ATTACHMENT 2
SCHEDULE OF MATERIAL
SUBMITTALS
(AF Form 66 Modified)
PROJECT NO. PROJECT TITLE SOLICITATION/CONTRACT
NO.
VGLZ 232036 Repair of ATC Tower Sidewalks Bldg.560
TO BE COMPLETED BY PROJECT ENGINEER
NO. OF COPIES REQUIRED
LI
N
E N
U M
B E
R
Spec Section
ITEM OR
DESCRIPTION OF
ITEM, CONTRACT
REFERENCE, TYPE
OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C
M
P
LI
A N
C E
A N
D
LO
S E
O U
T
S H
O P
D R
A W
IN
G
A
M P
LE
L O
R S
E L
E C
T
IO
M
N U
F A
C T
U R
E
M A
N U
F A
C T
U R
E R
'S
T A
LO
G
D A
H E
R M
A T
E R
IA
L or D
A
P
E R
A T
IN
G
IN
S
T R
U C
T
IO
SUBMITTAL
REQUIRED
BY 14
DAYS
AFTER
NTP
DATE
RECEIVED
IN
CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSION
DATE
FOLLOW-
UP
DATE CONTRACTOR
NOTIFIED
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
REMARKS
APPROVED DISAPPROVED
01.00.00 AF Form 3000 Material
Approval Form
X
01.00.00
01.26.00
AF Form 3064 Contract Progress Schedule
X
01.00.00
01.26.00
AF Form 3065 Contract Progress Report
X
01.00.00
SANGB Form 23 Hazardous Material Identification
X
01.00.00
SANGB From 72 Recycling and Disposal Form
X
01.00.10 Affirmative Procurement
Reporting Form
X
01.00.10 DD Form 1354
01.25.00 Substitution Request Form:
CSI Form 13.1A
X
01.32.00 Construction Progress
Schedules
X X
01.32.33 Construction Photos
X X
1.33.00 SubmittalRegisrtry Form 66
X
01.33.00 Schedule
X X
01.35.23 Safety Plan
X
01.40.00 QA/QC Plan X
15 01.78.23 O & M Data X
16 01.00.00 SANGB Form 23 Hazardou Material Identification
17 SOW Construction Materials X X
SOW Radiation Safety Plan X X 18 19 QC Test Report Data
| PROJECT NO: |
| PROJECT TITLE: |
| VGLZ 192040: |
| SOLICITATIONCONTRACT NORepair South Perimeter Road DLA: |
| TO BE COMPLETED BY PROJECT ENGINEERRow1: |
| NO OF COPIES REQUIRED: |
| Road DLA: |
| TO BE COMPLETED BY PROJECT ENGINEERRow2: |
| NO OF COPIES REQUIREDITEM OR DESCRIPTION OF ITEM CONTRACT REFERENCE TYPE OF SUBMITTAL: |
| 1: |
| NO OF COPIES REQUIREDAF Form 3000 Material Approval Form: |
| SHOP DRAWINGSAF Form 3000 Material Approval Form: |
| SAMPLESAF Form 3000 Material Approval Form: |
| COLOR SELECTIONAF Form 3000 Material Approval Form: |
| MANUFACTUREAF Form 3000 Material Approval Form: |
| SUBMITTAL REQUIRED BY 14 DAYS AFTER NTP: |
| DATE RECEIVED IN CONTRACTING: |
| DATE TO CIVIL ENGINEERING: |
| RETURN SUSPENSION DATE: |
| FOLLOW UP: |
| APPROVED: |
| DISAPPROVED: |
| CONTRACTOR RESUBMITTAL: |
| FINAL APPROVAL: |
| REMARKS: |
| 2: |
| SHOP DRAWINGSX: |
| SAMPLESX: |
| COLOR SELECTIONX: |
| MANUFACTUREX: |
| X: |
| X_2: |
| XX: |
| SUBMITTAL REQUIRED BY 14 DAYS AFTER NTP_2: |
| DATE RECEIVED IN CONTRACTING_2: |
| DATE TO CIVIL ENGINEERING_2: |
| RETURN SUSPENSION DATE_2: |
| FOLLOW UP_2: |
| APPROVED_2: |
