This is a Prevailing Wage Rates document issued by the Commonwealth of Pennsylvania Department of Labor & Industry for Project 26-04131, a stormwater infrastructure project managed by the Bath Borough Stormwater Authority in Northampton County. The project involves retrofitting two existing detention basins in the Holiday Hills Subdivision along Spyglass Hill Road and constructing a rain garden within a stormwater easement on the Northampton Area School District property at the south end of Broad Street. The project is classified as a Highway project, with a contract award date of June 1, 2026, and a determination date of April 27, 2026. A mandatory pre-bid meeting is scheduled for 10:00 AM on Tuesday, May 12, 2026, at the Bath Borough Municipal Building, with sealed bids due by 12:00 Noon on Friday, May 22, 2026. Bid security of at least ten percent of the bidder's maximum bid price is required in the form of a certified check.

The prevailing wage rates document, effective April 28, 2026, establishes hourly wages and fringe benefits for all labor classifications applicable to this project under Pennsylvania's prevailing wage requirements. The rates are divided into Building and Heavy/Highway categories and include multiple labor classifications such as carpenters, laborers, operators, electricians, plumbers, and various specialized trades. Wage rates vary by classification and effective date, with multiple escalation schedules extending through 2028 for certain trades. The Scranton Field Office of the Pennsylvania Department of Labor & Industry, contact (570)963-4577 or toll-free (877)214-3962, administers compliance with these prevailing wage requirements. All contractors and subcontractors must compensate workers in accordance with these established rates for the duration of the project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Name: SPYGLASS HILL ROAD STORMWATER BASINS

RETROFIT & BROAD STREET RAIN GARDEN

General Description: This project will include the conversion of two existing basins in the Holiday Hill Subdivision and the construction of a rain garden within a stormwater easement on the Northampton Area School District property located at the south end of Broad Street.

Project Locality Borough of Bath, Northampton C

Awarding Agency: Bath Borough Stormwater Authority

Contract Award Date: 6/1/2026

Serial Number: 26-04131

Project Classification: Highway

Determination Date: 4/27/2026

Assigned Field Office: Scranton

Field Office Phone Number: (570)963-4577

Toll Free Phone Number: (877)214-3962

Project County: Northampton County

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Commonwealth of Pennsylvania Department of Labor & Industry Report Date: 4/28/2026 Page 1 of 6

Project: 26-04131 - Building Effective Date

Expiration Date

Hourly Rate Fringe Benefits

Total

Asbestos & Insulation Workers 6/30/2025 $41.50 $29.86 $71.36

Boilermaker (Commercial, Institutional, and Minor Repair Work)

3/1/2024 $36.71 $19.13 $55.84

Boilermaker (Commercial, Institutional, and Minor Repair Work)

