4-Pricing Section BT-27CS 1793024476.3383017.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- US.256751
- Issued by
- Delaware County, Pennsylvania
About this file
This file is a pricing section for the Indian Springs Road and Clearwater Drive Pipe Replacement Project administered by Upper Providence Township in Delaware County, Pennsylvania. The project involves replacing existing corrugated metal pipes (CMP) and other drainage infrastructure with high-density polyethylene (HDPE) pipes, including the replacement of 15-inch, 18-inch, 24-inch, and 36-inch pipes, as well as inlet structures and associated site restoration work. The scope encompasses removal and replacement of three Type 4 inlet boxes with Type-C tops, twenty Type-C inlets, one Type-C inlet replaced with a Type 4 box with Type-C inlet top, concrete sidewalk and driveway apron restoration totaling 105 square feet, full-depth roadway restoration of 300 square yards, curb restoration of 490 linear feet, and final site stabilization including grading and seeding. The project bid deadline was October 26, 2026, with a required completion timeframe of sixty days from notice to proceed. Sixteen contractors submitted bids for evaluation, with Delaware Environmental Construction Services providing the lowest total bid at $395,533.88.
The pricing spreadsheet presents individual line-item costs and total contract costs for each bidding contractor, with Delaware Environmental Construction Services identified as the lowest-priced bidder across the overall project scope. All contractors were required to submit bids accompanied by certified checks or bid bonds equal to ten percent of their total bid amounts, made payable to Upper Providence Township. The contract is subject to Pennsylvania Prevailing Wage Act requirements, mandating that the successful contractor pay no less than the determined wage rates for the project area. Performance and payment bonds equal to 100 percent of the contract price are required. The Township reserved the right to accept or reject any or all bids and to waive any bidding informalities as deemed in the Township's best interest, with no bidder permitted to withdraw their bid within ninety days of the opening date.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Legend
Pricing Section (BT-27CS)
Legend
| The green cells with bolded numbers indicate that this bid was the lowest price. | $ 123 |
| The orange cells indicate that this item from that vendor was selected. | |
