This is a comprehensive geotechnical engineering report prepared by Atlas Technical Consultants for Hall County Government, detailing a soil survey and wall foundation investigation for the White Sulphur Road Widening and Highway 365/US 23 Intersection Improvement Project. The project involves widening White Sulphur Road approximately 2,500 feet from the Port entrance near Cagle Road to State Route 365, with additional intersection modifications extending 800 feet west and 500 feet east of White Sulphur Road along SR 365. The scope includes adding a 12-foot wide lane, lengthening left turn lanes, and constructing two mechanically stabilized earth (MSE) walls ranging from 14 to 26 feet in height between stations 147+50 to 150+50 and 153+00 to 155+50 on the left side of the roadway.
The report provides detailed subsurface investigation findings based on eleven soil test borings and hand auger borings, revealing predominantly residual soils in the Piedmont Physiographic Province. Key technical recommendations include a recommended soil support value of 2.5 for pavement design, using graded aggregate base, constructing slopes no steeper than 2H:1V, and an allowable bearing pressure of 3,000 psf for cast-in-place walls. The geotechnical analysis indicates no significant groundwater issues, no hard rock requiring extensive blasting, and an average shrinkage factor of 25% for earthwork calculations. The report also includes global stability analyses using Bishop and Spencer methods, confirming the wall system meets AASHTO LRFD requirements with factors of safety ranging from 1.3 to 1.7 depending on wall height and analysis method.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C U
R V
E
C U
R V
E
C U
R V
E
CURVE #02CURVE #02
CURVE #03
CURVE #03 CURVE #04CURVE 04 CURVE #04
CURVE #05CURVE #05
E: 2419639.208
N: 1582551.374
STA 209+80.96 SR365
WHITE SULPHUR ROAD
STA 169+56.45
HALL COUNTY
18095.001
STA 214+00.00
LIMIT OF CONSTRUCTION
N.T.S
PROJECT LOCATION
MILES
0.683
NET LENGTH OF EXCEPTIONS
GROSS LENGTH OF PROJECT
NET LENGTH OF ROADWAY
NET LENGTH OF BRIDGES
NET LENGTH OF PROJECT
LENGTH OF PROJECT
COUNTY No. 139
MILES
COUNTY No.
authorized agent, under my direct supervision."
site visit to the location described herein by myself or my
"I certify under penalty of law that this plan was prepared after a identified un-sampled receiving water."
representative of the increase in the turbidity of a specific each specific identified sampled receiving water will be
NPDES Permit No. GAR100002, that the increase in the turbidity of professional judgment, utilizing the factors required in the General body is not proposed to be sampled, I have determined in my specific identified perennial or intermittent stream and other water intermittent streams and other water bodies, or (b) where any such topographic map and all other field verified perennial and intermittent streams and other water bodies shown on the USGS
Control Plan provides for the monitoring of: (a) all perennial and
"I certify that the permittee's Erosion, Sedimentation and Pollution
NPDES Permit No. GAR100002."
methods is expected to meet the requirements contained in the General that the designed system of best management practices and sampling receiving water(s) or the sampling of the storm water outfalls and disturbing activity was permitted, provides for sampling of the
Conservation Commission as of January 1 of the year in which the land in Georgia" (Manual) published by the State Soil and Water
Control Act and the document "Manual for Erosion and Sediment Control best management practices required by the Georgia Water Quality
Control Plan provides for an appropriate and comprehensive system of
"I certify that the permittee's Erosion, Sedimentation and Pollution
NPDES Permit No. GAR100002."
Plan has been prepared in accordance with Part IV, of the General
"I certify that this Erosion, Sedimentation and Pollution Control
EROSION, SEDIMENTATION & POLLUTION CONTROL PLAN
HALL COUNTY
DEPARTMENT OF PUBLIC WORKS
PHASE II
WHITE SULPHUR ROAD
LOCATION SKETCH
0001 50-and the North American Vertical Datum (NAVD) of 1988.
Georgia Coordinate System of 1984(NAD1983)/94 WEST Zone, This project has been prepared using the Horizontal
HALL
COUNTY NAME:
COUNTY NAME:
0.000
0.000
GSWCC LEVEL II, CERTIFICATION NUMBERSIGNATURE:
0000004987 becook@hallcounty.org
770-531-6800
GAINESVILLE, GA 30504-5635
2875 BROWNS BRIDGE ROAD
DEPARTMENT OF PUBLIC WORKS
HALL COUNTY
09-29-2025
Brent Cook
770-531-6800
D.S. 0 mph
D.S. mph ed 0.0%
'0.04E
1500.00'R
21.60'L
10.80'T
03°49'10.99"D
(LT)00°49'29.5"¬
2,419,018.3956E
1,583,490.3033N
8+72.86PI
CURVE# __
E: 2418045.458
N: 1584783.726
WHITE SULPHUR ROAD
STA 140+00.00
HALL COUNTY
18095.001
BEGIN PROJECT
STA 201+50.00
LIMIT OF CONSTRUCTION
E: 2419859.918
N: 1581938.658
WHITE SULPHUR ROAD
STA 176+08.00
HALL COUNTY
18095.001
END PROJECT
PLPL
PL
PL
PL
PL
PL
PL
P L
PL
P L
PL
P L
PL
P L
P L
P L
PL
PL
PL
STREAM BUFFER
ESA 25'
205+00.00
200+00.00
135+00
0+0
S R
C O R N E L I A
H
W Y
WHITE SULPHUR RD.
S R
C O R N E L I A
H
W Y
WHITE SULPHUR RD.
W H I T E
S U L P H U R
R D
C E N T R E
P K
W Y
G A T E
W A Y
L I V I N G S T O N
R D
E: 2419115.245
N: 1583574.732
WHITE SULPHUR ROAD
STA 158+04.00
HALL COUNTY
18095.001
PROJECT MID-POINT
REVISIONS
09-19-2025PLANS COMPLETED
DATE ENTITY REQUESTING REVISION(S)
DRAWING NUMBER(S)
24 HOUR CONTACT:
Contractor shall complete the information in this box.
BY:
PLANS PREPARED
Longitude: -083.7642079°
Latitude: 34.3558234°
MID-POINT COORDINATES
Longitude: -083.7606793°
Latitude: 34.3524895°
END-POINT COORDINATES
Longitude: -083.7582338°
Latitude: 34.3479855°
BEGIN-POINT COORDINATES
Phone Number
PRIMARY PERMITTEE
Jason.ONeal
9/29/2025 GPLOT-ORD
gplotborder-ORD.tbl
18095.001_50.dgn
CONCOV
PROJECT No.
18095.001
11/05/2020
DRAWING No.
EROCOV-CE
SIGNATURE
GSWCC LEVEL II CERT.#
770.263.5945 Duluth, Georgia 30096
Suite 100 2450 Commerce Avenue
941705 SF = 21.62 ACRES
TOTAL PROJECT AREA:
779321 SF = 17.89 ACRES
TOTAL DISTURBED AREA:
BUFFER
STREAM
ESA 25'
Name
NCRS
No.PE032208
PROFESSIONAL
AI
GRO
E G
N O
S
NAH KR
A
M
B
REENIGN
E
D
ERETSIG
E R
9/30/2025
000000498754-0001 TO 54-0045, 56-0001 TO 56-0008, ADD 51-0009 TO 51-0029
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
9/16/2025
Jason.ONeal
GPLOT-ORD
gplotborder-ORD.tbl
18095.001_51.dgn
11:57:50 AM
GPLN-CE
0001-51
WHITE SULPHUR ROAD AT SR 365
18095.001
ESPCP GENERAL NOTES
Duluth, Georgia 30096
No.PE032208
PROFESSIONAL
AI
GRO
E G
N O
S
NAH KR
A
M
B
REENIGN
E
D
ERETSIG
E R layout sheets included in the Plan Set.
For additional information, see the project installed on the proposed mainline shoulders.
length. Curb and gutter and sidewalk will be
Sulphur Road of approximately 2,500 feet in
365 with a 12-foot receiving lane on White left turn land on the eastbound approach of SR
The project proposes to construct an additional rural principal arterial.
intersects with SR 365 that is classified as a classified as a local minor collector that undivided roadway that runs north/south and is
The existing site consists of a two-lane
PROJECT
DESCRIPTION OF EXISTING SITE AND PROPOSED
ESPCP ALTERATIONS, AMENDMENTS, AND REVISIONS
and Sedimentation.
