4-NW-C4319A WHSPT Pacific Co Surfacing-Ph2-Bid Proposal Form.xlsx

XLSX spreadsheet 159 KB Posted

Attached to
State Parks Project – Pacific County Surfacing - Phase 2 at Willapa Hills State Park Trail
Solicitation number
NW-C4319A
Issued by
Washington

About this file

This is a bid proposal form for the Washington State Parks project at Willapa Hills State Park Trail in Pacific County, submitted through the MRSC Bonfire Procurement Portal. The project, designated NW-C4319A, involves surfacing work in Phase 2 and includes grubbing, grading, crushed rock surfacing, and associated trail improvements. Base bid items include trench excavation safety provisions, mobilization, temporary erosion and sediment control, grading and compaction of 39,500 linear feet, 1-1/2" crushed surfacing base course totaling 5,500 tons, 3/8" crushed surfacing top course totaling 15,000 tons, and 100 tons of boulders. Alternate bid items include 1,500 tons of 1-1/2" crushed surfacing base course and 4,200 tons of 3/8" crushed surfacing top course without trucking costs. Bidders must achieve substantial completion within 120 calendar days from the Notice to Proceed and final completion within 30 calendar days thereafter. Liquidated damages are assessed at $250.00 per calendar day for delays beyond the completion deadline. The Owner reserves the right to accept or reject all bids and waive informalities, with a 60-day acceptance period from the bid deadline.

All costs must be submitted as "in place" costs excluding Washington State Sales Tax, with unit prices and estimated quantities used to determine the base bid and adjust contract amounts for quantity changes. Bidders must comply with Washington Public Works Bid Laws, maintain current contractor registration under Chapter 18.27 RCW, and hold appropriate licenses for any self-performed plumbing, electrical, or elevator work. The bid form requires certification of wage compliance under RCW 49.46, 49.48, and 49.52, confirming no willful violations within three years preceding the bid solicitation. Bidders must certify good faith efforts to utilize minority-owned, women-owned, small, and veteran-owned businesses, with a summary table for tracking utilization percentages. For projects valued at one million dollars or more, bidders must identify HVAC, plumbing, electrical, structural steel, and rebar subcontractors at time of bid submission, with structural steel and rebar subcontractors permitted submission within 48 hours after bid deadline. The form requires acknowledgment of all addenda received and signature by an authorized official, with failure to comply rendering the bid non-responsive.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Compliance

Willapa Hills State Park Trail
Pacific County Surfacing - Phase 2
NW-C4319A
https://mrscrosters.bonfirehub.com/portal
The Bidder will submit the Bid to State Parks Public Opportunities MRSC Bonfire Procurement Portal
Bidder Compliance Form Proposal Form
Contractor Information
Person Signing BidFirm Name
Title Person SigningPhysical Address
Contractor Registration #City, State, ZIP
Taxpayer Identification #Phone #
Washington UBI #Cellular Phone #
WA ESD #Email Address
The Bidder Compliance Form verifies compliance with State of Washington Public Works Bid Laws and associated Project Documents. It highlights key project components and ensures acknowledgment. Failure to acknowledge this form within the Bid Form, as directed, will render the bid non-responsive. Acknowledging the form does not alter the bidder’s obligation to comply with all contract documents if awarded the project.
Bidder’s Declaration
The Bidder declares that they have carefully examined the site of the proposed work, the Drawings, Specifications and all of the conditions affecting the work. Therefore, the Bidder proposes to provide all labor, equipment, materials, and permits and to perform all work as required by, and in strict accordance with the Contract Documents as shown on the bid proposal form.
Bid Acceptance and Owner Discretion
The Owner reserves the right to accept or reject all bids and to waive informalities. The Bidder will allow sixty (60) days from bid deadline date for acceptance of its bid by the Owner.
Registration and Required Licenses
The Bidder is a registered contractor in compliance with Chapter 18.27 RCW. If applicable, as the prime contractor, the Bidder self-performing plumbing work holds the required licensure under Chapter 18.106 RCW. Similarly, if self-performing elevator work, the Bidder holds the necessary license in accordance with Chapter 70.87 RCW. Additionally, if the Bidder is self-performing electrical work, they are properly licensed under Chapter 19.28 RCW.
Time for Completion
Bidder agrees to Substantially Complete the project, including accepted alternates, in accordance with the drawings and specifications from the date provided on the Notice to Proceed letter, within the following calendar days:120
Final Completion of all Work, in accordance with the Contract Documents, shall be achieved within 30 calendar days after the date of Substantial Completion.

