4-Pricing Section BT-27CS 1793024476.3383017.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Indian Springs Road and Clearwater Drive Pipe Replacement Project
Solicitation number
US.256751
Issued by
Delaware County, Pennsylvania

About this file

This file is a pricing section for the Indian Springs Road and Clearwater Drive Pipe Replacement Project administered by Upper Providence Township in Delaware County, Pennsylvania. The project involves replacing existing corrugated metal pipes (CMP) and other drainage infrastructure with high-density polyethylene (HDPE) pipes, including the replacement of 15-inch, 18-inch, 24-inch, and 36-inch pipes, as well as inlet structures and associated site restoration work. The scope encompasses removal and replacement of three Type 4 inlet boxes with Type-C tops, twenty Type-C inlets, one Type-C inlet replaced with a Type 4 box with Type-C inlet top, concrete sidewalk and driveway apron restoration totaling 105 square feet, full-depth roadway restoration of 300 square yards, curb restoration of 490 linear feet, and final site stabilization including grading and seeding. The project bid deadline was October 26, 2026, with a required completion timeframe of sixty days from notice to proceed. Sixteen contractors submitted bids for evaluation, with Delaware Environmental Construction Services providing the lowest total bid at $395,533.88.

The pricing spreadsheet presents individual line-item costs and total contract costs for each bidding contractor, with Delaware Environmental Construction Services identified as the lowest-priced bidder across the overall project scope. All contractors were required to submit bids accompanied by certified checks or bid bonds equal to ten percent of their total bid amounts, made payable to Upper Providence Township. The contract is subject to Pennsylvania Prevailing Wage Act requirements, mandating that the successful contractor pay no less than the determined wage rates for the project area. Performance and payment bonds equal to 100 percent of the contract price are required. The Township reserved the right to accept or reject any or all bids and to waive any bidding informalities as deemed in the Township's best interest, with no bidder permitted to withdraw their bid within ninety days of the opening date.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Legend

Pricing Section (BT-27CS)

Legend

The green cells with bolded numbers indicate that this bid was the lowest price.$ 123
The orange cells indicate that this item from that vendor was selected.
The green cells with orange outline indicate that this item from that vendor was selected, and has the lowest price.

Sheet 1

Barrasso Excavation, IncBuck Frank Excavation, IncDEPAUL AND COMPANY INC.Delaware Environmental Construction ServicesErnel Co., Inc.Foresite ConceptsG&B ConstructionJMCCONTRACTORS, Inc.Joseph J Danielle LLCKBC Construction, LLCMOR Construction Services, LLCMayfield SiteN. Abbonizio Contractors, Inc.Ply-Mar Construction Co., Inc.Premier Concrete, Inc.RIII Construction IncT. Schiefer Contractors, Inc.
Total Cost$ 477,968.0$ 488,561.0$ 677,022.0$ 395,533.88$ 639,065.0$ 693,400.0$ 487,319.0$ 465,441.0$ 745,588.6900000001$ 518,533.0$ 681,143.2$ 696,285.0$ 411,867.0$ 597,520.0$ 842,850.0$ 769,730.0$ 577,565.0
Selected #00000000000000000
Selected ($)$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0
#LockedItemsSelectedLowestUnit