Special Provision 161-Control of Soil Erosion
Professional. Additional BMPs may be added per of a GSWCC Level-II Certified Design formal revision of the ESPCP and the signature
BMPs with a hydraulic component requires a the ESPCP which have a significant effect on disturbing activities. Amendments/revisions to evaluate this plan prior to commencing land-
Professional, and the WECS shall carefully
The Contractor, the Certified Design
Sedimentation of the contract.
Provision 161-Control of Soil Erosion and revise the plans in accordance to Special this plan ineffective, the Contractor shall utilize construction techniques that render construction from that shown in the plans or
If the Contractor elects to alter the staged common construction methods and techniques.
construction of the project on the basis of
Department. It addresses the staged
Control Plan (ESPCP) is provided by the
This Erosion, Sedimentation, and Pollution
WASTE DISPOSAL
unless authorized by a Section 404 Permit.
shall not be discharged to Waters of the State, Solid materials, including building materials, regulations and obtain all necessary permits.
and local waste storage and disposal
Contractor shall comply with applicable state likelihood of contaminated discharges. The waste collection areas to minimize the containment shall be provided around liquid watercourses and storm drains. Secondary least 50 feet away from streets, gutters, dumpsters, trash cans and portable toilets at
Where attainable, locate waste collection areas, MAINTAINING EROSION CONTROL MEASURES sediment source.
shall be implemented to control or treat the erosion and sedimentation control measures provide for effective control, additional implementation of the approved plan does not be maintained at all times. If full
Erosion and sedimentation control measures will practices prior to land-disturbing activities.
erosion and sediment control measures and shall be prevented by the installation of
The escape of sediment from the project site
SCHEDULE
SITE STABLIZATION AND VEGETATION PLANTING
documents or landscaping plans.
Provisions) and other applicable contract
Department's Standard Specifications (or Special
Section 700 of the current edition of the mulching rates for this project can be found in dates, seeding, fertilizing, liming, and practices including plant species, planting
All temporary and permanent vegetative activities are expected to resume.
711 on the basis of when construction
Special Provisions) Sections 161, 163, 700, or of the Department's Standard Specifications (or suitable material listed in the current edition
Disturbed areas shall be stabilized with perform stabilization more often than 14 days.
Project Engineer may require the contractor to conditions. However, in special cases, the practicable if precluded by adverse weather
14 days of such cessation or as soon as permanently ceased shall be stabilized within construction activities have temporarily or indicates that the disturbed area where
The EPD General NPDES GAR100002 permit mulch or temporary seeding.
greater than 14 days shall be stabilized with
Any disturbed area left exposed for a period
READY MIX CHUTE & TOOLS WASHDOWN
Wash-down".
Program's "A Guide for Ready Mix Chute/Hopper
Georgia Small Business Environmental Assistance site. For additional information, refer to the transport the container to a proper disposal drum or other suitable container and then may have to wash-down into a sealable 55-gallon a wash-down pit is unavailable, the Contractor
On sites where permission or access to excavate down.
and (4) permission to use the area for wash down, (3) sufficient volume for wash-down water,
(2) access to the vehicle being used for wash away from any storm drain, stream, or river, that includes the following: (1) a location down a storm drain. Establish a wash-down pit and rivers. Never dispose of wash-down water prevent wash-down water from entering streams
Wash-down plans describe procedures that
Engineer.
wash-down plans must be approved by the Project elevation of the surrounding areas. Alternate ground above it shall be graded to match the the ground, the pit shall be filled in, and the and after the wash-down water has soaked into after the wash-down operations are completed down water without overtopping. Immediately pit shall be large enough to store all wash-including shoulders, for a wash-down pit. The storm drain and outside of the travelled way, State water buffers, at least 25 feet from any
Contractor shall excavate a pit outside of rinsed free of fresh concrete remains. The the delivery of Portland cement concrete may be
Public, only the discharge chute utilized in
Legal Regulations and Responsibility to the
In accordance with Standard Specification 107:
site.
Portland cement concrete is prohibited on this dump truck bodies used in the delivery of
The washing of ready-mix concrete drums and
NON-STORMWATER DISCHARGES
construction materials.
paint, oils, curing compounds, and other discharge of wastewater containing stucco, used in vehicle and equipment washing or the authorize the discharge of soaps or solvents contract documents. The NPDES does not
Georgia, Department Standards, and other
Manual for Erosion and Sediment Control in
Act, the NPDES Permit, the Clean Water Act, the by the Georgia Erosion and Sedimentation Control requirements as storm water discharges required discharges shall be subject to the same after construction has commenced. These
III.A.2 of the NPDES Permit will be identified
Non-stormwater discharges defined in Part
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
9/16/2025
Jason.ONeal
GPLOT-ORD
1:15:30 PM
0002-51
Duluth, Georgia 30096
AI
GRO
E G
N O
S
NAH KR
A
M
B
REENIGN
E
D
ERETSIG
E
PETROLEUM STORAGE,SPILLS AND LEAKS
requirements.
Responsibility to the public for additional
Specification 107-Legal Regulations and attention is specifically directed to Standard inclusion with these plans. The Contractor's
Professional as required by GAR100002 for shall be prepared by a Certified Design prevention for petroleum products. This plan
BMPs needed for onsite storage and spill an ESPCP addendum that addresses the additional products on site, the Contractor shall prepare
If the Contractor elects to store petroleum equipment within stream buffers.
Contractor shall not park, refuel, or maintain be familiar with the action plan. The personnel operating or servicing equipment shall and maintained on the project site. All plan shall be submitted to the Project Engineer utilized at the site. A copy of the action refueling or operation of any equipment leaks or spills associated with the servicing, petroleum product, or other hazardous material, for the capture, clean up, and disposal of any plan and keep the necessary materials on site
Contractor shall at a minimum provide an action material management to the Contractor. The responsibility of proper on-site hazardous
These plans expressly delegate the
POSTCONSTRUCTION BMPs FOR STORMWATER MANAGEMENT receiving waters.
transportation of sediment and pollutants into stabilization of the site and prevent abnormal postconstruction BMPs will provide permanent ditch lining where necessary. The stabilization matting, riprap and concrete stabilization with turf reinforcing mats, slope outlet stabilization, channel/ditch pipe outlets for velocity dissipation and permanent slope drains and/or flumes, riprap at consist of vegetated swales/ditches, vegetation, The postconstruction BMPs for this project in the construction plans and in the ESPCP plan.
All permanent postconstruction BMPs are shown
OTHER CONTROLS
Specifications.
edition of the Department's Standard in accordance with Section 161 of the current
The Contractor shall control dust from the site systems, and petroleum storage.
waste disposal, sanitary sewer and septic applicable State and/or local regulations for ensure and demonstrate compliance with all
The Contractor shall follow this ESPCP and outdoor use.
stormwater contamination or is intended for material or product poses little risk to pollutants, or where exposure of the specific stormwater will not result in a discharge of cases where exposure to precipitation and to
Minimization of exposure is not required in
ACTIVITIES
CONSTRUCTION SCHEDULE AND SEQUENCE OF MAJOR
Specifications.
edition of the Department's Standard in accordance with Section 161 of the current
The Contractor shall control dust from the site systems, and petroleum storage.
waste disposal, sanitary sewer and septic applicable State and/or local regulations for ensure and demonstrate compliance with all
The Contractor shall follow this ESPCP and intended for outdoor use.
little risk to stormwater contamination or is of the specific material or product poses in a discharge of pollutants, or where exposure precipitation and to stormwater will not result required in cases where exposure to pollutants. Minimization of exposure is not stormwater to minimize the discharge of materials or products to precipitation and covering to minimize the exposure of those
Contractor shall provide an appropriate waste, and other materials on the site, the pesticides, herbicides, detergents, sanitary trash, landscape materials, fertilizers, material, building products, construction waste, If the Contractor elects to store building pollutants.