| DISAPPROVED_2: |
| CONTRACTOR RESUBMITTAL_2: |
| FINAL APPROVAL_2: |
| REMARKS_2: |
| 3: |
| SHOP DRAWINGSX_2: |
| SAMPLESX_2: |
| COLOR SELECTIONX_2: |
| MANUFACTUREX_2: |
| X_3: |
| X_4: |
| XX_2: |
| X_5: |
| SUBMITTAL REQUIRED BY 14 DAYS AFTER NTPX: |
| DATE RECEIVED IN CONTRACTINGX: |
| DATE TO CIVIL ENGINEERINGX: |
| RETURN SUSPENSION DATEX: |
| FOLLOW UPX: |
| APPROVEDX: |
| DISAPPROVEDX: |
| CONTRACTOR RESUBMITTALX: |
| FINAL APPROVALX: |
| REMARKSX: |
| XSANGB Form 23 Hazardous Material Identification: |
| SHOP DRAWINGSSANGB Form 23 Hazardous Material Identification: |
| SAMPLESSANGB Form 23 Hazardous Material Identification: |
| COLOR SELECTIONSANGB Form 23 Hazardous Material Identification: |
| MANUFACTURESANGB Form 23 Hazardous Material Identification: |
| SANGB Form 23 Hazardous Material Identification: |
| SANGB Form 23 Hazardous Material Identification_2: |
| X_6: |
| SUBMITTAL REQUIRED BY 14 DAYS AFTER NTPX_2: |
| DATE RECEIVED IN CONTRACTINGX_2: |
| DATE TO CIVIL ENGINEERINGX_2: |
| RETURN SUSPENSION DATEX_2: |
| FOLLOW UPX_2: |
| APPROVEDX_2: |
| DISAPPROVEDX_2: |
| CONTRACTOR RESUBMITTALX_2: |
| FINAL APPROVALX_2: |
| REMARKSX_2: |
| SHOP DRAWINGSX_3: |
| SAMPLESX_3: |
| COLOR SELECTIONX_3: |
| MANUFACTUREX_3: |
| X_7: |
| X_8: |
| XX_3: |
| X_9: |
| SUBMITTAL REQUIRED BY 14 DAYS AFTER NTPX_3: |
| DATE RECEIVED IN CONTRACTINGX_3: |
| DATE TO CIVIL ENGINEERINGX_3: |
| RETURN SUSPENSION DATEX_3: |
| FOLLOW UPX_3: |
| APPROVEDX_3: |
| DISAPPROVEDX_3: |
| CONTRACTOR RESUBMITTALX_3: |
| FINAL APPROVALX_3: |
| REMARKSX_3: |
| 6: |
| SHOP DRAWINGSX_4: |
| SAMPLESX_4: |
| COLOR SELECTIONX_4: |
| MANUFACTUREX_4: |
| X_10: |
| X_11: |
| XX_4: |
| X_12: |
| SUBMITTAL REQUIRED BY 14 DAYS AFTER NTPX_4: |
| DATE RECEIVED IN CONTRACTINGX_4: |
| DATE TO CIVIL ENGINEERINGX_4: |
| RETURN SUSPENSION DATEX_4: |
| FOLLOW UPX_4: |
| APPROVEDX_4: |
| DISAPPROVEDX_4: |
| CONTRACTOR RESUBMITTALX_4: |
| FINAL APPROVALX_4: |
| REMARKSX_4: |
| XDD Form 1354: |
| SHOP DRAWINGSDD Form 1354: |
| SAMPLESDD Form 1354: |
| COLOR SELECTIONDD Form 1354: |
| MANUFACTUREDD Form 1354: |
| DD Form 1354: |
| DD Form 1354_2: |
| XDD Form 1354_2: |
| DD Form 1354_3: |
| SUBMITTAL REQUIRED BY 14 DAYS AFTER NTPDD Form 1354: |
| DATE RECEIVED IN CONTRACTINGDD Form 1354: |
| DATE TO CIVIL ENGINEERINGDD Form 1354: |
| RETURN SUSPENSION DATEDD Form 1354: |
| FOLLOW UPDD Form 1354: |
| APPROVEDDD Form 1354: |
| DISAPPROVEDDD Form 1354: |
| CONTRACTOR RESUBMITTALDD Form 1354: |
| FINAL APPROVALDD Form 1354: |
| REMARKSDD Form 1354: |
| 8: |
| SHOP DRAWINGSX_5: |
| SAMPLESX_5: |
| COLOR SELECTIONX_5: |
| MANUFACTUREX_5: |
| X_13: |
| X_14: |
| XX_5: |
| X_15: |
| SUBMITTAL REQUIRED BY 14 DAYS AFTER NTPX_5: |
