PACIFIC NORTHWEST (PNW) STEWARDSHIP BPA SOLICITATION 12363N23Q4024

REGION 6 OR & WA - MULTIPLE NATIONAL FORESTS PAGE 1 OF 37

APPENDIX C

C(T)5.31# – ROAD MAINTENANCE REQUIREMENTS. (9/04) Contractor shall maintain roads in accordance with the following Contract Road Maintenance Requirements Summary:

PRE HAUL

ROAD TERMINI MILES ROAD MAINTENACE T-SPECIFICATIONS

FROM TO T-803 T-811 T-812 T-838 T-839 T-842 T-854 T-891

NFSR 260 JCT w/

LCR 86

End of Contract

Area

6.5 C C C C C C C

LCR 90 JCT w/

LCR 86 EOR 2.50 C C C C C C C

DURING HAUL

FROM TO T-803 T-811 T-812 T-838 T-839 T-842 T-854 T-891

NFSR 260 JCT w/

LCR 86

End of Contract

Area

6.5 C C C C C C C C

LCR 90 JCT w/

LCR 86 EOR 2.50 C C C C C C C C

POST HAUL

FROM TO T-803 T-811 T-812 T-838 T-839 T-842 T-854 T-891

NFSR 260 JCT w/

LCR 86

End of Contract

Area

6.5 C C C C

LCR 90 JCT w/

LCR 86 EOR 2.50 C C C C

Notes:

C = Contractor Performance Item The maximum volume of Contractor responsibility for Slide and Slump repair is 20 cubic yards O = Optional Contract Line Item NFSR = National Forest Service Road CR = County Road JCT = Junction MP = Milepost EOR = End of Road

REGION 6 OR & WA - MULTIPLE NATIONAL FORESTS PAGE 2 OF 37

ROAD MAINTENANCE T-SPECIFICATIONS FOR STEWARDSHIP CONTRACTS

Contractor shall maintain roads in accordance with the following Contract Road Maintenance Requirements Summary:

Contractor will be responsible for doing all pre, during and post haul road maintenance with no compensation from the Forest Service.

T-SPECIFICATIONS

T-SPEC NUMBER SPECIFICATION TITLE

T-803 Snow Removal T-805 Bridge Maintenance T-811 Blading T-812 Dust Abatement T-813 Surfacing T-815 Paved Surface Cleaning T-831 Ditch Maintenance T-832 Remove and End Haul Materials T-834 Drainage Structure Maintenance T-835 Roadway Drainage Maintenance T-836 Maintenance for Limited Use T-838 Maintenance for High Clearance Vehicle Use T-839 Maintenance for Project Use T-841 Vegetation Establishment T-842 Cutting Roadway Vegetation T-851 Logging Out T-854 Treatment and Disposal of Danger Trees T-891 Water Supply and Watering T-892 Bituminous Products

REGION 6 OR & WA - MULTIPLE NATIONAL FORESTS PAGE 3 OF 37

T-803 - SNOW REMOVAL (06/2020)

803.01 Description

This section provides for removal of snow from roads to facilitate logging operations and safe use.

803.02 Maintenance Requirements

1. Erect signs required by the Sign Plan in the SUPPLEMENTAL SPECIFICATIONS.

2. Perform work in a manner to preserve and protect roads and appurtenances, and prevent erosion damage to roads, streams, and other Forest values.

3. Do not undercut banks. Do not blade gravel or other surfacing material off the road.

4. Keep roadbed, drainage ditches, drain dips, and culverts functional during operations and upon completion of operations.

5. Control snow removal to identify the usable traveled way and roadbed support. Reshape over-width plowing as necessary to define the usable width.

6. Space, construct, and maintain drainage holes in the dike of snow or berm caused by snow removal operations. Place drain holes to obtain surface drainage without discharging on erodible fills.

7. Close roads to wheeled vehicles at times and in the manner specified in C(T)5.12# or the

Road Rules document.

8. Upon seasonal completion of Purchaser/Contractor's Operations, effectively block the road by a snow barricade, unless otherwise approved by the Contracting Officer.

9. Remove snow for either public access or project use as established in the SUPPLEMENTAL

SPECIFICATIONS and meet the following requirements:

a. Removal for Public Access (Method JU) - Remove snow from all the traveled way, including turnouts, for safe and efficient use for both timber haul and the public. Remove intruding windfalls, debris, or slough and slide material for the full width of the traveled way and deposit out of drainages at locations designated by the Contracting Officer.

b. Removal for Project Use (Method TS) - Remove snow from all or part of the traveled way, including enough turnouts for safe and efficient use for timber haul and to protect the road.

Remove intruding windfalls, debris or slough and slide material and dispose of only as necessary to provide passage for timber transportation. Removed materials may be deposited off the traveled way or outside the traveled way at locations designated by the Contracting Officer.

c. When directed by the Contracting Officer, replace surfacing which has been bladed off the road with in-kind material within 60 days of notification. Contracting Officer will notify Purchaser/Contractor in writing as to the cubic yard equivalent of bladed off material by the start of the Normal Operating Season.

REGION 6 OR & WA - MULTIPLE NATIONAL FORESTS PAGE 4 OF 37

803.03 Equipment

Purchaser/Contractor may use any type of equipment to remove snow, providing:

1. Type or use of equipment is not restricted in C(T)5.12# or Road Rules document.

2. Equipment is of the size and type commonly used to remove snow and will not cause damage to the road.

3. The use of plows or dozers to remove snow requires written approval by the Contracting Officer.

Equip plows or dozers with shoes or runners to keep the dozer blade a minimum of 2 inches above the road surface unless otherwise approved by the Contracting Officer.

803.04 Ice Control

Ice control may be performed by Purchaser/Contractor when approved by the Contracting Officer in writing. Such approval will include ice control materials, application rates, and any specific requirements of use.

