4.3.1 S3184 cost schedule.pdf

PDF 424 KB Posted

Attached to
On Call Plumbing - Lake Tahoe Region
Solicitation number
70CNR-S3184
Issued by
Washoe County, Nevada

About this file

The file appears to be a cost schedule template for a state or local government contract opportunity, designed for vendor pricing submission. The document provides a structured grid for vendors to complete pricing details across multiple line items, with spaces for proposed pricing and estimated usage calculations. The template includes provisions for estimating travel costs and overall project value, with a specific note that travel is billable at current GSA rates.

The cost schedule allows for up to 16 line items of pricing, plus an additional travel cost estimate, indicating a potentially complex procurement with multiple components or service categories. Vendors are explicitly instructed to complete the shaded areas with proposed pricing and are responsible for ensuring calculation accuracy. The document references GSA (General Services Administration) rates for travel reimbursement, suggesting this may be a federal, state, or local government contract that follows standard GSA guidelines for cost recovery and pricing.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

XXXX cost schedule Vendor

Please complete shaded areas with proposed pricing. Vendor is responsible for ensuring calculations are correct.

Line Description and term Type Price Est. Usage Extended

1 -$

2 -$

3 -$

4 -$

5 -$

6 -$

7 -$

8 -$

9 -$

10 -$

11 -$

12 -$

13 -$

14 -$

15 -$

16 Estimated travel costs per year 4 -$

Estimated project value -$

Travel is allowed as a billable costs of this contract, at then current GSA rates.

gsa.gov

File details come from the government source that posted it. Updated .