal to ten percent (10%) of the bid plus all add alternates. Bid security issued in bond form, shall be issued by a Surety Company or Corporation licensed in the State of Ohio to provide said surety.
RECOMMENDED BID GUARANTY FORM
(Form of combined Bid Guaranty and Bond prescribed by Ohio Revised Code Section 153.571)
KNOW ALL PERSONS BY THESE PRESENTS, that we, the undersigned , as Principal, at (Address) and (licensed to do business and execute bonds in the State of Ohio) as Surety, are hereby held and firmly bound unto the City of Westerville, Ohio, as Obligee in the penal sum of the dollar amount of the bid submitted by the Principal to the Obligee on , 20 , to undertake the project known as 2026 Street Rehabilitation, Contract B (Project No. 2026-002). The penal sum referred to herein shall be the dollar amount of the Principal’s bid to the Obligee, incorporating any additive or deductive alternate bids made by the Principal on the date referred to above to the Obligee, which are accepted by the Obligee.
In no case shall the penal sum exceed the amount of dollars ($ ). (If the foregoing blank is not filled in, the penal sum will be the full amount of the principal’s bid, including alternates. Alternatively, if the blank is filled in, the amount stated must not be less than the full amount of the bid including alternates, in dollars and cents. A percentage is not acceptable.) For the payment of the penal sum well and truly to be made, we hereby jointly and severally bind ourselves, our heirs, executors, administrators, successors, and assigns.
THE CONDITION OF THE ABOVE OBLIGATION IS SUCH, that whereas the above named Principal has submitted a bid on the above referenced project;
NOW, THEREFORE, if the Obligee accepts the Bid of the Principal, and the Principal fails to enter into a proper CONTRACT in accordance with the Bid, Plans, Specifications, details, and bills of material; and in the event the Principal pays to the Obligee the difference, not to exceed ten percent of the penal sum hereof between the amount specified in the Bid and such larger amount for which the Obligee may in good faith CONTRACT with the Bidder determined by the Obligee to be the next lowest responsive and responsible to perform the Work covered by the Bid; or in the event the Obligee does not award the CONTRACT to such next lowest responsive and responsible Bidder and resubmits the Project for bidding, the Principal pays to the Obligee the difference not to exceed ten percent of the penal sum hereof between the amount specified in the Bid, or the costs, in connection with the resubmission, of printing new CONTRACT DOCUMENTS, required advertising and printing and mailing notices to prospective Bidders, whichever is less, then this obligation shall be null and void, otherwise to remain in full force and effect. If the Obligee accepts the Bid of the Principal, and the Principal, within 10 days after the awarding of the CONTRACT, enters into a proper CONTRACT and executes the Agreement Form in accordance with the CONTRACT DOCUMENTS, including without limitation the Bid, Plans, Specifications, details, and bills of material, which said CONTRACT is made a part of this Bond the same as though set forth herein; and
NOW ALSO, IF THE SAID Principal shall well and faithfully perform each and every condition of such CONTRACT; and indemnify the Obligee against all damage suffered by failure to perform such CONTRACT according to the provisions thereof and in accordance with the CONTRACT DOCUMENTS, including without limitation Plans, Specifications, details, and bills of material therefore; and shall pay all lawful claims of Subcontractors, Material Suppliers and laborers for labor performed and materials furnished in the carrying forward, performing or completing of said CONTRACT; we, agreeing and assenting that this undertaking shall be for the benefit of any Subcontractor, Material Suppliers or laborer having a just claim, as well as for the Obligee herein; then this obligation shall be void;
otherwise the same shall remain in full force and effect; it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall in no event exceed the penal amount of this obligation as herein stated.
THE SAID Surety hereby stipulates and agrees that no modifications, omissions or additions, in or to the terms of said CONTRACT, the Work thereunder or the CONTRACT DOCUMENTS, including without limitation the Plans and Specifications, therefore, shall in any way affect the obligations of said Surety on its bond, and it does hereby waive notice of any such modifications, omissions or additions in or to the terms of the CONTRACT, the Work, or the CONTRACT DOCUMENTS, including without limitation the Plans and Specifications.
