4. Gate Opener Specs.pdf
PDF 92 KB Posted
- Attached to
- 127EAW21R0096 - Yreka Security Fence Upgrades
- Solicitation number
- 127EAW21R0096
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 6. Davis-Bacon Act WD # CA20210007.pdf | ||
| 2. CALTRANS SPEC A85.pdf | ||
| 5. Service Center Fence drawing.pdf | ||
| 3. CALTRANS SPEC A85A.pdf | ||
| 1. Statment of Work.pdf | ||
| 127EAW21R0096 - Yreka Security Fence Upgrades.pdf | ||
| 7. RFI Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Gate Operators 32 31 11-1
SECTION 32 31 11 – GATE OPERATORS
PART 1 GENERAL
1.1 SUBMITTALS
A. Action Submittals:
1. Shop Drawings: Illustrate products, installation, and relationship to adjacent construction.
2. Product Data: Manufacturer’s descriptive data and product attributes.
B. Closeout Submittals:
1. Operation and Maintenance Data.
1.2 WARRANTY
A. Manufacturer’s 5 year warranty against material and manufacturing defects.
PART 2 PRODUCTS
2.1 MANUFACTURERS
A. Contract Documents are based on products by LiftMaster. www.LiftMaster.com
B. Substitutions: or equal product
2.2 MANUFACTURED UNITS
A. Swing Gate Operators:
1. Model: CSW200UL.
2. Operation: Gear driven.
3. Meet UL 325, UL 991, ASTM F2200, and CAS C22.2 No. 247.
4. Motor: 24 VDC, continuous duty type, sized to gate conditions.
5. Battery backup: Maximum 400 cycles.
6. Monitoring and controls:
a. Internet connectivity: MyQ technology with 50 channel FHSS.
b. Built-in Wi-Fi with internet gateway.
c. Radio receiver: Security+ 2.0 technology.
d. Monitored retro reflective photo eye.
7. Accessories:
a. Monitored safety devices: Through-beam photo eyes
b. Wired monitored safety edges:
c. One-button encrypted DIP remote control.
d. Smart video intercom.
e. Wireless commercial keypad.
f. Plug-in loop detector.
PART 3 EXECUTION
3.1 INSTALLATION
A. Install in accordance with manufacturer’s instructions.
3.2 CLOSEOUT ACTIVITIES
A. Test and adjust operators for proper operation.
B. Demonstration: Host a demonstration of the operation and programming of operators to the COR and other FS personnel on site.
END OF SECTION
http://www.liftmaster.com/
File details come from the government source that posted it. Updated .