stormwater to minimize the discharge of materials or products to precipitation and covering to minimize the exposure of those
Contractor shall provide an appropriate waste, and other materials on the site, the pesticides, herbicides, detergents, sanitary trash, landscape materials, fertilizers, material, building products, construction waste, If the Contractor elects to store building rap as indicated on the plans.
sod/grassing, slope mats, ditch lining, and rip in any area of the project, install permanent
As soon as the final grade has been established
Final Phase:
on the plans.
inlet sediment traps, and rip rap as indicated exits as needed. Install check dams, silt gates, adjust silt fence and install construction
As earthwork and construction progresses, Intermediate Phase:
as indicated on the plans.
fence, check dams in existing ditches, and silt distubing activities, install perimeter silt
Prior to clearing and grubbing or any land
INITIAL PHASE:
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
9/16/2025
Jason.ONeal
GPLOT-ORD
1:17:34 PM
0003-51
Duluth, Georgia 30096
AI
GRO
E G
N O
S
NAH KR
A
M
B
REENIGN
E
D
ERETSIG
E
INSPECTIONS AND REPORTING
day time frame.
operational as soon as practical after the 7-
Department shall schedule the BMP repair to be
7 days is infeasible, the Contractor and the time of discovery. If the repair time within operational by no later than 7 days from the replacement BMP or significant repair must be discovery. A repair requiring a new or close of the next business day from the time of failure or deficiency must be corrected by the replacement BMP or significant repair, the BMP
When the repair does not require a new or not discharge in subsequent storm events.
any contaminated surfaces so the material will address the condition, including cleaning up
Contractor shall take reasonable steps to deposition into waters of the State, the maintenance and has resulted in sediment failed or is deficient beyond routine
Whenever the Department finds that a BMP has
Termination (NOT) is submitted.
inspections shall continue until the Notice of inspection and reporting requirements. These
Provision) 167 and other contract documents for
See Standard Specification (or Special the appropriate Department inspection forms.
All other inspections shall be documented on installations.
subsequent 7-day inspections for all new BMP
Project Engineer will be responsible for all
Additionally, the Department's Construction conditions are such that more time is required.
inspection report, unless on-site weather within 2 business days of receipt of the the permittee must correct all deficiencies to the primary permittee within 7 days, and design professional shall report the results within 7 days of installation. The inspecting the entire linear infrastructure project installation and all sediment basins within
GAR100002 Permit, within 7 days of as defined by Part IV.A.5. of the current perimeter control BMPs for the initial segment, the initial sediment storage requirements and retain either of these personnel to inspect infrastructure projects, the permittee must project. Alternatively, for linear installation over the entire infrastructure perimeter control BMPs within 7 days of initial sediment storage requirements and inspect and certify the installation of the professional approved by EPD in writing, to the ESPCP, or an alternative design retain the design professional who prepared
As the primary permittee, the Department must
STATEMENT
APPROPRIATE BMP AND SAMPLING CERTIFICATION
cover sheet serves as the certification.
signature of the preparer affixed on the Plan stated in Part IV page 20 of the permit. The and sampling to meet permit requirements as appropriate and comprehensive system of BMPs
The permittee's ES&PC Plan provides for an
WATER QUALITY INSPECTING AND SAMPLING PROCEDURES
the Sampling Location table herein.
procedures. Sampling locations are provided in documents for the inspecting and sampling
See Special Provision 167 and other contract
RETENTION OF RECORDS
GAR100002.
accordance with Part IV of the General Permit related to the implementation of this ESPCP in
The primary permittee will retain all records
SOIL SERIES INFORMATION
are expected to be found on the project site:
The following is a summary of the soils that and fertilizers.
and in the selection of permanent vegetation temporary BMP's, design of energy dissipaters, design of channels and linings, selection of consideration in the hydrologic analysis, the characteristics have been given full and can be made available upon request. Soil investigation was performed for this project
A project-specific soil survey and geotechnical
BMP INSTALLATION AND MAINTENANCE MEASURES
and maintenance measures.
and other contract documents for installation
(or Special Provisions) 161, 163, 165, 700, 711, See the Department's Standard Specifications
SILT FENCE INSTALLATION WITH J HOOKS AND SPURS
fence.
cost of installing and maintaining the silt and other incidental items are included in the as silt fence items per linear foot. All costs upgradient J hook. J Hooks shall be paid for same elevation as the bottom of the immediately reached when the top of the J hook is at the
Detail D-24C. The maximum J-hook spacing is spaced in accordance with GDOT Construction embankments or slopes. The J hooks shall be perimeter of the project and along the toe of all silt fences that are located around the
(or spurs). The J hooks shall be utilized on fence. This technique is called using J hooks and force stormwater to flow through the silt or slope to create small pockets that trap silt
The silt fence should turn back into the fill
Silt fence should never be run continuously.
DEWATERING AND PUMPING ACTIVITIES
discharges.
be made for water quality sampling of pump
Design Professional. No separate payment will
GAR100002 NPDES permit by utilizing a Certified sampling plans in accordance with the current pumped discharges. The contractor shall prepare contractor to perform water quality sampling of
Failure to create sheet flow will obligate the the post BMP treated discharge is sheet flowing.
suitable BMP's. The contractor shall ensure bag, or shall be treated equivalently with appropriately sized sediment basin, silt filter disturbed area shall be routed through an
Any pumped discharge from an excavation or
USE OF ALTERNATIVE AND/OR ADDITIONAL BMPS
by the Georgia EPD and GSWCC.
Certified Design Professional and was required submitted and certified by the Level-II specific and was based on documentation only for this ESPCP. This review was site determined by the Georgia EPD to be allowable reviewed by the Georgia EPD and has been alternative BMP for stone check dams has been as an alternative BMP. The use of the
Fabric check dams will be used on this project contract documents.
non-refundable deductions as specified in the failure to perform inspections shall result in
Traffic Control and Erosion Control. Continued construction activities with the exception of shall result in the cessation of all the contract documents and the NPDES permit
Failure to perform inspections as required by
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
9/18/2025
Jason.ONeal
GPLOT-ORD
10:20:13 AM
0004-51
Duluth, Georgia 30096
AI
GRO
E G
N O
S
NAH KR
A
M
B
REENIGN
E
D
ERETSIG
E
SEDIMENT STORAGE
This site has a total disturbed area of 17.89 acres.
ensures stormwater does not bypass the inlet. The Contractor may submit alternate temporary containment berm designs to the Project Engineer for approval.
point or an excavated sump. Construct temporary sumps in accordance with Construction Detail D-24C. Temporary sumps shall be installed in a manner that
To prevent runoff from bypassing inlet sediment traps, a temporary sump shall be installed around all inlet sediment traps that are not located in a low the storage volumes for the BMP's specified in this table.
Sediment Storage Table summarizes the required and available sediment storage for every outfall on this project. The Contractor shall provide and maintain
STATE WATER BUFFER IMPACTS
Department's stream buffer variance, this shall be noted in the buffer-variance-required column.
conjunction with the impacts caused by their activities. If utility impacts are covered by the
Unless noted otherwise, utility companies will be submitting the required permits/variances in
Impact Table.
The Contractor is not authorized to enter into stream buffers, except as described in the Buffer and permits.
measured from the Jurisdictional Determination Line without first acquiring the necessary variances measured from the point wrested vegetation or within 25-feet of the coastal marshland buffer as
Non-exempt activities shall not be conducted within the 25- or 50-foot undisturbed stream buffers as
State water buffers, as defined by O.C.G.A. 12-7-1, are not impacted by this project.
basin will be utilized.
Land disturbance activites with constructing & removing a sediment basin at these sites would cause additional adverse impacts; therefore no sediment
Sediment storage calculations indicate that the use of check dams, inlet sediment traps, rock filter dams and silt fence will provide adequate storage.
OUTFALLS 1,2,3,4,5
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
9/16/2025
Jason.ONeal
GPLOT-ORD
1:18:46 PM
0005-51
Duluth, Georgia 30096
AI
GRO
E G
N O
S
NAH KR
A
M
B
REENIGN
E
D
ERETSIG
E
SAMPLING LOCATIONS AND GENERAL NOTES
preparer affixed on the Plan cover sheet serves as the certification.