| The green cells with orange outline indicate that this item from that vendor was selected, and has the lowest price. |
Sheet 1
| Barrasso Excavation, Inc | Buck Frank Excavation, Inc | DEPAUL AND COMPANY INC. | Delaware Environmental Construction Services | Ernel Co., Inc. | Foresite Concepts | G&B Construction | JMCCONTRACTORS, Inc. | Joseph J Danielle LLC | KBC Construction, LLC | MOR Construction Services, LLC | Mayfield Site | N. Abbonizio Contractors, Inc. | Ply-Mar Construction Co., Inc. | Premier Concrete, Inc. | RIII Construction Inc | T. Schiefer Contractors, Inc. | |||||||
| Total Cost | $ 477,968.0 | $ 488,561.0 | $ 677,022.0 | $ 395,533.88 | $ 639,065.0 | $ 693,400.0 | $ 487,319.0 | $ 465,441.0 | $ 745,588.6900000001 | $ 518,533.0 | $ 681,143.2 | $ 696,285.0 | $ 411,867.0 | $ 597,520.0 | $ 842,850.0 | $ 769,730.0 | $ 577,565.0 | ||||||
| Selected # | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| Selected ($) | $ 0 | $ 0 | $ 0 | $ 0 | $ 0 | $ 0 | $ 0 | $ 0 | $ 0 | $ 0 | $ 0 | $ 0 | $ 0 | $ 0 | $ 0 | $ 0 | $ 0 | ||||||
| # | Locked | Items | Selected | Lowest | Unit |
of
| Measure | Quantity | |
| Required | Unit | |
| Price | Total | |
| Cost | Unit | |
| Price | Total | |
| Cost | Unit | |
| Price | Total | |
| Cost | Unit | |
| Price | Total | |
| Cost | Unit | |
| Price | Total | |
| Cost | Unit | |
| Price | Total | |
| Cost | Unit | |
| Price | Total | |
| Cost | Unit | |
| Price | Total | |
| Cost | Unit | |
| Price | Total | |
| Cost | Unit | |
| Price | Total | |
| Cost | Unit | |
| Price | Total | |
| Cost | Unit | |
| Price | Total | |
| Cost | Unit | |
| Price | Total | |
| Cost | Unit | |
| Price | Total | |
| Cost | Unit | |
| Price | Total | |
| Cost | Unit | |
| Price | Total | |
| Cost | Unit | |
| Price | Total |
Cost
| 1 | Base Bid Pricing (16) | |||||||||||||||||||||||||||||||||||||||
| #1-1 | FALSE | All site preparations include project scope site removal, erosion controls, equipment and material staging area, and traffic controls. | $ 0 | $ 3,500.88 | LS | 1 | $ 18,300.0 | $ 18,300.0 | $ 30,000.0 | $ 30,000.0 | $ 38,907.0 | $ 38,907.0 | $ 3,500.88 | $ 3,500.88 | $ 8,000.0 | $ 8,000.0 | $ 43,006.74 | $ 43,006.74 | $ 20,000.0 | $ 20,000.0 | $ 12,400.0 | $ 12,400.0 | $ 10,092.0 | $ 10,092.0 | $ 17,000.0 | $ 17,000.0 | $ 22,335.0 | $ 22,335.0 | $ 24,000.0 | $ 24,000.0 | $ 28,335.0 | $ 28,335.0 | $ 18,000.0 | $ 18,000.0 | $ 50,000.0 | $ 50,000.0 | $ 65,000.0 | $ 65,000.0 | $ 20,000.0 | $ 20,000.0 |
