4 La Jolla Seawater Service SOW_Redacted.pdf
PDF 89 KB Posted
- Attached to
- La Jolla Lab Seawater Services
- Solicitation number
- 143051240049
About this file
This notice announces the intent to award a sole source, one-year firm fixed price contract to the University of California San Diego for seawater services. The National Oceanic and Atmospheric Administration's Southwest Fisheries Science Center La Jolla Laboratory requires a continuous flow of 80 gallons per minute of seawater from September 14, 2024 to September 13, 2025. The University of California San Diego currently owns and maintains the infrastructure to supply seawater from their Scripps Institution of Oceanography pier intake to NOAA's laboratory and back to the ocean outfall under a 2009 ground lease agreement. Interested parties must submit capability statements including technical and cost details by March 08, 2024 to be considered for the sole source award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2 JOFOC 143051240049_redacted.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOAA/NATIONAL MARINE FISHERIES SERVICE
SOUTHWEST FISHERIES SCIENCE CENTER
O&M DIVISION
Statement of Work
Performance Period: September 14, 2024- September 13, 2025
I. Introduction and Background The NOAA / Southwest Fisheries Science Center requires continuous seawater flow supplied from the University of California at San Diego’s (UCSD) Scripps Institution of Oceanography (SIO). The UCSD Regents has been providing continuous seawater to the SWFSC for over 5 decades for the experimental aquarium and newly built technology tank. The SWFSC La Jolla Laboratory is located on the campus of SIO, which is part of the University of California system, governed by the UC Regents. NOAA and the UC Regents signed the Ground Lease for the land on which the laboratory was built on 17 June 2009. The Ground Lease further specifies that NOAA will pay the UC Regents for seawater usage. The infrastructure to provide the seawater is in place and there is no other source.
II. Description of Work and Services Requirement is to provide a continuous flow of seawater to the La Jolla Laboratory.
Seawater will be pumped from the intake at the end of the Scripps Institution of Oceanography (SIO) Pier, flow through the SWFSC experimental aquarium, and returned to the ocean via SIO’s seawater outfall. All piping, valves, pumps and associated equipment are owned and maintained by SIO, with the exception of equipment on the premises of the SWFSC La Jolla Laboratory. Expected flow is 80 gallons per minute.
Period of performance will be September 14, 2024 to September 13, 2025. This will allow the SWFSC to accomplish its mission of conducting research on the conservation and management of living marine resources.
IV. Deliverables Provide continuous seawater flow to the SWFSC La Jolla Laboratory.
V. Period of Performance 9/14/2024-9/13/2025
File details come from the government source that posted it. Updated .