This document is Appendix C containing road maintenance specifications for a Mastodon Stewardship Integrated Resource Stewardship Contract (IRSC) on the Prescott National Forest's Bradshaw Ranger District, revised January 27, 2025.
The contractor is responsible for performing all pre-haul, during-haul, and post-haul road maintenance with no compensation from the Forest Service. Five roads totaling 19.8 miles are subject to maintenance requirements: FR52 (Senator Highway, 6.4 miles), FR82 (Bodhi Mine Rd, 2.3 miles), FR84 (Betty Mine Rd, 0.1 miles), C177 (Mayer Bolada Rd, 10 miles), and FR9268U (Pollards Rd, 0.1 miles). All roads require compliance with four T-Specifications: T-803 (Surfacing Blading), T-804 (Opening & Maintaining Roads), T-811 (Closing Roads), and T-812 (Miscellaneous Structures). The specifications define detailed technical requirements for maintenance activities including slide and slump repair (maximum 20 cubic yards contractor responsibility), ditch cleaning, surface blading, road opening and closing, drainage structure maintenance, vegetation removal, and miscellaneous structure maintenance. Work must maintain roads to facilitate traffic and proper drainage while protecting National Forest resources. All maintenance activities must comply with specific standards for materials, compaction methods, dust abatement, and environmental protection, with the designated Forest Service official retaining approval authority over field modifications based on actual conditions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mastodon Stewardship IRSC Prescott National Forest Page 1 of 23 Bradshaw Ranger District
Revised 1.27.2025
APPENDIX C
C(T)5.31# – ROAD MAINTENANCE REQUIREMENTS. (9/04) Contractor shall maintain roads in accordance with the following Contract Road Maintenance Requirements Summary:
PRE HAUL
ROAD
ALT NAME TERMINI MILES ROAD MAINTENACE T-
SPECIFICATIONS
FROM TO T-803 T-804 T-811 T-812
FR52 Senator Highway FR82 CU15 6.4 C C C C
FR82 Bodhi Mine Rd FR52 CU1 2.3 C C C C
FR84 Betty Mine Rd CU21 FR52 .1 C C C C
C177 Mayer Bolada Rd FR52 Forest
Boundary 10 C C C C
FR9268U Pollards Rd CU13 FR52 .1 C C C C
DURING HAUL
ALT NAME TERMINI MILES ROAD MAINTENACE T-
SPECIFICATIONS
FROM TO T-803 T-804 T-811 T-812
FR52 Senator Highway FR82 CU15 6.4 C C C C
FR82 Bodhi Mine Rd FR52 CU1 2.3 C C C C
FR84 Betty Mine Rd CU21 FR52 .1 C C C C
C177 Mayer Bolada Rd FR52 Forest
Page 2 of 23 Bradshaw Ranger District
POST HAUL
ALT NAME TERMINI MILES ROAD MAINTENACE T-
SPECIFICATIONS
FROM TO T-803 T-804 T-811 T-812
FR52 Senator Highway FR82 CU15 6.4 C C C C
FR82 Bodhi Mine Rd FR52 CU1 2.3 C C C C
FR84 Betty Mine Rd CRU21 FR52 .1 C C C C
C177 Mayer Bolada Rd FR52 Forest
Notes:
C = Contractor Performance Item The maximum volume of Contractor responsibility for Slide and Slump repair is 20 cubic yards O = Optional Contract Line Item NFSR = National Forest Service Road CR = County Road JCT = Junction MP = Milepost EOR = End of Road
Page 3 of 23 Bradshaw Ranger District
ROAD MAINTENANCE T-SPECIFICATIONS FOR STEWARDSHIP CONTRACTS
Contractor shall maintain roads in accordance with the following Contract Road Maintenance Requirements Summary:
Contractor will be responsible for doing all pre, during and post haul road maintenance with no compensation from the Forest Service.
T-SPECIFICATIONS
T-SPEC NUMBER SPECIFICATION TITLE
T-800 Definitions T-801 Slide and Slump Repair T-802 Ditch Cleaning T-803 Surfacing Blading T-804 Opening & Maintaining Roads T-805 Opening & Maintaining Roads (High Blading) T-806 Surface Repair T-807 Surface Stabilization (Water) T-808 Obsolete T-809 Minor Drainage Structures T-810 Roadway vegetation T-811 Closing Roads T-812 Miscellaneous Structures T-813 Treatment and Disposal of Hazard Trees T-GEN General Requirements
Alligator Stewardship IRSC Prescott National Forest Page 4 of 23 Bradshaw Ranger District
T-800 DEFINITIONS
Wherever the following terms or pronouns are used, the intent and meaning shall be interpreted as follows:
Wherever the following terms or pronouns are used in Specifications T-801 through T-GEN, the intent and meaning shall be interpreted as follows:
800-1.1 - Agreement. Maintenance projects require a mutually acceptable method to resolve the problems, which arise when incompatible situations arise between drawings and specifications and actual conditions on the ground to allow orderly and satisfactory progress of the maintenance.