REGION 6 OR & WA - MULTIPLE NATIONAL FORESTS PAGE 5 OF 37

T-805 - BRIDGE MAINTENANCE (06/2020)

805.01 Description

This section provides for routine maintenance of bridge decks and minor approach maintenance.

All approaches to be maintained will be marked in the field and approved by the Contracting Officer prior to the start of work on any bridge.

805.02 Maintenance Requirements

1. General

a. Deck Cleaning

Clean deck, running planks, caps and scuppers of curbs by sweeping, washing and/or air-blasting so that the bridge is free of debris and dirt and all drainage openings on the bridge are clear and operating as intended. Do not allow any debris or dirt into the stream. All material shall be disposed of in accordance with T-832; sites designated by the Contracting Officer and at least 100 feet from any stream, in a location that will not contribute sediment back into the stream. Smooth out and blend with adjacent area. Do not block ditches.

b. Approach and Drainage Blading

All approaches designated by the Contracting Officer shall be bladed in accordance with T- 811.

c. Invasive Species

Where DESIGNATED ON THE GROUND, included in C(T)5.31#, SHOWN ON THE

DRAWINGS,

or as ordered by the Contracting Officer, invasive species of concern prevention practices shall be followed as listed below.

Invasive Species of Concern Prevention Practices

To be filled in by local FS invasive plant specialist, if applicable.

REGION 6 OR & WA - MULTIPLE NATIONAL FORESTS PAGE 6 OF 37

T-811 - BLADING (06/2020)

811.01 Description

This work consists of surface blading the traveled way to a condition that facilitates traffic and provides proper drainage. Blading includes shaping the crown or slope of travel way, berms, and drainage dips in accordance with this specification. Compaction is required when shown on C(T)5.31#.

811.02 Maintenance Requirements

1. Timing - Perform surface blading during the contract period as often as needed to provide conditions stated for the maintenance level of the road.

2. General

a. Blade and shape the existing traveled way and shoulders, including turnouts, to produce a surface which is uniform, consistent to grade, and crowned or cross-sloped as indicated by the character of the existing surface, unless otherwise shown in C(T)5.31#, to at least ½ inch per 1 foot of width, but not more than ¾ inch per 1 foot of width. Thoroughly loosen surfacing material to no less than 2 inches depth or the depth of potholes or corrugations.

Scarification to facilitate cutting to the full depth of potholes or corrugations may be elected but will be considered incidental to blading. Do not scarify to a depth that will cause contamination of the surfacing.

b. Apply water during blading when sufficient moisture is not present to prevent segregation.

Supply, haul, and apply water in accordance with Section T-891.

c. Shape existing native rock or aggregate surfaced drainage dips to divert surface runoff to existing outlet devices, ditches, or discharge locations.

d. Establish a blading pattern which provides a uniform driving surface, retains the surfacing on the roadbed, and provides a thorough mixing of the materials within the completed surface width. Upon final blading, no disturbed rock shall protrude more than 2 inches above the adjacent surface unless otherwise provided in the contract. Remove material not meeting this dimension and place outside the roadbed; do not to obstruct drainage ways or structures. This material may be scattered off the roadbed if there is free drainage.

e. Where DESIGNATED ON THE GROUND, included in C(T)5.31#, SHOWN ON THE

DRAWINGS, or as ordered by the Contracting Officer, invasive species of concern prevention practices shall be followed as listed below.

REGION 6 OR & WA - MULTIPLE NATIONAL FORESTS PAGE 7 OF 37

3. Routine Blading

a. Conform to the dimensions SHOWN ON THE DRAWINGS or designated in the SUPPLEMENTAL SPECIFICATIONS upon completion of blading.

b. Shape roadbed width in excess of the dimensions shown only as needed to provide drainage away from the traveled way. Do not remove established grasses and other vegetation from the excess width except as incidental to providing drainage or unless otherwise provided in the contract.

4. Compaction

Roads requiring compaction will be included in the C(T)5.31#. Unless Compaction Method B is designated in the C(T)5.31#, all traveled ways requiring compaction may be compacted by Method A. Compaction shall commence immediately following blading.

Compaction Method A: Breaking track over full width of traveled way while operating equipment.

Compaction Method B: 7-10 ton pneumatic, steel, or equivalent vibratory roller, operated to cover the full width two (2) times.

5. Undercutting

Undercutting roadway back slope is not permitted.

6. Intersections

At intersections, blade the roadbeds of side roads which are not closed or restricted from vehicular use to ensure smooth transitions.

a. Signing, cross ditching in the road surface (traveled way), earth berms, or other devices placed to discourage or eliminate use by passenger cars, are field evidence of road closure or restriction. Roads listed for work under Sections T-835, T-836, T-838, or T-839 are considered restricted.

b. Side roads listed for work under this Section are not restricted.

7. Cleaning of Structures Do not allow materials resulting from work under this Section to remain on or in structures, such as bridges, culverts, cattle guards, or drainage dips.

8. Berms

Maintain existing berms to the condition of adjacent segments. Do not create new berms.

9. Smooth Blading Smooth blading may be used as an interim measure to remove loose surfacing material from the wheel paths. Store removed materials in a recoverable windrow until blade processing as described in this section is feasible. Watering will not be required for smooth blading. Accomplish smooth blading without distorting the existing cross-slope or crown of the traveled way.

REGION 6 OR & WA - MULTIPLE NATIONAL FORESTS PAGE 8 OF 37

Move and store loose surfacing materials on the high side of super-elevated curves and sections with uniform inslope or outslope. In crowned sections, store the material on either or both sides as elected. Windrow and place stored materials to provide not less than 12 feet of smooth traveled way on one-lane segments, or 20 feet of smooth traveled way on two-lane segments, or segments with turnouts. Place holes through windrows for drainage every 500 feet or less to provide drainage

REGION 6 OR & WA - MULTIPLE NATIONAL FORESTS PAGE 9 OF 37

T-812 - DUST ABATEMENT (06/2020)

812.01 Description

This work consists of applying dust palliatives on roads shown in the C(T)5.31# Road List.