SIGNED AND SEALED this day of , 20 .
Principal:
Surety:
By:
By:
Title:
Surety Company Address:
Surety Agent ‘s Address:
(A) (B) (C)
ITEM SPEC CMS DESCRIPTION QUANTITY UNIT UNIT PRICE
Unit Item TOTAL
IN FIGURES (A x B)
MONROE LANE IMPROVEMENTS
ROADWAY
1 201 COLS CLEARING AND GRUBBING 1.00 LS $ $
2 202 COLS PAVEMENT REMOVED 2,164.00 SY $ $
3 202 COLS WALK REMOVED 433.00 SF $ $
4 202 COLS CURB AND GUTTER REMOVED 81.00 FT $ $
5 202 COLS PIPE REMOVED 760.00 FT $ $
6 202 COLS CATCH BASIN OR INLET REMOVED 1.00 EA $ $
7 202 COLS YARD DRAIN REMOVED 3.00 EA $ $
8 202 COLS MAILBOX REMOVED AND RESET 8.00 EA $ $
9 203 COLS EXCAVATION 1,635.00 CY $ $
10 203 COLS EMBANKMENT 91.00 CY $ $
11 204 ODOT EXCAVATION OF SUBGRADE, AS DIRECTED 50.00 CY $ $
12 204 ODOT GRANULAR MATERIAL, TYPE E, NO. 2 STONE, 703.01, AS DIRECTED 25.00 CY $ $
13 204 COLS SUBGRADE COMPACTION 2,650.00 SY $ $
14 204 COLS PROOF ROLLING 2.00 HOUR $ $
15 206 COLS CEMENT STABILIZED SUBGRADE, 12" DEEP 1,841.00 SY $ $
16 206 COLS CEMENT, AS DIRECTED 46.00 TON $ $
17 206 COLS CURING COAT, AS DIRECTED 1,841.00 SY $ $
18 12608 WEST 4" CONCRETE WALK, WEST RD-05, CLASS COC 5 292.00 SF $ $
19 12608 WEST 6" CONCRETE WALK, WEST RD-05, CLASS COC 5 157.00 SF $ $
20 12608 WEST CURB RAMP, 6", WEST RD-05, CLASS COC 5 3.00 EA $ $
21 12608 WEST DETECTABLE WARNING, TUFTILE, CAST IRON, DARK GRAY 28.00 SF $ $
22 SPECIAL MAILBOX SUPPORT, SINGLE 8.00 EA $ $
EROSION CONTROL
2026 STREET REHABILITATION, CONTRACT B (Project No. 2026-002)
BID SCHEDULE
Bid Schedule
Unit Item TOTAL
IN FIGURES (A x B)
2026 STREET REHABILITATION, CONTRACT B (Project No. 2026-002)
BID SCHEDULE
23 12653 WEST PROCESSED TOPSOIL, FURNISHED AND PLACED 328.00 CY $ $
24 12659 WEST SEEDING AND MULCHING 2,955.00 SY $ $
25 12659 WEST COMMERCIAL FERTILIZER 0.40 TON $ $
26 12659 WEST WATER 16.00 MGAL $ $
DRAINAGE
27 603 COLS 3" CONDUIT, TYPE E, 720.08, PER WEST STD STM-01 500.00 FT $ $
28 604 COLS PRECAST REINFORCED CONCRETE OUTLET ENDWALL (AA-S169) 1.00 EA $ $
29 604 WEST DOUBLE CURB AND GUTTER INLET (AAS125B) 3.00 EA $ $
30 604 WEST MANHOLE, TYPE C 1.00 EA $ $
31 604 WEST MANHOLE, TYPE E 1.00 EA $ $
32 604 WEST MANHOLE, TYPE E (AA-S104), WITH INLET TOP (AA-S142) 1.00 EA $ $
33 604 WEST CURB AND GUTTER INLET RECONSTRUCTED TO GRADE 1.00 EA $ $
34 605 COLS 6" PIPE UNDERDRAINS, 707.12 TYPE SP 1,282.00 FT $ $
35 895 ODOT MANUFACTURED WATER QUALITY STRUCTURE TYPE 1, AS PER PLAN 1.00 EA $ $
36 901 COLS 12" STORM RCP CLASS IV PIPE, w/ TYPE II BEDDING, w/ ITEM 912 BACKFILL 181.00 FT $ $