The permittee's ES&PC Plan provides for representative sampling as stated on Part IV.D.6.c.(3) page 37 of the permit as applicable. The signature of the is required or to replace a primary sampled feature that is no longer located within the active phase of construction.
The primary sampled features specified should be used as the initial sampling locations. An alternate sampled feature may be used if additional sampling outfall drainage basins exist. Approved primary and alternate representative sampled features are identified in the Sampling Location Table.
The increase in turbidity at the specified locations in the table below will be representative of the alternate outfall drainage basins when similar shows the groups of similar outfall drainage basins.
control plans, the Department has determined that the representative sampling scheme shown below is valid for the duration of the project. The table project's drainage area map, hydrology and hydraulic studies, construction plans, geotechnical soil survey, and erosion sedimentation and pollution erosion index is low if it is less than or equal to 5 and high if it is greater than 5. After evaluation of these characteristics as presented in the to or greater than 2 acres. The average outfall slope is mild if it is equal to or less than 0.03, and steep if it is greater than 0.03. The soil road widening, and maintenance/safety. The disturbed area classes are less than or equal to 1 acre, greater than 1 acre to less than 2 acres, and equal the outfall, and the soil erosion index 0-10, 10 being the most erodible soil. The construction activity types are new road on fill, new road in cut, carefully evaluated and compared on the basis of four characteristics: the type of construction activity, the disturbed acreage, the average slope about
Representative sampling may be utilized on this project as explained here. The individual outfall drainage basins along the project corridor have been maintained.
qualifying event until the turbidity standard is attained or until post-rain event inspections determine that BMPs are properly designed, installed, and
(c) Follow-up sampling is needed if BMPs are not properly designed, installed, and maintained during the first two sampling events. Each subsequent
(b) The second sampling event is at least 90 days after the first sampling event or after all mass grading is complete
(a) The first sampling event is after clearing and grubbing but prior to completion of mass grading and has a stormwater discharge.
Sampling shall be during normal business hours. Sampling shall be of qualifying events defined as a rain event which that reaches or exceeds 0.5 inches occur during each stage.
The applicable stages are when the outfall or receiving water exists. Sampling needs to occur during the applicable stages. Sampling does not need to
Sampling frequency shall be according to GAR100002 IV.D.6.d. Below is a short summary. For complete requirements refer to the permit.
SAMPLING FREQUENCY
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
9/16/2025
Jason.ONeal
GPLOT-ORD
1:19:18 PM
0006-51
Duluth, Georgia 30096
AI
GRO
E G
N O
S
NAH KR
A
M
B
REENIGN
E
D
ERETSIG
E
RIPRAP OUTLET PROTECTION
in the Riprap Outlet Protection Table.
Information about outlet protection is included
CHANNEL PROTECTION
the Channel Protection Table.
permanent grassing except as noted otherwise in
All channels may be stabilized exclusively with
4a, 4b or 5, and the potential cause is either "NP" (nonpoint source) or "UR" (urban runoff).
(impaired fish community) and/or "Bio M" (impaired macro invertebrate community), within Category of an identified impaired stream segment that has been listed for criteria violated, "Bio F"
The Impaired Stream Table is a summary of project outfalls within 1 mile and within the watershed
A BIOTA IMPAIRED STREAM SEGMENT
DISCHARGES INTO OR WITHIN ONE LINEAR MILE UPSTREAM OF AND WITHIN THE SAME WATERSHED AS ANY PORTION OF
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
9/16/2025
Jason.ONeal
GPLOT-ORD
1:20:10 PM
0007-51
Duluth, Georgia 30096
AI
GRO
E G
N O
S
NAH KR
A
M
B
REENIGN
E
D
ERETSIG
E
ESPCP SIGN
www.dot.ga.gov/BS/Projects/ProjectSearch
The permittee-hosted website is:
and their telephone number.
"Telephone" enter Construction Project Manager project id number. For "Project Engineer" and submitted NOI. For "PROJECT #" enter full
Plan can be viewed must be provided on the and (4) the permittee-hosted website where the the contact person(s) and telephone number(s),
(1) construction site, (2) permittee(s), (3) road. The sign must identify the following:
be such that it is visible and readable from a office trailer. The location of the sign shall preferably facing the driveway to the field
The sign shall be posted parallel to a road, has been submitted.
available on the provided website until a NOT end of construction. The project plans must be of construction and remain on site until the
It shall be posted on site by the actual start removal shall be included in pay item 161-1000.
cost of the sign installation, maintenance, and
Section 911, Section 912, and Section 913. The the sign according to Section 636, Section 910, Special Provision 153. Fabricate and install
The large sign shall be in the format shown in
DISTURBED AREA STABILIZATION
activities are expected to resume.
711 on the basis of when construction
Special Provisions) Sections 161, 163, 700, or of the Department's Standard Specifications (or suitable material listed in the current edition
Disturbed areas shall be stabilized with
FERTILIZER NEEDS
SOIL TESTS FOR IDENTIFYING SITE-SPECIFIC
site-specific fertilizer needs.
Conduct soil tests to identify and to implement
ADDITIONAL SITE INSPECTIONS
a) (c) *
(c); and tertiary permittees Part IV.D.4.c.(3)(
(c); secondary permittees, Part IV.D.4.b.(3)(a) greater in accordance with Part IV.D.4.a.(3)(a) end of the storm that is 0.5 inches rainfall or
(7) calendar days and within 24 hours of the conduct inspections at least twice every seven
Certified personnel for primary permittees shall
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
9/16/2025
Jason.ONeal
GPLOT-ORD
1:21:04 PM
0008-51
Duluth, Georgia 30096
AI
GRO
E G
N O
S
NAH KR
A
M
B
REENIGN
E
D
ERETSIG
E
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
9/25/2025
Jay.Guisasola
GPLOT-ORD
3:23:04 PM
0009-51
Duluth, Georgia 30096
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
9/25/2025
Jay.Guisasola
GPLOT-ORD
3:23:33 PM
0010-51
Duluth, Georgia 30096
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
9/25/2025
Jay.Guisasola
GPLOT-ORD
3:23:58 PM
0011-51
Duluth, Georgia 30096
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
9/25/2025
Jay.Guisasola