3/1/2026 $41.34 $19.23 $60.57

Boilermakers 1/1/2024 $52.10 $35.72 $87.82

Boilermakers 1/1/2026 $58.00 $36.57 $94.57

Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners

5/4/2025 $40.14 $22.07 $62.21

Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners

5/3/2026 $41.99 $22.07 $64.06

Carpenter - Chief of Party (Surveying & Layout) 5/1/2025 $43.71 $28.09 $71.80

Carpenter - Chief of Party (Surveying & Layout) 5/1/2026 $45.01 $28.44 $73.45

Carpenter - Chief of Party (Surveying & Layout) 5/1/2027 $46.51 $28.79 $75.30

Carpenter - Chief of Party (Surveying & Layout) 5/1/2028 $48.16 $29.14 $77.30

Carpenter - Instrument Person (Surveying & Layout) 5/1/2025 $39.74 $28.09 $67.83

Carpenter - Instrument Person (Surveying & Layout) 5/1/2026 $41.04 $28.44 $69.48

Carpenter - Instrument Person (Surveying & Layout) 5/1/2027 $42.54 $28.79 $71.33

Carpenter - Instrument Person (Surveying & Layout) 5/1/2028 $44.19 $29.14 $73.33

Carpenter - Rodman (Surveying & Layout) 5/1/2025 $23.84 $22.20 $46.04

Carpenter - Rodman (Surveying & Layout) 5/1/2026 $24.62 $22.55 $47.17

Carpenter - Rodman (Surveying & Layout) 5/1/2027 $25.52 $22.90 $48.42

Carpenter - Rodman (Surveying & Layout) 5/1/2028 $26.51 $23.25 $49.76

Carpenters 5/1/2025 $39.74 $28.09 $67.83

Carpenters 5/1/2026 $41.04 $28.44 $69.48

Carpenters 5/1/2027 $42.54 $28.79 $71.33

Carpenters 5/1/2028 $44.19 $29.14 $73.33

Cement Finishers & Plasterers 5/4/2025 $33.66 $22.42 $56.08

Cement Finishers & Plasterers 5/3/2026 $35.66 $22.42 $58.08

Cement Finishers & Plasterers 5/3/2027 $34.92 $25.16 $60.08

Cement Masons 5/1/2024 $36.18 $25.20 $61.38

Cement Masons 5/1/2025 $37.78 $25.40 $63.18

Dockbuilder, Pile Drivers 5/1/2025 $55.23 $37.99 $93.22

Dockbuilder, Pile Drivers 5/1/2026 $56.98 $37.99 $94.97

Dockbuilder/Pile Driver Diver 5/1/2025 $64.35 $41.74 $106.09

Dockbuilder/Pile Driver Diver 5/1/2026 $66.54 $41.74 $108.28

Dockbuilder/pile driver tender 5/1/2025 $55.23 $37.99 $93.22

Dockbuilder/pile driver tender 5/1/2026 $56.98 $37.99 $94.97

Drywall Finisher 5/1/2025 $31.83 $23.26 $55.09

Electricians 6/2/2025 $65.43 $42.20 $107.63

Electricians 6/1/2026 $67.92 $43.81 $111.73

Electricians 5/31/2027 $70.29 $45.34 $115.63

Elevator Constructor 1/1/2025 $61.41 $44.95 $106.36

Elevator Constructor 1/1/2026 $64.06 $46.01 $110.07

Floor Coverer 5/1/2025 $41.23 $29.79 $71.02

Floor Coverer 5/1/2026 $42.23 $30.79 $73.02

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 4/28/2026 Page 2 of 6

Expiration Date

Hourly Rate Fringe Benefits

Total

Floor Layer 5/1/2018 $33.32 $26.49 $59.81

Glazier 5/1/2024 $39.48 $23.81 $63.29

Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)