37 901 COLS 15" STORM RCP CLASS IV PIPE, w/TYPE II BEDDING, w/ ITEM 912 BACKFILL 160.00 FT $ $
38 901 COLS 42" STORM RCP CLASS IV PIPE, WITH TYPE II BEDDING, w/ITEM 912 BACKFILL 20.00 FT $ $
PAVEMENT
39 301 COLS ASPHALT CONCRETE BASE, PG64-22 358.00 CY $ $
40 304 COLS AGGREGATE BASE 323.00 CY $ $
41 304 ODOT AGGREGATE BASE, AS DIRECTED 25.00 CY $ $
42 12401 WEST J-BAND VOID REDUCING ASPHALT MEMBRANE, AS PER PLAN 610.00 FT $ $
43 407 COLS NON-TRACKING TACK COAT 277.00 GAL $ $
44 441 COLS ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22, 448, (DRIVEWAYS) 9.00 CY $ $
45 441 COLS ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG64-22 63.00 CY $ $
Unit Item TOTAL
IN FIGURES (A x B)
2026 STREET REHABILITATION, CONTRACT B (Project No. 2026-002)
BID SCHEDULE
46 441 COLS ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (448) 89.00 CY $ $
47 452 COLS 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS COC MS 349.00 SY $ $
48 12609 WEST COMBINED CURB AND GUTTER, WEST RD-02, CLASS COC 5 1,304.00 FT $ $
49 12609 WEST 3.5" DIAMETER CORED CURB 20.00 EA $ $
50 SPC GEOGRID, TENSAR BX1300 OR APPROVED EQUAL, AS DIRECTED 10.00 SY $ $
WATER WORK
51 202 COLS FIRE HYDRANT REMOVED, AS PER PLAN 2.00 EA $ $
52 202 COLS VALVE AND VALVE BOX REMOVED 2.00 EA $ $
53 203 ODOT EXCAVATION, AS DIRECTED 10.00 CY $ $
54 613 COLS LOW STRENGTH MORTAR BACKFILL, TYPE 2, AS DIRECTED 5.00 CY $ $
55 12801 WEST 6" ZINC COATED DUCTILE IRON WATER PIPE AND FITTINGS w/ITEM 912 BACKFILL 18.00 FT $ $
56 12801 WEST 8" ZINC COATED DUCTILE IRON WATER PIPE AND FITTINGS w/ITEM 912 BACKFILL 525.00 FT $ $
57 12801 WEST CONCRETE BLOCKING CLASS C, INCREAE OR DECREASE, AS DIRECTED 2.00 CY $ $
58 12801 WEST ZINC COATED DUCTILE IRON FITTINGS, INCREASE OR DECREASE 500.00 LB $ $
59 12802 WEST 6" VALVE AND APPURTENANCES 2.00 EA $ $
60 12805 WEST 3/4" WATER SERVICE COMPLETE, SHORT 4.00 EA $ $
61 12805 WEST 3/4" WATER SERVICE COMPLETE, LONG 4.00 EA $ $
62 12807 WEST VALVE BOX ADJUSTED TO GRADE 1.00 EA $ $
63 12808 WEST CUT AND PLUG (CAP) 6" WATER MAIN 1.00 EA $ $
64 12809 WEST FIRE HYDRANT 2.00 EA $ $
65 912 COLS COMPACTED GRANULAR MATERIAL, AS DIRECTED 5.00 CY $ $
SANITARY SEWER
66 12604 WEST SANITARY MANHOLE ADJUSTED TO GRADE, AS PER PLAN 1.00 EA $ $
TRAFFIC CONTROL
Unit Item TOTAL
IN FIGURES (A x B)
2026 STREET REHABILITATION, CONTRACT B (Project No. 2026-002)
BID SCHEDULE
67 630 COLS GROUND MOUNTED SUPPORT, NO. 2 POST 12.00 FT $ $
68 630 COLS STREET NAME SIGN SUPPORT, NO. 2 POST 11.80 FT $ $
69 630 COLS SIGN POST REFLECTOR 1.00 EA $ $
70 630 COLS REMOVAL OF GROUND MOUNTED SIGN AND REERECTION 3.00 EA $ $