GPLOT-ORD
3:24:34 PM
0012-51
Duluth, Georgia 30096
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
9/25/2025
Jay.Guisasola
GPLOT-ORD
3:24:58 PM
0013-51
Duluth, Georgia 30096
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
9/25/2025
Jay.Guisasola
GPLOT-ORD
3:25:31 PM
0014-51
Duluth, Georgia 30096
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
9/25/2025
Jay.Guisasola
GPLOT-ORD
3:26:00 PM
0015-51
Duluth, Georgia 30096
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
9/25/2025
Jay.Guisasola
GPLOT-ORD
3:26:28 PM
0016-51
Duluth, Georgia 30096
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
9/25/2025
Jay.Guisasola
GPLOT-ORD
3:26:54 PM
0017-51
Duluth, Georgia 30096
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
9/25/2025
Jay.Guisasola
GPLOT-ORD
3:27:19 PM
0018-51
Duluth, Georgia 30096
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
9/25/2025
Jay.Guisasola
GPLOT-ORD
3:27:46 PM
0019-51
Duluth, Georgia 30096
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
9/25/2025
Jay.Guisasola
GPLOT-ORD
3:28:19 PM
0020-51
Duluth, Georgia 30096
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
9/25/2025
Jay.Guisasola
GPLOT-ORD
3:34:14 PM
0021-51
Duluth, Georgia 30096
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
9/25/2025
Jay.Guisasola
GPLOT-ORD
3:34:41 PM
0022-51
Duluth, Georgia 30096
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
9/25/2025
Jay.Guisasola
GPLOT-ORD
3:38:54 PM
0023-51
Duluth, Georgia 30096
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
9/25/2025
Jay.Guisasola
GPLOT-ORD
3:39:30 PM
0024-51
Duluth, Georgia 30096
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
9/25/2025
Jay.Guisasola
GPLOT-ORD
3:39:54 PM
0025-51
Duluth, Georgia 30096
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
9/25/2025
Jay.Guisasola
GPLOT-ORD
3:40:20 PM
0026-51
Duluth, Georgia 30096
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
9/25/2025
Jay.Guisasola
GPLOT-ORD
3:40:44 PM
0027-51
Duluth, Georgia 30096
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
9/25/2025
Jay.Guisasola
GPLOT-ORD
3:41:07 PM
0028-51
Duluth, Georgia 30096
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
9/25/2025
Jay.Guisasola
GPLOT-ORD
3:41:47 PM
0029-51
Duluth, Georgia 30096
18"
18"
18"
18"
18"
18"
18"
18"
24"
18"
18"
18"
18" 1
18"
18"
ESA
STREAM
BUFFER
ESA
STREAM
BUFFER
ESA 25- STREAM BUFFER
ESA 25- STREAM BUFFER
IS-2
IS
-1
E S
A
S T R E
A M
B
U F F E R
S
W
11+00
12+00
13+00
14+00
S25°59'50.8"E
P O
B
P O
E
28.91' Lt.OFF:
0+70.45STA:
28.91' Lt.OFF:
0+70.45STA:
18"
18"
18"
18"
18"
18"
18"
18"
24"
18"
18"
18"
18" 1
18"
18"
N
E
N
E
21+00
22+00
10+00
11+00
S
W
10+00
11+00
12+00
13+00
14+00
135+00
138+00
139+00
+00
1+0
135+00
136+00
137+00
N
E
200+00
201+00
202+00
203+00
204+00
205+00
206+00
207+00
208+00
209+00
210+00
211+00
212+00
213+00
214+00
L T
S T
A
P I
N
T I E
T
O
E
X I S T I
N G
B E
G I
N
C
G
T P
W H I T E
S U L P H U R
R O A D
WHI
TE
SULP
HUR
ROAD
WHITE SULPHUR ROAD
WHITE SULPHUR ROAD
WHITE SULPHUR ROAD
WHITE SULPHUR ROAD
R T
S T
A
U S E
P
A T
H
B E
G I
N
S
H A R
D
B
G I
N
C
G
T P
L I
V I
N G S T
A D
WHITE SULPHUR ROAD
W H I T E
S
U L P
H U
A D
P A
R K
W A
Y
G A T E
W A
Y
N T
R E
S R
R N E L
H W
Y
S R
R N E L
Y S
R
R N E L
Y
S R
R N E L
Y
S R
R N E L
Y
W O
F
N C
E
WOOD FENCE
WOOD FENCE
W O
N C
E
WOOD FENCE
WOOD FENCE
WOOD FENCE
S i d e w a l k
T
E
E
C L
F
L U
M E
C L
F
L U
M
E
E
E
E
C L
F
L U
M E
G A
K
Y
P
E
E
C L
F
L U
E
E
E
E
C L
F
L U
E
E
C L
F
L U
E
E
C L
F
L U
E
E
E
E
C O
N T
R
L
S
H O
T
C
O N
T R
S
H O
T i d e w a l k
OUTFALL#1
OUTFALL#3
OUTFALL#4
OUTFALL#5
SHEET FLOW
SHEET FLOW
SHEET FLOW
SHEET FLOW
SHEET FLOW
SHEET FLOW
SHEET FLOW
SHEET FLOW
TRIBUTARY
N. OCONEE RIVER
DITCH TO
RECEIVING WATERS
TRIBUTARY
N. OCONEE RIVER
DITCH TO
RECEIVING WATERS
IS-2
TRIBUTARY
N. OCONEE RIVER
DITCH TO
RECEIVING WATERS IS-1
THE TOTAL DISTURBED AREA IS 17.89 ACRES.
THE TOTAL PROJECT AREA IS 21.62 ACRES.
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
9/10/2025
Jason.ONeal
GPLOT-ORD
18095.001_53.dgn
11:36:06 AM
0001-53
EROSION CONTROL DRAINAGE AREA MAP
Duluth, Georgia 30096
300 600
SCALE IN FEET
0 150
WIDENING AND INTERSECTION IMPROVEMENT
No.PE032208
PROFESSIONAL
AI
GRO
E G
N O
S
NAH KR
A
M
B
REENIGN
E
D
ERETSIG
E
IS-1
ESA 25- STREAM BUFFER
1225.0
1205.0
1205.0
1175.0
1180.0
1185.0
1215.0
1215.0
1190.0
1210.0
1210.0
1200.0
1200.0
1200.0
.0
1195.0
1220.0
1185.0
1190.0
1220.0
1230.0
Rt-Sg3
Cd-F
Cd-F
MdE
MID2
M
ID
2M dE
Ds1 Ds2
Ds1 Ds2
Co
Co
LIMIT OF DISTURBANCE
LIMIT OF DISTURBANCE
WHITE SULPHUR ROAD
WHITE SULPHUR ROAD
REQ'D R/W
EXIST. R/W
N/F
CAROL ANN BROWN TRUSTEE
N/F
THE WILEY HEYWARD COLEY TRUST
REQ'D R/W
PL
PL
N/F
PATRICIA C PUCKETT
EXIST. R/W
EXIST. R/W
TEMP ESMT
TEMP ESMT
PERM ESMT
BEGIN PROJECT
18095.001
HALL COUNTY
STA 140+00.00
WHITE SULPHUR ROAD
M A
T
N E
S
T A
A W I
G o
EASEMENT FOR CONSTR OF SLOPES
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION LIMITS C F
REQUIRED R/W LINE
PROPERTY AND EXISTING R/W LINE PL
& MAINTENANCE OF SLOPES
EASEMENT FOR CONSTR
ORANGE BARRIER FENCE
BEGIN LIMIT OF ACCESS............BLA
END LIMIT OF ACCESS..............ELA
ESA - ENV. SENSITIVE AREA
REQ'D LIMIT OF ACCESS
EXISTING LIMIT OF ACCESS & R/W
REQ'D LIMIT OF ACCESS & R/W
EXISTING LIMIT OF ACCESS
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
PROJECT No.
11/05/2020
REVISION DATES
9/29/2025
Jason.ONeal
GPLOT-ORD
gplotborder-ORD-PO.tbl
18095.001_54.dgn
9:14:42 AM
54-0001
INITIAL STAGE
BMP LOCATION DETAILS
Duluth, Georgia 30096
20 40
0 10
No.PE032208
PROFESSIONAL
AI
GRO
E G
N O
S
NAH KR
A
M
B
REENIGN
E
D
ERETSIG
E
IS-2
ORANGE BARRIER FENCE
1130.0 1125.0
1135.0
1155.0
1150.0
1160.0
1145.0
1180.0
1185.0
.0
1165.0
.0
.0
1180.0
1175.0
1185.0
1190.0
5.0
.0
.0
0.0
5.0
.0
.0
1120.0
1140.0
1190.0
1165.0
Rt-Sg
Rt-Sg3
Rt-Sg3
Cd-F Cd-F
Cd-F
Cd-F
Cd-F
Cd-F
Cd-F
Cd-F
Cd-F
M
ID
M d E
Ds1 Ds2
Ds2
Ds1
Ds1 Ds2
Ds1 Ds2
Ds1 Ds2
Ds1 Ds2
LIMIT OF DISTURBANCE
LIMIT OF DISTURBANCE
LIMIT OF DISTURBANCE
S65 °45 '28
.1" E
WHITE SULPHUR ROAD
N/F
WILEY HEYWARD
COLEY TRUST
N/F
CLARA
GAINES
COLEY
N/F
W.H.
COLEY
N/F
AIRLINE BAPTIST
CHURCH
N/F
GA PORTS AUTHORITY
N/F
PATRICIA C PUCKETT
REQ'D R/W
REQ'D R/W
EXIST. R/W
EXIS
T. R
/W
P L
P L
PL
P L
TEMP ESMT
TEMP ESMT
PERM ESMT
DWESMT
PERM ESMT
TEMP ESMT
M A
T
A
A W I
M A
T
N E
S
T A
A W I
EASEMENT FOR CONSTR OF SLOPES
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION LIMITS C F
REQUIRED R/W LINE
PROPERTY AND EXISTING R/W LINE PL
& MAINTENANCE OF SLOPES
EASEMENT FOR CONSTR
ORANGE BARRIER FENCE
BEGIN LIMIT OF ACCESS............BLA
END LIMIT OF ACCESS..............ELA
ESA - ENV. SENSITIVE AREA
REQ'D LIMIT OF ACCESS
EXISTING LIMIT OF ACCESS & R/W
REQ'D LIMIT OF ACCESS & R/W
EXISTING LIMIT OF ACCESS
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
PROJECT No.
