DOCX document 1 MB Posted
- Solicitation number
- 12363N21Q0018
- Issued by
-
Department of Agriculture Forest Service
About this file
This solicitation is for a Mosquito Biomass Stewardship IRSC on the Tahoe National Forest in California. The purpose is to chip and remove 1,760 tons of slash from 18 timber landings within 11 units, as well as various types of hand work to reduce fuel loading in preparation for controlled burning. The resulting contract will be a firm fixed price commercial services contract awarded using best value. All work must be completed by February 1, 2022. Offerors must be registered in SAM to be eligible. No bonds are required. A pre-proposal site visit was held on May 10, 2021 and another will be held on June 2, 2021. The contracting officer is Karen Ruklic, located in Grangeville, Idaho with the National Stewardship Contracting Branch.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mosquito Biomass IRSC
APPENDIX C
C(T)5.31# – ROAD MAINTENANCE REQUIREMENTS.
(9/04) Contractor shall maintain roads in accordance with the following Contract Road Maintenance Requirements Summary:
PRE HAUL
| ROAD |
| TERMINI |
| MILES |
| ROAD MAINTENACE T-SPECIFICATIONS |
| FROM |
| TO |
| T-800 |
| T-801 |
| T-802 |
| T-803 |
| T-804 |
| T-805 |
| T-806 |
| T-807 |
| T-808 |
| T-809 |
| T-810 |
| 96-38 |
| JCT 16-46 NFSR |
| Biggie IRTC unit 17 boundary |
| 1.2 |
| C |
C
C
| 96-34-02 |
| JCT 96-34 NFSR |
| Biggie IRTC unit 8 boundary |
| 0.85 |
| C |
C
C
| 16-46 |
| JCT 16 NFSR |
| Biggie IRTC unit 81 boundary |
| 1.77 |
| C |
C
C
DURING HAUL
| ROAD |
| TERMINI |
| MILES |
| ROAD MAINTENACE T-SPECIFICATIONS |
| FROM |
| TO |
| T-800 |
| T-801 |
| T-802 |
| T-803 |
| T-804 |
| T-805 |
| T-806 |
| T-807 |
| T-808 |
| T-809 |
| T-810 |
| 96-38 |
| JCT 16-46 NFSR |
| Biggie IRTC unit 17 boundary |
| 1.2 |
| C |
C
| 96-34-02 |
| JCT 96-34 NFSR |
| Biggie IRTC unit 8 boundary |
| 0.85 |
| C |
C
| 16-46 |
| JCT 16 NFSR |
| Biggie IRTC unit 81 boundary |
| 1.77 |
| C |
C
POST HAUL
| ROAD |
| TERMINI |
| MILES |
| ROAD MAINTENACE T-SPECIFICATIONS |
| FROM |
| TO |
| T-800 |
| T-801 |
| T-802 |
| T-803 |
| T-804 |
| T-805 |
| T-806 |
| T-807 |
| T-808 |
| T-809 |
| T-810 |
| 96-38 |
| JCT 16-46 NFSR |
| Biggie IRTC unit 17 boundary |
| 1.2 |
| C |
| 96-34-02 |
| JCT 96-34 NFSR |
| Biggie IRTC unit 8 boundary |
| 0.85 |
| C |
C
| C |
| C |
| 16-46 |
| JCT 16 NFSR |
| Biggie IRTC unit 81 boundary |
| 1.77 |
| C |
Notes:
C = Contractor Performance Item The maximum volume of Contractor responsibility for Slide and Slump repair is 20 cubic yards O = Optional Contract Line Item NFSR = National Forest Service Road CR = County Road JCT = Junction MP = Milepost EOR = End of Road
NOTES:
1. The number of water applications per day and the rate of application shall be as required to abate dust.
2. Where watering is designated, initial and subsequent applications are estimated at 0.5 GAL/SQ YD. A minimum of one complete watering per day is required for volumes up to 50 MBF. For volumes exceeding 50 MBF per day, additional water will be applied as needed to abate dust. Water draft site must have a minimum flow of 1.5 CU FT per second to allow water drafting.
3. Armor road approaches as necessary from the end of the approach nearest a stream for a minimum of 50 feet, or to the nearest drainage structure (e.g. waterbar of rolling dip) or point where drainage does not drain toward the stream.
4. Check all water-drafting vehicles daily and repair as necessary to prevent leaks of petroleum products from entering protected stream management zone. Water-drafting vehicles will contain petroleum spill kits. Dispose of absorbent pads according to Hazardous Response Plan.