These specifications have been developed in anticipation of those problem areas and have provided that such changes will be by Agreement.
It is intended that drawings and specifications will govern unless "on-the-ground" conditions warrant otherwise, when specifications call for "Agreement", "agreed", or "approval" such Agreement or approval shall be promptly confirmed in writing.
800-1.2 - Annual Road Maintenance Plan. A plan prepared by various users of one or several roads. The plan is an Agreement on maintenance responsibilities to be performed for the coming year.
800-1.3 - Base Course. Material used to reinforce Subgrade or, as shown on drawings, placed on Subgrade to distribute wheel loads.
800-1.4 - Berm. Curb or dike constructed to prevent uncontrolled Roadway runoff water from discharging onto embankment slope.
800-1.5 - Borrow. Select Material taken from designated borrow sites.
800-1.6 - Crown, Inslope, and Outslope. The cross slope of the Traveled Way to aid in drainage and traffic maneuverability.
800-1.7 - Culverts. A conduit or passageway under a road, trail, or other obstruction. A culvert differs from a bridge in that it is usually entirely below the elevation of the Traveled Way.
800-1.8 - Drainage Dip. A dip in the Traveled Way which intercepts surface runoff and diverts the water off the Traveled Way. A Drainage Dip does not block the movement of traffic.
800-1.9 - Drainage Structures. Manufactured structures which control the runoff of water from the Roadway including Inslope, overside drains, aprons, flumes, downdrains, downpipes, culverts, and the like.
800-1.10 - Dust Abatement Plan. A table which lists the road, dust palliative, application rates, and estimated number of subsequent applications.
800-1.11 - Lead-off Ditches. A ditch used to transmit water from a Drainage Structure or Drainage Dip outlet to the natural drainage area.
800-1.12 - Material. Any substances specified for use in the performance of the work.
800-1.13 – Pre-haul Maintenance. Road maintenance work which must be accomplished to maintain the roads to a
Rev. April 2019
Page 5 of 23 Bradshaw Ranger District satisfactory condition commensurate with the Contractor 's use, provided Contractor 's Operations do not damage improvements under BT6.22, or National Forest resources and hauling can be done safely. This work will be shown in the Annual Road Maintenance Plan as provided in CT5.31#. Pre-haul Maintenance work the Contractor elects to perform will be in compliance with the Road Maintenance T-Specifications.
800-1.14 - Roadbed. The portion of a road between the intersection of Subgrade and sideslopes, excluding that portion of the ditch below Subgrade.
800-1.15 - Road Maintenance Plan. A table which shows applicable road maintenance specifications to be performed by Contractor on specific roads.
800-1.16 - Roadside. A general term denoting the area adjoining the outer edge of the Roadway.
800-1.17 - Roadway. The portion of a road within the limits of excavation and embankment.
800-1.18 - Shoulder. That portion of Roadway contiguous with Traveled Way for accommodation of stopped vehicles, for emergency use, and lateral support of base and Surface Course, if any.
800-1.19 - Slide. A concentrated deposit of Materials from above or on backslope extending onto the Traveled Way or Shoulders, whether caused by mass land movements or accumulated ravelling.
800-1.20 - Slough. Material eroded from the backslope which partially or completely blocks the ditch, but does not encroach on the Traveled Way so as to block passage of traffic.
800-1.21 - Slump. A localized portion of the Roadbed which has slipped or otherwise become lower than that of the adjacent Roadbed and constitutes a hazard to traffic.
800-1.22 - Special Project Specifications. Specifications which detail conditions and requirements peculiar to the individual project.
800-1.23 - Subgrade. Top surface of Roadbed upon which Base Course or Surface Course is constructed. For roads without Base Course or Surface Course, that portion of Roadbed prepared as the finished wearing surface.
800-1.24 - Surface Course. The Material placed on Base Course or Subgrade primarily to resist abrasion and the effects of climate. Surface Course may be referred to as surfacing.
800-1.25 - Surface Treatment Plan. A table which lists the roads and surface treatments to be applied.
800-1.26 - Traveled Way. That portion of Roadway, excluding Shoulders, used for the movement of vehicles.
800-1.27 - Turnouts. That portion of the Traveled Way constructed as additional width on single lane roads to allow for safe passing of vehicles.