7/1/2025 $38.76 $33.38 $72.14

Laborers (Class 01 - See notes) 5/1/2025 $32.09 $20.14 $52.23

Laborers (Class 01 - See notes) 5/1/2026 $33.09 $20.79 $53.88

Laborers (Class 02 - See notes) 5/1/2025 $33.12 $20.14 $53.26

Laborers (Class 02 - See notes) 5/1/2026 $34.12 $20.79 $54.91

Laborers (Class 03 - See notes) 4/27/2025 $32.74 $20.14 $52.88

Laborers (Class 03 - See notes) 5/1/2026 $33.74 $20.79 $54.53

Laborers (Class 04 - See notes) 4/27/2025 $34.24 $20.14 $54.38

Laborers (Class 04 - See notes) 5/1/2026 $35.24 $20.79 $56.03

Laborers (Class 05 - See notes) 5/1/2025 $34.09 $20.14 $54.23

Laborers (Class 05 - See notes) 5/1/2026 $35.09 $20.79 $55.88

Laborers (Class 06 - See notes) 5/1/2025 $33.44 $20.14 $53.58

Laborers (Class 06 - See notes) 5/1/2026 $34.44 $20.79 $55.23

Marble Mason 5/1/2025 $36.57 $21.69 $58.26

Marble Mason 5/1/2026 $38.52 $21.69 $60.21

Millwright 5/1/2025 $53.87 $33.95 $87.82

Millwright 5/1/2026 $56.51 $33.95 $90.46

Operators (Building, Class 01 - See Notes) 5/1/2025 $44.89 $30.92 $75.81

Operators (Building, Class 01 - See Notes) 5/1/2026 $46.05 $31.76 $77.81

Operators (Building, Class 01A - See Notes) 5/1/2025 $47.14 $31.58 $78.72

Operators (Building, Class 01A - See Notes) 5/1/2026 $48.30 $32.42 $80.72

Operators (Building, Class 02 - See Notes) 5/1/2025 $44.61 $30.83 $75.44

Operators (Building, Class 02 - See Notes) 5/1/2026 $45.77 $31.67 $77.44

Operators (Building, Class 02A - See Notes) 5/1/2025 $46.86 $31.50 $78.36

Operators (Building, Class 02A - See Notes) 5/1/2026 $48.02 $32.34 $80.36

Operators (Building, Class 03 - See Notes) 5/1/2025 $41.88 $30.03 $71.91

Operators (Building, Class 03 - See Notes) 5/1/2026 $43.04 $30.87 $73.91

Operators (Building, Class 04 - See Notes) 5/1/2025 $40.74 $29.70 $70.44

Operators (Building, Class 04 - See Notes) 5/1/2026 $41.90 $30.54 $72.44

Operators (Building, Class 05 - See Notes) 5/1/2025 $40.30 $29.56 $69.86

Operators (Building, Class 05 - See Notes) 5/1/2026 $41.45 $30.41 $71.86

Operators (Building, Class 06 - See Notes) 5/1/2025 $39.42 $29.30 $68.72

Operators (Building, Class 06 - See Notes) 5/1/2026 $40.58 $30.14 $70.72

Operators (Building, Class 07A- See Notes) 5/1/2025 $54.56 $35.21 $89.77

Operators (Building, Class 07A- See Notes) 5/1/2026 $56.03 $36.14 $92.17

Operators (Building, Class 07B- See Notes) 5/1/2025 $54.22 $35.10 $89.32

Operators (Building, Class 07B- See Notes) 5/1/2026 $55.69 $36.03 $91.72

Painters Class 1 (see notes) 5/1/2025 $32.71 $24.17 $56.88

Painters - Line Stripping 12/1/2024 $44.12 $27.91 $72.03

Painters - Line Stripping 12/1/2025 $45.12 $29.41 $74.53

Painters Class 2 (see notes) 5/1/2025 $35.61 $24.18 $59.79

Painters Class 3 (see notes) 5/1/2025 $41.71 $24.18 $65.89

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 4/28/2026 Page 3 of 6

Expiration Date

Hourly Rate Fringe Benefits

Total

Piledrivers 1/1/2022 $37.60 $20.50 $58.10

Plasterers 5/1/2024 $37.13 $24.51 $61.64

Plasterers 5/1/2025 $38.43 $24.71 $63.14 plumber 5/1/2024 $54.28 $35.26 $89.54 plumber 5/1/2025 $56.28 $36.01 $92.29 plumber 5/1/2026 $58.43 $36.61 $95.04