812.02 Materials

The dust palliative materials are shown in C(T)5.31#, unless shown as Optional for Purchaser/Contractor's election. If Optional is shown the Purchaser/Contractor may use any of the products listed below. Dust palliative materials shall meet the following requirements:

1. Water (H2O): will be obtained from sources displayed on the SALE AREA MAP or listed in

SPECIFICATION T-891 Water Supply, unless otherwise approved by the Contracting Officer.

2. Lignosulfonate: Provide certification that material meets the requirements of Subsection 725.02 of the "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14)" and the Forest Service Supplemental Specification 725.02.

3. Magnesium Chloride (MgCl2): Provide certification that material meets the requirements of

Subsection 725.02 of the "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14)" and the Forest Service Supplemental Specification 725.02.

4. Calcium Chloride Liquid (CaCl2B): Provide certification that material meets the requirements of

Subsection 725.02 of the “Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14) " and the Forest Service Supplemental Specification 725.02.

5. Calcium Chloride Mass (CaCl2F): Provide certification that material meets the requirements of

Subsection 725.02 of the "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14)” and the Forest Service Supplemental Specification 725.02.

6. Bituminous dust palliatives: Materials manufactured specifically for dust abatement purposes which conform to the requirements of Section T-892 for each listed road in C(T)5.31#.

812.03 Methods

As shown in the SUPPLEMENTAL SPECIFICATIONS, Purchaser/Contractor may utilize a variety of methods to decrease or eliminate the need for dust abatement.

812.04 Equipment

1. Design, equip, and operate application equipment for spreading dust palliatives so that the material is uniformly applied at the rate and traveled way widths shown in C(T)5.31#.

2. For bituminous palliatives, provide equipment that heats and applies the bituminous material.

Provide a bituminous distributor that is self-powered and mounted on pneumatic tires and equipped with a pump and circulating spray bar, a tachometer, pressure gauges, accurate volume measuring devices such as visual volume dial or gauge calibrated to the tank, and a

REGION 6 OR & WA - MULTIPLE NATIONAL FORESTS PAGE 10 OF 37

thermometer. Provide equipment which is a standard commercial type of proven performance.

3. Accomplish dilution of dust palliatives within the application vehicle with the water source protected from contamination. Circulate the resulting mixture at least five (5) minutes to ensure uniform mixing prior to application.

812.05 Maintenance Requirements

1. Limit water applications to abatement for hauling vehicles and provide at a frequency and rate which controls dust such that vehicle taillights and turn signals remain visible. Vary rates of application as needed but remain low enough to avoid forming rivulets. Accomplish the abatement by enough frequency of application without saturating and softening the traveled way. Compacted or glazed road surface or wheel tracks may be loosened as needed for water penetration.

2. Apply all other dust palliatives at the rates and times approved by the Contracting Officer.

C(T)5.31# shows the expected average application rate and may be varied to meet field conditions. Lignosulfonate, Magnesium Chloride, and Calcium Chloride Brine are listed as gallons per square foot of the undiluted product at fifty (50), thirty-three (33), and thirty-eight

(38) percent respectively. Calcium Chloride Mass is listed in pounds per square foot at seventy-seven (77) percent concentration.

3. Apply bituminous dust palliatives only when the surface to be treated contains enough moisture to obtain uniform distribution of the dust palliative unless noted differently in the SUPPLEMENTAL

SPECIFICATIONS.

4. Prior to initial application, when needed, the road will be bladed and shaped under Section T-

811-Blading.

5. Required subsequent applications may be applied to the existing road surface without blading.

6. Dust palliatives will not be applied in a manner that spatters or mars adjacent structures or trees or placed on or across cattleguards or bridges. Discharge dust abatement material only on roads approved by the Contracting Officer.

REGION 6 OR & WA - MULTIPLE NATIONAL FORESTS PAGE 11 OF 37

T-813 - SPOT SURFACING (06/2020)

813.01 Description

This work consists of placing surface aggregate as DESIGNATED ON THE GROUND, or as ordered by the Contracting Officer. It includes preparing the area, furnishing, hauling, and placing all necessary materials and other work necessary to blend with the adjacent road cross section.

813.02 Materials

1. Materials will be Government-furnished when stated in the SUPPLEMENTAL

2. Materials furnished by the Purchaser/Contractor shall conform to the gradation and quality requirements of Section 703 of the "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-14 U.S. Customary Units" and FS supplements to the

FP-14.

3. All materials transported onto National Forest System land shall be free of invasive species of concern. Written documentation of methods used to determine the invasive species of concern free status of any and all materials furnished by the Purchaser/Contractor shall be submitted for approval to the Contracting Officer before transport of any materials onto NFS System land.

The Contracting Officer shall have 5 days, excluding weekends and Federal holidays, to review the methods and inspect the materials after the required written documentation is provided by the Purchaser/Contractor. After satisfactory review and inspection or after 5 days without review and inspection, the Purchaser/Contractor may transport the material onto National Forest System land. Material receiving unsatisfactory review and inspection shall not be transported onto National Forest System land.

Material or methods appropriate for establishing invasive species of concern free status for the invasive species of concern are listed below.

Invasive Species of Concern

Appropriate Prevention Practices

REGION 6 OR & WA - MULTIPLE NATIONAL FORESTS PAGE 12 OF 37

813.03 Maintenance Requirements

1. Thoroughly loosen the area to be surfaced to a minimum depth of 1 inch prior to placement of aggregate.

2. Mixing and Placing

When scheduled coincidentally with work under Section T-811, and included in the SUPPLEMENTAL SPECIFICATIONS, mix surfacing and existing aggregate with water until a uniform mixture is obtained prior to final shaping and compaction.