800-1.28 - Water Source. A place designated by the Contracting Officer for acquiring water for road maintenance purposes.
800-1.29 - Waterbar. A dip in the Roadbed which intercepts surface runoff and diverts the water off the Roadway. A Waterbar is not designed to be traversable by logging trucks.
Page 6 of 23 Bradshaw Ranger District
Figure 800-1: ILLUSTRATION OF ROAD STRUCTURE TERMS.
Page 7 of 23 Bradshaw Ranger District
T-801 SLIDE AND SLUMP REPAIR
DESCRIPTION
1.1 Slide removal and slump repair shall include excavation, loading, hauling, placing and shaping of waste or replacement of materials.
a). Slide Repair - This work shall consist of the removal and disposal of any materials such as soil, rock and vegetation which has encroached onto the roadway and cannot be routinely handled by a motor-grader during ditch cleaning and surface-blading operations.
b). Slump Repair - This work shall consist of filling, with select-material, depressions or washouts in roadway which have developed and cannot be routinely filled by a motor-grader during surface-blading operations.
REQUIREMENTS
3.1 Slide removal and slump repair shall be performed whenever necessary during Purchaser's use to facilitate traffic, proper drainage, and to prevent resource damage.
3.2 Material removed from slides shall be placed at locations designated by the Forest Service. Unless otherwise agreed, material shall not be wasted over road-fills and material placed shall be shaped and compacted by the hauling and spreading equipment.
3.3 When filling depressions or washouts, selected-material shall be moved from agreed locations, placed in layers and compacted to withstand settlement and deformation.
Existing aggregate-surfacing shall be salvaged when practicable and replaced after depressions have been filled.
Damaged aggregate-base and surfacing shall be repaired under Specification T-806, Surface Repair.
3.4 Following slide repair, roadway shall be shaped so as to reasonably conform to the adjacent roadway, unless otherwise agreed.
3.5 During repair, care shall be taken not to permanently foul aggregate or bituminous-surfaces through covering or mixing with earth or other debris from ditches, slides or other sources.
Page 8 of 23 Bradshaw Ranger District
T-802 DITCH CLEANING
1.1 This work shall consist of removing and disposing of all material from roadway drainage ditches to provide a free draining waterway conforming reasonably to the previous lines, grades and cross-sections.
REQUIREMENTS
3.1 Ditch-cleaning shall be performed whenever necessary during the Purchaser’s use to facilitate drainage.
3.2 Slough Material –
a). Slough material removed from the ditch, if suitable, may be placed in designed berms.
b). Slough material from ditch cleaning operations shall not be blended into aggregate surfaced roads, unless otherwise agreed, in writing, by the Forest Service.
c). Slough material that is not blended into existing roads or placed in berms shall be loaded and hauled to a waste-area designated by the Forest Service, placed in layers and compacted by the hauling vehicle, or disposed of as otherwise agreed.
3.3 During ditch cleaning, care shall be taken not to permanently foul aggregate or bituminous-surfaces through covering or mixing with earth or other debris from the ditches.
3.4 Roadway backslopes and berms shall not be undercut.
Page 9 of 23 Bradshaw Ranger District
T-803 SURFACE BLADING
1.1 Surface blading consists of keeping a native or aggregate surface Roadbed in a condition to facilitate traffic and provide proper drainage. It includes maintaining the Crown or Slope of the Traveled Way, Shoulders, Drainage Dips, all drainage ditches, Turnouts, Berms, and approach road intersections;
also cleaning bridge decks. It also provides a level of smoothness appropriate for the traffic served.
MATERIALS
2.1 Water. When required, water shall be applied according to the requirements in Specification T-807 during scarifying and/or blading if sufficient moisture is not present to cut, mix, or compact the surface Material. Water Sources will be shown on the project area map, or designated by the designated Forest Service official. The requirement will be listed in C/CT5.31#, when applicable.
REQUIREMENTS
3.1 Surface blading shall be performed immediately before, during, and after Contractor 's use as often as necessary to facilitate traffic and proper drainage.
3.2 Surface irregularities shall be eliminated by scarification and/or blading, and the surface left in a free-draining state and to a smoothness needed to facilitate traffic. The surface blading shall preserve the existing cross-section. Surface Material which has been displaced to the Shoulders or Turnouts shall be returned to the Traveled Way. The blading operation shall be conducted to prevent the loss of surface Material and to provide for a thorough mixing of the Material being worked.
3.3 When directed by the designated Forest Service official, residual bituminous material from previous surface- stabilization treatments shall be scarified and reduced to produce material not exceeding 3 inches (76.2 mm) in greatest dimension.