| DATE RECEIVED IN CONTRACTINGX_5: |
| DATE TO CIVIL ENGINEERINGX_5: |
| RETURN SUSPENSION DATEX_5: |
| FOLLOW UPX_5: |
| APPROVEDX_5: |
| DISAPPROVEDX_5: |
| CONTRACTOR RESUBMITTALX_5: |
| FINAL APPROVALX_5: |
| REMARKSX_5: |
| 9: |
| SHOP DRAWINGSX_6: |
| SAMPLESX_6: |
| COLOR SELECTIONX_6: |
| MANUFACTUREX_6: |
| X_16: |
| X_17: |
| Construction Progress: |
| X_18: |
| SUBMITTAL REQUIRED BY 14 DAYS AFTER NTPX_6: |
| DATE RECEIVED IN CONTRACTINGX_6: |
| DATE TO CIVIL ENGINEERINGX_6: |
| RETURN SUSPENSION DATEX_6: |
| FOLLOW UPX_6: |
| APPROVEDX_6: |
| DISAPPROVEDX_6: |
| CONTRACTOR RESUBMITTALX_6: |
| FINAL APPROVALX_6: |
| REMARKSX_6: |
| SHOP DRAWINGSX_7: |
| SAMPLESX_7: |
| COLOR SELECTIONX_7: |
| MANUFACTUREX_7: |
| X_19: |
| X_20: |
| X_21: |
| SUBMITTAL REQUIRED BY 14 DAYS AFTER NTPX_7: |
| DATE RECEIVED IN CONTRACTINGX_7: |
| DATE TO CIVIL ENGINEERINGX_7: |
| RETURN SUSPENSION DATEX_7: |
| FOLLOW UPX_7: |
| APPROVEDX_7: |
| DISAPPROVEDX_7: |
| CONTRACTOR RESUBMITTALX_7: |
| FINAL APPROVALX_7: |
| REMARKSX_7: |
| SHOP DRAWINGSX_8: |
| SAMPLESX_8: |
| COLOR SELECTIONX_8: |
| MANUFACTUREX_8: |
| X_22: |
| X_23: |
| XX_6: |
| X_24: |
| SUBMITTAL REQUIRED BY 14 DAYS AFTER NTPX_8: |
| DATE RECEIVED IN CONTRACTINGX_8: |
| DATE TO CIVIL ENGINEERINGX_8: |
| RETURN SUSPENSION DATEX_8: |
| FOLLOW UPX_8: |
| APPROVEDX_8: |
| DISAPPROVEDX_8: |
| CONTRACTOR RESUBMITTALX_8: |
| FINAL APPROVALX_8: |
| REMARKSX_8: |
| SubmittalRegisrtry Form 66: |
| SHOP DRAWINGSX_9: |
| SAMPLESX_9: |
| COLOR SELECTIONX_9: |
| MANUFACTUREX_9: |
| X_25: |
| X_26: |
| X_27: |
| SUBMITTAL REQUIRED BY 14 DAYS AFTER NTPX_9: |
| DATE RECEIVED IN CONTRACTINGX_9: |
| DATE TO CIVIL ENGINEERINGX_9: |
| RETURN SUSPENSION DATEX_9: |
| FOLLOW UPX_9: |
| APPROVEDX_9: |
| DISAPPROVEDX_9: |
| CONTRACTOR RESUBMITTALX_9: |
| FINAL APPROVALX_9: |
| REMARKSX_9: |
| XSafety Plan: |
| SHOP DRAWINGSSafety Plan: |
| SAMPLESSafety Plan: |
| COLOR SELECTIONSafety Plan: |
| MANUFACTURESafety Plan: |
| Safety Plan: |
| Safety Plan_2: |
| X_28: |
| SUBMITTAL REQUIRED BY 14 DAYS AFTER NTPX_10: |
| DATE RECEIVED IN CONTRACTINGX_10: |
| DATE TO CIVIL ENGINEERINGX_10: |
| RETURN SUSPENSION DATEX_10: |
| FOLLOW UPX_10: |
| APPROVEDX_10: |
| DISAPPROVEDX_10: |
| CONTRACTOR RESUBMITTALX_10: |
| FINAL APPROVALX_10: |
| REMARKSX_10: |
| XQAQC Plan: |
| X_29: |
| X_30: |
| SUBMITTAL REQUIRED BY 14 DAYS AFTER NTPX_11: |
| DATE RECEIVED IN CONTRACTINGX_11: |
| DATE TO CIVIL ENGINEERINGX_11: |
| RETURN SUSPENSION DATEX_11: |
| FOLLOW UPX_11: |
| APPROVEDX_11: |
| DISAPPROVEDX_11: |
| CONTRACTOR RESUBMITTALX_11: |
| FINAL APPROVALX_11: |
| REMARKSX_11: |
| XO M Data: |
| X_31: |
| X_32: |
| SUBMITTAL REQUIRED BY 14 DAYS AFTER NTPX_12: |