| #1-2 | FALSE | Remove 15” CMP and replace with 18” HDPE pipe | $ 0 | $ 1,520.0 | LF | 19 | $ 88 | $ 1,672.0 | $ 144 | $ 2,736.0 | $ 185 | $ 3,515.0 | $ 98 | $ 1,862.0 | $ 200 | $ 3,800.0 | $ 240 | $ 4,560.0 | $ 80 | $ 1,520.0 | $ 200 | $ 3,800.0 | $ 380.85 | $ 7,236.150000000001 | $ 129 | $ 2,451.0 | $ 133.9 | $ 2,544.1 | $ 225 | $ 4,275.0 | $ 102 | $ 1,938.0 | $ 220 | $ 4,180.0 | $ 250 | $ 4,750.0 | $ 200 | $ 3,800.0 | $ 175 | $ 3,325.0 |
| #1-3 | FALSE | Remove 18” CMP and replace with 18” HDPE Pipe | $ 0 | $ 104,160.0 | LF | 1488 | $ 97 | $ 144,336.0 | $ 140 | $ 208,320.0 | $ 165 | $ 245,520.0 | $ 89 | $ 132,432.0 | $ 205 | $ 305,040.0 | $ 134 | $ 199,392.0 | $ 138 | $ 205,344.0 | $ 102 | $ 151,776.0 | $ 190.28 | $ 283,136.64 | $ 129 | $ 191,952.0 | $ 154.9 | $ 230,491.2 | $ 110 | $ 163,680.0 | $ 70 | $ 104,160.0 | $ 220 | $ 327,360.0 | $ 225 | $ 334,800.0 | $ 200 | $ 297,600.0 | $ 175 | $ 260,400.0 |
| #1-4 | FALSE | Remove 24” CMP and replace with 24” HDPE Pipe | $ 0 | $ 8,774.0 | LF | 82 | $ 145 | $ 11,890.0 | $ 155 | $ 12,710.0 | $ 200 | $ 16,400.0 | $ 107 | $ 8,774.0 | $ 250 | $ 20,500.0 | $ 230 | $ 18,860.0 | $ 165 | $ 13,530.0 | $ 255 | $ 20,910.0 | $ 265.57 | $ 21,776.739999999998 | $ 140 | $ 11,480.0 | $ 187.2 | $ 15,350.4 | $ 150 | $ 12,300.0 | $ 122 | $ 10,004.0 | $ 240 | $ 19,680.0 | $ 300 | $ 24,600.0 | $ 300 | $ 24,600.0 | $ 195 | $ 15,990.0 |
| #1-5 | FALSE | Remove 36” SLPP and replace with 36” HDPE Pipe | $ 0 | $ 3,800.0 | LF | 25 | $ 380 | $ 9,500.0 | $ 225 | $ 5,625.0 | $ 280 | $ 7,000.0 | $ 152 | $ 3,800.0 | $ 400 | $ 10,000.0 | $ 338 | $ 8,450.0 | $ 325 | $ 8,125.0 | $ 370 | $ 9,250.0 | $ 588.44 | $ 14,711.000000000002 | $ 200 | $ 5,000.0 | $ 213.9 | $ 5,347.5 | $ 315 | $ 7,875.0 | $ 207 | $ 5,175.0 | $ 300 | $ 7,500.0 | $ 650 | $ 16,250.0 | $ 360 | $ 9,000.0 | $ 350 | $ 8,750.0 |
| #1-6 | FALSE | Remove & Replace (3) Type 4 Inlet Boxes with Type-C Top | $ 0 | $ 15,000.0 | EA | 3 | $ 12,800.0 | $ 38,400.0 | $ 8,000.0 | $ 24,000.0 | $ 7,500.0 | $ 22,500.0 | $ 6,200.0 | $ 18,600.0 | $ 8,000.0 | $ 24,000.0 | $ 8,202.0 | $ 24,606.0 | $ 5,000.0 | $ 15,000.0 | $ 9,875.0 | $ 29,625.0 | $ 6,500.0 | $ 19,500.0 | $ 7,500.0 | $ 22,500.0 | $ 7,905.0 | $ 23,715.0 | $ 5,500.0 | $ 16,500.0 | $ 7,265.0 | $ 21,795.0 | $ 5,500.0 | $ 16,500.0 | $ 9,500.0 | $ 28,500.0 | $ 7,400.0 | $ 22,200.0 | $ 8,400.0 | $ 25,200.0 |