3.4 Roadway backslopes or Berms shall not be undercut, nor shall new Berms be established unless agreed to, in writing, by the designated Forest Service official.
Berms shall be repaired by placing Material, as needed to restore the Berm, to reasonably blend with existing line, grade, and cross-section. Other berms, which are determined by the designated Forest Service official as unnecessary, shall be removed.
3.5 Intersecting roads shall be bladed for a reasonable distance to assure proper blending of the two riding surfaces.
3.6 Drainage Dips and all Ditches shall be cleaned and maintained to reasonably blend with existing line, grade, and cross-section and to provide positive drainage.
Page 10 of 23 Bradshaw Ranger District
T-803-1
3.7 On native surfaced roads, Material generated from backslope Sloughing, and ditch cleaning may be blended with the surface Material being worked. On aggregate surfaced roads this Material shall not be blended with Surface or Base Course Material unless agreed to, in writing, by the designated Forest Service official.
3.8 Rocks or other Material remaining on the Traveled Way after the final pass that are larger than 4 inches in diameter or are larger than the maximum size of imported surfacing shall be removed from the Traveled Way. Unless otherwise designated by the designated Forest Service official, the oversized Material shall be disposed of by sidecasting. Sidecasting into streams, lakes, or water courses shall not be permitted.
3.9 Material and/or debris resulting from work under this specification shall not remain on or in structures, such as Culverts, bridge decks, overside drains, cattleguards, ditches, Drainage Dips, and the like.
3.10 Compaction. When required, the roadbed shall be compacted according to one of the following compaction methods, as listed in CT5.31#:
Compaction Method A - Operate equipment over the full-width until there is no visible evidence of further consolidation.
Compaction Method B - Use compression-type or vibratory rollers. Compact, full width, to at least 95 percent of the maximum density. Determine the in-place density and moisture content according to AASHTO T 310 or other approved test procedures. When required, use AASHTO T 224 to correct coarse particles.
3.11 Grid Rolling. When required, the roadbed shall be grid rolled as listed in CT5.31#. Unless otherwise agreed by the designated Forest Service official, grid-rolling will continue until roadbed imported surfacing-materials are reduced to a size not exceeding 3 inches (76.2 mm) in greatest dimension or two-thirds of the depth of the existing surfacing, whichever is greater.
Page 11 of 23 Bradshaw Ranger District
T-804 OPENING AND MAINTAINING ROADS
1.1 Opening and Maintaining Roads consists of opening roads by removing closure devices, cleaning ditches and other drainage devices built into the roadway, removing berms, and blading the traveled-way. This work also consists of maintaining the roadway immediately before, during, and after the Contractor 's use as necessary to facilitate traffic and proper drainage.
3.1 All closure devices, such as waterbars, depressions, mounds of earth, or downed-trees, shall be removed and disposed of at locations designated by the Forest Service.
All trees and logs on the roadbed, and trees and brush that overhang the traveled-way and interferes with vehicle travel shall be removed and scattered outside the roadway.
All drainage-dips, ditches, out-sloped or in-sloped sections, and other drainage devices built into the roadway shall be cleaned and maintained so they are functional.
The traveled-way shall be bladed to produce a rideable surface.
No scarifying, watering, or compaction will be required to complete the work. Berms shall be removed as directed by the Forest Service.
Page 12 of 23 Bradshaw Ranger District
T-806 SURFACE REPAIR
1.1 This work shall consist of repairing potholes or small soft areas on imported aggregate surface, paved surface or native surfaced roads when materials are inadequate to withstand continuing use.
1.2 This work includes preparing the area to be repaired, furnishing and placing all necessary materials, and other work necessary to repair the surface.
1.3 Damage resulting from the Purchaser's operations is covered under B 5.12 and B 6.22 and is not provided for under this Specification.
MATERIAL
2.1 Aggregates - The types and gradations of aggregate shall be similar to, and compatible with, the existing surface material, as determined by the Forest Service.
a). Pit-run Aggregate: Pit-run aggregates shall consist of native materials of a size and gradation that can be taken directly from the source and placed on the road without crushing or screening. The maximum size shall be three-inches in the greatest dimension.
b). Grid-rolled Aggregate: Grid-rolled aggregate shall consist of native materials of a quality that can be taken directly from the source, without crushing or screening, and broken-down on the road by grid-rolling. The material shall be broken-down to a maximum size of three-inches (76.2 mm) in the greatest dimension.
c). Crushed Aggregate: Crushed-aggregate shall be crushed stone, slag, or gravel meeting current Forest
Service or State DOT requirements.
