4.02.2 Attach_2 Statement of Work - Miele PWL 7111 Dishwasher.pdf

PDF 128 KB Posted

Attached to
Miele Model PLW 7111 Glassware Washer and Installation
Solicitation number
N0060426Q4114
Issued by

About this file

This is a Statement of Work for the decommissioning and installation of laboratory equipment at Joint Base Pearl Harbor-Hickam (JBPHH), Hawaii.

The Contractor shall decommission and dispose of the existing laboratory washer and procure, deliver, install, and commission one Miele PLW 7111 SlimLine Laboratory Glassware Washer system at JB7 Fuel Laboratory. The system includes 12 line items encompassing the core unit, dispensing pump, baskets, modules, chemical supplies, installation service, and connectivity software. All utility integration, calibration, and commissioning must be performed by a Miele Factory Authorized Technician to preserve the manufacturer warranty. Coordination shall occur within 8–10 weeks after receipt of order, with installation scheduled 14 calendar days from delivery. Utility connections require strict compliance with Miele Installation Plan Rev. 01 and include 208V three-phase 60Hz electrical power (35A fuse rating), cold water via 3/4" union, deionized water meeting specific pH and conductivity standards, DN40 waste line, and steam venting using approved materials rated to 203°F. Work is restricted to Monday through Friday, 0730 to 1600 hours, with weekend and Federal Holiday work prohibited. The Contractor must safely disconnect and haul away the old washer off-base, ensure all personnel are US Citizens with DBIDS clearance, provide all tools and rigging, execute at least two full test cycles to verify zero leakage and proper function, provide a 1-year workmanship warranty, and conduct minimum 1-hour hands-on training for lab chemists. Government Technical Points of Contact are Benjamin Fegurgur and Charisse Chu, both Supervising Chemists at JBPHH.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

The Contractor shall decommission and dispose of the existing laboratory washer and procure, deliver, install, and commission one (1) Miele PLW 7111 SlimLine Laboratory Glassware

Washer system at JB7 Fuel Laboratory, JBPHH, HI.

All utility integration, calibration, and commissioning must be executed by a Miele Factory

Authorized Technician to preserve the manufacturer warranty.

Coordination to occur within 8–10 weeks after receipt of order (ARO). Installation shall occur 14 calendar days from delivery.

Equipment & Accessories

(Core Unit) Item 1 – 12929050 PLW 7111 3AC 208 EL OIL S-1041, Quantity 1

Item 2 - 11993930 APLWDS7111 dispensing pump RFK, Quantity 1

Item 3 - 11854610 APLW 106 Basket, for two injector module, Quantity 2

Item 4 - 11854290 APLW 107 Basket, with spray arms, Quantity 1

Item 5 - 11131690 AK 12/1 Insert, Quantity 2

Item 6 - 11116900 A300/3 Module, Quantity 2

Item 7 - 11116950 A301/5 Module, Quantity 2

Item 8 - 12958910 ProCare Lab 10 AP - 5 l V2, Quantity 1

Item 9 - 12960640 ProCare Lab 30 C - 5 l V2, Quantity 1

Item 10 - 94000140 Neodisher EM 5l, Quantity 1

Item 11 - 94001820 Install, UC labwasher, Quantity 1

Item 12 - 12804200 Miele MOVE Connect, Quantity 1

Utility Connections (Strict compliance with Miele Installation Plan Rev. 01)

• EL (Electrical)Connect to facility 208V, 3-Phase, 60Hz power (35A fuse rating). Requires an external manual isolation switch within 39.37 inches.

• Connect to cold water via 3/4" male threaded union. Connect/bypass hot water based on site availability.

• Connect to deionized water (pH 5.0 - 7.5, conductivity < 15 µS/cm).

• Connect to minimum DN40 waste line; maximum pump lift of 1.0 meter.

• Vent steam using A304 stainless steel or high-temperature polypropylene (PP) ducting rated to withstand 203°F (95°C).

• Secure grounding terminal to facility loop using the M8 screw connection point.

Execution Constraints & Requirements

• Working Hours - Monday through Friday, 0730 to 1600. Weekend and Federal Holiday work is strictly prohibited.

• Safety & Cleanliness - Secure physical envelope, cap/test utility connections at the end of each shift, and clean industrial dust/debris daily.

• Testing Protocol - Execute at least two (2) full test cycles to verify zero leakage, heating function, and chemical dosing pump calibration.

• Contractor must safely disconnect, haul away, and dispose of the old inoperable washer off-base.

• All personnel must be US Citizens and clear DBIDS (Defense Biometric Identification

System)base access requirements.

• Government Furnished Property - None. Contractor is 100% responsible for all tools, rigging, and off-loading.

• Provide 1-year workmanship warranty, hand-over Miele manuals/MOVE credentials, and conduct a minimum 1-hour hands-on training for lab chemists.

Government Technical POC / Facility Representatives:

Benjamin Fegurgur, SUPV Chemist

Email: benjamin.p.fegurgur.civ@us.navy.mil

Phone: 808-306-2324

Charisse Chu, SUPV Chemist

Email: charisse.r.chu.civ@us.navy.mil

Phone: 808-306-2324 mailto:benjamin.p.fegurgur.civ@us.navy.mil mailto:charisse.r.chu.civ@us.navy.mil