| #1-7 | FALSE | Remove and replace (20) Type C Inlets | $ 0 | $ 75,200.0 | EA | 20 | $ 5,500.0 | $ 110,000.0 | $ 5,000.0 | $ 100,000.0 | $ 6,500.0 | $ 130,000.0 | $ 5,030.0 | $ 100,600.0 | $ 6,200.0 | $ 124,000.0 | $ 7,784.0 | $ 155,680.0 | $ 4,175.0 | $ 83,500.0 | $ 6,200.0 | $ 124,000.0 | $ 7,878.25 | $ 157,565.0 | $ 4,900.0 | $ 98,000.0 | $ 6,600.0 | $ 132,000.0 | $ 7,700.0 | $ 154,000.0 | $ 3,760.0 | $ 75,200.0 | $ 5,000.0 | $ 100,000.0 | $ 6,500.0 | $ 130,000.0 | $ 4,800.0 | $ 96,000.0 | $ 5,900.0 | $ 118,000.0 |
| #1-8 | FALSE | Remove (1) Type C Inlet and replace with (1) Type 4 Box with Type-C Inlet Top | $ 0 | $ 5,000.0 | EA | 1 | $ 12,800.0 | $ 12,800.0 | $ 6,250.0 | $ 6,250.0 | $ 10,456.0 | $ 10,456.0 | $ 6,200.0 | $ 6,200.0 | $ 8,500.0 | $ 8,500.0 | $ 10,073.35 | $ 10,073.35 | $ 5,000.0 | $ 5,000.0 | $ 10,000.0 | $ 10,000.0 | $ 6,500.0 | $ 6,500.0 | $ 7,500.0 | $ 7,500.0 | $ 7,700.0 | $ 7,700.0 | $ 9,700.0 | $ 9,700.0 | $ 6,410.0 | $ 6,410.0 | $ 5,500.0 | $ 5,500.0 | $ 9,500.0 | $ 9,500.0 | $ 8,800.0 | $ 8,800.0 | $ 8,200.0 | $ 8,200.0 |
| #1-9 | FALSE | Utility Trench Restoration: Backfill roadway trench with 2A modified stone and compact in 12" lifts | $ 0 | $ 5,000.0 | LS | 1 | $ 43,000.0 | $ 43,000.0 | $ 5,000.0 | $ 5,000.0 | $ 45,905.0 | $ 45,905.0 | $ 28,000.0 | $ 28,000.0 | $ 30,000.0 | $ 30,000.0 | $ 101,226.3 | $ 101,226.3 | $ 37,000.0 | $ 37,000.0 | $ 33,400.0 | $ 33,400.0 | $ 75,284.0 | $ 75,284.0 | $ 54,000.0 | $ 54,000.0 | $ 57,895.0 | $ 57,895.0 | $ 115,000.0 | $ 115,000.0 | $ 65,649.0 | $ 65,649.0 | $ 34,000.0 | $ 34,000.0 | $ 80,000.0 | $ 80,000.0 | $ 5,600.0 | $ 5,600.0 | $ 15,000.0 | $ 15,000.0 |
| #1-10 | FALSE | Remove and replace 4’ wide concrete sidewalk. | $ 0 | $ 1,575.0 | SF | 105 | $ 24 | $ 2,520.0 | $ 50 | $ 5,250.0 | $ 29 | $ 3,045.0 | $ 35 | $ 3,675.0 | $ 15 | $ 1,575.0 | $ 59 | $ 6,195.0 | $ 19 | $ 1,995.0 | $ 32 | $ 3,360.0 | $ 24.25 | $ 2,546.25 | $ 40 | $ 4,200.0 | $ 52 | $ 5,460.0 | $ 85 | $ 8,925.0 | $ 38 | $ 3,990.0 | $ 30 | $ 3,150.0 | $ 50 | $ 5,250.0 | $ 122 | $ 12,810.0 | $ 30 | $ 3,150.0 |
| #1-11 | FALSE | Remove and replace concrete driveway apron. | $ 0 | $ 2,400.0 | EA | 1 | $ 2,400.0 | $ 2,400.0 | $ 5,000.0 | $ 5,000.0 | $ 3,500.0 | $ 3,500.0 | $ 7,100.0 | $ 7,100.0 | $ 6,000.0 | $ 6,000.0 | $ 6,463.0 | $ 6,463.0 | $ 4,320.0 | $ 4,320.0 | $ 3,550.0 | $ 3,550.0 | $ 10,138.0 | $ 10,138.0 | $ 7,500.0 | $ 7,500.0 | $ 9,500.0 | $ 9,500.0 | $ 15,500.0 | $ 15,500.0 | $ 4,380.0 | $ 4,380.0 | $ 4,500.0 | $ 4,500.0 | $ 7,500.0 | $ 7,500.0 | $ 15,000.0 | $ 15,000.0 | $ 3,500.0 | $ 3,500.0 |