2.2 Material used in the repair of bituminous pavements may be acquired from local commercial sources. If a mixing table is required, the location shall be approved by the Forest Service. The bituminous mixture to be used by the Purchaser shall be approved by the Forest Service. The Purchaser's share of the quantity of bituminous mixture used in the appraisal estimate will be shown on Road Maintenance Plan. However, Purchaser's share of the work may vary depending on Purchaser's hauling schedule, ground conditions, other traffic, etc.
2.3 Water, if required, will be as specified in Supplemental Specification T-803-1. Water source locations are shown on the timber sale area map.
2.4 Borrow material used in the repair of soft areas may be from Commercial or Forest Service sources as agreed to with the Forest Service. The quality and quantity of the material used in the repair will be limited to that needed to provide a stable traveled way for hauling.
3.1 Aggregate surface repair shall be performed as often as necessary during Purchaser's use to facilitate traffic and to prevent extensive damage to the road-surface.
3.2 Aggregate Surface Repair - Existing aggregate, which has been contaminated with unsuitable material from the subgrade or from other activities shall be removed as directed by the Forest Service. New aggregate shall be mixed until it is uniform throughout, at a moisture-content suitable to prevent segregation and to attain the desired compaction.
Page 13 of 23 Bradshaw Ranger District
The aggregate shall be spread in a uniform layer, with no segregation of size, and to a loose depth that shall have the required thickness when compacted.
If the required compacted depth of any aggregate base or surface course exceeds six inches, it shall be placed in two or more layers of approximately equal thickness. The maximum compacted thickness of any layer shall not exceed six- inches.
Hauling equipment shall be operated over the surface at the previously constructed layer in such a way as to minimize rutting or uneven compaction.
Compaction and grid-rolling, if required, will be as specified in Supplemental Specifications; T-803-2 and T-803-3 as applicable.
All material removed from aggregate-surface repair shall be disposed of as designated by the Forest
Service.
3.3 Bituminous Pavement Repairs. The areas to receive bituminous pavement repairs will be marked on the road surface by the Forest Service just prior to Purchaser performing the work.
3.4 Potholes (deep patch). Surface Course and Base Course materials shall be excavated to a depth necessary to reach firm, suitable material. The minimum depth of excavation shall be 2 inches and the maximum depth of excavation shall be to the top of the subgrade.
The edges of the prepared hole shall be extended to form a vertical face in un-fractured asphalt surfacing.
The prepared hole shall generally be circular or rectangular in shape, dry, and cleaned of all loose Material.
Prepared potholes shall be patched or barricaded immediately.
The faces of the prepared hole shall be tacked with a slow-setting emulsified asphalt.
The bituminous mixture shall be placed in layers not exceeding a compacted depth of 2 inches. Each layer shall be compacted thoroughly with hand or mechanical tampers or rollers. Compaction shall not be done with equipment wheels.
Upon completion, the compacted patch in the pothole shall be flush, with a tolerance or approximately ¼ inch to ½ inch above the level of the adjacent pavement.
3.5 Skin Patches. Bituminous mixture shall be distributed uniformly with feathered edges in layers not to exceed 2 inches compacted depth. When multiple layers are ordered, joints shall be offset at least 6 inches between layers.
Each layer shall be compacted by two passes with a 7-10 ton steel roller or comparable vibratory roller.
3.6 Disposal. All materials removed from potholes and patches shall be disposed of at disposal sites designated by the Forest Service.
Page 14 of 23 Bradshaw Ranger District
T-807 SURFACE STABILIZATION (Water)
1.1 This work shall consist of applying water to the road surface as necessary to control road-surface loss, provide for road user safety, and minimize damage to adjacent resources.
MATERIAL
2.1 Water is the specified-material for surface stabilization; however, Purchaser may use other materials if agreed in advance by the Forest Service. Water-source locations are shown on the sale area map.
REQUIREMENTS
3.1 The rate of application shall be such that the water will not run-off of the surface and cause erosion or unnecessary waste. Water shall be applied to abate dust and stabilize surfacing when requested, in writing, by the Forest Service.
Page 15 of 23 Bradshaw Ranger District
T-808 SURFACE STABILIZATION (Bituminous)
1.1 This work shall consist of preparing the roadbed and furnishing and applying surface-stabilization materials as necessary to abate dust, control road-surfacing loss, provide for user safety and minimize damage to adjacent resources.
MATERIAL
2.1 The type of dust-abatement material to be used, the rates of application, and frequency of applications will be shown in TABLE 2, SURFACE STABILIZATION MAINTENANCE PLAN.