Liquidaded Damages

It is agreed that liquidated damages shall be levied for each and every calendar day by which the completion of the work is delayed beyond the time fixed for completion or extension of the contract, in the following amount: $250.00

Chart Data

Total
Trench Excavation Safety ProvisionsLS.
ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A

Bid Form

Willapa Hills State Park Trail
Pacific County Surfacing - Phase 2
NW-C4319A
https://mrscrosters.bonfirehub.com/portal
The Bidder will submit the Bid to State Parks Public Opportunities MRSC Bonfire Procurement Portal
Bid Form
Unit prices and estimated quantities shall be used to determine the Base Bid
These prices shall also be used to adjust the Contract in the event there is an increase or decrease in the estimated quantities. All costs shall be “in place” costs and complete, excluding Washington State Sales Tax. In the event of an irregularity, the unit price prevails. The Owner reserves the right to make mathematical corrections of multiplication or addition errors on the bid form.
Trench Excavation Safety Provisions
If the contract contains any work which requires trenching exceeding a depth of four (4) feet, all costs for adequate trench safety systems shall be identified as a separate bid item in compliance with Chapter 39.04 RCW. The purpose of this provision is to ensure that the bidder agrees to comply with all relevant trench safety requirements of Chapter 49.17 RCW and WAC 296-155-650. This bid amount shall be considered part of the total base bid. Include a lump sum dollar amount (even if the value is $0.00) to be considered responsive to the bid solicitation.
Wage Certification
The bidder certifies under penalty of perjury under the laws of the State of Washington that the foregoing is true and correct: within the three-year period immediately preceding the bid solicitation date, the bidder has not been a “willful” violator, as defined in RCW 49.48.082, of any provision of chapters 49.46, 49.48, or 49.52 RCW, as determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction.
Base Bid Items (Be sure to include unit prices)
Item No.DescriptionEst QtyUnit TypeUnit PriceTotal AmountCosts Ranked
1Trench Excavation Safety Provisions1LS.$0.001
2Mobilization1LS.$0.001
3Temporary Erosion and Sediment Control1LS.$0.001
4Grading/Compaction39500LF.$0.001
51-1/2" Crushed Surfacing Base Course (CSBC)5500TON$0.001
63/8" Crushed Surfacing Top Course (CSTC)15000TON$0.001
7Boulders (3-4 man)100TON$0.001
Total Base Bid$0.00
Alternate Bid Items
Item No.DescriptionEst QtyUnit TypeUnit PriceTotal AmountCosts Ranked
A11-1/2" CSBC Unit Price/No Trucking1500TON$0.001
A23/8" CSTC Unit Price/No Trucking4200TON$0.001
Total Alternates$0.00

Receipt of Addenda

List all addenda received, separated by commas (e.g., "1, 2, 3, 4"). Do not list only the final number (e.g., "4"). If no addenda, type "N/A." Failure to follow this may render your bid non-responsive.

Bid Acknowledgment and Compliance Certification

By signing and returning this form, you acknowledge compliance with the bid requirements. Failure to sign and submit this form will result in the bid being considered non-responsive.

/s/ Signature of Authorized OfficialDate
Typing your name can count as a signature.

MWBE

Willapa Hills State Park Trail
Pacific County Surfacing - Phase 2
NW-C4319A
https://mrscrosters.bonfirehub.com/portal
The Bidder will submit the Bid to State Parks Public Opportunities - MRSC Bonfire Procurement Portal
MWBE, WA Small Business, Veteran-Owned Business
Business Utilization Certification
The bidder certifies good faith efforts to provide opportunities to MWBEs, Small Businesses, and Veteran-Owned Businesses. If awarded, the bidder commits to utilizing these firms or approved substitutes on the project. If no such firms will be used, enter "N.A." on the first line.
Firm Name, AddressFederal I.D. #Type of
WorkCertificate
NumberMBE%WBE%Small Business%Veteran Business%
1
2
3
4
Totals0.00%0.00%0.00%0.00%
The bidder may add rows for additional MWBE/WA Small and Veteran-Owned Business Utilization Certifications.