Roofers (Composition) 5/1/2024 $44.13 $34.77 $78.90

Roofers (Composition) 5/1/2025 $46.03 $34.77 $80.80

Roofers (Shingle) 5/1/2024 $34.35 $22.20 $56.55

Roofers (Slate & Tile) 5/1/2024 $37.35 $22.20 $59.55

Sheet Metal Workers 6/1/2024 $43.09 $43.14 $86.23

Sheet Metal Workers 6/1/2025 $45.02 $44.71 $89.73

Sign Makers and Hangars 7/15/2024 $32.32 $25.82 $58.14

Sign Makers and Hangars 7/15/2025 $33.48 $26.41 $59.89

Sprinklerfitters 4/1/2024 $46.45 $28.62 $75.07

Sprinklerfitters 4/1/2025 $49.75 $29.21 $78.96

Sprinklerfitters 4/1/2026 $52.82 $30.56 $83.38

Steamfitters 5/1/2024 $59.65 $43.09 $102.74

Steamfitters 5/1/2025 $61.47 $44.89 $106.36

Terrazzo Finisher 5/1/2024 $35.66 $20.76 $56.42

Terrazzo Finisher 5/1/2025 $36.32 $21.68 $58.00

Terrazzo Finisher 5/1/2026 $37.12 $22.76 $59.88

Terrazzo Grinder 5/1/2024 $36.42 $20.76 $57.18

Terrazzo Grinder 5/1/2025 $37.10 $21.68 $58.78

Terrazzo Grinder 5/1/2026 $37.93 $22.76 $60.69

Terrazzo Mechanics 5/1/2024 $36.44 $22.51 $58.95

Terrazzo Mechanics 5/1/2025 $37.17 $23.43 $60.60

Terrazzo Mechanics 5/1/2026 $38.06 $24.51 $62.57

Tile & Marble Finisher 5/1/2025 $34.55 $18.09 $52.64

Tile & Marble Finisher 5/1/2026 $36.50 $18.09 $54.59

Tile Setter 5/1/2025 $36.57 $21.69 $58.26

Tile Setter 5/1/2026 $38.52 $21.69 $60.21

Truckdriver class 1(see notes) 5/1/2025 $41.87 $0.00 $41.87

Truckdriver class 2 (see notes) 5/1/2025 $41.94 $0.00 $41.94

Truckdriver class 3 (see notes) 5/1/2025 $42.43 $0.00 $42.43

Window Film / Tint Installer 6/1/2024 $26.37 $14.83 $41.20

Window Film / Tint Installer 6/1/2025 $27.42 $15.13 $42.55

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 4/28/2026 Page 4 of 6

Project: 26-04131 - Heavy/Highway Effective

Expiration Date

Hourly Rate Fringe Benefits

Total

Carpenter - Chief of Party (Surveying & Layout) 5/1/2025 $46.05 $28.09 $74.14

Carpenter - Chief of Party (Surveying & Layout) 5/1/2026 $47.31 $28.44 $75.75

Carpenter - Instrument Person (Surveying & Layout) 5/1/2025 $40.04 $28.09 $68.13

Carpenter - Instrument Person (Surveying & Layout) 5/1/2026 $41.14 $28.44 $69.58

Carpenter - Rodman (Surveying & Layout) 5/1/2025 $32.03 $22.20 $54.23

Carpenter - Rodman (Surveying & Layout) 5/1/2026 $32.91 $22.55 $55.46

Carpenters 5/1/2025 $40.04 $28.09 $68.13

Carpenters 5/1/2026 $41.14 $28.44 $69.58

Dockbuilder, Pile Drivers 5/1/2025 $55.23 $37.99 $93.22

Dockbuilder, Pile Drivers 5/1/2026 $56.98 $37.99 $94.97

Dockbuilder/Pile Driver Diver 5/1/2025 $60.31 $44.97 $105.28

Dockbuilder/Pile Driver Diver 5/1/2026 $61.88 $45.47 $107.35

Dockbuilder/pile driver tender 5/1/2025 $55.23 $37.99 $93.22

Dockbuilder/pile driver tender 5/1/2026 $56.98 $37.99 $94.97

Electric Lineman 6/3/2024 $52.80 $30.61 $83.41

Electric Lineman 6/2/2025 $55.42 $31.04 $86.46

Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)