2.2 Water
a). Water shall be reasonably clean and free of oil, salt, acid. alkali, sugar, vegetative-matter, or any other substance injurious to the finished product. Water to be mixed with bituminous-materials shall be tested in accordance with and shall meet the requirements of AASHTO T-26.
b). Water known to be of potable-quality may be used without being tested.
2.3 Bituminous dust-abatement materials shall meet the following requirements:
Application Temperatures - Bituminous materials shall be applied within the temperature ranges indicated in the following table:
Application Temperature Range, °F Type and Grade of Material Spray Mix
Min. – Max. Min. – Max.
MC 30 85-145 60-105
RC-MC-SC 70 120-185 90-155
RC-MC-SC-250 165-225 125-200
RC-MC-SC-800 200-265 160-225
RC-MC-SC-3000 230-295 200-260
Emulsified Asphalts:
RS-1, SS-1, SS-1h, CSS-1h 75-130 70-160 CRS-1, CRS-1h 75-130 70-160
RS-2 110-160 70-160
MS-2, MS-2h 110-160 70-160
CRS-2, CRS-2h, CRS-2 Modified 110-160 70-160 CMS-2, CMS-2h 110-160 70-160
Asphalt Cement (All Grades) 400 Max. 250-325
DO-1-2-3 80-125 ---
DO-4 80-175 ---
DO-8, R3-DO 50-140 ---
Liquid Asphalts - Liquid asphalts shall meet the requirements of the following specifications:
a). Rapid curing liquid asphalts………………………………………AASHTO M - 81 b). Medium-curing liquid asphalts……………………………………AASHTO M - 82
Page 16 of 23 Bradshaw Ranger District
Emulsified Asphalts - Emulsified asphalts shall meet the requirements of the following specifications:
a). Emulsified asphalt (anionic)………………………………………………AASHTO M – 140
(ASTM D – 977)
b). Emulsified asphalt (cationic)………………………………………………AASHTO M – 208*
CMS - 2S: Shall comply with requirements of CMS - 2, except that oil distillate by volume of emulsion shall be twelve-percent to twenty-percent, and the distillation residue shall have a minimum value of sixty percent.
CMS - 3:Shall comply with the requirements of CMS-2, except that oil distillate by volume of emulsion shall have a maximum value of four-percent and the distillation residue shall have a minimum value of sixty-eight-percent.
Bituminous Dust Palliatives-
DO-1 DO-2 DO-3 DO-4
General Requirements ASTM Forest Service Dust Oil Certified D O - 8 R3-DO Method Light Medium Heavy Dust Oil Flash Point:
Tag Open-Cup, °F, Min. D1310 125 125 125 200 Cleveland Open-Cup, °F, Min. D92 --- --- --- --- 212 212 Viscosity:
Kinematics, @ 100 °F, cSt D2170 40-70 90-125 135-200 20-100 Saybolt Furol, @ 77°F, SFS, Max. D88 --- --- --- --- 50 50-100 Water, % Maximum D95 0.5 0.5 0.5 0.5 --- --- D244 --- --- --- --- 50 --- Sieve Test % Maximum D255 --- --- --- --- --- 50 Asphaltenes % D2006-70 3-6 4-8 5-10 0-5 5-10 2-10 Saturates, % Minimum D2006-70 25 25 25 10 8 8 24-Hour Settlement, % D244 --- ----- --- --- 2 2-3 Sieve Test % Maximum D244 ----- --- --- --- 0.1 0.1 Distillation Test:
Total Distillate to 550°F, Max, % by Volume D244 35 30 30 5 50 50 Total Distillate to 680°F, Max, % by Volume D402 --- --- --- --- --- --- Oil Distillate, % by Volume D244 --- --- --- --- 5 5-10 Total Residue, % by Volume D244 --- --- --- --- 45 45 Tests on Residue from Distillation Viscosity, Kinematics, @ 100°F, cSt
D2170 75-250 200-600 500-1500 20-150 --- ---
Viscosity, Kinematics, @ 122°F, cSt
D2170 --- --- --- --- 250-1200 50-500
Solubility in Trichloroethylene, % Min. D2042 98 98 98 98 98 99 Ductility, CM Minimum D113 --- --- --- --- --- ---
2-4 Acceptance of Materials - Certification, sampling and acceptance of bituminous materials will be based upon manufacturer's certification.
Page 17 of 23 Bradshaw Ranger District
3.1 Preparation for Dust-abatement Materials Other Than Water - Prior to application of any material, the entire roadbed shall be prepared as required under Specification T-803, Surface Blading.
Bituminous and other residue from previous treatments shall be scarified and pulverized to produce loosened material not exceeding three-inches in greatest dimension.
