4. Project Drawings.pdf

PDF 3 MB Posted

Attached to
127EAW24R0056 - 39N30 Roadway Reconditioning
Solicitation number
127EAW24R0056
Issued by

About this file

This document contains project drawings and related information for a 39N30 Roadway Reconditioning project on the Klamath National Forest in California. The project includes roadway and ditch reconditioning work on approximately 1.5 miles of the 39N30 road (also known as the Godfrey Ranch Road). Key details include:

The project is a small business set-aside solicitation issued by the US Forest Service with an estimated value between $100,000 and $250,000. Offers must be submitted by 1300 hours PST on July 12, 2024. No pre-proposal site visit will be held, but the project location can be viewed by prospective offerors. The drawings provide details on roadway cross-sections, rolling dips, staging areas, and other project requirements. Contractors must use pre-approved aggregate sources and meet various environmental and logistical specifications outlined in the general notes.

View the file

Other files

File Type Posted
3. FS Suplimental Specifications.pdf PDF
1. Statement of Work.pdf PDF
2. Schedule.docx DOCX document
5. Fire Plan.pdf PDF
7. RFI Form.docx DOCX document
6. Davis-Bacon Act WD # CA20240007.pdf PDF
127EAW24R0056 - 39N30 Roadway Reconditioning.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEGEND

STATE HIGHWAY

U.S. HIGHWAY

INTERSTATE HIGHWAY

PRIMARY FOREST ROUTE93

COUNTY ROAD

PROJECT LOCATION

KLAMATH NATIONAL FOREST

OREGON

1C

YREKA

FORT JONES

ETNA

KLAMATH RIVER

HAPPY CAMP

ORLEANS

DORRIS

MACDOEL

WEED1C

1C

2B

7C

7F

TO REDDING

TO MEDFORD

TO CAVE JUNCTION

TO WEAVERVILLETO EUREKA

TO KLAMATH FALLS

PROJECT

LOCATION

FOREST LOCATION MAP

PROJECT LOCATION MAP

TRAVEL DIRECTIONS:

SHEET OF

United States Department of Agriculture Forest Service

39N30 ROADWAY RECONDITIONING

FROM THE SALMON SCOTT DISTRICT OFFICE LOCATED IN FORT JONES HEAD SOUTH ON CA-3 SOUTH FOR 11 MILES, THEN CONTINUE STRAIGHT ONTO COLLIER WAY. CONTINUE STRAIGHT FOR 0.5 MILES AND THEN TURN RIGHT ONTO MAIN STREET/SAWYERS BAR ROAD(1C01). CONTINUE STRAIGHT FOR

39.4 MILES. ONCE IN FORKS OF SALMON TURN LEFT ONTO THE CECILVILLE - CALLAHAN ROAD AND

CONTINUE STRAIGHT FOR 5 MILES TO ARRIVE AT THE 39N30 ROAD(GODFREY RANCH ROAD).

LAT: 41.2326 LONG: -123.2507

RECOMMENDED BY:

FOREST ENGINEER

DISTRICT RANGER DATE

DATE

FOREST SUPERVISOR DATE

5/1 6/2

4 0 8:

S

MA

RA

NO

C

:\U

SE

RS

\S

MA

RA

NO

\B

OX

\01

. S

AM

UE

L.

MA

RA

NO

W

OR

KS

PA

CE

\00

KN

F

EN

GI

NE

ER

IN

G\

LE

GA

CY

S

IT

ES

\01

BE

AR

C

OU

NT

RY

\D

ES

IG

N

DR

AW

IN

GS

\B

EA

RC

OU

NT

RY

PH

AS

E1 _5

.13 _U

PD

AT

ED

S.

