This document is a Scope of Work and Specifications for the 4-H Barn Restoration Project issued by Lewis County, Washington, in collaboration with the Southwest Washington Fairgrounds and the Washington State Department of Agriculture Fairs Program. The project involves comprehensive structural and roofing improvements to the 4-H Barn, including repairing the south and north walls, installing new doors (garage and man doors), replacing roofing with a white composition roof with a 30-year manufacturer's warranty, resurfacing both the north and south floors with asphalt, and installing metal siding. The project is subject to a mandatory site walk-through on March 18, 2025, at 10:00 am, with electronic proposal submissions due by March 28, 2025, at 12:00 pm through the OpenGov procurement portal, and questions must be submitted by March 23, 2025, at 8:00 pm.
The project is funded through a $237,500 state grant, with strict adherence to prevailing wage requirements and applicable building codes. Lewis County is committed to equal opportunity and affirmative action, encouraging submissions from minority, veteran, and women-owned firms. Only contractors previously accepted to a small works roster can be invited to bid and potentially awarded the contract. Proposals will be evaluated exclusively through the OpenGov electronic procurement system, with direct communication available through Project Manager Matt Patana via phone (360-219-6147) or email. The project emphasizes compliance with Title VI of the Civil Rights Act and ensures non-discriminatory consideration of bids based on race, color, or national origin.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4-H_Barn_Restoration_Project_RFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. (South Wall)
2. Pour Footing and stem-wall that can support the damaged wall (as referenced in pictures 2a and b.) Reframe and replace any sheeting or supports as necessary to meet safety and code.
a.
b.
3. Frame in a man door (for future) in west corner of south wall, just west of the nearest roll up door. (as referenced in 3a). Re-sheet the south wall up to the rafters with ½” OSB (as shown in blue referenced in 3b). The bottom 16” shall be covered with ¾” PT Plywood. Re-sheet the east wall with ½” OSB or plywood up to the window area. The bottom 16” shall be covered with ¾” PT Plywood (As shown per picture 3a2).
a. a2.
b.
4. Install metal siding on the exterior of the south building in area’s designated below in picture 4a. (3’ exposed fastener minimum 29 gauge metal). Color to be determined by county.
a.
5. Remove sheet metal roofing (as referenced in pictures 5a ). This must be done at correct rate of pay for prevailing wage. With the proper safety in-place at all times.
a.
6. Install new (plywood or osb as determined by code) over truss components, with identical overhangs.
7. New roof shall be Composition roof.
a. White in color.
b. Felt shall be approved thickness
c. Manufacturer’s warranty shall be 30 Years.
d. Workmanship warranty shall be 5 Years.
8. Identify and replace all necessary eve’s, facia, exposed overhangs and rafter tails that are compromised.
9. Remove, re-use, replace, or install all gutters to complete the gutter system for the building in the area being affected.
10. Exhaust Fans (as shown in 15a) shall be salvaged and reused if possible, so leave in place or re-install them physically (not electrically).
a.
11. North Wall a.
12. Frame where necessary and Install two 8x8x14 PT beams to mount the garage doors, in the center of the opening. (as shown in red picture 12a).
a.
13. Install two 12’ wide x 10’ tall sliders on the east and west side of the center dividing wall as per the picture. (as show in figure 12a).
14. Install a 12’ x 12’ tall garage door that will be centered in the dividing wall between the two sliders. (as show in figure 12a).
15. Install Man door at the northwest side of the 60’ wide portion of the building. (as show in figure 12a and 15a.).
a.
16. Install 14’ wide by 10’ tall garage doors on the center entrances on the East and West side of the building. These will replace the current sliders shown below. (pictures in 16a).
a.
17. Resurface the south floor of the 4 H barn by adding 1 lift of asphalt and eliminating potential tripping hazards. (some issues a depicted in pictures 17a.)
a.
18. Add a line item to resurface the north floor of the 4 H barn by prepping and asphalting area as necessary to do the entire covered area within the current north side of building and tying in with the south portion of the building.