A light-application of water shall be applied just prior to applying the dust-palliative, unless otherwise agreed by the Forest Service.
3.2 Application Methods of Bituminous Dust-abatement Materials – One or more of the following methods shall be used as specified in C5.4, Table 2.
a). Direct Penetration -
1). Prepared Surface: The palliative application is made directly to the traveled-way and any shoulders prepared in accordance with Specification T-803. The road shall be closed to traffic until penetration is complete or until excess material is blotted according to Subsection 3.4, or as approved by the Forest Service.
2). No Surface Preparation: The palliative is applied directly to the existing surface, regardless of its condition. The road shall be closed to traffic until penetration is complete or until excess material is blotted according to Subsection 3.4, or as approved by the Forest Service.
b). Penetration - The top one-inch (25.4 mm) of roadway-surfacing is placed to the side in a windrow. The palliative application is made to the exposed roadway, and the windrow is pulled-back across the road as a blotter since penetration into the compacted-surface is minimal.
c). Enhanced Penetration - The top one-inch (25.4 mm), plus or minus, is loosened and left in-place. The palliative application then penetrates the loose material.
3.3 Weather Limitations - Dust-abatement materials shall not be applied when it is raining, when the surface is too wet to receive the material, or if rain is anticipated to occur within twenty-four-hours of palliative application.
Dust palliatives shall be applied only when the surface temperature of the traveled-way is fifty-degrees Fahrenheit in the shade, and rising.
3.4 Blotter Material - Blotter-material, when used, shall be spread in sufficient quantities to prevent tire pickup.
3.5 Traffic - Traffic shall be maintained in accordance with C6.33
Page 18 of 23 Bradshaw Ranger District
Supplemental Specification T-808 T-808-1 SURFACE STABILIZATION (Magnesium Chloride) Materials
2.1 Add the following subsection:
2.5 Magnesium Chloride brine shall contain 28 to 35 percent Magnesium Chloride (Mg CL2) by weight and
62 to 72 percent water (H2O) by weight. The brine may contain small amounts of non-detrimental ions not to exceed the quantities listed in the following table:
Chemical Constituents Range % by Weight Magnesium (Mg) 7.0 – 9.5 Chloride (Cl2) 20.0 – 24.0 Sulfate (SO4) 0.0 – 3.5 Sodium (Na) 0.0 – 0.8 Potassium (K) 0.0 – 0.8
Other non-detrimental elements such as Li, Br, Fe and Ca may be present in minute quantities.
The presence of nitrates of any material which is potentially detrimental to the brine or Forest Service resources and activities is not acceptable.
Ion presence shall be quantitatively determined by Atomic Absorption Spectrometry or acceptable titration methods.
Specific gravity shall be between 1.290 and 1.330 and shall be determined by use of a heavy liquid hydrometer capable of reading between 1.200 and 1.400.
3.1 Requirements. Amend subsection 3.2 as follows:
3.2 Application methods of Bituminous and Magnesium Chloride Dust Abatement Materials. One or more of the following……
Page 19 of 23 Bradshaw Ranger District
T-809 MINOR DRAINAGE STRUCTURES
1.1 This work shall consist of cleaning and maintaining culverts; cleaning, maintaining and repairing inlets, outlets, related ditches, existing riprap, trash-racks and drop-inlets. Minor drainage-structures are those with waterway opening of less than thirty-five square-feet (3.2 SM) in a single installation or a multiple installation in which the smallest opening is less than nineteen square-feet (1.7 SM). This includes overside drains.
MATERIAL
2.1 All materials used in the maintenance of minor-drainage structures shall conform by type and specification to the material in the structure being maintained.
REQUIREMENTS
3.1 During periods of Purchaser's operation, Purchaser shall keep ditches, culverts and other drainage facilities clear and functioning.
3.2 Culverts, inlet and outlet channels, inlet trash-racks and drop-inlets shall be cleared of loose materials that could cause plugging or prevent the free-flow of water. Vegetative debris shall be scattered outside of the roadbed unless otherwise agreed. Debris shall be placed so as not to enter the stream-channels.
Page 20 of 23 Bradshaw Ranger District
T 810 ROADWAY VEGETATION
1.1 This work shall consist of removal of brush or tree growth or other obstructions to visibility, as shown on the drawings or designated by the Forest Service.
REQUIREMENTS
3.1 All trees that have fallen across the roadway shall be removed, unless otherwise agreed. Merchantable timber, if any, shall be cut in standard log lengths and decked along the roadbed in locations where traveled way width or sight distances will not be impaired.
3.2 Brush and trees that obstruct proper sight distance shall be removed. Low shrubs and brush, which do not restrict sight distance, provides ground cover or reduces erosion, shall not be removed.