7/1/2024 $37.26 $32.63 $69.89

Laborers (Class 01 - See notes) 5/1/2025 $26.61 $19.99 $46.60

Laborers (Class 01 - See notes) 5/1/2026 $27.61 $20.44 $48.05

Laborers (Class 02 - See notes) 5/1/2025 $33.23 $19.99 $53.22

Laborers (Class 02 - See notes) 5/1/2026 $34.23 $20.44 $54.67

Laborers (Class 03 - See notes) 5/1/2025 $30.22 $19.99 $50.21

Laborers (Class 03 - See notes) 5/1/2026 $31.22 $20.44 $51.66

Laborers (Class 04 - See notes) 5/1/2025 $30.57 $19.99 $50.56

Laborers (Class 04 - See notes) 5/1/2026 $31.57 $20.44 $52.01

Laborers (Class 05 - See notes) 5/1/2025 $31.24 $19.99 $51.23

Laborers (Class 05 - See notes) 5/1/2026 $32.24 $20.44 $52.68

Laborers (Class 06 - See notes) 5/1/2025 $30.66 $19.99 $50.65

Laborers (Class 06 - See notes) 5/1/2026 $31.66 $20.44 $52.10

Laborers (Class 07 - See notes) 5/1/2025 $30.95 $19.99 $50.94

Laborers (Class 07 - See notes) 5/1/2026 $31.95 $20.44 $52.39

Laborers (Class 08 - See notes) 5/1/2025 $31.43 $19.99 $51.42

Laborers (Class 08 - See notes) 5/1/2026 $32.43 $20.44 $52.87

Operators (Heavy, Class 01 - See Notes) 5/1/2025 $43.46 $30.50 $73.96

Operators (Heavy, Class 01 - See Notes) 5/1/2026 $44.61 $31.35 $75.96

Operators (Heavy, Class 01A - See Notes) 5/1/2025 $45.71 $31.16 $76.87

Operators (Heavy, Class 01A - See Notes) 5/1/2026 $46.86 $32.01 $78.87

Operators (Heavy, Class 02 - See Notes) 5/1/2025 $43.18 $30.41 $73.59

Operators (Heavy, Class 02 - See Notes) 5/1/2026 $44.34 $31.25 $75.59

Operators (Heavy, Class 02A - See Notes) 5/1/2025 $45.43 $31.08 $76.51

Operators (Heavy, Class 02A - See Notes) 5/1/2026 $46.59 $31.92 $78.51

Operators (Heavy, Class 03 - See Notes) 5/1/2025 $40.26 $29.55 $69.81

Operators (Heavy, Class 03 - See Notes) 5/1/2026 $41.43 $30.38 $71.81

Operators (Heavy, Class 04 - See Notes) 5/1/2025 $39.12 $29.22 $68.34

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 4/28/2026 Page 5 of 6

Project: 26-04131 - Heavy/Highway Effective

Expiration Date

Hourly Rate Fringe Benefits

Total

Operators (Heavy, Class 04 - See Notes) 5/1/2026 $40.28 $30.06 $70.34

Operators (Heavy, Class 05 - See Notes) 5/1/2025 $38.67 $29.09 $67.76

Operators (Heavy, Class 05 - See Notes) 5/1/2026 $39.83 $29.93 $69.76

Operators (Heavy, Class 06 - See Notes) 5/1/2025 $37.80 $28.82 $66.62

Operators (Heavy, Class 06 - See Notes) 5/1/2026 $38.96 $29.66 $68.62

Operators (Heavy, Class 07A - See Notes) 5/1/2025 $52.85 $34.71 $87.56

Operators (Heavy, Class 07A - See Notes) 5/1/2026 $54.32 $35.64 $89.96

Operators (Heavy, Class 07B - See Notes) 5/1/2025 $52.51 $34.60 $87.11

Operators (Heavy, Class 07B - See Notes) 5/1/2026 $53.97 $35.54 $89.51

Operators (Highway, Class 01 - See Notes) 5/1/2025 $42.56 $30.24 $72.80

Operators (Highway, Class 01 - See Notes) 5/1/2026 $43.72 $31.08 $74.80

Operators (Highway, Class 01a - See Notes) 5/1/2025 $44.81 $30.92 $75.73

Operators (Highway, Class 01a - See Notes) 5/1/2026 $45.97 $31.76 $77.73

Operators (Highway, Class 02 - See Notes) 5/1/2025 $41.39 $29.89 $71.28

Operators (Highway, Class 02 - See Notes) 5/1/2026 $42.55 $30.73 $73.28

Operators (Highway, Class 03 - See Notes) 5/1/2025 $40.70 $29.68 $70.38

Operators (Highway, Class 03 - See Notes) 5/1/2026 $41.87 $30.51 $72.38

Operators (Highway, Class 04 - See Notes) 5/1/2025 $40.26 $29.54 $69.80

Operators (Highway, Class 04 - See Notes) 5/1/2026 $41.41 $30.39 $71.80

Operators (Highway, Class 05 - See Notes) 5/1/2025 $39.73 $29.41 $69.14

Operators (Highway, Class 05 - See Notes) 5/1/2026 $40.89 $30.25 $71.14

Operators (Highway, Class 06 - See Notes) 5/1/2025 $42.80 $30.30 $73.10

Operators (Highway, Class 06 - See Notes) 5/1/2026 $43.95 $31.15 $75.10

Operators (Highway, Class 06/A - See Notes) 5/1/2025 $45.05 $30.96 $76.01

Operators (Highway, Class 06/A - See Notes) 5/1/2026 $46.21 $31.80 $78.01

Operators (Highway, Class 07/A - See Notes) 5/1/2025 $51.79 $34.38 $86.17

Operators (Highway, Class 07/A - See Notes) 5/1/2026 $53.25 $35.32 $88.57

Operators (Highway, Class 07/B - See Notes) 5/1/2025 $50.37 $33.97 $84.34

Operators (Highway, Class 07/B - See Notes) 5/1/2026 $51.84 $34.90 $86.74

Painters - Line Stripping 12/1/2024 $44.12 $27.91 $72.03

Painters - Line Stripping 12/1/2025 $45.12 $29.41 $74.53

Painters Class 2 (see notes) 5/1/2025 $35.61 $24.18 $59.79

Painters Class 3 (see notes) 5/1/2025 $41.71 $24.18 $65.89

Piledrivers 5/1/2021 $43.73 $37.99 $81.72

Steamfitters (Heavy and Highway - Gas Distribution) 5/1/2025 $54.39 $44.73 $99.12

Truckdriver class 1(see notes) 5/1/2025 $41.87 $0.00 $41.87

Truckdriver class 2 (see notes) 5/1/2025 $41.94 $0.00 $41.94

Truckdriver class 3 (see notes) 5/1/2025 $42.43 $0.00 $42.43

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 4/28/2026 Page 6 of 6

File details come from the government source that posted it. Updated .