5. Use a screened intake device and pumps with low entry velocity and suction strainers with screen less than 2mm (1/8 in) in size to minimize removal of aquatic species, including juvenile fish, amphibian egg masses and tadpoles, from aquatic habitats. The suction strainer shall be inserted close to the substrate in the deepest water available. Place strainer in a canvas bucket to avoid substrate and aquatic species disturbance when stream flow approaches 1.5 Cu.Ft. per sec.
6. If portable pump is used for stream drafting, place pump in containment pan. Spill pads shall be used for fueling in riparian buffer zones. Fuel shall be stored outside of buffer zones.
7. Water drafting by more than one truck at a time at the same site is prohibited.
1. Cooperative Road Use: When two or more commercial users are simultaneously using the same road, they shall agree on a maintenance plan and arrangements for accomplishing the work. The Forest Service shall approve this plan.
2. Temporary Roads: As necessary to attain stabilization of roadbed and fill slopes of Temporary Roads, Contractor shall employ such measures as out-sloping, drainage dips, and water-spreading ditches. After a Temporary Road has served Contractor’s purpose, Contractor shall give notice to Forest Service and shall remove bridges and culverts, eliminate ditches, out-slope roadbed, remove ruts and berms, effectively block the road to normal vehicular traffic where feasible under existing terrain conditions, and build cross ditches and water bars, as staked or otherwise marked on the ground by Forest Service. When bridges and culverts are removed, associated fills shall also be removed to the extent necessary to permit normal maximum flow of water.
3. Landings: After landings have served Contractor’s purpose, Contractor shall ditch and slope them to permit water to drain or spread. Unless agreed otherwise, cut and fill banks around landings shall be sloped to remove overhangs and otherwise minimize erosion.
4. Erosion Prevention and Control: The following specifications shall govern erosion control work made necessary by Contractor's operations to minimize soil erosion. The Agreement for Wet Weather Operations and Operations Outside Normal Operating Season are included in Section J.
a. Grading: To minimize the potential of offsite sediment transport from grading activities (T-803), drainage structures must be concurrently maintained (T-805).
b. Erosion Prevention and Control: Erosion prevention and control work, including Streamcourse protection, shall be completed within 15 calendar days after forwarding or mastication operations related to each landing are substantially completed or after Forest Service designation on the ground of work where such designation is required hereunder. Said time limit shall be exclusive of full days lost in Contractor’s Operations due to causes beyond Contractor’s control. Such on the ground designation shall be done as promptly as feasible unless it is agreed that the location of such work can be established without marking on the ground. After September 15 and as long thereafter as operations continue the work shall be done as promptly as practicable. Damage resulting from Contractor’s Operations due to failure to perform required work shall be repaired by Contractor.
5. Use of roads, or landings, shall be halted during wet weather. Contractor shall install temporary waterbars to maintain drainage on travel way if rutting results in unacceptable road damage.
a. Work may be allowed when:
1. Earth surfaced landings must be dry enough to be bladed and shaped to maintain proper drainage. This may be necessary quite frequently, depending on road conditions and pending storms.
2. Appropriate drainage structures are in place and the soil is frozen.
b. Work shall not be allowed when:
1. The landing is stabilized with aggregate, but the subgrade becomes saturated and the stability of the landing cannot support log loading or haul.
2. When native surface landings turn to mud and cannot be immediately shaped for drainage.
3. If sections of landings lose structural strength and will not support log loading or haul.
4. When sediment is draining from the landing and entering a streamcourse or paved roadway.
c. Other than haul traffic:
1. In some instances, work may alter the designed landing drainage through rutting. When this occurs, the contractor will be required to install temporary waterbars to maintain drainage on the landing. This will be done daily if melting and run-off is occurring. If this traffic is causing soil resource damage or sediment to enter a streamcourse, work on landings shall not be allowed.
d. General
1. If Contractor removes snow from landings, such work shall be done in a manner that will protect roads and adjacent resources.
2. Snow berms shall be removed or placed to avoid accumulation of melt water on the road and prevent water concentration on erosive slopes or soils. If the landing is damaged, Contractor shall replace lost surface material and repair structures damaged in blading operations prior to log loading, unless climatic conditions prevent necessary work from being accomplished or as otherwise agreed in writing.