11/05/2020
REVISION DATES
9/29/2025
Jason.ONeal
GPLOT-ORD
9:14:43 AM
0002-54
Duluth, Georgia 30096
0 10
No.PE032208
PROFESSIONAL
AI
GRO
E G
N O
S
NAH KR
A
M
B
REENIGN
E
D
ERETSIG
E
ORANGE BARRIER FENCE
1110.0
1105.0
1130.0
1130.0
1125.0
1125.0
.0
1115.0
.0
1115.0
.0
1120.0
1120.0
0.0
.0
1135.0
1140.0
1140.0
1140.0
1155.0
1155.0
1150.0
1160.0
1145.0
1165.0
1140.0
1145.0
1115.0
Rt-Sg3
Cd-F Cd-F
Cd-F
Cd-F Cd-F
Cd-F
Cd-F Cd-F
Cd-F
Cd-F
M d E
M
ID
Ds2Ds1
Ds2Ds1
Ds1 Ds2
Ds2Ds1
Ds2Ds1
LIMIT OF DISTURBANCE
LIMIT OF DISTURBANCE
S11°13'11.9"E
WHITE SULPHUR ROAD
N/F
GAINESVILLE & HALL CO
DEVELOPMENT
N/F
BUSKER ENTERPRISES LLC
N/F
AIRLINE BAPTIST
CHURCH
EXIST. R/W
REQ'D R/W
EXIST. R/WREQ'D R/W
REQ'D R/W
P L
PARKING TO REMAIN
TEMPORARY EASEMENT IS FOR REMOVAL OF
EXISTING WALLS AND CONSTRUCTION OF
PROPOSED MSE WALL
TEMP ESMT
PERM ESMT
TEMP ESMT
PERM ESMT
TEMP ESMT
TEMP ESMT
DWESMT
M A
T
A
A W I
M A
T
A
A W I
EASEMENT FOR CONSTR OF SLOPES
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION LIMITS C F
REQUIRED R/W LINE
PROPERTY AND EXISTING R/W LINE PL
& MAINTENANCE OF SLOPES
EASEMENT FOR CONSTR
ORANGE BARRIER FENCE
BEGIN LIMIT OF ACCESS............BLA
END LIMIT OF ACCESS..............ELA
ESA - ENV. SENSITIVE AREA
REQ'D LIMIT OF ACCESS
EXISTING LIMIT OF ACCESS & R/W
REQ'D LIMIT OF ACCESS & R/W
EXISTING LIMIT OF ACCESS
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
PROJECT No.
11/05/2020
REVISION DATES
9/29/2025
Jason.ONeal
GPLOT-ORD
9:14:44 AM
0003-54
Duluth, Georgia 30096
0 10
No.PE032208
PROFESSIONAL
AI
GRO
E G
N O
S
NAH KR
A
M
B
REENIGN
E
D
ERETSIG
E
0.0
1100.0
1095.0
1090.0
1120.0
1095.0
1085.0
1080.0
1090.0
0.0
1075.0
1085.0
Rt-Sg3
Rt-Sg3
Cd-F
Cd-F Cd-F
Cd-F Cd-FCd-F
Cd-FCd-F Cd-FCd-F Cd-F
Cd-F
MdE
MID2
Ds2Ds1
Ds2Ds1
Ds2Ds1
Ds1 Ds2
Ds2Ds1
LIMIT OF DISTURBANCE
LIMIT OF DISTURBANCE
LIMIT OF DISTURBANCE
9+00
S31°55'29.8"EWHITE SULPHUR ROAD
L I
V I
N G S T
A D
N/F
AIRLINE BAPTIST
CHURCH
N/F
BUSKER ENTERPRISES LLC
N/F
AIRLINE BAPTIST
CHURCH
N/F
AIRLINE BAPTIST
CHURCH
N/F
REYNOLDS-HEMMER
PROPERTIES, LP
EXIST. R/W
REQ'D R/W
EXIST. R/W
EXIST. R/W
EXIST. R/W
PL
PL
E X I S
T
R
W
E X I S
T
R
W
TEMP ESMT
PERM ESMT
TEMP ESMT
DWESMT
M A
T
A
A W I
M A
T
A
A W I
EASEMENT FOR CONSTR OF SLOPES
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION LIMITS C F
REQUIRED R/W LINE
PROPERTY AND EXISTING R/W LINE PL
& MAINTENANCE OF SLOPES
EASEMENT FOR CONSTR
ORANGE BARRIER FENCE
BEGIN LIMIT OF ACCESS............BLA
END LIMIT OF ACCESS..............ELA
ESA - ENV. SENSITIVE AREA
REQ'D LIMIT OF ACCESS
EXISTING LIMIT OF ACCESS & R/W
REQ'D LIMIT OF ACCESS & R/W
EXISTING LIMIT OF ACCESS
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
PROJECT No.
11/05/2020
REVISION DATES
9/29/2025
Jason.ONeal
GPLOT-ORD
9:14:45 AM
0004-54
Duluth, Georgia 30096
0 10
No.PE032208
PROFESSIONAL
AI
GRO
E G
N O
S
NAH KR
A
M
B
REENIGN
E
D
ERETSIG
E
ORANGE
BARRI
ER
FENCE
ORANGE
BARRIER FENCE
1080.0
1090.0
1095.0
1105.0
5.0
1115.0
1100.0
.0
1085.0
1080.0
1085.0
1090.0
1095.0
.0
Cd-F Cd-F
Cd-F
Cd-F
Cd-F
MID2
Ds1 Ds2
Ds1 Ds2
Ds1 Ds2
Ds1 Ds2
Ds1 Ds2
Ds1 Ds2
LIMIT OF DISTURBANCE
LIMIT OF DISTURBANCE
LIMIT OF DISTURBANCE
10+00
11+00
21+00
20+00
WHITE SULPHUR ROAD
G A T E
W
N T
R E
P
A R
K W
A Y
N/F
REYNOLDS-HEMMER
PROPERTIES, LP
N/F
AIRLINE BAPTIST
CHURCH
N/F
QUIKTRIP
CORPORATION
N/F
REYNOLDS-HEMMER
PROPERTIES, LP
N/F
QUIKTRIP
CORPORATION
EXIST. R/W
EXIST. R/W
E X I S
T
R
W
E X I S
T
R
W
E X I S
T
R
W
PL
PL
EXIST. R/W
TEMP ESMT
DWESMT
DWESMT
TEMP ESMT
M A
T
A
A W I
M A
T
A
A W I
MATCH LINE STA. 11+50.00 DRAWING No. 54-0008
EASEMENT FOR CONSTR OF SLOPES
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION LIMITS C F
REQUIRED R/W LINE
PROPERTY AND EXISTING R/W LINE PL
& MAINTENANCE OF SLOPES
EASEMENT FOR CONSTR
ORANGE BARRIER FENCE
BEGIN LIMIT OF ACCESS............BLA
END LIMIT OF ACCESS..............ELA
ESA - ENV. SENSITIVE AREA
REQ'D LIMIT OF ACCESS
EXISTING LIMIT OF ACCESS & R/W
REQ'D LIMIT OF ACCESS & R/W
EXISTING LIMIT OF ACCESS
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
PROJECT No.
11/05/2020
REVISION DATES
9/29/2025
Jason.ONeal
GPLOT-ORD
9:14:46 AM
0005-54
Duluth, Georgia 30096
0 10
No.PE032208
PROFESSIONAL
AI
GRO
E G
N O
S
NAH KR
A
M
B
REENIGN
E
D
ERETSIG
E
BARRI
ER
FE
NCE
ORANGE
BARRIER FENCE
(DO NOT CLEAR BEYOND
O.B.F.)ORANGE
BARRIER FENCE
(DO NOT CLEAR BEYOND
O.B.F.)