DW

G;

CALIFORNIA

SISKIYOU COUNTY

(R05) PACIFIC SOUTHWEST REGION

KLAMATH NATIONAL FOREST

SALMON/SCOTT RANGER DISTRICT

INDEX OF SHEETS

SHEET SHEET TITLE DATE

G-01 TITLE SHEET 3/30/2024

G-02 PROJECT VICINITY 3/30/2024

G-03 GENERAL NOTES 3/30/2024

C-01 ROADWAY DETAIL 3/30/2024

C-02 ROLLING DIP DETAIL 3/30/2024

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A12

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

5/1 6/2

4 0 8:

S

MA

RA

NO

C

:\U

SE

RS

\S

MA

RA

NO

\B

OX

\01

. S

AM

UE

L.

MA

RA

NO

W

OR

KS

PA

CE

\00

KN

F

EN

GI

NE

ER

IN

G\

LE

GA

CY

S

IT

ES

\01

BE

AR

C

OU

NT

RY

\D

ES

IG

N

DR

AW

IN

GS

\B

EA

RC

OU

NT

RY

PH

AS

E1 _5

.13 _U

PD

AT

ED

S.

DW

G;

REGION 5

PACIFIC SOUTHWEST

39N30 ROADWAY

RECONDITIONING

KLAMATH NATIONAL

FOREST

SALMON/SCOTT RANGER DISTRICT

PROJECT VICINITY

03/30/2024

S.MARANO

S.MARANO

C.BIELECKI

G-02 002 005

MP 0.00: BOP

BEGIN ROADWAY

RECONDITIONING

BEGIN AGGREGATE

SURFACE COURSE

(41.2326,-123.2507)

MP 1.50: EOP

END ROADWAY

RECONDITIONING

(41.2464,-123.2421)

MP 1.34: ROLLING DIP

(41.2377,-123.2400)

MP 0.75

END AGGREGATE

SURFACE COURSE

(41.2324,-123.2441)

MP 1.20: ROLLING DIP

(41.2362,-123.2419)

MP 0.81: ROLLING DIP

(41.2325,-123.2433)

MP 0.53: ROLLING DIP

(41.2301,-123.2465)

MP 0.34: ROLLING DIP

(41.2304,-123.2496)

MP 0.27: STAGING LOCATION

(41.2298,-123.2504)

MP 0.17: ROLLING DIP

(41.2433,-123.2389)

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

E

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

5/1 6/2

4 0 8:

S

MA

RA

NO

C

:\U

SE

RS

\S

MA

RA

NO

\B

OX

\01

. S

AM

UE

L.

MA

RA

NO

W

OR

KS

PA

CE

\00

KN

F

EN

GI

NE

ER

IN

G\

LE

GA

CY

S

IT

ES

\01

BE

AR

C

OU

NT

RY

\D

ES

IG

N

DR

AW

IN

GS

\B

EA

RC

OU

NT

RY

PH

AS

E1 _5

.13 _U

PD

AT

ED

S.

DW

G;

REGION 5

PACIFIC SOUTHWEST

39N30 ROADWAY

RECONDITIONING

KLAMATH NATIONAL

FOREST

SALMON/SCOTT RANGER DISTRICT

GENERAL NOTES

03/30/2024

S.MARANO

S.MARANO

C.BIELECKI

G-03 003 005

GENERAL NOTES:

1. NO WORK THAT GENERATES NOISE ABOVE AMBIENT LEVELS(I.E USE OF HEAVY

EQUIPMENT) SHALL BE COMPLETED PRIOR TO JULY 9TH AND AFTER FEBRUARY 1ST

2. ALL AGGREGATE SURFACING & REINFORCING SHALL BE FROM A COMMERCIAL

SOURCE . BEFORE PLACEMENT OF ANY MATERIAL CONTRACTOR SHALL SUBMIT LAB

TEST RESULTS TO COR FOR APPROVAL.

3. STAGING AREAS FOR EQUIPMENT STORAGE OR MATERIAL STOCKPILES WILL BE

ALLOWED ONLY IN AREAS SHOWN ON THE PLANS AND WITH APPROVAL FROM THE

COR

4. ALL EQUIPMENT WILL ARRIVE ON SITE WASHED AND FREE OF ALL VISIBLE SOIL,

DEBRIS, OR ORGANIC MATERIAL.

