CONSTRUCTION COST ESTIMATEDATE:
CONTRACTOR:ADDRESS:
CONTRACT FOR (word to be performed): Hanger 1010 Fan RepairPROPOSED TOTAL CONTRACT PRICE:$ - 0
PURCHASE REQUEST NUMBER:PROJECT NUMBER: FA302020R0019WORK LOCATION: Sheppard AFB, TX
LINE NO.SummaryUNIT OF MEASUREQUANTITYMATERIAL COSTLABOR COSTEQUIPMENT COSTOTHER DIRECT COSTSLINE TOTAL
UNIT PRICETOTAL MATERIAL COSTUNIT PRICETOTAL LABOR COSTUNIT PRICETOTAL EQUIPMENT COST
Basic Bid Option
172" Downrod Assemble/Gripple Cable and Assembly KitEA2$ - 0$ - 0$ - 0
2HUNTER Industrial 24' TITAN Hanger Fan BladeEA1$ - 0$ - 0$ - 0
3Repair Bird NettingJOB1$ - 0$ - 0$ - 0
4Overhead Lift 30'-40'JOB1$ - 0$ - 0$ - 0
5SuperintendantEA1$ - 0$ - 0$ - 0
6Inflation%1$ - 0$ - 0$ - 0
7Prime Contractor Overhead%1$ - 0$ - 0$ - 0
8Prime Contractor Profit%1$ - 0$ - 0$ - 0
9Bond%1$ - 0$ - 0$ - 0

10 Total $ - 0