3. Snow removal to 2 inches above paved landing surfaces, 6 inches above compacted soils shall be permitted. Soil surface shall not be removed by plowing. Any damage or loss of landing surface shall be replaced or repaired. Drain outs shall be provided at 100 to 200 foot intervals or as designated on the ground.
4. Temporary cross drains may be required in advance of predicted storms or warm fronts.
5. Large puddles shall be drained.
6. Ditches and culverts shall be maintained so they will be functional at all times.
6. After landings, log decking and sorting areas have served Contractor's purpose or prior to seasonal precipitation, Contractor shall ditch, waterbar, or slope landings to permit water to drain or spread as determined by the Forest Service. If landings are used for log decking, Contractor shall close all landings following completion of log hauling and fuels treatment. Closure shall consist of subsoiling, spreading slash or mulch over the landing surface, and blocking all access to the landing from the road.
7. The Government shall approve the location, size and allowable uses of equipment service and refueling areas. If the Contractor maintains storage facilities for oil or oil products at the contract location, they shall take appropriate preventative measures to insure that any spill of such oil or oil products does not enter any stream, ground water, or other waters of the United States or any of the individual States. If the total oil or oil products storage exceeds 1320 gallons or if any single container exceeds a capacity of 55 gallons, the Contractor shall prepare a Spill Prevention Control and Countermeasures (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR 112) including certification by a registered professional engineer.
Winter Operating Standards:
A minimum of 12 inches of compacted snow/ice with slash where available, shall be maintained on all skid trails and forwarder trails. A minimum of 6 inches of compacted snow/ice shall be maintained on all landings where compacted soils already exist. The snow/slash must be able to support the weight of the equipment without causing disturbance or detrimental compaction to the soil. Transfer Point Landings on pavement must have a minimum 2 inches packed snow and ice. Paved surface shall not be removed by plowing. Any damage or loss of road surface shall be replaced or repaired. Any debris on pavement shall be removed immediately after snow melts. Operations shall be suspended when suitable snow conditions do not exist. After March 1 or when extended warming periods occur, a minimum of 12 inches of compacted snow/ice/slash shall be maintained on all skid trails and forwarder trails. An agreement may be made between the C.O. and the Contractor to allow lesser snow depths when the soil is adequately frozen or soils have a low susceptibility to compaction.
ROAD MAINTENANCE T-SPECIFICATIONS FOR STEWARDSHIP CONTRACTS
Contractor shall maintain roads in accordance with the following Contract Road Maintenance Requirements Summary:
Contractor will be responsible for doing all pre, during and post haul road maintenance with no compensation from the Forest Service.
T-SPECIFICATIONS
| T-SPEC NUMBER |
| SPECIFICATION TITLE |
| T-800 |
| Definitions |
| T-801 |
| Slide and Slump Repair |
| T-802 |
| Ditch Cleaning |
| T-803 |
| Surfacing Blading |
| T-804 |
| Surfacing Repair |
| T-805 |
| Drainage Structures |
| T-806 |
| Dust Abatement |
| T-807 |
| Roadway Vegetation |
| T-808 |
| Miscellaneous Structures |
| T-809 |
| Waterbars |
| T-810 |
| Barriers |
Mosquito Biomass Stewardship IRSC
SPECIFICATION T-800 DEFINITIONS
Mosquito Biomass IRSC
T-800 (5/83)
Wherever the following terms or pronouns are used in Specifications T-801 through T-811, the intent and meaning shall be interpreted as follows:
800-1.1 - Agreements. Maintenance projects require a mutually acceptable method to resolve the problems which arise when incompatible situations arise between drawings and specifications and actual conditions on the ground to allow orderly and satisfactory progress of the maintenance.
These specifications have been developed in anticipation of those problem areas and have provided that such changes will be by agreement.
It is intended that drawings and specifications will govern unless "on-the-ground" conditions warrant otherwise, when specifications call for "agreement", "agreed", or "approval" such agreement or approval shall be promptly confirmed in writing.
800-1.2 - Annual Road Maintenance Plan. A plan prepared by various users of one or several roads. The plan is an agreement on maintenance responsibilities to be performed for the coming year.
800-1.3 - Base Course. Material used to reinforce subgrade or, as shown on drawings, placed on subgrade to distribute wheel loads.
800-1.4 - Berm. Curb or dike constructed to prevent roadway run-off water from discharging onto embankment slope.
800-1.5 - Borrow. Select material taken from designated borrow sites.
800-1.6 - Crown, Inslope and Outslope. The cross slope of the traveled way to aid in drainage and traffic maneuverability.