of

MeasureQuantity
RequiredUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal

Cost

1Base Bid Pricing (16)
#1-1FALSEAll site preparations include project scope site removal, erosion controls, equipment and material staging area, and traffic controls.$ 0$ 3,500.88LS1$ 18,300.0$ 18,300.0$ 30,000.0$ 30,000.0$ 38,907.0$ 38,907.0$ 3,500.88$ 3,500.88$ 8,000.0$ 8,000.0$ 43,006.74$ 43,006.74$ 20,000.0$ 20,000.0$ 12,400.0$ 12,400.0$ 10,092.0$ 10,092.0$ 17,000.0$ 17,000.0$ 22,335.0$ 22,335.0$ 24,000.0$ 24,000.0$ 28,335.0$ 28,335.0$ 18,000.0$ 18,000.0$ 50,000.0$ 50,000.0$ 65,000.0$ 65,000.0$ 20,000.0$ 20,000.0
#1-2FALSERemove 15” CMP and replace with 18” HDPE pipe$ 0$ 1,520.0LF19$ 88$ 1,672.0$ 144$ 2,736.0$ 185$ 3,515.0$ 98$ 1,862.0$ 200$ 3,800.0$ 240$ 4,560.0$ 80$ 1,520.0$ 200$ 3,800.0$ 380.85$ 7,236.150000000001$ 129$ 2,451.0$ 133.9$ 2,544.1$ 225$ 4,275.0$ 102$ 1,938.0$ 220$ 4,180.0$ 250$ 4,750.0$ 200$ 3,800.0$ 175$ 3,325.0
#1-3FALSERemove 18” CMP and replace with 18” HDPE Pipe$ 0$ 104,160.0LF1488$ 97$ 144,336.0$ 140$ 208,320.0$ 165$ 245,520.0$ 89$ 132,432.0$ 205$ 305,040.0$ 134$ 199,392.0$ 138$ 205,344.0$ 102$ 151,776.0$ 190.28$ 283,136.64$ 129$ 191,952.0$ 154.9$ 230,491.2$ 110$ 163,680.0$ 70$ 104,160.0$ 220$ 327,360.0$ 225$ 334,800.0$ 200$ 297,600.0$ 175$ 260,400.0
#1-4FALSERemove 24” CMP and replace with 24” HDPE Pipe$ 0$ 8,774.0LF82$ 145$ 11,890.0$ 155$ 12,710.0$ 200$ 16,400.0$ 107$ 8,774.0$ 250$ 20,500.0$ 230$ 18,860.0$ 165$ 13,530.0$ 255$ 20,910.0$ 265.57$ 21,776.739999999998$ 140$ 11,480.0$ 187.2$ 15,350.4$ 150$ 12,300.0$ 122$ 10,004.0$ 240$ 19,680.0$ 300$ 24,600.0$ 300$ 24,600.0$ 195$ 15,990.0
#1-5FALSERemove 36” SLPP and replace with 36” HDPE Pipe$ 0$ 3,800.0LF25$ 380$ 9,500.0$ 225$ 5,625.0$ 280$ 7,000.0$ 152$ 3,800.0$ 400$ 10,000.0$ 338$ 8,450.0$ 325$ 8,125.0$ 370$ 9,250.0$ 588.44$ 14,711.000000000002$ 200$ 5,000.0$ 213.9$ 5,347.5$ 315$ 7,875.0$ 207$ 5,175.0$ 300$ 7,500.0$ 650$ 16,250.0$ 360$ 9,000.0$ 350$ 8,750.0
#1-6FALSERemove & Replace (3) Type 4 Inlet Boxes with Type-C Top$ 0$ 15,000.0EA3$ 12,800.0$ 38,400.0$ 8,000.0$ 24,000.0$ 7,500.0$ 22,500.0$ 6,200.0$ 18,600.0$ 8,000.0$ 24,000.0$ 8,202.0$ 24,606.0$ 5,000.0$ 15,000.0$ 9,875.0$ 29,625.0$ 6,500.0$ 19,500.0$ 7,500.0$ 22,500.0$ 7,905.0$ 23,715.0$ 5,500.0$ 16,500.0$ 7,265.0$ 21,795.0$ 5,500.0$ 16,500.0$ 9,500.0$ 28,500.0$ 7,400.0$ 22,200.0$ 8,400.0$ 25,200.0
#1-7FALSERemove and replace (20) Type C Inlets$ 0$ 75,200.0EA20$ 5,500.0$ 110,000.0$ 5,000.0$ 100,000.0$ 6,500.0$ 130,000.0$ 5,030.0$ 100,600.0$ 6,200.0$ 124,000.0$ 7,784.0$ 155,680.0$ 4,175.0$ 83,500.0$ 6,200.0$ 124,000.0$ 7,878.25$ 157,565.0$ 4,900.0$ 98,000.0$ 6,600.0$ 132,000.0$ 7,700.0$ 154,000.0$ 3,760.0$ 75,200.0$ 5,000.0$ 100,000.0$ 6,500.0$ 130,000.0$ 4,800.0$ 96,000.0$ 5,900.0$ 118,000.0
#1-8FALSERemove (1) Type C Inlet and replace with (1) Type 4 Box with Type-C Inlet Top$ 0$ 5,000.0EA1$ 12,800.0$ 12,800.0$ 6,250.0$ 6,250.0$ 10,456.0$ 10,456.0$ 6,200.0$ 6,200.0$ 8,500.0$ 8,500.0$ 10,073.35$ 10,073.35$ 5,000.0$ 5,000.0$ 10,000.0$ 10,000.0$ 6,500.0$ 6,500.0$ 7,500.0$ 7,500.0$ 7,700.0$ 7,700.0$ 9,700.0$ 9,700.0$ 6,410.0$ 6,410.0$ 5,500.0$ 5,500.0$ 9,500.0$ 9,500.0$ 8,800.0$ 8,800.0$ 8,200.0$ 8,200.0