5. CONTRACTOR SHALL IMMEDIATELY NOTIFY THE C.O.R. OF ANY DISCREPANCIES

ENCOUNTERED IN THE FIELD OR ERRORS IDENTIFIED IN THE CONTRACT.

6. CONTRACTOR SHALL BE REQUIRED TO PROVIDE TWO WEEKS NOTIFICATION BEFORE

START OF WORK.

7. ALL NECESSARY STAKING SHALL BE COMPLETED BY FOREST SERVICE PRIOR TO THE

START OF WORK.

STAKING ABBREVIATIONS:

AG - AGGREGATE BASE COURSE

BOP - BEGINNING OF PROJECT

CC - CLEAN CULVERT

DP - DIP

DR - DITCH RECONDITIONING

EOP - END OF PROJECT

IS - INSLOPE

MP - MILE POST

OS -OUTSLOPE

RR - ROADBED RECONDITIONING

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

5/1 6/2

4 0 8:

S

MA

RA

NO

C

:\U

SE

RS

\S

MA

RA

NO

\B

OX

\01

. S

AM

UE

L.

MA

RA

NO

W

OR

KS

PA

CE

\00

KN

F

EN

GI

NE

ER

IN

G\

LE

GA

CY

S

IT

ES

\01

BE

AR

C

OU

NT

RY

\D

ES

IG

N

DR

AW

IN

GS

\B

EA

RC

OU

NT

RY

PH

AS

E1 _5

.13 _U

PD

AT

ED

S.

DW

G;

REGION 5

PACIFIC SOUTHWEST

39N30 ROADWAY

RECONDITIONING

KLAMATH NATIONAL

FOREST

SALMON/SCOTT RANGER DISTRICT

ROADWAY DETAIL

03/30/2024

S.MARANO

S.MARANO

C.BIELECKI

C-01 004 005

NOT TO SCALE

OUTSLOPED ROAD CROSS SECTION1

NOT TO SCALE

INSLOPED ROAD CROSS SECTION2

ROADBED

AGGREGATE SURFACE

COURSE(SEE NOTE 5)2% - 4%

RECONDITIONED SUBBASE(SEE NOTE 4)

NOTES:

1. ROADWAY RECONDITIONING SHALL INCLUDE DITCH RECONDITIONING AND ROADBED

RECONDITIONING. ASSUME 14 FOOT ROADBED WIDTH FOR ALL QUANTITY CALCULATIONS.

2. DITCH RECONDITIONING SHALL CONFORM WITH FP-14 SPEC 303.03 AND ROADBED

RECONDITIONING SHALL CONFORM WITH FP-14 SPEC 303.05.

3. SUITABLE NATIVE MATERIAL GENERATED DURING DITCH RECONDITIONING SHALL BE SPREAD

ACROSS ROADBED AND COMPACTED. BEFORE SPREADING AND COMPACTION, ALL ORGANIC

MATERIAL AND ROCKS GRATER THAN 6.0 INCHES SHALL BE REMOVED.

4. WHERE NATIVE MATERIAL EXISTS IN ROADBED, ORGANIC MATERIAL AND ROCKS GREATER THAN

6.0 INCHES SHALL BE REMOVED FROM THE TOP 6.0 INCHES OF ROADBED. SURFACE SHALL THEN

BE SCARIFIED TO A DEPTH OF 6.0 INCHES, SHAPED, AND THEN COMPACTED FOLLOWING

PLACEMENT METHOD 2 IN THE FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS(FSSS).

5. AGGREGATE SURFACE COURSE SHALL MEET THE SPECIFICATIONS FOR GRADATION F WITHIN

THE FSSS AND SHALL BE COMPACTED FOLLOWING COMPACTION METHOD D IN THE FSSS.

6. CROSS SLOPES FOR BOTH INSLOPED AND OUTSLOPED ROAD SECTIONS SHALL BE A MINIMUM OF

2% AND A MAXIMUM OF 4%.

7. ALL NECESSARY STAKING OF REQUIRED ROAD TEMPLATE SHALL BE COMPLETED BY THE

FOREST SERVICE PRIOR TO THE START OF WORK.