800-1.7 - Culverts. A conduit or passageway under a road, trail or other obstruction. A culvert differs from a bridge in that it is usually entirely below the elevation of the traveled way.
800-1.8 - Drainage Dip. A dip in the traveled way which intercepts surface runoff and diverts the water off the traveled way. A drainage dip does not block the movement of traffic.
800-1.9 - Drainage Structures. Manufactured structures which control the runoff of water from the road including culverts, overside drains, apron, flumes, downdrains, downpipes, and the like.
800-1.10 - Dust Abatement Plan. A table which lists the road, dust palliative, application rates and estimated number of subsequent applications.
800-1.11 - Lead-off Ditches. A ditch used to transmit water from a drainage structure or drainage dip outlet to the natural drainage area.
800-1.12 - Material. Any substances specified for use in the performance of the work.
800-1.13 - Prehaul Maintenance. Road maintenance work, which the Purchaser determines must be accomplished to maintain the roads to a satisfactory condition commensurate with Purchaser's use, provided Purchaser's Operations do not damage improvements under B6.22 or National Forest resources and hauling can be done safely. This work will be shown in the Annual Road Maintenance Plan as provided in C5.4.
Prehaul maintenance work the Purchaser elects to perform will be in compliance with the Road Maintenance T-Specifications.
800-1.14 - Roadbed. The portions of a road between the intersection of subgrade and sideslopes, excluding that portion of the ditch below subgrade.
800-1.15 - Road Maintenance Plan. A table which shows applicable road maintenance specifications to be performed by Purchaser on specific roads.
800-1.16 - Roadside. A general term denoting the area adjoining the outer edge of the roadway.
Mosquito Biomass IRSC
800-1.17 - Roadway. The portion of a road within the limits of excavation and embankment.
800-1.18 - Shoulder. That portion of roadway contiguous with traveled way for accommodation of stopped vehicles, for emergency use, and lateral support of base and surface course, if any.
800-1.19 - Slide. A concentrated deposit of materials from above or on backslope extending onto the traveled way or shoulders, whether caused by mass land movements or accumulated ravelling.
800-1.20 - Slough. Material eroded from the backslope which partially or completely blocks the ditch, but does not encroach on the traveled way so as to block passage of traffic.
800-1.21 - Slump. A localized portion of the roadbed which has slipped or otherwise become lower than that of the adjacent roadbed and constitutes a hazard to traffic.
800-1.22 - Special Project Specifications. Specifications which detail conditions and requirements peculiar to the individual project.
800-1.23 - Subgrade. Top surface of roadbed upon which base course or surface course is constructed. For roads without base course or surface course, that portion of roadbed prepared as the finished wearing surface.
800-1.24 - Surface Course. The material placed on base course or subgrade primarily to resist abrasion and the effects of climate. Surface course may be referred to as surfacing.
800-1.25 - Surface Treatment Plan. A table which lists the roads and surface treatments to be applied.
800-1.26 - Traveled Way. That portion of roadway, excluding shoulders, used for the movement of vehicles.
800-1.27 - Turnouts. That portion of the traveled way constructed as additional width on single lane roads to allow for safe passing of vehicles.
800-1.28 – Water Source. A place designated on the Road Maintenance Map for acquiring water for road maintenance purposes.
800-1.29 – Waterbar. A dip in the roadbed which intercepts surface runoff and diverts the water off the roadway. A waterbar is not designed to be traversable by logging trucks.
Mosquito Biomass IRSC
ILLUSTRATION OF ROAD STRUCTURE TERMS
SPECIFICATION T-801 SLIDE AND SLUMP REPAIR
Mosquito Biomass IRSC
T-801 (5/83)
DESCRIPTION
1.1 - Slide removal is the removal from Roadway and disposal of any material such as soil, rock and vegetation that cannot be routinely handled by a motor grader during Ditch Cleaning, T-802 and Surface Blading, T-803 Operations.
Slump repair is the filling of depressions or washouts in Roadway which cannot be routinely filled by a motor grader during Surface Blading, T-803 Operations.
Slide removal and slump repair includes excavation, loading, hauling, placing and compacting of waste or replacement material and the development of disposal or borrow areas.
REQUIREMENTS
3.1 - Slide material, including soil, rock and vegetative matter which encroaches into the Roadway, shall be removed. The slope which generated the slide material shall be reshaped during the removal of the slide material deposited on the fill slope and below the Traveled Way will not be removed unless needed for slope stability or to protect adjacent resources.