ORANGE
BARRIER FENCE
(DO NOT CLEAR BEYOND
O.B.F.)
ORANGE
BARRIER FENCE
(DO NOT CLEAR BEYOND
O.B.F.)
.0
.0
1070.0
1070.
1070.0
1070.0
1075.0
.0
Rt-Sg3
Cd-F
Cd-F
Cd-F Cd-F Cd-FCd-F
Cd-F
Cd-F
MID2
Ds1 Ds2
Ds1 Ds2
Ds1 Ds2
Co
Co
Co
Co
Ds1 Ds2
Ds1 Ds2
LIMIT OF DISTURBANCE
LIMIT OF DISTURBANCE
S21°23'47.9"E
208+00
209+00
210+00
211+00
WHITE SULPHUR ROAD
S R
R N E L
Y
S R
R N E L
Y
N/F
REYNOLDS-HEMMER
PROPERTIES, LP
N/F
RAVION
ENTERPRISE
E X
IS
T . R
W
EXIST. R/W
E X
IS
T . R
W
EXIST. R
/W
E X I S
T
R
W
PL
M A
T
A
A W I
M A
T
A
A W I
MATCH LINE STA. 20
8+00.0
0 DRAWING No. 5 4-001
MATCH LI
NE STA. 2
11+00.
00 DRAWING No.
54-0
EASEMENT FOR CONSTR OF SLOPES
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION LIMITS C F
REQUIRED R/W LINE
PROPERTY AND EXISTING R/W LINE PL
& MAINTENANCE OF SLOPES
EASEMENT FOR CONSTR
ORANGE BARRIER FENCE
BEGIN LIMIT OF ACCESS............BLA
END LIMIT OF ACCESS..............ELA
ESA - ENV. SENSITIVE AREA
REQ'D LIMIT OF ACCESS
EXISTING LIMIT OF ACCESS & R/W
REQ'D LIMIT OF ACCESS & R/W
EXISTING LIMIT OF ACCESS
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
PROJECT No.
11/05/2020
REVISION DATES
9/29/2025
Jason.ONeal
GPLOT-ORD
9:14:47 AM
0006-54
Duluth, Georgia 30096
0 10
No.PE032208
PROFESSIONAL
AI
GRO
E G
N O
S
NAH KR
A
M
B
REENIGN
E
D
ERETSIG
E
1080.0
1080.0
1075.0
1075.0
1075.0
.0
1085.0 1070.0
1090.0
1095.0
1065.0
1080.0
1075.0
1070.0
1080.0
1100.0
1095.0
1075.0
Rt-Sg3
Rt-Sg3
Cd-F Cd-F
MID2
Ds1 Ds2
Ds1 Ds2
LIMIT OF DISTURBANCE
LIMIT OF DISTURBANCE
S16°30'21.0"E
WHITE SULPHUR ROAD
N/F
REYNOLDS-HEMMER
PROPERTIES, LP
N/F
REYNOLDS-HEMMER
PROPERTIES, LP
N/F
REYNOLDS-HEMMER
PROPERTIES, LP
N
Y N
O L
D S
H E
M M
P
O P E
R T I E S
L P
EXIST. R/W
EXIST. R/W
PL
P L
P L
P L
P L
END PROJECT
18095.001
HALL COUNTY
STA 176+08.00
WHITE SULPHUR ROAD
M A
T
A
A W I
EASEMENT FOR CONSTR OF SLOPES
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION LIMITS C F
REQUIRED R/W LINE
PROPERTY AND EXISTING R/W LINE PL
& MAINTENANCE OF SLOPES
EASEMENT FOR CONSTR
ORANGE BARRIER FENCE
BEGIN LIMIT OF ACCESS............BLA
END LIMIT OF ACCESS..............ELA
ESA - ENV. SENSITIVE AREA
REQ'D LIMIT OF ACCESS
EXISTING LIMIT OF ACCESS & R/W
REQ'D LIMIT OF ACCESS & R/W
EXISTING LIMIT OF ACCESS
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
PROJECT No.
11/05/2020
REVISION DATES
9/29/2025
Jason.ONeal
GPLOT-ORD
9:14:48 AM
0007-54
Duluth, Georgia 30096
0 10
No.PE032208
PROFESSIONAL
AI
GRO
E G
N O
S
NAH KR
A
M
B
REENIGN
E
D
ERETSIG
E
.0
MdE
MID2
LIMIT OF DISTURBANCE
12+00
13+00
14+00
PL
PL
N/F
QUIKTRIP
CORPORATION
PL
PL
PL
P L
N/F
QUIKTRIP
CORPORATION
PL
TEMP ESMT
TEMP ESMT
MATCH LINE STA. 11+50.00 DRAWING No. 54-0005
EASEMENT FOR CONSTR OF SLOPES
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION LIMITS C F
REQUIRED R/W LINE
PROPERTY AND EXISTING R/W LINE PL
& MAINTENANCE OF SLOPES
EASEMENT FOR CONSTR
ORANGE BARRIER FENCE
BEGIN LIMIT OF ACCESS............BLA
END LIMIT OF ACCESS..............ELA
ESA - ENV. SENSITIVE AREA
REQ'D LIMIT OF ACCESS
EXISTING LIMIT OF ACCESS & R/W
REQ'D LIMIT OF ACCESS & R/W
EXISTING LIMIT OF ACCESS
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
PROJECT No.
11/05/2020
REVISION DATES
9/29/2025
Jason.ONeal
GPLOT-ORD
9:14:49 AM
0008-54
Duluth, Georgia 30096
0 10
No.PE032208
PROFESSIONAL
AI
GRO
E G
N O
S
NAH KR
A
M
B
REENIGN
E
D
ERETSIG
E
1050.0
1055.0 1060.0
1065.0
1065.0
1065.0
MID2
LIMIT OF DISTURBANCE
N65°06'11.1"E
SR 365/ CORNELIA HWY
EXIST. R/W
EXIST. R/W
M A
T C
H L
I N
E S
T A
.0
D
R A
W I N
G N o
EASEMENT FOR CONSTR OF SLOPES
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION LIMITS C F
REQUIRED R/W LINE
PROPERTY AND EXISTING R/W LINE PL
& MAINTENANCE OF SLOPES
EASEMENT FOR CONSTR
ORANGE BARRIER FENCE
BEGIN LIMIT OF ACCESS............BLA
END LIMIT OF ACCESS..............ELA
ESA - ENV. SENSITIVE AREA
REQ'D LIMIT OF ACCESS
EXISTING LIMIT OF ACCESS & R/W
REQ'D LIMIT OF ACCESS & R/W
EXISTING LIMIT OF ACCESS
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
PROJECT No.
11/05/2020
REVISION DATES
9/29/2025
Jason.ONeal
GPLOT-ORD
10:24:44 AM
0009-54
Duluth, Georgia 30096
0 10
No.PE032208
PROFESSIONAL
AI
GRO
E G
N O
S
NAH KR
A
M
B
REENIGN
E
D
ERETSIG
E
1040.0
1045.0
1050.0
1055.0
1060.0
1065.0
1070.0
.0
1070.0
0.0
Cd-F Cd-F Cd-F Cd-F
Cd-F Cd-F
Cd-F
MID2
LIMIT OF DISTURBANCE
N65°06'11.1"E
SR 365/ CORNELIA HWY
EXIST. R/W
EXIST. R/W
M A
T
A
A W I
M A
T
A
A W I
EASEMENT FOR CONSTR OF SLOPES
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION LIMITS C F
REQUIRED R/W LINE
PROPERTY AND EXISTING R/W LINE PL
& MAINTENANCE OF SLOPES
EASEMENT FOR CONSTR
ORANGE BARRIER FENCE
BEGIN LIMIT OF ACCESS............BLA
END LIMIT OF ACCESS..............ELA
ESA - ENV. SENSITIVE AREA
REQ'D LIMIT OF ACCESS
EXISTING LIMIT OF ACCESS & R/W
REQ'D LIMIT OF ACCESS & R/W
EXISTING LIMIT OF ACCESS
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
PROJECT No.