71 630 COLS REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSAL 2.00 EA $ $
72 644 COLS STOP LINE 10.00 FT $ $
73 644 COLS CROSSWALK LINE, 24", TYPE B90 53.00 FT $ $
MAINTENANCE OF TRAFFIC
74 410 COLS TRAFFIC COMPACTED SURFACE, TYPE A, AS DIRECTED 10.00 TON $ $
75 616 WATER 2.00 MGAL $ $
LANDSCAPE
76 661 COLS HEARTLAND NORTHERN CATALPA, CATALPA SPECIOSA 'HIAWATHA 2', 2" CAL, B&B 5.00 EA $ $
77 661 COLS SAWTOOTH OAK, QUERCUS ACUTISSIMA, 2" CAL, B&B 5.00 EA $ $
78 661 COLS TULIP POPLAR, LIRIODENDRON TULIPIFERA L., 2" CAL, B&B 5.00 EA $ $
COMMUNICATIONS
79 13120 WEST 24" X 36" COMMUNICATION BOX, PER WEST COMM-03 2.00 EA $ $
80 13200 WEST 2" SCH 40 PVC COMMUNICATION CONDUIT 50.00 FT $ $
INCIDENTALS
81 614 COLS MAINTAINING TRAFFIC 1.00 LS $ $
82 614 COLS STEEL PLATE, AS DIRECTED 2,500.00 LB $ $
83 623 COLS CONSTRUCTION LAYOUT STAKES 1.00 LS $ $
84 624 COLS MOBILIZATION 1.00 LS $ $
85 624 COLS MOBILIZATION - CHEMICALLY STABILIZED SUBGRADE, AS PER PLAN 1.00 EA $ $
Unit Item TOTAL
IN FIGURES (A x B)
2026 STREET REHABILITATION, CONTRACT B (Project No. 2026-002)
BID SCHEDULE
86 12832 WEST TEMPORARY SEDIMENT AND EROSION CONTROLS 1.00 LS $ $
87 SPC IRRIGATION OR INVISIBLE FENCE REPAIR, AS DIRECTED (ALLOWANCE) 1.00 LS 2,500.00$ 2,500.00$
ASH COURT WATERLINE IMP AND STREET RECONSTRUCTION
WATERLINE IMPROVEMENTS
88 202 COLS WALK REMOVED 250.00 SF $ $
89 203 ODOT EXCAVATION, AS DIRECTED 10.00 CY $ $
90 259 COLS PERMANENT PAVEMENT REPLACEMENT, TYPE I 50.00 CY $ $
91 410 COLS TRAFFIC COMPACTED SURFACE, TYPE A, AS DIRECTED 50.00 CY $ $
92 12608 WEST 4" CONCRETE WALK, Per WEST STD RD-05,CLASS COC 5 250.00 SF $ $
93 613 COLS LOW STRENGTH MORTAR BACKFILL, TYPE 2, AS DIRECTED 5.00 CY $ $
94 12801 WEST 6" ZINC COATED DUCTILE IRON WATER PIPE AND FITTINGS w/912 BACKFILL 287.00 FT $ $
95 12801 WEST CONCRETE BLOCKING CLASS C, INCREAE OR DECREASE, AS DIRECTED 2.00 CY $ $
96 12801 WEST ZINC COATED DUCTILE IRON FITTINGS, INCREASE OR DECREASE 500.00 LB $ $
97 12802 WEST 6" VALVE AND APPURTENANCES 2.00 EA $ $
98 12802 WEST 8" VALVE AND APPURTENANCES 2.00 EA $ $
99 12803 WEST 6" x 6" TAPPING SLEEVE & VALVE AND APPURTENANCES 1.00 EA $ $
100 12805 WEST 3/4" WATER SERVICE COMPLETE, SHORT 4.00 EA $ $
101 12805 WEST 3/4" WATER SERVICE COMPLETE, LONG 4.00 EA $ $
102 12808 WEST CUT AND PLUG (CAP) 4" WATER MAIN 1.00 EA $ $
103 12809 WEST FIRE HYDRANT 1.00 EA $ $
104 912 COLS COMPACTED GRANULAR MATERIAL, AS DIRECTED 5.00 CY $ $
STREET RECONSTRUCTION
105 202 COLS CATCH BASIN OR INLET REMOVED 2.00 EA $ $
106 202 COLS CURB AND GUTTER REMOVED 597.00 FT $ $