Surface and Base Courses shall not be excavated during slide removal operations.
Slide material which cannot be used for other beneficial purposes shall be disposed of at disposal sites SHOWN ON THE SALE AREA MAP. Material placed in disposal sites will not require compaction unless compaction is SHOWN ON THE ROAD MAINTENANCE PLAN.
3.2 - When filling slumps or washouts, material shall be moved from agreed locations or borrow sites SHOWN ON SALE AREA MAP, placed in layers and compacted by operating the hauling and spreading equipment uniformly over the full width of each layer.
Existing aggregate surfacing shall be salvaged when practical and relaid after depressions have been filled.
Damaged aggregate base, aggregate surfacing and bituminous pavement shall be repaired under Specification T-804, Surfacing Repair.
The repaired areas of the slump shall conform to the cross section which existed prior to the slump and shall blend with the adjacent undistrubed Traveled Way.
3.3 - The maximum volume of Purchaser responsibility for slide and slump repair is SHOWN ON THE ROAD MAINTENANCE PLAN. Greater volumes of slide and slump repair not qualifying as Catastrophic Damage are Forest Service responsibility.
SPECIFICATION T-802 DITCH CLEANING
Mosquito Biomass IRSC
T-802 (5/83)
1.1 - Ditch cleaning is removing and disposing of all slough material from roadway ditches to provide a free-draining waterway.
3.1 - Ditch cleaning shall be repeated during the year as often as necessary to facilitate proper drainage.
3.2 - All slough material or other debris which might obstruct water flow in the roadway ditch shall be removed. Material removed from the ditch, if suitable, may be blended into existing native road surface or shoulder or placed in designated Berms in conjunction with Surface Blading, T-803 operations.
Material removed from ditches that is not by agreement blended into existing roads or placed in Berms shall be loaded and hauled to the disposal site SHOWN ON THE SALE AREA MAP.
3.3 - Roadway backslope or Berm shall not be undercut.
SPECIFICATION T-803 SURFACE BLADING
Mosquito Biomass IRSC
T-803 (5/83)
1.1 - Surface blading is keeping a native or aggregate Roadbed in a condition to facilitate traffic and provide proper drainage. It includes maintaining the crown, inslope or outslope of the Traveled Way, Turnouts and Shoulder; repairing Berms; blending approaching road intersections and cleaning bridge decks, Drainage Dips and Lead-off Ditches.
3.1 - Surface blading shall be performed before, during and after Purchaser's use as often as necessary to facilitate traffic and proper drainage.
3.2 - The surface blading shall preserve the existing cross section. Surface irregularities shall be eliminated and the surface left in a free draining state and to a smoothness needed to facilitate traffic. Surface material which has been displaced to the Shoulders or Turnouts shall be returned to the Traveled Way. The blading operation shall be conducted to prevent the loss of surface material and to provide for a thorough mixing of the material being worked.
3.3 - Water, taken from water sources DESIGNATED ON THE SALE AREA MAP, shall be applied during blading if sufficient moisture is not present to cut, mix or compact the surface material.
3.4 - On native surfaced roads, Material generated from backslope sloughing and ditch cleaning may be blended with the surface material being worked. On aggregate surfaced roads, this Material shall not be blended with Surface or Base Course material unless agreed otherwise.
Berms shall be repaired by placing Material as needed to restore the Berm to reasonably blend with existing line, grade and cross section.
3.6 - Drainage Dips and Lead-off Ditches shall be cleaned and maintained to reasonably blend with existing line, grade and cross section.
3.7 - Intersecting roads shall be bladed for a distance of 50 feet to assure proper blending of the two riding surfaces.
3.8 - Rocks or other material remaining on the Traveled Way after the final pass, that are larger than 4 inches in diameter or are larger than the maximum size of imported surfacing, shall be removed from the Traveled Way. The oversized material shall be disposed of by sidecasting unless SHOWN OTHERWISE ON THE SALE AREA MAP. Sidecasting into streams, lakes or water courses will not be permitted.
3.9 - Material resulting from work under this specification shall not remain on or in structures, such as culverts, overside drains, cattleguards, ditches, drainage dips and the like.
3.10 - Material resulting from work under this specification plus any accumulated debris shall be removed from bridge decks and the deck drains opened.
Mosquito Biomass IRSC
SPECIFICATION T-804 SURFACING REPAIR
DESCRIPTION
1.1—Surfacing repair is repairing potholes or small soft areas in the Traveled Way. It includes area preparation and furnishing and placing all necessary Materials, and other work necessary to repair the surface.