11/05/2020
REVISION DATES
9/29/2025
Jason.ONeal
GPLOT-ORD
11:02:15 AM
0010-54
Duluth, Georgia 30096
0 10
No.PE032208
PROFESSIONAL
AI
GRO
E G
N O
S
NAH KR
A
M
B
REENIGN
E
D
ERETSIG
E
ORANGE
BARRIER FENCE
(DO NOT CLEAR BEYOND
O.B.F.)
1060.0
0.0
1060.0
1065.0
1065.0
1065.0
1065.0
1080.0
1075.0
1070.0
1080.0
1075.0
1070.0
1060.0
5.0
.0
.0
.0
0.0
.0
1065.0
1060.0
1055.0
5.0
R dCd-F
MID2
LIMIT OF DISTURBANCE
168+00
SR 365/ CORNELIA HWY
EXIST. R/W
EXIST. R/W
P L
M A
T
A
A W I
EASEMENT FOR CONSTR OF SLOPES
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION LIMITS C F
REQUIRED R/W LINE
PROPERTY AND EXISTING R/W LINE PL
& MAINTENANCE OF SLOPES
EASEMENT FOR CONSTR
ORANGE BARRIER FENCE
BEGIN LIMIT OF ACCESS............BLA
END LIMIT OF ACCESS..............ELA
ESA - ENV. SENSITIVE AREA
REQ'D LIMIT OF ACCESS
EXISTING LIMIT OF ACCESS & R/W
REQ'D LIMIT OF ACCESS & R/W
EXISTING LIMIT OF ACCESS
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
PROJECT No.
11/05/2020
REVISION DATES
9/29/2025
Jason.ONeal
GPLOT-ORD
9:14:51 AM
0011-54
Duluth, Georgia 30096
0 10
No.PE032208
PROFESSIONAL
AI
GRO
E G
N O
S
NAH KR
A
M
B
REENIGN
E
D
ERETSIG
E
Rt-Sg3
Cd-F
Cd-F
TEMP ESMT
TEMP ESMT
PERM ESMT
BEGIN PROJECT
18095.001
HALL COUNTY
STA 140+00.00
WHITE SULPHUR ROAD
1225.0
1205.0
1205.0
1175.0
1180.0
1185.0
1215.0
1215.0
1190.0
1210.0
1210.0
1200.0
1200.0
1200.0
.0
1195.0
1220.0
1185.0
1190.0
1220.0
1230.0
Ds1 Ds2
MID2
MdEMID2MdE
LIMIT OF DISTURBANCE
BEGIN STAGE 1 CONSTRUCTION
BEGIN TEMPORARY PVMT
STA 140+57.79
REQ'D R/W
EXIST. R/W
N/F
CAROL ANN BROWN TRUSTEE
N/F
THE WILEY HEYWARD COLEY TRUST
REQ'D R/W
PL
PL
N/F
PATRICIA C PUCKETT
EXIST. R/W
EXIST. R/W
IS-1
ESA 25- STREAM BUFFER
WHITE SULPHUR ROAD
WHITE SULPHUR ROAD
BEGIN STAGE 1 CONSTRUCTION
BEGIN TEMPORARY PVMT
STA 140+57.79
M A
T
N E
S
T A
A W I
EASEMENT FOR CONSTR OF SLOPES
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION LIMITS C F
REQUIRED R/W LINE
PROPERTY AND EXISTING R/W LINE PL
& MAINTENANCE OF SLOPES
EASEMENT FOR CONSTR
ORANGE BARRIER FENCE
BEGIN LIMIT OF ACCESS............BLA
END LIMIT OF ACCESS..............ELA
ESA - ENV. SENSITIVE AREA
REQ'D LIMIT OF ACCESS
EXISTING LIMIT OF ACCESS & R/W
REQ'D LIMIT OF ACCESS & R/W
EXISTING LIMIT OF ACCESS
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
PROJECT No.
11/05/2020
REVISION DATES
9/29/2025
Jason.ONeal
GPLOT-ORD
9:14:52 AM
54-0012
STAGE 1 INTERMEDIATE PHASE
Duluth, Georgia 30096
0 10
No.PE032208
PROFESSIONAL
AI
GRO
E G
N O
S
NAH KR
A
M
B
REENIGN
E
D
ERETSIG
E
Rt-Sg
Rt-Sg3
Rt-Sg3
Cd-F
Cd-F
Cd-F
TEMP ESMT
TEMP ESMT
PERM ESMT
DWESMT
PERM ESMT
TEMP ESMT
Cd-F
Cd-F
1130.0 1125.0
1135.0
1155.0
1150.0
1160.0
1145.0
1180.0
1185.0
.0
1165.0
.0
.0
1180.0
1175.0
1185.0
1190.0
5.0
.0
.0
0.0
5.0
.0
.0
1120.0
1140.0
1190.0
1165.0
Ds1 Ds2
Ds1 Ds2
Cd-F
Cd-F Cd-F
M d E
M
ID
LIMIT OF DISTURBANCE
Ss
END TEMPORARY PVMT
STA 148+80.05
BEGIN TEMPORARY PVMT
STA 149+10.55
N/F
WILEY HEYWARD
COLEY TRUST
N/F
CLARA
GAINES
COLEY
N/F
W.H.
COLEY
N/F
AIRLINE BAPTIST
CHURCH
N/F
GA PORTS AUTHORITY
N/F
PATRICIA C PUCKETT
REQ'D R/W
REQ'D R/W
EXIST. R/W
EXIS
T. R
/W
P L
P L
PL
P L
ESA 25- STREAM BUFFER
ESA 25- STREAM BUFFER
IS-2
ORANGE BARRIER FENCE
WHITE SULPHUR ROAD
END TEMPORARY PVMT
STA 148+80.05
BEGIN TEMPORARY PVMT
STA 149+10.55
M A
T
A
A W I
M A
T
N E
S
T A
A W I
EASEMENT FOR CONSTR OF SLOPES
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION LIMITS C F
REQUIRED R/W LINE
PROPERTY AND EXISTING R/W LINE PL
& MAINTENANCE OF SLOPES
EASEMENT FOR CONSTR
ORANGE BARRIER FENCE
BEGIN LIMIT OF ACCESS............BLA
END LIMIT OF ACCESS..............ELA
ESA - ENV. SENSITIVE AREA
REQ'D LIMIT OF ACCESS
EXISTING LIMIT OF ACCESS & R/W
REQ'D LIMIT OF ACCESS & R/W
EXISTING LIMIT OF ACCESS
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
PROJECT No.
11/05/2020
REVISION DATES
9/29/2025
Jason.ONeal
GPLOT-ORD
9:14:53 AM
0013-54
Duluth, Georgia 30096
0 10
No.PE032208
PROFESSIONAL
AI
GRO
E G
N O
S
NAH KR
A
M
B
REENIGN
E
D
ERETSIG
E
Cd-F Cd-F
Cd-F
Cd-F Cd-F
Cd-F
Cd-F Cd-F
TEMP ESMT
PERM ESMT
TEMP ESMT
PERM ESMT
TEMP ESMT
TEMP ESMT
DWESMT
1110.0
1105.0
1130.0
1130.0
1125.0
1125.0
.0
1115.0
.0
1115.0
.0
1120.0
1120.0
0.0
.0
1135.0
1140.0
1140.0
1140.0
1155.0
1155.0
1150.0
1160.0
1145.0
1165.0
1140.0
1145.0
1115.0
Ds1 Ds2
Ds1 Ds2 Ds1 Ds2
Cd-F Cd-FCd-F
Cd-F
Rt-Sg3
M d E
M
ID
LIMIT OF DISTURBANCE
Ss
TEMP 02
TEMP
24"
N/F
GAINESVILLE & HALL CO
DEVELOPMENT
N/F
BUSKER ENTERPRISES LLC
N/F
AIRLINE BAPTIST
CHURCH
EXIST. R/W
REQ'D R/W
EXIST. R/WREQ'D R/W
REQ'D R/W
P L
ESA 25- STREAM BUFFER
ESA 25- STREAM BUFFER
ORANGE BARRIER FENCE
WHITE SULPHUR ROAD
M A
T
A
A W I
M A
T
A
A W I
EASEMENT FOR CONSTR OF SLOPES
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .