A004 PNW STWD BPA
| PNW STEWARDSHIP BPA - REGION 6 - OREGON and WASHINGTON |
| SOLICITATION 12363N23Q4024 - AMENDMENT 004 - 17 NATIONAL FORESTS/AREAS |
| **INSTRUCTIONS: FILL-IN ONLY UNIT PRICES - TOTAL AMOUNTS WILL BE AUTOMATICALLY CALCULATED** |
| **PLEASE CONVERT YOUR COMPLETED SPREADSHEET TO ADOBE PDF BEFORE SUBMITTAL** |
| 19 | 20 | 21 | 22 | 23 | 24 |
| ITEM # | SCHEDULE OF SUPPLIES/SERVICES | QUANTITY | UOM | UNIT PRICE | AMOUNT |
| 1 | Commercial Harvest and Removal of Included Timber – All Forests | 300 | AC |
OREGON
| ITEM # | 1. DESCHUTES NATIONAL FOREST | QUANTITY | UOM | UNIT PRICE | AMOUNT |
| 2 | Cut, Skid, and Remove Non-sawtimber | 300 | AC | $ - 0 | $ - 0 |
| 3 | Cut, Skid and Deck Non-sawtimber | 300 | AC | $ - 0 | $ - 0 |
| 4 | Cut, Skid and Remove Biomass | 200 | AC | $ - 0 | $ - 0 |
| 5 | Masticate/Chip Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 6 | Mechanical Cutting and Piling Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 7 | Mechanical Cutting and Lopping Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 8 | Hand Cutting and Piling Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 9 | Hand Cutting and Lopping Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 10 | Roadside Fuels Treatment | 200 | AC | $ - 0 | $ - 0 |
| 11 | Removal of Piled Material | 200 | AC | $ - 0 | $ - 0 |
| 12 | Road Maintenance (Pre, During, Post) | 10 | MI | $ - 0 | $ - 0 |
| 13 | Road (Re)Construction per Call Order Specifications | NA | MI |
| ITEM # | 2. FREMONT-WINEMA NATIONAL FORESTS | QUANTITY | UOM | UNIT PRICE | AMOUNT |
| 15 | Cut, Skid, and Remove Non-sawtimber | 300 | AC | $ - 0 | $ - 0 |
| 16 | Cut, Skid and Deck Non-sawtimber | 300 | AC | $ - 0 | $ - 0 |
| 17 | Cut, Skid and Remove Biomass | 200 | AC | $ - 0 | $ - 0 |
| 18 | Masticate/Chip Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 19 | Mechanical Cutting and Piling Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 20 | Mechanical Cutting and Lopping Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 21 | Hand Cutting and Piling Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 22 | Hand Cutting and Lopping Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 23 | Roadside Fuels Treatment | 200 | AC | $ - 0 | $ - 0 |
| 24 | Removal of Piled Material | 200 | AC | $ - 0 | $ - 0 |
| 25 | Road Maintenance (Pre, During, Post) | 10 | MI | $ - 0 | $ - 0 |
| 26 | Road (Re)Construction per Call Order Specifications | NA | MI |
| ITEM # | 3. MALHEUR NATIONAL FOREST | QUANTITY | UOM | UNIT PRICE | AMOUNT |
| 30 | Cut, Skid, and Remove Non-sawtimber | 300 | AC | $ - 0 | $ - 0 |
| 31 | Cut, Skid and Deck Non-sawtimber | 300 | AC | $ - 0 | $ - 0 |
| 32 | Cut, Skid and Remove Biomass | 200 | AC | $ - 0 | $ - 0 |
| 33 | Masticate/Chip Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 34 | Mechanical Cutting and Piling Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 35 | Mechanical Cutting and Lopping Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 36 | Hand Cutting and Piling Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 37 | Hand Cutting and Lopping Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 38 | Roadside Fuels Treatment | 200 | AC | $ - 0 | $ - 0 |
| 39 | Removal of Piled Material | 200 | AC | $ - 0 | $ - 0 |
| 40 | Road Maintenance (Pre, During, Post) | 10 | MI | $ - 0 | $ - 0 |
| 41 | Road (Re)Construction per Call Order Specifications | NA | MI |
| ITEM # | 4. MT. HOOD NATIONAL FOREST | QUANTITY | UOM | UNIT PRICE | AMOUNT |
| 45 | Cut, Skid, and Remove Non-sawtimber | 300 | AC | $ - 0 | $ - 0 |
| 46 | Cut, Skid and Deck Non-sawtimber | 300 | AC | $ - 0 | $ - 0 |
| 47 | Cut, Skid and Remove Biomass | 200 | AC | $ - 0 | $ - 0 |
| 48 | Masticate/Chip Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 49 | Mechanical Cutting and Piling Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 50 | Mechanical Cutting and Lopping Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 51 | Hand Cutting and Piling Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 52 | Hand Cutting and Lopping Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 53 | Roadside Fuels Treatment | 200 | AC | $ - 0 | $ - 0 |
| 54 | Removal of Piled Material | 200 | AC | $ - 0 | $ - 0 |
| 55 | Road Maintenance (Pre, During, Post) | 10 | MI | $ - 0 | $ - 0 |
| 56 | Road (Re)Construction per Call Order Specifications | NA | MI |
| ITEM # | 5. OCHOCO NATIONAL FOREST | QUANTITY | UOM | UNIT PRICE | AMOUNT |
| 60 | Cut, Skid, and Remove Non-sawtimber | 300 | AC | $ - 0 | $ - 0 |
| 61 | Cut, Skid and Deck Non-sawtimber | 300 | AC | $ - 0 | $ - 0 |
| 62 | Cut, Skid and Remove Biomass | 200 | AC | $ - 0 | $ - 0 |
| 63 | Masticate/Chip Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 64 | Mechanical Cutting and Piling Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 65 | Mechanical Cutting and Lopping Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 66 | Hand Cutting and Piling Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 67 | Hand Cutting and Lopping Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 68 | Roadside Fuels Treatment | 200 | AC | $ - 0 | $ - 0 |
| 69 | Removal of Piled Material | 200 | AC | $ - 0 | $ - 0 |
| 70 | Road Maintenance (Pre, During, Post) | 10 | MI | $ - 0 | $ - 0 |
| 71 | Road (Re)Construction per Call Order Specifications | NA | MI |
| ITEM # | 6. ROGUE RIVER-SISKIYOU NATIONAL FORESTS | QUANTITY | UOM | UNIT PRICE | AMOUNT |
| 75 | Cut, Skid, and Remove Non-sawtimber | 300 | AC | $ - 0 | $ - 0 |
| 76 | Cut, Skid and Deck Non-sawtimber | 300 | AC | $ - 0 | $ - 0 |
| 77 | Cut, Skid and Remove Biomass | 200 | AC | $ - 0 | $ - 0 |
| 78 | Masticate/Chip Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 79 | Mechanical Cutting and Piling Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 80 | Mechanical Cutting and Lopping Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 81 | Hand Cutting and Piling Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 82 | Hand Cutting and Lopping Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 83 | Roadside Fuels Treatment | 200 | AC | $ - 0 | $ - 0 |
| 84 | Removal of Piled Material | 200 | AC | $ - 0 | $ - 0 |
| 85 | Road Maintenance (Pre, During, Post) | 10 | MI | $ - 0 | $ - 0 |
| 86 | Road (Re)Construction per Call Order Specifications | NA | MI |
| ITEM # | 7. SIUSLAW NATIONAL FOREST | QUANTITY | UOM | UNIT PRICE | AMOUNT |
| 90 | Cut, Skid, and Remove Non-sawtimber | 300 | AC | $ - 0 | $ - 0 |
| 91 | Cut, Skid and Deck Non-sawtimber | 300 | AC | $ - 0 | $ - 0 |
| 92 | Cut, Skid and Remove Biomass | 200 | AC | $ - 0 | $ - 0 |
| 93 | Masticate/Chip Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 94 | Mechanical Cutting and Piling Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 95 | Mechanical Cutting and Lopping Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 96 | Hand Cutting and Piling Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 97 | Hand Cutting and Lopping Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 98 | Roadside Fuels Treatment | 200 | AC | $ - 0 | $ - 0 |
| 99 | Removal of Piled Material | 200 | AC | $ - 0 | $ - 0 |
| 100 | Road Maintenance (Pre, During, Post) | 10 | MI | $ - 0 | $ - 0 |
| 101 | Road (Re)Construction per Call Order Specifications | NA | MI |
| ITEM # | 8. UMATILLA NATIONAL FOREST | QUANTITY | UOM | UNIT PRICE | AMOUNT |
| 105 | Cut, Skid, and Remove Non-sawtimber | 300 | AC | $ - 0 | $ - 0 |
| 106 | Cut, Skid and Deck Non-sawtimber | 300 | AC | $ - 0 | $ - 0 |
| 107 | Cut, Skid and Remove Biomass | 200 | AC | $ - 0 | $ - 0 |
| 108 | Masticate/Chip Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 109 | Mechanical Cutting and Piling Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 110 | Mechanical Cutting and Lopping Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 111 | Hand Cutting and Piling Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 112 | Hand Cutting and Lopping Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 113 | Roadside Fuels Treatment | 200 | AC | $ - 0 | $ - 0 |
| 114 | Removal of Piled Material | 200 | AC | $ - 0 | $ - 0 |
| 115 | Road Maintenance (Pre, During, Post) | 10 | MI | $ - 0 | $ - 0 |
| 116 | Road (Re)Construction per Call Order Specifications | NA | MI |
| ITEM # | 9. UMPQUA NATIONAL FOREST | QUANTITY | UOM | UNIT PRICE | AMOUNT |
| 120 | Cut, Skid, and Remove Non-sawtimber | 300 | AC | $ - 0 | $ - 0 |
| 121 | Cut, Skid and Deck Non-sawtimber | 300 | AC | $ - 0 | $ - 0 |
| 122 | Cut, Skid and Remove Biomass | 200 | AC | $ - 0 | $ - 0 |
| 123 | Masticate/Chip Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 124 | Mechanical Cutting and Piling Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 125 | Mechanical Cutting and Lopping Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 126 | Hand Cutting and Piling Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 127 | Hand Cutting and Lopping Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 128 | Roadside Fuels Treatment | 200 | AC | $ - 0 | $ - 0 |
| 129 | Removal of Piled Material | 200 | AC | $ - 0 | $ - 0 |
| 130 | Road Maintenance (Pre, During, Post) | 10 | MI | $ - 0 | $ - 0 |
| 131 | Road (Re)Construction per Call Order Specifications | NA | MI |
| ITEM # | 10. WALLOWA-WHITMAN NATIONAL FORESTS | QUANTITY | UOM | UNIT PRICE | AMOUNT |
| 135 | Cut, Skid, and Remove Non-sawtimber | 300 | AC | $ - 0 | $ - 0 |
| 136 | Cut, Skid and Deck Non-sawtimber | 300 | AC | $ - 0 | $ - 0 |
| 137 | Cut, Skid and Remove Biomass | 200 | AC | $ - 0 | $ - 0 |
| 138 | Masticate/Chip Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 139 | Mechanical Cutting and Piling Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 140 | Mechanical Cutting and Lopping Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 141 | Hand Cutting and Piling Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 142 | Hand Cutting and Lopping Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 143 | Roadside Fuels Treatment | 200 | AC | $ - 0 | $ - 0 |
| 144 | Removal of Piled Material | 200 | AC | $ - 0 | $ - 0 |
| 145 | Road Maintenance (Pre, During, Post) | 10 | MI | $ - 0 | $ - 0 |
| 146 | Road (Re)Construction per Call Order Specifications | NA | MI |
| ITEM # | 11. WILLAMETTE NATIONAL FOREST | QUANTITY | UOM | UNIT PRICE | AMOUNT |
| 150 | Cut, Skid, and Remove Non-sawtimber | 300 | AC | $ - 0 | $ - 0 |
| 151 | Cut, Skid and Deck Non-sawtimber | 300 | AC | $ - 0 | $ - 0 |
| 152 | Cut, Skid and Remove Biomass | 200 | AC | $ - 0 | $ - 0 |
| 153 | Masticate/Chip Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 154 | Mechanical Cutting and Piling Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 155 | Mechanical Cutting and Lopping Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 156 | Hand Cutting and Piling Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 157 | Hand Cutting and Lopping Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 158 | Roadside Fuels Treatment | 200 | AC | $ - 0 | $ - 0 |
| 159 | Removal of Piled Material | 200 | AC | $ - 0 | $ - 0 |
| 160 | Road Maintenance (Pre, During, Post) | 10 | MI | $ - 0 | $ - 0 |
| 161 | Road (Re)Construction per Call Order Specifications | NA | MI |
| ITEM # | 12. COLUMBIA RIVER GORGE NATIONAL SCENIC AREA | QUANTITY | UOM | UNIT PRICE | AMOUNT |
| 165 | Cut, Skid, and Remove Non-sawtimber | 300 | AC | $ - 0 | $ - 0 |
| 166 | Cut, Skid and Deck Non-sawtimber | 300 | AC | $ - 0 | $ - 0 |
| 167 | Cut, Skid and Remove Biomass | 200 | AC | $ - 0 | $ - 0 |
| 168 | Masticate/Chip Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 169 | Mechanical Cutting and Piling Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 170 | Mechanical Cutting and Lopping Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 171 | Hand Cutting and Piling Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 172 | Hand Cutting and Lopping Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 173 | Roadside Fuels Treatment | 200 | AC | $ - 0 | $ - 0 |
| 174 | Removal of Piled Material | 200 | AC | $ - 0 | $ - 0 |
| 175 | Road Maintenance (Pre, During, Post) | 10 | MI | $ - 0 | $ - 0 |
| 176 | Road (Re)Construction per Call Order Specifications | NA | MI |
WASHINGTON
| ITEM # | 1. COLVILLE NATIONAL FOREST | QUANTITY | UOM | UNIT PRICE | AMOUNT |
| 180 | Cut, Skid, and Remove Non-sawtimber | 300 | AC | $ - 0 | $ - 0 |
| 181 | Cut, Skid and Deck Non-sawtimber | 300 | AC | $ - 0 | $ - 0 |
| 182 | Cut, Skid and Remove Biomass | 200 | AC | $ - 0 | $ - 0 |
| 183 | Masticate/Chip Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 184 | Mechanical Cutting and Piling Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 185 | Mechanical Cutting and Lopping Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 186 | Hand Cutting and Piling Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 187 | Hand Cutting and Lopping Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 188 | Roadside Fuels Treatment | 200 | AC | $ - 0 | $ - 0 |
| 189 | Disposal of Piled Material | 200 | AC | $ - 0 | $ - 0 |
| 190 | Road Maintenance (Pre, During, Post) | 10 | MI | $ - 0 | $ - 0 |
| 191 | Road (Re)Construction per Call Order Specifications | NA | MI |
| ITEM # | 2. GIFFORD PINCHOT NATIONAL FOREST | QUANTITY | UOM | UNIT PRICE | AMOUNT |
| 195 | Cut, Skid, and Remove Non-sawtimber | 300 | AC | $ - 0 | $ - 0 |
| 196 | Cut, Skid and Deck Non-sawtimber | 300 | AC | $ - 0 | $ - 0 |
| 197 | Cut, Skid and Remove Biomass | 200 | AC | $ - 0 | $ - 0 |
| 198 | Masticate/Chip Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 199 | Mechanical Cutting and Piling Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 200 | Mechanical Cutting and Lopping Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 201 | Hand Cutting and Piling Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 202 | Hand Cutting and Lopping Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 203 | Roadside Fuels Treatment | 200 | AC | $ - 0 | $ - 0 |
| 204 | Removal of Piled Material | 200 | AC | $ - 0 | $ - 0 |
| 205 | Road Maintenance (Pre, During, Post) | 10 | MI | $ - 0 | $ - 0 |
| 206 | Road (Re)Construction per Call Order Specifications | NA | MI |
| ITEM # | 3. MT. BAKER-SNOQUALMIE NATIONAL FORESTS | QUANTITY | UOM | UNIT PRICE | AMOUNT |
| 210 | Cut, Skid, and Remove Non-sawtimber | 300 | AC | $ - 0 | $ - 0 |
| 211 | Cut, Skid and Deck Non-sawtimber | 300 | AC | $ - 0 | $ - 0 |
| 212 | Cut, Skid and Remove Biomass | 200 | AC | $ - 0 | $ - 0 |
| 213 | Masticate/Chip Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 214 | Mechanical Cutting and Piling Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 215 | Mechanical Cutting and Lopping Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 216 | Hand Cutting and Piling Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 217 | Hand Cutting and Lopping Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 218 | Roadside Fuels Treatment | 200 | AC | $ - 0 | $ - 0 |
| 219 | Removal of Piled Material | 200 | AC | $ - 0 | $ - 0 |
| 220 | Road Maintenance (Pre, During, Post) | 10 | MI | $ - 0 | $ - 0 |
| 221 | Road (Re)Construction per Call Order Specifications | NA | MI |
| ITEM # | 4. OKANOGAN & WENATCHEE NATIONAL FORESTS | QUANTITY | UOM | UNIT PRICE | AMOUNT |
| 225 | Cut, Skid, and Remove Non-sawtimber | 300 | AC | $ - 0 | $ - 0 |
| 226 | Cut, Skid and Deck Non-sawtimber | 300 | AC | $ - 0 | $ - 0 |
| 227 | Cut, Skid and Remove Biomass | 200 | AC | $ - 0 | $ - 0 |
| 228 | Masticate/Chip Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 229 | Mechanical Cutting and Piling Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 230 | Mechanical Cutting and Lopping Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 231 | Hand Cutting and Piling Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 232 | Hand Cutting and Lopping Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 233 | Roadside Fuels Treatment | 200 | AC | $ - 0 | $ - 0 |
| 234 | Removal of Piled Material | 200 | AC | $ - 0 | $ - 0 |
| 235 | Road Maintenance (Pre, During, Post) | 10 | MI | $ - 0 | $ - 0 |
| 236 | Road (Re)Construction per Call Order Specifications | NA | MI |
| ITEM # | 5. OLYMPIC NATIONAL FOREST | QUANTITY | UOM | UNIT PRICE | AMOUNT |
| 240 | Cut, Skid, and Remove Non-sawtimber | 300 | AC | $ - 0 | $ - 0 |
| 241 | Cut, Skid and Deck Non-sawtimber | 300 | AC | $ - 0 | $ - 0 |
| 242 | Cut, Skid and Remove Biomass | 200 | AC | $ - 0 | $ - 0 |
| 243 | Masticate/Chip Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 244 | Mechanical Cutting and Piling Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 245 | Mechanical Cutting and Lopping Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 246 | Hand Cutting and Piling Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 247 | Hand Cutting and Lopping Non-included Material | 200 | AC | $ - 0 | $ - 0 |
| 248 | Roadside Fuels Treatment | 200 | AC | $ - 0 | $ - 0 |
| 249 | Removal of Piled Material | 200 | AC | $ - 0 | $ - 0 |
| 250 | Road Maintenance (Pre, During, Post) | 10 | MI | $ - 0 | $ - 0 |
| 251 | Road (Re)Construction per Call Order Specifications | NA | MI |