| DATE RECEIVED IN CONTRACTINGX_12: |
| DATE TO CIVIL ENGINEERINGX_12: |
| RETURN SUSPENSION DATEX_12: |
| FOLLOW UPX_12: |
| APPROVEDX_12: |
| DISAPPROVEDX_12: |
| CONTRACTOR RESUBMITTALX_12: |
| FINAL APPROVALX_12: |
| REMARKSX_12: |
| 16: |
| XSANGB Form 23 Hazardou Material Identification: |
| SHOP DRAWINGSSANGB Form 23 Hazardou Material Identification: |
| SAMPLESSANGB Form 23 Hazardou Material Identification: |
| COLOR SELECTIONSANGB Form 23 Hazardou Material Identification: |
| MANUFACTURESANGB Form 23 Hazardou Material Identification: |
| SANGB Form 23 Hazardou Material Identification: |
| SANGB Form 23 Hazardou Material Identification_2: |
| XSANGB Form 23 Hazardou Material Identification_2: |
| SANGB Form 23 Hazardou Material Identification_3: |
| SUBMITTAL REQUIRED BY 14 DAYS AFTER NTPSANGB Form 23 Hazardou Material Identification: |
| DATE RECEIVED IN CONTRACTINGSANGB Form 23 Hazardou Material Identification: |
| DATE TO CIVIL ENGINEERINGSANGB Form 23 Hazardou Material Identification: |
| RETURN SUSPENSION DATESANGB Form 23 Hazardou Material Identification: |
| FOLLOW UPSANGB Form 23 Hazardou Material Identification: |
| APPROVEDSANGB Form 23 Hazardou Material Identification: |
| DISAPPROVEDSANGB Form 23 Hazardou Material Identification: |
| CONTRACTOR RESUBMITTALSANGB Form 23 Hazardou Material Identification: |
| FINAL APPROVALSANGB Form 23 Hazardou Material Identification: |
| REMARKSSANGB Form 23 Hazardou Material Identification: |
| SOW: |
| XConstruction Materials: |
| X_33: |
| X_34: |
| SUBMITTAL REQUIRED BY 14 DAYS AFTER NTPX_13: |
| DATE RECEIVED IN CONTRACTINGX_13: |
| DATE TO CIVIL ENGINEERINGX_13: |
| RETURN SUSPENSION DATEX_13: |
| FOLLOW UPX_13: |
| APPROVEDX_13: |
| DISAPPROVEDX_13: |
| CONTRACTOR RESUBMITTALX_13: |
| FINAL APPROVALX_13: |
| REMARKSX_13: |
| Radiation Safety Plan: |
| X_35: |
| SUBMITTAL REQUIRED BY 14 DAYS AFTER NTPX_14: |
| DATE RECEIVED IN CONTRACTINGX_14: |
| DATE TO CIVIL ENGINEERINGX_14: |
| RETURN SUSPENSION DATEX_14: |
| FOLLOW UPX_14: |
| APPROVEDX_14: |
| DISAPPROVEDX_14: |
| CONTRACTOR RESUBMITTALX_14: |
| FINAL APPROVALX_14: |
| REMARKSX_14: |
| SOW19: |
| XQC Test Report Data: |
| undefined: |
| SUBMITTAL REQUIRED BY 14 DAYS AFTER NTPQC Test Report Data: |
| DATE RECEIVED IN CONTRACTINGQC Test Report Data: |
| DATE TO CIVIL ENGINEERINGQC Test Report Data: |
| RETURN SUSPENSION DATEQC Test Report Data: |
| FOLLOW UPQC Test Report Data: |
| APPROVEDQC Test Report Data: |
| DISAPPROVEDQC Test Report Data: |
| CONTRACTOR RESUBMITTALQC Test Report Data: |
| FINAL APPROVALQC Test Report Data: |
| REMARKSQC Test Report Data: |
File details come from the government source that posted it. Updated .