This is a Bid Bond Form for the Washington State Parks Project at Willapa Hills State Park Trail in Pacific County, specifically for surfacing work in Phase 2 (Project NW-C4319A). The project encompasses grubbing, grading, crushed rock surfacing, and associated trail improvements. Bidders must submit their responses through the MRSC Bonfire Procurement Portal at https://mrscrosters.bonfirehub.com/portal. The bid validity period requires bidders to allow for a 60-day acceptance period from the bid opening date. All bid bonds must be submitted as scanned PDF copies included with the electronic bid submission.
Bid bond requirements are contingent on total bid amount, including all additive alternates. No bid bond is required for bids of $35,000 or less; however, for bids exceeding $35,000, a mandatory bid bond of 5% of the total bid amount must be submitted, or the bid will be deemed non-responsive. Bid bonds for the three lowest bidders will be retained for 30 days or until contract execution with the successful bidder, while all other bid bonds will be released within 15 days of bid opening. If the successful bidder fails to execute the contract or provide a performance bond within 15 days of receiving contract forms, the bid bond may be forfeited as liquidated damages. Bidders should direct questions to contracts@parks.wa.gov and must review all bid documents thoroughly to ensure compliance with submission requirements, with additional details available in Section 11.1 of the Instructions to Bidders in the project manual.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-NW-C4319A WHSPT Pacific Co Surfacing-Ph2-Drwgs.pdf | ||
| 3-NW-C4319A WHSPT Pacific Co Surfacing-Ph2-Specs.pdf | ||
| 4-NW-C4319A WHSPT Pacific Co Surfacing-Ph2-Bid Proposal Form.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Bond Requirements
| Willapa Hills State Park Trail |
| Pacific County Surfacing - Phase 2 |
| NW-C4319A |
| https://mrscrosters.bonfirehub.com/portal |
| The Bidder will submit the Bid Bond (if Applicable) to State Parks Public Opportunities MRSC Bonfire Procurement Portal |
| Bid Bond Requirements |
| Bid Guarantee: See Instructions to Bidders 11.1 Bid Bond. No particular bid bond form is required. Failure of the Bidder to provide bid guarantee when required shall render the bid non-responsive. |
Bid Bond Threshold
| 1 | A bid bond is not required if the total bid amount, including all additive alternates, is $35,000 or less. |
| 2 | For bids exceeding $35,000, a bid bond of 5% of the total bid amount is mandatory. |
| Acceptable Forms |
| 1 | Acceptable forms of bid guarantee: A bid bond, and must be submitted as part of the bid response. |
| 2 | Scanned copies of the bid bond (e.g., PDF) are acceptable and should be included with the electronic bid submission. |
| Submission Process |
| 1 | Include the bid bond in a single PDF file. |
| 2 | At the time of bid, the bidder must upload an electronic copy of the acceptable bid guarantee to the State Parks Oportunities via MRSC Portal Bonfire https://mrscrosters.bonfirehub.com/portal |
| Retention and Forfeiture |
| 1 | Bid bonds for the three lowest bidders will be retained for 30 days or until a contract is executed with the successful bidder. |
| 2 | All other bid bonds will be released within 15 days of the bid opening. |
| 3 | If the successful bidder fails to execute the contract or provide a performance bond within 15 days of receiving the contract forms, the bid bond may be forfeited as liquidated damages. |
| Bid Validity Period |
| 1 | Bidders must allow for a 60-day acceptance period from the bid opening date. |
| Important Reminder |
| 1 | Review all bid documents thoroughly to ensure compliance with submission requirements, including proper completion and inclusion of the bid bond when applicable. |
| For further details or clarification, refer to Section 11.1 of the "Instructions to Bidders" in the project manual. If you have questions, contact contracts@parks.wa.gov | |
| FALSE | Check the box to the left if the total bid, including all additive alternates, is $35,000 or less, and include this statement with your bid response. No bid bond is required for bids at or below this amount. For bids exceeding $35,000, a bid bond must be submitted instead. Failure to provide a required bid bond will render the bid non-responsive. |
https://mrscrosters.bonfirehub.com/portal Chart Data
| Total | |
| ERROR:#REF! | ERROR:#REF! |
| ERROR:#REF! | ERROR:#REF! |
| ERROR:#REF! | ERROR:#REF! |
| ERROR:#REF! | ERROR:#REF! |
| ERROR:#REF! | ERROR:#REF! |
image2.png
File details come from the government source that posted it. Updated .