#1-9FALSEUtility Trench Restoration: Backfill roadway trench with 2A modified stone and compact in 12" lifts$ 0$ 5,000.0LS1$ 43,000.0$ 43,000.0$ 5,000.0$ 5,000.0$ 45,905.0$ 45,905.0$ 28,000.0$ 28,000.0$ 30,000.0$ 30,000.0$ 101,226.3$ 101,226.3$ 37,000.0$ 37,000.0$ 33,400.0$ 33,400.0$ 75,284.0$ 75,284.0$ 54,000.0$ 54,000.0$ 57,895.0$ 57,895.0$ 115,000.0$ 115,000.0$ 65,649.0$ 65,649.0$ 34,000.0$ 34,000.0$ 80,000.0$ 80,000.0$ 5,600.0$ 5,600.0$ 15,000.0$ 15,000.0
#1-10FALSERemove and replace 4’ wide concrete sidewalk.$ 0$ 1,575.0SF105$ 24$ 2,520.0$ 50$ 5,250.0$ 29$ 3,045.0$ 35$ 3,675.0$ 15$ 1,575.0$ 59$ 6,195.0$ 19$ 1,995.0$ 32$ 3,360.0$ 24.25$ 2,546.25$ 40$ 4,200.0$ 52$ 5,460.0$ 85$ 8,925.0$ 38$ 3,990.0$ 30$ 3,150.0$ 50$ 5,250.0$ 122$ 12,810.0$ 30$ 3,150.0
#1-11FALSERemove and replace concrete driveway apron.$ 0$ 2,400.0EA1$ 2,400.0$ 2,400.0$ 5,000.0$ 5,000.0$ 3,500.0$ 3,500.0$ 7,100.0$ 7,100.0$ 6,000.0$ 6,000.0$ 6,463.0$ 6,463.0$ 4,320.0$ 4,320.0$ 3,550.0$ 3,550.0$ 10,138.0$ 10,138.0$ 7,500.0$ 7,500.0$ 9,500.0$ 9,500.0$ 15,500.0$ 15,500.0$ 4,380.0$ 4,380.0$ 4,500.0$ 4,500.0$ 7,500.0$ 7,500.0$ 15,000.0$ 15,000.0$ 3,500.0$ 3,500.0
#1-12FALSERoadway Restoration (Full Depth)$ 0$ 21,900.0SY300$ 90$ 27,000.0$ 126$ 37,800.0$ 165$ 49,500.0$ 95.3$ 28,590.0$ 100$ 30,000.0$ 203$ 60,900.0$ 127.75$ 38,325.0$ 73$ 21,900.0$ 201.28$ 60,384.0$ 100$ 30,000.0$ 165.55$ 49,665.0$ 200$ 60,000.0$ 113$ 33,900.0$ 80$ 24,000.0$ 150$ 45,000.0$ 235$ 70,500.0$ 85$ 25,500.0
#1-13FALSECurb Restoration (6”)$ 0$ 28,420.0LF490$ 85$ 41,650.0$ 63$ 30,870.0$ 68$ 33,320.0$ 80$ 39,200.0$ 85$ 41,650.0$ 64$ 31,360.0$ 65$ 31,850.0$ 60$ 29,400.0$ 110.23$ 54,012.700000000004$ 105$ 51,450.0$ 153$ 74,970.0$ 97$ 47,530.0$ 58$ 28,420.0$ 60$ 29,400.0$ 80$ 39,200.0$ 118$ 57,820.0$ 95$ 46,550.0
#1-14FALSEGrass Area Stabilization: Grading, seeding, erosion control matting$ 0$ 2,000.0LS1$ 3,000.0$ 3,000.0$ 5,000.0$ 5,000.0$ 14,987.0$ 14,987.0$ 3,500.0$ 3,500.0$ 8,000.0$ 8,000.0$ 9,036.0$ 9,036.0$ 7,500.0$ 7,500.0$ 3,145.0$ 3,145.0$ 8,825.2$ 8,825.2$ 2,000.0$ 2,000.0$ 10,450.0$ 10,450.0$ 12,000.0$ 12,000.0$ 11,469.0$ 11,469.0$ 2,000.0$ 2,000.0$ 20,000.0$ 20,000.0$ 15,000.0$ 15,000.0$ 6,500.0$ 6,500.0
#1-15FALSEMaintenance and Protection of Traffic$ 0$ 1,250.0LS1$ 8,500.0$ 8,500.0$ 5,000.0$ 5,000.0$ 45,678.0$ 45,678.0$ 6,200.0$ 6,200.0$ 8,000.0$ 8,000.0$ 10,248.61$ 10,248.61$ 5,760.0$ 5,760.0$ 5,500.0$ 5,500.0$ 5,895.31$ 5,895.31$ 5,000.0$ 5,000.0$ 18,360.0$ 18,360.0$ 31,000.0$ 31,000.0$ 10,500.0$ 10,500.0$ 1,250.0$ 1,250.0$ 22,500.0$ 22,500.0$ 48,000.0$ 48,000.0$ 10,000.0$ 10,000.0
#1-16FALSELandscaping Restoration (Restoring any disturbance on residential property from project) Grass Area Restoration: Excavate subsidence, backfill with suitable fill material, to match finished grade and compact in 8" lifts$ 0$ 500LS1$ 3,000.0$ 3,000.0$ 5,000.0$ 5,000.0$ 6,789.0$ 6,789.0$ 3,500.0$ 3,500.0$ 10,000.0$ 10,000.0$ 3,343.0$ 3,343.0$ 8,550.0$ 8,550.0$ 3,425.0$ 3,425.0$ 7,985.7$ 7,985.7$ 8,500.0$ 8,500.0$ 15,360.0$ 15,360.0$ 14,000.0$ 14,000.0$ 542$ 542$ 500$ 500$ 25,000.0$ 25,000.0$ 18,000.0$ 18,000.0$ 7,500.0$ 7,500.0

File details come from the government source that posted it. Updated .