MATERIALS
2.1—Material used in the repair of soft areas on aggregate or native surfaced roads may be acquired from approved commercial sources, designated Forest Service Borrow areas, or Borrow sources agreed to. The quality and quantity of the imported Material used in the repair will be limited to that needed to provide a stable Traveled Way for hauling and to minimize damage to the road and adjacent resources. The quantity of imported surface repair Material used in the appraisal estimate will be shown on Road Maintenance Plan. However, the magnitude of the work may vary depending on Contractor’s hauling schedule and ground conditions.
2.2—Material used in the repair of bituminous pavements may be acquired from local commercial sources. If a mixing table is required, the location shall be approved by the Forest Service. The bituminous mixture to be used by the Contractor shall be approved by the Forest Service. The Contractor’s share of the quality of bituminous mixture used in the appraisal estimate will be shown on Road Maintenance Plan. However, Contractor’s share of the work may vary depending on Contractor’s hauling schedule, ground conditions, other traffic, etc.
REQUIREMENTS
3.1—Work under this specification shall be performed in a timely manner to reduce further deterioration of the Traveled Way.
3.2—Soft spots on aggregate or native surfaces shall be repaired by placing the imported Surface Course on top of the soft spot. Layers of imported Material shall be placed until a firm surface is produced.
3.3—Bituminous Pavement Repairs—The areas to receive bituminous pavement repairs will be marked on the road surface by the Forest Service just prior to Contractor performing the work.
3.4—Potholes (deep patch)—Surface Course and Base Course Materials shall be excavated to a depth necessary to reach firm, suitable Material. The minimum depth of excavation shall be 2 inches and the maximum depth of excavation shall be to the top of the Subgrade.
The edges of the prepared hole shall be extended to form a vertical face in unfractured asphalt surfacing. The prepared hole shall generally be circular or rectangular in shape, dry, and cleaned of all loose Material.
Prepared potholes shall be patched or barricaded immediately.
The faces of the prepared hole shall be tacked with a slow-setting emulsified asphalt.
The bituminous mixture shall be placed in layers not exceeding a compacted depth of 2 inches. Each layer shall be compacted thoroughly with hand or mechanical tampers or rollers. Compaction shall not be done with equipment wheels.
Upon completion, the compacted patch in the pothole shall be flush, with a tolerance or approximately ¼ inch to ½ inch above the level of the adjacent pavement.
3.5—Skin Patches—Bituminous mixture shall be distributed uniformly with feathered edges in layers not to exceed 2 inches compacted depth. When multiple layers are ordered, joints shall be offset at least 6 inches between layers.
Each layer shall be compacted by two passes with a 7-10 ton steel roller or comparable vibratory roller.
3.6—Asphalt Berm—Damaged segments of Berm shall be removed and the exposed ends beveled at approximately 45 degrees from vertical. The Berm foundation shall be cleaned and patched as necessary. The foundation and joining surfaces shall be coated with a slow-setting emulsified asphalt. Asphalt mix shall be placed and compacted to conform with the shape and alignment of the undamaged segment.
3.7—Disposal—All Materials removed from potholes, patches, and Berms shall be disposed of at disposal sites designated by the Forest Service.
MEASUREMENT
4.1—Surface repair for native roads will be measured by the Cubic Yard as determined by the average end area of the segments to be repaired. Surface repair for the aggregate surfaced roads will be determined by truck measure for material acceptably placed. Vehicles shall be loaded to at least their water level capacity.
SPECIFICATION T-805 DRAINAGE STRUCTURES
Mosquito Biomass IRSC
T-805 (5/83)
1.1 - This work consists of maintaining Drainage Structures and related items such as inlet and outlet channels, existing riprap, trash racks and drop inlets.
MATERIALS
2.1 - All materials used in the maintenance of Drainage Structures shall conform by type and specification to the material in the structure being maintained.
3.1 - Drainage Structures and related items shall be cleared of all foreign material which has been deposited above the bottom of the structure and all vegetative growth which interferes with the flow pattern. Material removed that cannot be incorporated into maintenance work shall be hauled to a disposal site SHOWN ON THE SALE AREA MAP.
3.2 - If outlet or inlet riprap was installed by Purchaser as a construction item or existed prior to Purchaser's haul, it shall be maintained in good condition including the replacement of riprap if necessary to previous line, grade and cross section.