NOT TO SCALE

ROADBED DETAIL3

2% - 4% AGGREGATE SURFACE

COURSE(SEE NOTE 5)

RECONDITIONED SUBBASE(SEE NOTE 4)

DRAINAGE DITCH

ROADBED

FILL SLOPE

CUT SLOPE

FILL SLOPE

CUT SLOPE

6.0 IN

AGGREGATE SURFACE COURSE (SEE

NOTE 5)

RECONDITIONED SUBBASE(SEE NOTE 4)

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

DOWNGRADE

1.

0'

M

IN

R

B BA

R

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

5/1 6/2

4 0 8:

S

MA

RA

NO

C

:\U

SE

RS

\S

MA

RA

NO

\B

OX

\01

. S

AM

UE

L.

MA

RA

NO

W

OR

KS

PA

CE

\00

KN

F

EN

GI

NE

ER

IN

G\

LE

GA

CY

S

IT

ES

\01

BE

AR

C

OU

NT

RY

\D

ES

IG

N

DR

AW

IN

GS

\B

EA

RC

OU

NT

RY

PH

AS

E1 _5

.13 _U

PD

AT

ED

S.

DW

G;

REGION 5

PACIFIC SOUTHWEST

39N30 ROADWAY

RECONDITIONING

KLAMATH NATIONAL

FOREST

SALMON/SCOTT RANGER DISTRICT

ROLLING DIP DETAIL

03/30/2024

S.MARANO

S.MARANO

C.BIELECKI

C-02 005 005

EXISTING ROAD GRADE

NOTES:

1. CROSS SLOPE OF DRAINLINE SHALL BE 2% MIN AND 4% MAX.

2. SKEW OF DRAINLINE SHALL BE 0-25 DEGREES.

3. RIP RAP SHALL BE PLACED ON FILL SLOPE FOR THE FULL WIDTH OF THE

HYDRAULIC BOTTOM. RIP RAP SHALL BE SHAPED TO ASSURE WATER

GOES ONTO RIPRAP, NOT AROUND. RIPRAP TOP ELEVATION SHALL BE

AT THE TOP OF FINISHED OUTLET GRADE, NOT THE SUBGRADE

ELEVATION. A QUANTITY OF 3.0 CUBIC YARDS SHALL BE PLACED AT

EACH DIP.

4. RIP RAP SHALL BE CLASS 2 RIP RAP(FP-14 SPEC 705) AND SHALL BE

CONSIDERED INCIDENTAL TO THE CONSTRUCTION OF THE ROLLING DIP.

AGGREGATE SURFACE COURSE SHALL BE CONSIDERED INCIDENTAL TO

TO THE CONSTRUCTION OF THE DIP.

5. TAPER LENGTHS SHALL BE WITHIN 10% OF LISTED LENGTHS.

AGGREGATE SURFACE COURSE

RIP RAP(SEE NOTES 3 & 4)

NOT TO SCALE

ROLLING DIP DETAIL1

NOT TO SCALE

ROLLING DIP TYPICAL 2

DIMENSIONS

LENGTH TAPER ROUNDING

GRADE

0-5

6-9

10-12

60 60

60 60

60 60

A(ft) B(ft) R(ft)

CHORD LENGTH

FOR ROUNDING

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

Sheets and Views
BearCountryPhase1_5.13_updateds-G01) TITLE SHEET
BearCountryPhase1_5.13_updateds-G02) PROJECT VICINITY
BearCountryPhase1_5.13_updateds-G03) GENERAL NOTES
BearCountryPhase1_5.13_updateds-C01) ROADWAY DETAIL
BearCountryPhase1_5.13_updateds-C02) ROLLING DIP DETAIL
2024-05-24T12:32:46-0700
CHRISTOPHER BIELECKI
2024-05-28T15:56:11-0700
DANIKA CARLSON
2024-05-30T09:07:32-0700
Natalie Kelly

File details come from the government source that posted it. Updated .