4. Gate Opener Specs.pdf

PDF 92 KB Posted

Attached to
127EAW21R0096 - Yreka Security Fence Upgrades
Solicitation number
127EAW21R0096
Issued by

View the file

Other files

File Type Posted
6. Davis-Bacon Act WD # CA20210007.pdf PDF
2. CALTRANS SPEC A85.pdf PDF
5. Service Center Fence drawing.pdf PDF
3. CALTRANS SPEC A85A.pdf PDF
1. Statment of Work.pdf PDF
127EAW21R0096 - Yreka Security Fence Upgrades.pdf PDF
7. RFI Form.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Gate Operators 32 31 11-1

SECTION 32 31 11 – GATE OPERATORS

PART 1 GENERAL

1.1 SUBMITTALS

A. Action Submittals:

1. Shop Drawings: Illustrate products, installation, and relationship to adjacent construction.

2. Product Data: Manufacturer’s descriptive data and product attributes.

B. Closeout Submittals:

1. Operation and Maintenance Data.

1.2 WARRANTY

A. Manufacturer’s 5 year warranty against material and manufacturing defects.

PART 2 PRODUCTS

2.1 MANUFACTURERS

A. Contract Documents are based on products by LiftMaster. www.LiftMaster.com

B. Substitutions: or equal product

2.2 MANUFACTURED UNITS

A. Swing Gate Operators:

1. Model: CSW200UL.

2. Operation: Gear driven.

3. Meet UL 325, UL 991, ASTM F2200, and CAS C22.2 No. 247.

4. Motor: 24 VDC, continuous duty type, sized to gate conditions.

5. Battery backup: Maximum 400 cycles.

6. Monitoring and controls:

a. Internet connectivity: MyQ technology with 50 channel FHSS.

b. Built-in Wi-Fi with internet gateway.

c. Radio receiver: Security+ 2.0 technology.

d. Monitored retro reflective photo eye.

7. Accessories:

a. Monitored safety devices: Through-beam photo eyes

b. Wired monitored safety edges:

c. One-button encrypted DIP remote control.

d. Smart video intercom.

e. Wireless commercial keypad.

f. Plug-in loop detector.

PART 3 EXECUTION

3.1 INSTALLATION

A. Install in accordance with manufacturer’s instructions.

3.2 CLOSEOUT ACTIVITIES

A. Test and adjust operators for proper operation.

B. Demonstration: Host a demonstration of the operation and programming of operators to the COR and other FS personnel on site.

END OF SECTION