3.3 - Perform maintenance to insure the proper functioning of the head walls, aprons, inlet assemblies, overside drains, riprap, trash racks and other facilities related to the Drainage Structure.
SPECIFICATION T-806 DUST ABATEMENT
Mosquito Biomass IRSC
T-806 (5/83)
1.1 - This work shall consist of preparing Traveled Way and furnishing and applying materials to abate dust.
2.1 - The roads requiring dust abatement, type of dust abatement material to be used, the rates of application sand frequency of applications will be SHOWN ON THE DUST ABATEMENT PLAN (C5.31#). The Dust Abatement Plan may be changed by written agreement.
2.2 - Water sources are covered under C5.36 and the locations are SHOWN ON SALE AREA MAP.
2.3 - Dust abatement materials shall meet the requirements of the following Subsections of Forest Service Standard Specifications for Construction of Roads and Bridges or ATTACHED SPECIAL PROJECT SPECIFICATIONS.
Bituminous Materials
Liquid Asphalts 702.02
Bituminous Dust Palliatives 702.04 Application Temperatures 702.05
Blotter Material 703.14
Lignin Sulfonate 5-725.01
Application Temperature 5-725.02
Water, for diluting712.01
Magnesium Chloride 5-730.01
Application Temperature 5-730.02
2.4 - Testing of Materials
Certification and sampling of bituminous materials lignin sulfonate and magnesium chloride shall be in accordance with Subsection 105.04, 5-725.03 and 5-730.03, respectively, of Forest Service Standard Specification for Constructioin of Roads and Bridges.
3.1 - General
Dust abatement materials shall be applied to the road surface as necessary to control road surface loss, provide for road user safety and minimize damage to adjacent resources.
3.2 - Compaction
When the methods listed below specify compaction, Traveled Way shall be compacted by an 8- to 10- ton pneumatic, steel-wheeled or equivalent vibrating roller making 2 passes over the full Traveled Way and Shoulder width, unless compactioin is not required on the DUST ABATEMENT PLAN (C5.31#).
3.3 - Preparation for Dust Abatement Materials Other Than Water
The following applies to all methods of preparation: Bituminous residue shall be scarified and pulverized to produce loosened material not exceeding 4 inches in greatest dimension. Traveled Way shall be bladed in accordance with T-803.
Prior to applying DO-6BA, DO-6PA or DO-8, the top 2 inches of Traveled Way shall contain not less than 80 percent nor more than 120 percent of optium moisture as determined by AASHTO T-99, Method C. Prior to applying other bituminous material, Traveled Way shall have a moisture content between 1 and 3 percent. If surface dusting prevents the bituminous material from penetrating, a light application of water shall be applied just prior to applying the bituminous material.
Mosquito Biomass IRSC
Lignin Sulfonate and magnesium chloride shall be applied when the top 1 inch of Traveled Way contains not less than 3 percent moisture nor more than 120 percent of optium moisture as determined by AASHTO T-99, Method C.
Moisture content will be determined in accordance with AASHTO T-217 or T-239.
One or more of the following methods shall be used as specified in the DUST ABATEMENT PLAN (C5.31#)
Method 1 Compact Traveled Way and apply the dust abatement material.
Method 2 Develop a layer of loose material approximately one inch in depth for the full width of Traveled Way. Apply the dust abatement material to this loose material and compact after penetration. If traffic makes maintenance of the loose material difficult, one inch of the material may be bladed into
Method 2a windrow along the shoulder. The specified moisture content shall be maintained in the window and the top one inch of Traveled Way. The windrow shall be bladed to a uniform depth across Traveled Way just prior to applying the dust abatement material. When the dust abatement material has penetrated, Traveled Way shall be compacted.
Method 3 Blade one inch of material from Traveled Way, into a windrow along the Shoulder. Miantain the specified moisture content in the windrow and the top inch of Traveled Way. Apply half the dust abatement material. When the dust abatement material has penetrated, the windrow shall be bladed to a uniform depth across dust abatement Traveled Way and the remaining dust abatement material shall be applied. Traveled Way shall be compacted.
Method 4 Develop a layer of loose material approximately 2 inches in depth for the full width of Traveled Way. Apply half the dust abatement material to the loose material. Blade the top 2 inches into a windrow along the Shoulder. Apply the remaining dust abatement material to Traveled Way and the Berm. Spread the Berm evenly across Traveled Way and compact.