Vegetative material consisting of limbs, tops and brush shall be scattered outside of the roadway. Stumps and logs not meeting utilization standards may also be scattered outside of the roadway. Purchaser shall avoid placing vegetative material in concentrations. Disposal of vegetative material will not be permitted in meadows or drainage ways.
Page 21 of 23 Bradshaw Ranger District
T-811 CLOSING ROADS
1.1 Closing roads consists of closing roads by restoring or installing closure-devices and drainage-facilities on roads no longer needed by the Contractor or when interim closures are required during periods of Contractor 's non-use.
Closure devices and drainage facilities may consist of cross-ditches, waterbars, drainage-dips, barriers or gates and restoring cross-sloped sections.
MAINTENANCE REQUIREMENTS
3.1 During periods of Contractor’s/Contractor 's non-use, roads designated for interim closures shall be closed unless otherwise agreed to, in writing, by the designated Forest Service official.
The entire roadway shall be bladed and shaped to provide drainage during periods of closure or non-use.
Where possible, and still retaining appropriate surface-drainage characteristics, existing surface-vegetation shall be protected in accordance with the High Blading requirements found in Specification T-805 Opening and Maintaining Roads (High Blading).
3.2 All drainage-dips, out-sloped or in-sloped sections, or other drainage devices built into the roadbed and roadway ditches shall be restored and replaced. Existing culverts shall be maintained to provide unobstructed flow.
Waterbars and other cross-ditches shall be installed at locations designated by the designated Forest Service official.
3.3 All closure-devices and signs shall be constructed, located, installed, and maintained according to the standards contained in the most current version of the MUTCD.
3.4 Where existing surface-vegetation has been destroyed as a result of Contractor ’s operation, the entire roadway will be seeded with a seed-mixture approved by the designated Forest Service official.
Page 22 of 23 Bradshaw Ranger District
T-812 MISCELLANEAOUS STRUCTURES
1.1 Maintenance of miscellaneous structures includes cattleguards, gates, H-braces, fencing, guardrails, signage, and other similar structures that have been previously installed to insure safe and efficient operation of the road.
MATERIALS
2.1 Any Materials needed in the maintenance of miscellaneous structures shall be similar in type and quality to the Material in the structure being maintained.
3.1 Cattleguards. Loose rail or wing elements shall be straightened and welded or bolted back in place.
Excess Material carried into the cattleguard shall be removed when drainage is blocked or when it reaches 6 inches from the bottom of the cattleguard frame. Drainage into and from the cattleguard shall be kept open.
3.2 Gates. Gates shall be kept in good repair and made to swing easily. Hinges or latches shall be repaired if not operating properly and hinges shall be oiled. Brush and debris shall be removed from within the swinging radius.
Loose wire gate ends and internal stays shall be maintained in good condition. Gate wire shall be maintained as necessary to insure proper operation of the gate both as a vehicle passageway and as a barrier to cattle movement.
3.3 H-braces. Posts, horizontal braces, and diagonal struts or tie wires shall be maintained to provide for tightness of fence and gate or latch posts.
3.4 Fencing. Fencing which has no opening or provisions for gating shall be temporarily braced prior to cutting. Fencing shall be replaced upon completion of use and shall be stretched and securely fastened to conform to its original spacing before cutting.
3.5 Signage. Structure delineators, regulatory and warning signs determined by the designated Forest Service official as necessary, shall be maintained in good, clean condition.
3.6 Guardrails. Guardrails shall be maintained according to the most recent AASHTO standards and specifications.
Page 23 of 23 Bradshaw Ranger District
| C(T)5.31# – ROAD MAINTENANCE REQUIREMENTS. (9/04) Contractor shall maintain roads in accordance with the following Contract Road Maintenance Requirements Summary: |
| ROAD MAINTENANCE T-SPECIFICATIONS FOR STEWARDSHIP CONTRACTS |
| T-800 DEFINITIONS |
| T-801 SLIDE AND SLUMP REPAIR |
| T-802 DITCH CLEANING |
| T-803 SURFACE BLADING |
| T-804 OPENING AND MAINTAINING ROADS |
| T-806 SURFACE REPAIR |
| T-807 SURFACE STABILIZATION (Water) |
| T-808 SURFACE STABILIZATION (Bituminous) |
| T-808-1 SURFACE STABILIZATION (Magnesium Chloride) Materials |
| T-809 MINOR DRAINAGE STRUCTURES |
| T 810 ROADWAY VEGETATION |
| T-811 CLOSING ROADS |
| T-812 MISCELLANEAOUS STRUCTURES |