Otherwise, spread the material on the prepared area in layers no more than 4 inches in depth.

When more than one (1) layer is required, shape and compact each layer before the succeeding layer is placed. Upon completion, the surfacing shall reasonably conform to the adjacent cross section and provide smooth transitions in the road profile.

3. Compaction Methods

Compaction Method A: Breaking track while operating equipment on the traveled way.

Compaction Method B: 7-10 ton pneumatic, steel, or equivalent vibratory roller, operated to cover the full width two (2) times.

Either Method A or B may be used unless Method B is designated in

C(T)5.31#.

REGION 6 OR & WA - MULTIPLE NATIONAL FORESTS PAGE 13 OF 37

T-815 – Paved Surface Cleaning (06/2020)

815.01 DESCRIPTION

This work consists of removing loose material from paved traveled way, including bridge decks, paved shoulders, and paved turnouts.

815.02 MAINTENANCE REQUIREMENTS

1. The surface shall be cleaned to the existing pavement width including bridge decks and paved shoulders and paved turnouts.

2. Materials shall be moved away from road centerline on double-lane roads.

3. Bridge deck cleaning shall require all materials to be moved longitudinally off the deck.

If hauling of material is required it will be ordered under T-832.

815.03 EQUIPMENT

1. Equipment shall have the capability of removing all loose material from paved surfaces without damage to the surface. Surface damage includes but is not limited to:

a. “Divots” in the paved surface;

b. Peeling of surface material;

c. Cracking or breaking of pavement edges.

2. Use of hydraulic flushing equipment will not be permitted within a horizontal distance of three hundred and fifty (350) feet from a live stream, unless approved by the Contracting Officer.

REGION 6 OR & WA - MULTIPLE NATIONAL FORESTS PAGE 14 OF 37

T-831 - DITCH MAINTENANCE (06/2020)

831.01 Description

This Section provides for routine maintenance of various types of ditches to provide drainage which is unobstructed, as shown on C(T) 5.31# or as Designated on the ground by the Contracting

831.02 Maintenance Requirements

1. Maintain ditches by removing rock, soil, wood, and other materials. Maintained ditches shall function to meet the intent of the original design.

2. Undercutting backslopes during ditch maintenance operations is not permitted.

3. Suitable material up to 4 inches in greatest dimension removed from the ditches may be blended into existing native road surface and shoulder or placed in designated berm.

4. Do not blend material from ditch cleaning operations into aggregate surfaced roads. Do not blade material across aggregate or bituminous surfaced roads, unless approved in writing by the Contracting Officer.

5. Remove excess materials temporarily stored on the ditch slope or edge of the shoulder daily.

Haul excess material to designated waste area under Section T-832.

6. Remove limbs and wood chunks in excess of 12 inches in length or 3 inches in diameter from ditches and place outside the roadway.

7. Clean paved surfaces of all materials resulting from ditch maintenance work.

8. Shape lead-off ditches to drain away from the traveled way.

9. Invasive species of concern prevention practices shall be followed as listed below, and where:

a. Designated on the Ground by the Contracting Officer,

b. Included in C(T)5.31#,

c. Shown on the Drawings, or

d. As ordered by the Contracting officer.

Invasive Species of Concern Prevention Practices

REGION 6 OR & WA - MULTIPLE NATIONAL FORESTS PAGE 15 OF 37

T-832 - REMOVE AND ENDHAUL MATERIALS (06/2020)

832.01 Description

Work consists of loading, hauling, and placing of slide, slough, or excess materials such as rock, soil, vegetation, and other materials to designated disposal sites.

832.02 Maintenance Requirements

1. Remove, end haul, and dispose of excess materials generated by work under other Sections of this contract.

2. Remove the slide and slough materials to a height of approximately 6 feet vertically above the road surface, upslope from the roadbed, and not more than 3 feet vertically below the road surface down slope from the roadbed. Dispose of material at designated sites as shown on the SALE/CONTRACT AREA MAP, identified in SUPPLEMENTAL SPECIFICATIONS, or as ordered by the Contracting Officer.

3. Reshape the slope which generated the slide material as nearly as practical to its original condition by equipment operating from road surface. Reshaping of roadside ditches in slide area shall be in accordance with Section T-831.

4. When approved by the Contracting Officer, fill slumps by compacting selected materials into roadway depressions. Compaction is by Placement Method 2.

5. Place all materials in disposal sites as specified in the SUPPLEMENTAL SPECIFICATIONS, as shown on the SALE/CONTRACT AREA MAP, or as ordered by the Contracting Officer.

a. Placement Method 1 - Side Casting and End Dumping: Material may be placed by side casting and end dumping. Where materials include large rocks, provide a solid fill by working smaller pieces and fines into voids. Shape the finished surfaces to drain.

b. Placement Method 2 - Layer Placement: Step or roughen surfaces on which materials are to be placed prior to placing any material. Place materials in approximately horizontal layers no more than 12 inches thick. Compact each layer by operating hauling and spreading equipment over the full width of each layer.

6. Repair any damage to existing aggregate or pavement surfaces.

REGION 6 OR & WA - MULTIPLE NATIONAL FORESTS PAGE 16 OF 37

T-834 - DRAINAGE STRUCTURE MAINTENANCE (06/2020)

834.01 Description

This work consists of cleaning and reconditioning culverts and other drainage structures.

834.02 Maintenance Requirements

1. Clean drainage structures, inlet structures, culverts, catch basins, and outlet channels specified in the SUPPLEMENTAL SPECIFICATIONS. Clean catch basins by removing the material within the area SHOWN ON THE DRAWINGS.

2. Clean the transition from the ditch line to the catch basin 10 feet or more from the catch basin.

Clean outlet channels and lead-off ditches 6 feet or more. Remove and place debris and vegetation to not enter the channel or ditch, or obstruct traffic or haul debris and vegetation to a designated disposal area in accordance with Section T-832 when shown on the SALE/CONTRACT ARE MAP, when specified in the SUPPLEMENTAL SPECIFICATIONS, or as ordered by the Contracting Officer,

3. Hydraulic flushing of drainage structures is not allowed unless provided for in the

SUPPLEMENTAL SPECIFICATIONS.

4. Cleaning and reconditioning are limited to the first 3 feet of inlet and outlet, determined along the top of the structure. Recondition culvert inlet and outlet by field methods such as jacking out or cutting away damaged metal which obstructs flow. Treat cut edges with a zinc rich coating, in accordance with AASHTO M 36M and ASTM A 849.

5. Where DESIGNATED ON THE GROUND, included in C(T)5.31#, shown on the

SALE/CONTRACT AREA MAP, or as ordered by the Contracting Officer, invasive species of concern prevention practices shall be followed as listed below.

REGION 6 OR & WA - MULTIPLE NATIONAL FORESTS PAGE 17 OF 37

T-835 - ROADWAY DRAINAGE MAINTENANCE (06/2020)

835.01 Description

This work consists of providing post-haul drainage on roads.

835.02 Maintenance Requirements

1. Drainage

a. Upon completion of work, shape the roadway to provide for the removal of surface water.

The roadway need not be passable to vehicles. Repair and reinstall water bars, barriers or berms existing prior to the Purchaser/Contractor's operation. Areas where water is ponded by existing centerline profile sags in through cuts may be left untreated.

b. Continuous blade shaping of the roadbed is not required under this specification.

c. Work to be done at staked locations shall be as indicated on the stake and/or stated in

SUPPLEMENTAL SPECIFICATIONS:

d. Any of the following methods are acceptable for use at eroded or rutted locations: Method A: Outsloping the roadbed at not less than ½ inch per foot of width. Method B: Insloping the roadbed at not less than ½ inch per foot of width.

Method C: Water bar roadbed at locations staked on the ground and construct as SHOWN ON THE DRAWINGS or as included in SUPPLEMENTAL SPECIFICATIONS.

e. Drainage structures located in through-fills and natural watercourses shall be fully functional without obstructions, including inlet and outlet channel within 20 feet of the structure.

f. Either clean culverts and other fabricated structures to provide drainage from road ditches and make the ditch functional or provide water bar(s) across the roadbed. Removed structures shall become Purchaser/Contractor's property to be removed from NFS land.

Remove and replace any Purchaser/Contractor-installed temporary drainage structures with a water bar.

2. Slides, Slumps and Slough

a. Slides and slough may be left in place, provided they do not potentially impound water or divert water from watercourses. Reshape the various surfaces to provide drainage.

b. Provide drainage to effectively decrease or eliminate the entry of surface water into slides, slumps, and roadbed surface cracks. Place berms, waterbars or ditches as needed to intercept and remove runoff water from the roadbed. Surface seal cracks by covering over with native soil materials to prevent additional water entry and compact with equipment tires.

3. Entrance Devices

Upon completion of work, replace entrance devices to effectively eliminate access by

REGION 6 OR & WA - MULTIPLE NATIONAL FORESTS PAGE 18 OF 37

motorized vehicles having four (4) wheels and a width in excess of 50 inches or by all motorized wheeled vehicles, as directed by the Contracting Officer.

4. Seeding

Seed and fertilize all disturbed areas in accordance with requirements in Section T-841.

REGION 6 OR & WA - MULTIPLE NATIONAL FORESTS PAGE 19 OF 37

T-836 - MAINTENANCE FOR LIMITED USE (06/2020)

836.01 Description

This work consists of making limited use roads passable for joint use by Purchaser/Contractor and high clearance vehicles while providing drainage from the traveled way and roadbed.

836.02 Maintenance Requirements

1. Traveled Way

Purchaser/Contractor may smooth or fill existing cross ditches and water bars and, as approved by the Contracting Officer, modify existing road junctions to enable vehicle access. Prior to beginning haul and resumption of haul after an extended stoppage:

a. Remove brush, fallen trees, rocks, and other debris from traveled way, including turnouts, turnarounds, and other locations that interfere with needed maintenance as follows:

i. No object extending over 4 inches above the road surface shall remain within the 12 feet usable traveled way and 10 feet turnout widths. Center the usable width on the roadbed or position away from the fill slope.

ii. Cut and remove standing or down trees, logs, brush, and limbs from the traveled way, including turnouts and turnarounds. Remove encroaching limbs to a height of 14 feet above the traveled way surface. Scatter material not meeting utilization standards outside and below the roadbed on the fill side. Limb and remove timber meeting utilization standards or deck at agreed locations.

iii. Place all removed materials away from drainages.

iv. During use, maintain drainage structures, including dips, ditches and culverts, in a useable condition.

b. Clean and recondition drainage facilities in accordance with Section T-831 and T- 834.

2. Slough and Slides

a. Slough and slides may be left in place, provided surface drainage is provided and at least 12 feet of width is available for vehicle passage.

b. Purchaser/Contractor may reposition or ramp over slides and slough when the traveled way width is less than 12 feet, providing the material is capable of supporting vehicles. Limit outslope to no more than six percent.

c. Reposition slough or slide materials on the roadbed which are not capable of supporting a vehicle to provide the 12-foot width. When directed by the Contracting Officer, slough or slide material shall be removed under Section T-832.

REGION 6 OR & WA - MULTIPLE NATIONAL FORESTS PAGE 20 OF 37

3. Slumps and Washouts

a. Drain the roadbed immediately upgrade of slumps and longitudinal cracks to prevent water from entering slump area.

b. Slumps and longitudinal cracks at the edge of the roadbed shall not be considered a part of the usable width. Usable width may be reduced to 10 feet in the area of the slump.

c. Unless the Contractor Officer agrees to material being placed on slumps, ramp the slumps on both ends into undisturbed roadbed to provide at least 10 feet usable width. Use removed materials to guide vehicles to the ramp location or to aid in draining the area.

d. Washouts may be filled with suitable material.

4. Post haul

At the end of hauling or prior to entering seasonal shutdowns or a period of extended inactivity:

a. Shape the traveled way and disturbed roadbed to provide functional drainage.

b. Reinstall removed cross ditches and water bars and provide any additional drainage structures necessary to offset changes caused through use and maintenance.

c. Leave roads useable for high clearance vehicles. Remove or reshape Purchaser/Contractor modifications at road junctions to leave the entrance as it was before use, or as agreed at the time of improvement.

REGION 6 OR & WA - MULTIPLE NATIONAL FORESTS PAGE 21 OF 37

T-838 - MAINTENANCE FOR HIGH CLEARANCE VEHICLE USE (06/2020)

838.01 Description

This work consists of making limited use roads passable for project use by Purchaser/Contractor and providing drainage from the traveled way and roadbed.

838.02 Maintenance Requirements

1. Traveled Way

Purchaser/Contractor may smooth or fill existing cross ditches and water bars and, as approved by the Forest Service, modify existing road junctions to enable vehicle access. Prior to beginning haul and resumption of haul after an extended stoppage:

a. Remove rocks, standing or down trees, and other debris from the 12-foot traveled way. No object extending over 4 inches above the road surface shall remain within the 12 feet usable traveled way. Center the usable width on the roadbed or position away from the fill slope.

b. Place all removed materials away from drainages.

c. During use, maintain drainage structures including dips, ditches and culverts in a usable condition.

d. Clean and recondition drainage facilities in accordance with Section T-831 and T-834.

The Purchaser/Contractor may perform the following work prior to beginning haul and resumption of haul after an extended stoppage:

a. Remove rocks, standing or down trees, logs, brush, limbs and other debris from turnouts, turnarounds, or other locations that interfere with maintenance.

b. Remove encroaching limbs to a height of 14 feet above the traveled way surface.

c. Scatter material not meeting utilization standards outside and below the roadbed on the fill side. Limb and remove timber that meets utilization standards or deck at locations approved by the Forest Service.

2. Slough and Slides

a. Slough and slides may be left in place when surface drainage is provided and at least 12 feet of width is available for vehicle passage.

b. Purchaser/Contractor may reposition or ramp over slides and slough when the traveled way width is less than 12 feet providing the material is capable of supporting vehicles. Limit outslope to no more than six percent.

c. Reposition slough or slide materials, which are not capable of supporting a vehicle, on the roadbed to provide the 12 feet width. When directed by the Forest Service, slough or slide material will be removed under Section T-832.

REGION 6 OR & WA - MULTIPLE NATIONAL FORESTS PAGE 22 OF 37

3. Slumps and Washouts

a. Drain the roadbed immediately upgrade of slumps and longitudinal cracks to prevent water from entering slump area.

b. Slumps and longitudinal cracks at the edge of the roadbed shall not be considered a part of the usable width. Usable width may be reduced to 10 feet in the area of the slump.

c. Unless the Forest Service approves material being placed on slumps, ramp the slumps on both ends into undisturbed roadbed to provide at least 10 feet usable width. Use removed materials to guide vehicles to the ramp location or to aid in draining the area.

d. Washouts may be filled with suitable material.

4. Post -haul

At the end of hauling or prior to seasonal shutdowns or a period of extended inactivity:

a. Shape the traveled way and disturbed roadbed to provide functional drainage.

structures necessary to offset changes caused through use and maintenance.

c. Leave roads useable for high clearance vehicles. Remove or reshape Purchaser/Contractor modifications at road junctions to leave the entrance as it was before use, or as agreed at the time of improvement.

REGION 6 OR & WA - MULTIPLE NATIONAL FORESTS PAGE 23 OF 37

T-839 - MAINTENANCE FOR PROJECT USE (06/2020)

839.01 Description

Work consists of providing minimum access required for Purchaser/Contractor's operations and associated Forest Service contract administration while preventing unacceptable resource or road damage.

839.02 Maintenance Requirements

1. Purchaser/Contractor is authorized to perform the following maintenance to provide vehicle passage and drainage:

a. Removing log, earth, and rock barriers and/or improving existing road junctions to enable vehicle access as mutually agreed.

b. Smoothing or filling existing cross ditches and water bars.

c. Installing Purchaser/Contractor-furnished culverts or other temporary drainage structures for shallow stream crossings, as approved by the Contracting Officer.

d. Removing brush, fallen trees, rocks, and other materials from the traveled way and other locations that interfere with needed maintenance:

i. Place all removed materials away from drainages.

ii. Limb and remove timber which meets utilization standards or deck at locations approved by the Contracting Officer. Scatter other woody materials, including limbs, off and below the roadbed without creating concentrations.

e. Clean and recondition drainage structures in accordance with Section T-831 and Section T-

834.

f. Reposition or ramp over slough and slides to provide adequate width of traveled way material.

g. Provide traveled way drainage above slumps and seal cracks in slump area. Ramp the slumps on both ends into undisturbed roadbed to provide usable width unless otherwise ordered by the Contracting Officer.

2. During use, the traveled way shall not channel water along the road. Prior to periods of anticipated rains and runoff, perform the following work:

a. Shape the traveled way and roadbed to drain.

structures necessary to offset changes through use and maintenance.

c. Perform work outlined in 839.02 1 (e), (f), and (g).