Subcontractor Utilization

Willapa Hills State Park Trail
Pacific County Surfacing - Phase 2
NW-C4319A
https://mrscrosters.bonfirehub.com/portal
The Bidder will submit the Bid to State Parks Public Opportunities MRSC Bonfire Procurement Portal
Subcontractor Utilization List
Subcontractor Utilization List (If Applicable)
In compliance with the contract documents, the following subcontractor list is submitted:
SUBCONTRACTOR LISTING - RCW 39.30.060
If the base bid and the sum of the additive alternates is ONE MILLION DOLLARS OR MORE, the Bidder shall provide names of the subcontractors with whom the Bidder will directly subcontract for performance of the following work. If the Bidder intends to perform the work, the Bidder must enter its name for that category of work.
A.Pursuant to RCW 39.30.060, the Bidder shall submit the names of subcontractors as follows:
1HVAC, Plumbing, and Electrical: The names of subcontractors and proof of license for these trades (or the Bidder's own name and proof of license) must be submitted at the published bid submittal time.
2Structural Steel and Rebar: The names of subcontractors for these trades may be submitted at the published bid submittal time, but must be submitted no later than 48 hours after the published bid submittal time.
B.List Subcontractors: The Bidder shall indicate on the Subcontractors List the names of the subcontractors with whom the Bidder, if awarded the contract, will directly subcontract for performance of the work of heating, ventilation, and air conditioning, plumbing as described in Chapter 18.106 RCW, electrical as described in Chapter 19.28 RCW, structural steel installation, and rebar installation.
C.List Bidder if Bidder Performing Work: If the Bidder will self-perform the work in any of the five areas required, the Bidder shall name itself for the work on the Subcontractors List.
D.Name Only One Firm for Each Category of Work: The Bidder shall not list more than one firm (subcontractor or Bidder) for each category of work identified, unless subcontractors vary with bid Alternatives or Additives, in which case the Bidder must indicate which firm will be used for which Alternate or Additive.
E.Substitution of Subcontractors: Substitution of any listed subcontractor may only be according to the procedure and parameters set forth in RCW 39.30.060.
F.Factors Relating to Non-Responsiveness: Failure of the Bidder to submit the names and license numbers of such subcontractors or to name itself to perform such work or the naming of two or more firms (subcontractors or Bidder) to perform the same work, or failure to sign the form shall render the Bidder’s bid non-responsive and, therefore, VOID.
G.The Subcontractor Utilization List is intended to discourage bid shopping, not to verify subcontractor qualifications. The Owner does not use the Subcontractor Utilization List as a tool to disqualify or qualify bidders.
H.Applicable to Direct Subcontractors: The obligation under this section to identify proposed subcontractors for heating, ventilation and air conditioning, plumbing, electrical, structural steel installation, and rebar installation applies solely to subcontractors in these trades who will enter into a direct contractual relationship with the Bidder.
1 For HVAC, Plumbing, and Electrical
HVAC. Electrical, Plumbing: The requirement of this section to name the bidder’s proposed heating, ventilation and air conditioning, plumbing and electrical subcontractors applies only to proposed heating, ventilation, and air conditioning, plumbing and electrical subcontractors who will contract directly with the bidder.
Errors in the proof of license may be corrected by the Bidder within 48 hours of submission.
Category of WorkBidder MUST check one box for each Category of Work.

If subcontracting the work, bidder must name the subcontractor

HVAC (Heating, Ventilation & Air Conditioning)FALSEName of Subcontractor:
Sub License Number:
FALSEBidder will self-perform this work, or the project does not include this work.
ElectricalFALSEName of Subcontractor:
Sub License Number:
FALSEBidder will self-perform this work, or the project does not include this work.
PlumbingFALSEName of Subcontractor:
Sub License Number:
FALSEBidder will self-perform this work, or the project does not include this work.
Bidder may attach a separate sheet for additional alternate bid subcontractors
2 For Structural Steel Installation and Rebar Installation
Structural Steel Installation and Rebar Installation: The requirement of this section to name the bidder’s proposed names of the subcontractors with whom the bidder, if awarded, will subcontract for performance of the work of structural steel installation and rebar installation.
You may submit these now, or strictly within 48 hours after the bid submittal time, to contracts@parks.wa.gov.
Category of WorkBidder MUST check one box for each Category of Work.

If subcontracting the work, bidder must name the subcontractor

Structural Steel InstallationFALSEName of Subcontractor:
Sub License Number:
FALSEBidder will self-perform this work, or the project does not include this work.
Rebar InstallationFALSEName of Subcontractor:
Sub License Number:
FALSEBidder will self-perform this work, or the project does not include this work.
Bidder may attach a separate sheet for additional alternate bid subcontractors
Bidder Certification
By signing below, the Bidder certifies that the above subcontractors have been contacted and have agreed to perform the work if the contract is awarded.
/s/ Signature of Authorized OfficialDate
Typing your name can count as a signature.