Unit Item TOTAL
IN FIGURES (A x B)
2026 STREET REHABILITATION, CONTRACT B (Project No. 2026-002)
BID SCHEDULE
107 202 COLS PAVEMENT REMOVED, AS DIRECTED (DRIVE APRONS) 30.00 SY $ $
108 202 COLS PAVEMENT REMOVED 976.00 SY $ $
109 202 COLS PIPE REMOVED 30.00 FT $ $
110 202 COLS WALK REMOVED 1,520.00 SF $ $
111 203 ODOT EXCAVATION 352.00 CY $ $
112 204 ODOT EXCAVATION OF SUBGRADE, AS DIRECTED 50.00 CY $ $
113 204 ODOT GRANULAR MATERIAL, TYPE E, NO. 2 STONE, 703.01, AS DIRECTED 25.00 CY $ $
114 204 COLS PROOFROLLING 1.00 HR $ $
115 204 COLS SUBGRADE COMPACTION 976.00 SY $ $
116 206 COLS CHEMICALLY STABILIZED SUBGRADE, 12" DEEP, AS DIRECTED 976.00 SY $ $
117 206 COLS CEMENT, AS DIRECTED 25.00 TON $ $
118 206 COLS CURING COAT, AS DIRECTED 976.00 SY $ $
119 259 COLS DRIVEWAY PAVEMENT REPLACEMENT, TYPE IIIA, AS PER PLAN 2.00 CY $ $
120 301 ODOT ASPHALT CONCRETE BASE, PG64-22 163.00 CY $ $
121 304 ODOT AGGREGATE BASE 190.00 CY $ $
122 304 ODOT AGGREGATE BASE, AS DIRECTED 25.00 CY $ $
123 12401 WEST J-BAND VOID REDUCING ASPHALT MEMBRANE, AS PER PLAN 260.00 FT $ $
124 407 ODOT NON-TRACKING TACK COAT 195.00 GAL $ $
125 410 COLS TRAFFIC COMPACTED SURFACE, TYPE A, AS DIRECTED 95.00 TON $ $
126 441 ODOT ASPHALT CONCRETE, INT. COURSE, TYPE 2 (448) 47.00 CY $ $
127 441 ODOT ASPHALT CONCRETE, SUR. COURSE, TYPE 1 (448) PG64-22 34.00 CY $ $
128 12452 WEST 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS MS 30.00 SY $ $
129 12608 WEST 4" CONCRETE WALK, Per WEST STD RD-05,CLASS COC 5 1,150.00 SF $ $
130 12608 WEST 6" CONCRETE WALK, Per WEST STD RD-05,CLASS COC 6 50.00 SF $ $
131 12608 WEST CURB RAMP, 6", PER WEST STD RD-05, CLASS COC 5 4.00 EA $ $
132 12608 WEST DETECTABLE WARNING, TUFTILE, CAST IRON, DARK GRAY 40.00 SF $ $
133 12609 WEST COMBINED CURB AND GUTTER, PER WEST STD RD-02, CLASS COC 5 597.00 FT $ $
Unit Item TOTAL
IN FIGURES (A x B)
2026 STREET REHABILITATION, CONTRACT B (Project No. 2026-002)
BID SCHEDULE
134 616 ODOT WATER 1.00 MGAL $ $
135 12653 WEST PROCESSED TOPSOIL FURNISHED AND PLACED 29.00 CY $ $
136 12659 WEST COMMERCIAL FERTILIZER 0.40 TON $ $
137 12659 WEST SEEDING AND MULCHING 265.00 SY $ $
138 12659 WEST WATER 1.00 MGAL $ $
139 SPC GEOGRID, TENSAR BX1300 OR APPROVED EQUAL, AS DIRECTED 10.00 SY $ $
140 SPC STORM MANHOLE TOP MODIFICATIONS, AS PER PLAN 1.00 LS $ $
DRAINAGE
141 603 COLS 3" CONDUIT, TYPE E, 720.08, PER WEST STD STM-01 192.00 FT $ $
142 604 WEST CATCH BASIN ADJUSTED TO GRADE 2.00 EA $ $
143 604 COLS CURB AND GUTTER INLET (AA-S125A), AS PER PLAN 2.00 EA $ $