REGION 6 OR & WA - MULTIPLE NATIONAL FORESTS PAGE 24 OF 37

d. During periods of non-use, replace original barrier or provide and maintain standard MUTCD

Type 3 barricades unless alternate barriers are approved by the Contracting Officer.

839.03 Post Haul Requirements

1. Upon completion of project use, perform work described in the requirements of 839.02 2 and in accordance with 839.03 2 and 3 or as otherwise provided for in the SUPPLEMENTAL SPECIFICATIONS or C(T)5.31#.

2. Roads designated in C(T)5.31# to be blocked shall conform to the requirements of Section T-835.

Unless otherwise approved by the Contracting Officer, remove Purchaser/Contractor-installed temporary structures from National Forest System land. Associated commercially obtained materials shall remain the property of the Purchaser/Contractor.

3. Remove or reshape Purchaser/Contractor improvements at road junctions, as approved by the

Contracting Officer at the time of improvement.

REGION 6 OR & WA - MULTIPLE NATIONAL FORESTS PAGE 25 OF 37

T-841 – VEGETATION ESTABLISHMENT (06/2020)

841.01 Description

This work consists of applying seed, fertilizer, mulch, and planting containerized or bare root plant stock singularly or in specified combinations to roadways and disposal areas. Work area may be limited to designated portions of the roadway and roadside or include treatment of the entire area bounded by the outer limits of the roadsides.

841.02 Materials and Application Rates

Provide the following listed materials:

1. Fertilizer: Fertilizer shall be a standard commercial grade and provide the following minimum percentage of available nutrients designated:

% Nitrogen % Phosphorous

Potassium

% Sulfur

Furnish fertilizer in sealed containers with the composition, weight, and guaranteed analysis of contents clearly marked. Apply at the rate of pounds per acre.

2. Seed: This work consists of furnishing and placing required seed mix on all areas disturbed under this contract and on any other areas specified.

a. Apply the seed in the following amounts and mixtures:

Species

Application Rate Pounds per Acre

b. Use hand-operated seeding devices, or other devices approved by the Contracting Officer, to apply seed.

c. Furnish weed-free seed, with additional requirement that no seed containing any prohibited noxious weed seed, or any restricted noxious weed seed in excess of current state standards. Weeds are defined in the current publication commonly referred to as the "All States Noxious Weed List" while the standards for prohibited and restricted noxious weeds are to be found in the appropriate state law or regulations.

Furnish seed separately or in mixture in standard containers with:

i. Seed name

ii. Lot number

REGION 6 OR & WA - MULTIPLE NATIONAL FORESTS PAGE 26 OF 37

iii. Net weight

iv. Percentages of purity and of germination. In case of legumes, percentage of germination to include hard seed.

v. Percentage of maximum weed seed content clearly marked for each kind of seed

vi. Certification that the seed lot meets applicable State and Federal laws regarding prohibited and restricted noxious weeds clearly marked for each kind of seed.

d. Furnish the Contracting Officer duplicate signed copies of a certification signed by a Registered Seed Technologist or Seed Analyst certified through either the Association of Official Seed Analysts or the Society of Commercial Seed Technologists. Certification shall state that each lot of seed has been tested in accordance with the Association of Official Seed Analysts standards within 12 months prior to the date of application. This certification shall include:

i. name and address of laboratory

ii. date of test

iii. lot number for each kind of seed

iv. name of seed

v. percentage of germination

vi. percentage of purity

vii. percentage of weed content

viii. certification that the seed lot meets applicable State and Federal laws regarding prohibited and restricted noxious weeds

ix. in the case of a mixture, the proportions of each kind of seed.

Legume seed shall be inoculated with approved cultures in accordance with the instructions of the manufacturer. No seed may be applied without prior written approval from the Contracting Officer.

3. Mulch: Apply mulch materials as follows:

Mulch Type Application Rate Pounds per Acre

4. Plant Stock: Furnish the following listed plant materials:

Stock Siz e Bare Root Containerized

841.03 Schedules and Applications

1. Schedule

a. Seeding may not be done until all other ground-disturbing work on the road has been completed and accepted. Complete seeding as soon as other ground-disturbing work is accepted, unless a specific seeding season is listed below.

Seeding season 1: to , inclusive.

REGION 6 OR & WA - MULTIPLE NATIONAL FORESTS PAGE 27 OF 37

Seeding Season 2: to , inclusive.

b. Do not apply the treatment when the ground is frozen or excessively wet. Terminate application during periods when there is too much wind to allow consistent treatment rates and control of the treatment area to the designated limits.

2. Roadside and Slope Treatment

a. Roadsides will not require advance preparation unless required in the SUPPLEMENTAL

b. Apply the designated treatment by hand-operated machine. When both roadbed (under 841.03C) and slopes are shown in the SUPPLEMENTAL SPECIFICATIONS for treatment, application may be done at the same time.

c. The Contractor will not be required to operate self-propelled equipment beyond the defined roadbed. Do not apply treatment materials to the foreslope of ditches unless roadbed treatment (841.03C) is also required.

3. Roadbed Treatment

a. Scarify portions of the roadbed not previously disturbed and left loose under Section T-835 to a minimum depth of 4 inches, unless bedrock is encountered at a lesser depth. The maximum distance between furrows formed by scarification is 12 inches.

b. Treat barrier mounds placed under Section T-835 while in a roughened condition.

4. Planting

a. Plant designated woody plant materials at the staked locations or designated spacings.

b. Place containerized plant stock in an appropriately sized hole formed by a dibble or other device to place the roots at the proper depth.

c. Place bare root plant stock in a slotted cut formed by a dibble, mattock, Pulaski, or other edged tool. Place the crown at ground level. Do not bend or break the roots.

d. Compress the area adjacent to the hole by foot or special tool to form a depression up and down slope from the stem and force the soil against the container or roots with no air voids.

e. Hold the plantings firmly in place by the soil. When checked by pulling upward on the top ½ inch of the plant stem, the planting shall either break at the hold point or the area compressed against the roots show evidence of movement. Remove and replace with fresh stock plantings that are not held firmly by the soil.