| #1-12 | FALSE | Roadway Restoration (Full Depth) | $ 0 | $ 21,900.0 | SY | 300 | $ 90 | $ 27,000.0 | $ 126 | $ 37,800.0 | $ 165 | $ 49,500.0 | $ 95.3 | $ 28,590.0 | $ 100 | $ 30,000.0 | $ 203 | $ 60,900.0 | $ 127.75 | $ 38,325.0 | $ 73 | $ 21,900.0 | $ 201.28 | $ 60,384.0 | $ 100 | $ 30,000.0 | $ 165.55 | $ 49,665.0 | $ 200 | $ 60,000.0 | $ 113 | $ 33,900.0 | $ 80 | $ 24,000.0 | $ 150 | $ 45,000.0 | $ 235 | $ 70,500.0 | $ 85 | $ 25,500.0 |
| #1-13 | FALSE | Curb Restoration (6”) | $ 0 | $ 28,420.0 | LF | 490 | $ 85 | $ 41,650.0 | $ 63 | $ 30,870.0 | $ 68 | $ 33,320.0 | $ 80 | $ 39,200.0 | $ 85 | $ 41,650.0 | $ 64 | $ 31,360.0 | $ 65 | $ 31,850.0 | $ 60 | $ 29,400.0 | $ 110.23 | $ 54,012.700000000004 | $ 105 | $ 51,450.0 | $ 153 | $ 74,970.0 | $ 97 | $ 47,530.0 | $ 58 | $ 28,420.0 | $ 60 | $ 29,400.0 | $ 80 | $ 39,200.0 | $ 118 | $ 57,820.0 | $ 95 | $ 46,550.0 |
| #1-14 | FALSE | Grass Area Stabilization: Grading, seeding, erosion control matting | $ 0 | $ 2,000.0 | LS | 1 | $ 3,000.0 | $ 3,000.0 | $ 5,000.0 | $ 5,000.0 | $ 14,987.0 | $ 14,987.0 | $ 3,500.0 | $ 3,500.0 | $ 8,000.0 | $ 8,000.0 | $ 9,036.0 | $ 9,036.0 | $ 7,500.0 | $ 7,500.0 | $ 3,145.0 | $ 3,145.0 | $ 8,825.2 | $ 8,825.2 | $ 2,000.0 | $ 2,000.0 | $ 10,450.0 | $ 10,450.0 | $ 12,000.0 | $ 12,000.0 | $ 11,469.0 | $ 11,469.0 | $ 2,000.0 | $ 2,000.0 | $ 20,000.0 | $ 20,000.0 | $ 15,000.0 | $ 15,000.0 | $ 6,500.0 | $ 6,500.0 |
| #1-15 | FALSE | Maintenance and Protection of Traffic | $ 0 | $ 1,250.0 | LS | 1 | $ 8,500.0 | $ 8,500.0 | $ 5,000.0 | $ 5,000.0 | $ 45,678.0 | $ 45,678.0 | $ 6,200.0 | $ 6,200.0 | $ 8,000.0 | $ 8,000.0 | $ 10,248.61 | $ 10,248.61 | $ 5,760.0 | $ 5,760.0 | $ 5,500.0 | $ 5,500.0 | $ 5,895.31 | $ 5,895.31 | $ 5,000.0 | $ 5,000.0 | $ 18,360.0 | $ 18,360.0 | $ 31,000.0 | $ 31,000.0 | $ 10,500.0 | $ 10,500.0 | $ 1,250.0 | $ 1,250.0 | $ 22,500.0 | $ 22,500.0 | $ 48,000.0 | $ 48,000.0 | $ 10,000.0 | $ 10,000.0 |
| #1-16 | FALSE | Landscaping Restoration (Restoring any disturbance on residential property from project) Grass Area Restoration: Excavate subsidence, backfill with suitable fill material, to match finished grade and compact in 8" lifts | $ 0 | $ 500 | LS | 1 | $ 3,000.0 | $ 3,000.0 | $ 5,000.0 | $ 5,000.0 | $ 6,789.0 | $ 6,789.0 | $ 3,500.0 | $ 3,500.0 | $ 10,000.0 | $ 10,000.0 | $ 3,343.0 | $ 3,343.0 | $ 8,550.0 | $ 8,550.0 | $ 3,425.0 | $ 3,425.0 | $ 7,985.7 | $ 7,985.7 | $ 8,500.0 | $ 8,500.0 | $ 15,360.0 | $ 15,360.0 | $ 14,000.0 | $ 14,000.0 | $ 542 | $ 542 | $ 500 | $ 500 | $ 25,000.0 | $ 25,000.0 | $ 18,000.0 | $ 18,000.0 | $ 7,500.0 | $ 7,500.0 |
File details come from the government source that posted it. Updated .