3.4 - Preparation for Dust Abatement with Water
Traveled Way shall be prepared in accordance with Specification T-803, Surface Blading, when required.
3.5 - Application Tolerance
Dust abatement materials other than water shall be applied within 0.05 gallons per square yard of the rate specified.
3.6 - Mixing Requirements
DO-68A, DO-6PA and DO-8 shall be thoroughly circulated in the distributor within one hour of application.
3.7 - Weather Limitations
Dust abatement materials shall not be applied when it is raining.
Bituminous material shall be applied when the surface temperature of Traveled Way is 50 degrees Fahrenheit or higher.
Lignin sulfonate and magnesium chloride shall be applied when the atmospheric temperature is 40 degrees Fahrenheit or higher.
3.8 - Blotter Material Blotter material shall be spread in a sufficient quantity to prevent tire pickup.
T-806 DUST ABATEMENT PLAN (C5.31)
Road Number
| Termini |
| Material |
Type1
| Application |
| Preparation |
| From |
| To |
| Rates1 |
| Method T803 |
All Native Surface Roads
| WATER |
| AS NEEDED TO ABATE DUST |
| T-803 AS NEEDED |
SPECIFICATION T-807 ROADWAY VEGETATION
Mosquito Biomass IRSC
T-807 (5/83)
1.1 This work includes removal of brush and trees from within the Roadway limits.
3.1 Vegetative matter within the Roadway which impedes vehicular travel or interferes with road maintenance operations, such as surface blading, ditch and culvert cleaning, shall be removed. Downed timber meeting utilization standards shall be cut in appropriate lengths and decked along the Roadside in locations where the Traveled Way or sight distances will not be impaired.
3.2 Vegetative matter removed from the Roadway shall be treated by the specified method SHOWN ON THE SALE AREA MAP and as required by C6.7.
Mosquito Biomass IRSC Page 1 of 2
SPECIFICATION T-808 MISCELLANEOUS STRUCTURES
DESCRIPTION
1.1—Maintenance of miscellaneous structures includes cattleguards, gates, and other similar structures that have been previously installed to insure safe and efficient operation of the road.
MATERIALS
2.1—Any Materials needed in the maintenance of miscellaneous structures shall be similar in type and quality to the Material in the structure being maintained.
REQUIREMENTS
3.1—Cattleguards—Loose rails shall be welded or bolted back in place.
Excess Material carried into the cattleguard shall be removed when drainage is blocked or when it reaches 6 inches from the bottom of the cattleguard frame. Drainage into and from the cattleguard shall be kept open.
3.2—Gates shall be kept in good repair and made to swing easily. Hinges or latches shall be repaired if not operating properly.
Brush and debris shall be removed from within the swinging radius.
MEASUREMENT
4.1—Measurement will be the number of units for each item listed in the Annual Road Maintenance Plan completed and accepted.
SPECIFICATION T-809 WATERBARS
1.1 - This work consists of installing or removing Waterbars in the Roadbed.
REQUIREMENTS
3.1 - Waterbars shall be installed on roads SHOWN ON THE ROAD MAINTENANCE PLAN in accordance with the ATTACHED DRAWING AND AT LOCATIONS DESIGNATED or STAKED ON THE GROUND.
All material excavated shall be used in the installation of the Waterbar. Bermed material shall be compacted by operating heavy equipment over the length and width of the Berm.
3.2 - Waterbars shall be removed on roads SHOWN ON ROAD MAINTENANCE PLAN by blading the Berm into the adjacent depression to form a smooth transition along the Traveled Way. The length and width of the fill material shall be compacted by the equipment performing the work.
3.3 - Waterbars may be required to be installed between seasons of use and then removed when haul is resumed. Waterbar installation may also be required when use of a road has been completed.
SPECIFICATION T-810 BARRIERS
Mosquito Biomass IRSC
T-810 (5/83)
1.1 - This work shall consist of furnishing, installing or removing barriers. Gates are not included.
2.1 - Materials for barriers shall meet the requirements AS SHOWN ON THE ATTACHED DRAWINGS.
REQUIREMENTS
3.1 - Barriers shall be installed in accordance with the ATTACHED DRAWINGS.
The location of barriers to be removed or installed is SHOWN ON THE SALE AREA MAP. Installation or removal may occur as often as road use is terminated and resumed.
ROLLING DIP:
image1.emf image2.jpg image3.png image4.png image5.png image6.jpeg image7.PNG
File details come from the government source that posted it. Updated .