REGION 6 OR & WA - MULTIPLE NATIONAL FORESTS PAGE 28 OF 37

T-841 – VEGETATION ESTABLISHMENT (06/2020)

841.04 Government Provided Materials

The Government will provide the following listed materials. At least ten (10) calendar days’ notice must be given to the Contracting Officer prior to actual date material will be picked up.

Materials will be provided at:

Material Location

REGION 6 OR & WA - MULTIPLE NATIONAL FORESTS PAGE 29 OF 37

T-842 - CUTTING ROADWAY VEGETATION (06/2020)

842.01 Description

This work consists of cutting all vegetative growth on roadway surfaces and roadsides, including trees and other vegetation less than 4 inches in diameter measured 6 inches above the ground.

842.02 Maintenance Requirements

1. General

a. Cut brush, trees, and other vegetation within each area treated to a maximum height of 6 inches above the ground surface or obstruction such as rocks or existing stumps. When work is performed under this Section, remove all limbs which extend into the treated area, or over the roadbed, to a height of 14 feet above the traveled way surface elevation.

b. Items to remain will be DESIGNATED ON THE GROUND.

c. Work may be performed either by hand or mechanically unless specifically shown in

C(T)5.31#. Self-propelled equipment is not allowed on cut and fill slopes or in ditches.

d. Correct damage to boles of standing trees caused by Purchaser/Contractor's operation either by treatment with a commercial nursery sealer or by removing the tree as directed by the Contracting Officer.

e. Limb trees within the cutting limits which are over 4 inches in lieu of cutting, measured at 6 inches above the ground.

f. When trees are limbed, cut limbs within 4 inches of the bole.

2. Cutting Side Vegetation

a. Show the width of vegetation to be removed in (C(T)5.31#.

b. Unless otherwise included in the SUPPLEMENTAL SPECIFICATIONS or DESIGNATED ON

THE GROUND:

i. Commence work at the edge of the traveled way and proceed away from the road centerline.

ii. Roads without a defined traveled way: The starting point for cutting will be marked on the ground or defined in the SUPPLEMENTAL SPECIFICATIONS.

c. The points for establishing cutting limits are as follows:

i. Fill and daylighted (wide roadbed) section cutting commences at the edge of the traveled way and proceeds away from the road center line.

ii. Drainage ditched section cutting commences at the bottom of the existing ditch and proceeds away from the road center line. Cutting on ditch foreslopes is not required.

iii. Unditched section cutting commences at the intersection of the cutbank and the roadbed and proceeds away from center line.

d. Provide transitions between differing increments of cutting width. Accomplish transitions in a taper length of not less than 50 feet nor more than 70 feet.

REGION 6 OR & WA - MULTIPLE NATIONAL FORESTS PAGE 30 OF 37

3. Debris

a. Materials resulting from the cutting operation in excess of 12 inches in length or 3 inches in diameter is not allowed to remain on roadway slopes within the treated area, in ditches, or within water courses.

b. Remove limbs and chunks in excess of 3 inches in any dimension from the traveled way and shoulders.

c. Materials may be scattered down slope from the roadbed, outside of the work area and drainages unless otherwise listed in D. Invasive Species of Concern.

4. Invasive Species of Concern

Where DESIGNATED ON THE GROUND, included in C(T)5.31#, shown on SALE/CONTRACT AREA MAP or as ordered by the Contracting Officer invasive species of concern prevention practices shall be followed as listed below.

REGION 6 OR & WA - MULTIPLE NATIONAL FORESTS PAGE 31 OF 37

T-851 - LOGGING OUT (06/2020)

851.01 Description

This work consists of removal of fallen trees and snags which encroach within 3 feet of the roadbed on both sides.

851.02 Maintenance Requirements

1. Limb and remove timber which meets Utilization Standards in Division A(T) or deck at locations designated by the Contracting Officer.

2. Limb non-merchantable material and cut into lengths for handling. Deck outside ditches and drainages, off the traveled way and turnouts or at staked locations. The clearing width is to the edge of the roadbed for public use roads, except limited use roads. The clearing width for limited use roads is shown in T-836, T-838, or T-839, as applicable.

3. Notwithstanding B(T)2.3, blowdown timber outside Sale/Contract Area required to be removed, which meets Utilization Standards in Division A(T), when designated by the Contracting Officer is Included Timber subject to requirements of B(T)2.2.

4. Do not leave woody debris and slash in excess of 12 inches in length or 3 inches in diameter, or concentrations which may plug ditches or culverts, in ditches, drainage channels, or on backslopes, traveled way, shoulders, or turnouts.

REGION 6 OR & WA - MULTIPLE NATIONAL FORESTS PAGE 32 OF 37

T-854 TREATMENT AND DISPOSAL OF DANGER TREES (06/2020)

854.01 Description

This work consists of felling and disposal of live or dead danger trees sufficiently tall to reach roads used by the Purchaser/Contractor. Any removal of logs is subject to prior agreement between the Contractor Officer and the Purchaser/Contractor.

854.02 Requirements

1. Designation of danger trees.

a. Danger trees to be felled will be documented in advance by the

Contracting Officer. Trees authorized to be removed will be Marked for removal.

2. Falling, bucking and treatment for disposal.

a. Use controlled felling to ensure the direction of fall and prevent damage to property, structures, roadway, residual trees, and traffic. Stump heights measured on the side adjacent to the highest ground shall meet requirements of A(T)6. Higher stump heights are permitted when necessary for safety.

b. Felled snags and trees, which are not Marked for removal,…