144 605 COLS 6" PIPE UNDERDRAIN, 720.12, TYPE SP 597.00 FT $ $
145 12609 WEST 3.5" DIAMETER CORED CURB 16.00 EA $ $
146 611 ODOT 52" CONDUIT, TYPE B, 706.02 w/RESILIANT AND FLEXIBLE GASKET JOINTS, 706.11 34.00 FT $ $
147 901 COLS 12" PIPE, w/TYPE 1 BEDDIING, 706.02 CLASS IV, w/912 BACKFILL 31.00 FT $ $
LANDSCAPE
148 661 COLS CHINKAPIN OAK, QUERCUS MUEHLENBERGI, 2" CAL, B&B 4.00 EA $ $
COMMUNICATIONS
149 13120 WEST 24" X 36" COMMUNICATION BOX, PER WEST COMM-03 2.00 EA $ $
150 13200 WEST 2" SCH 40 PVC COMMUNICATION CONDUIT 50.00 FT $ $
INCIDENTALS
151 614 ODOT MAINTAINING TRAFFIC 1.00 LS $ $
152 614 COLS STEEL PLATE, AS DIRECTED 2,500.00 LB $ $
Unit Item TOTAL
IN FIGURES (A x B)
2026 STREET REHABILITATION, CONTRACT B (Project No. 2026-002)
BID SCHEDULE
153 623 ODOT CONSTRUCTION LAYOUT STAKES 1.00 LS $ $
154 624 ODOT MOBILIZATION 1.00 LS $ $
155 624 COLS MOBILIZATION - CHEMICALLY STABILIZED SUBGRADE, AS PER PLAN 1.00 EA $ $
156 12832 WEST TEMPORARY SEDIMENT AND EROSION CONTROLS 1.00 LS $ $
157 SPC IRRIGATION OR INVISIBLE FENCE REPAIR, AS DIRECTED (ALLOWANCE) 1.00 LS 2,500.00$ 2,500.00$ INFORMAL TOTAL, ITEMS 1 through 157 $
BIDDER acknowledges the receipt of the following ADDENDUM(s):
CONTRACTOR: DOING BUSINESS AS:
ADDRESS:
CITY/STATE: PHONE NUMBER:
DATE: FAX NUMBER:
TITLE: EMAIL ADDRESS:
SIGNATURE: WEBSITE :
**THE BID MUST BE SIGNED**
Insert "a corporation", "a partnership", or "an individual" as applicable
To the City of Westerville, Ohio, hereinafter called OWNER. In compliance with your Advertisement for BIDS, BIDDER hereby proposes to perform all WORK in strict accordance with the CONTRACT DOCUMENTS and to the complete satisfaction of the City, within the time and at the prices stated herein. By submission of this BID, each BIDDER certifies, and in case of a joint BID, each party thereto certifies as to their own organization, that this BID has been arrived at independently, without consultation, communication, or agreement as to any matter relating to this BID with any other BIDDER or with any competitor.
BIDDER hereby agrees to commence WORK under this CONTRACT on or after a date to be specified in the NOTICE TO PROCEED and to fully complete the PROJECT on or before August 7, 2026. BIDDER further agrees to pay liquidated damages as provided in Section 108.07 of the General Provisions and Section SP 8 of the Special Provisions.
Bidders are required to BID the Base BID and all ALTERNATES. Unit Prices set forth shall include all materials, equipment, labor, delivery, installation, overhead, profit, and any other cost or expense, in…