4. Price Schedule ABBIE BURGESS (WLM 175) UPDS FQ2 Attachment 2.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
USCG ABBIE BURGESS UPDS FY25
Solicitation number
70Z08525QIBCT0010
Issued by

About this file

This document is a Price Schedule for the USCGC ABBIE BURGESS (WLM-175) Unplanned Dockside Availability (UPDS) for Fiscal Year 2025, covering the period from 05/27/2025 to 07/17/2025. The solicitation (70Z08525QIBCT0010) is issued by the Department of Homeland Security US Coast Guard and requires a contractor to provide comprehensive dockside repair services, including labor, materials, equipment, and specialized services.

The pricing schedule includes various line items with a composite labor rate of $0.00 per hour, with an assumed General and Administrative (G&A) factor of 15% and a profit factor of 10%. The document provides a detailed breakdown of potential labor categories such as Engineering Technicians, Machinists/Pipe Fitters, Electricians, Shipfitters, Welders, Firewatches, Insulators/Laggers, Painters, and General Labor/Helpers. The schedule also lists labor rates for multiple geographic areas, ranging from Baltimore, MD to Seattle, WA, with rates varying between $45 and $67 per hour. Despite the detailed pricing template, the total price for definite and optional items is currently listed as $0.00.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC ABBIE BURGESS (WLM-175) UNPLANNED DOCKSIDE AVAILABILITY FY2025
POP 05/27/2025 - 07-17/2025
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Fire Prevention RequirementsNSPJOB1NSP
D-002ATON Tie-down, Install$0.00JOB1$0.00
O-00AComposite Labor Rate$0.00Hour2800
D-00BGFP ReportNSPEANSP
O-00ZNot ApplicableDay0
Total Price of Definite Items$0.00
Total Price of Option Items$0.00
Total Price of Definite and Optional Items$0.00

(01/10/2024)

Rev-0 - Page &P of &N

CostEstimateBreakdowns

Composite Labor Rate55
Assumed G&A Factor15%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
ITEMDESCRIPTIONUNIT PRICESub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDTMat/Sub Cost 1Mat/Sub Cost 2Mat/Sub Cost 3Mat/Sub Cost 4Lab RateAreaWorkItemIDWIFileIDLoadData
62Baltimore, MD
52Biloxi, MS
56Boston, MA
50Charleston, SC
60Corpus Christi, TX
51Hampton Roads
64Honolulu, HI
55Houston, TX
56Los Angeles, CA
55Median Rate
49Miami
50Narragansett Bay, RI
55New London, CN
45New Orleans
62NYNY
49Panama City, FL
60Philadelphia, PA
51Portland, ME
57Portland, OR
55San Diego, CA
67San Francisco, CA
55Santa Barbara, CA
55SE North Carolina
65Seattle, WA
48Tampa-St. Petersburg
60Wilmington, DE

(09/28/2009)_x000D_ Page &P of &N

CostEstimateTemplate