4-CWU-090-B SWISHER PAVING 001.pdf

PDF 972 KB Posted

Attached to
SSHE-82-CWU-0037-B: Nelson Field – Rally Statue Foundation & Plaza Project
Solicitation number
Not on record
Issued by
Clearfield County, Blawnox Borough, Pennsylvania

About this file

This is a construction project plan document for the Commonwealth University of Pennsylvania's Bloomsburg Campus, a constituent institution of the State System of Higher Education, detailing the Swisher Drive paving and storm drainage repair project (4-CWU-090-B). The project encompasses milling and paving approximately 3,425 square yards of Swisher Drive roadway, along with repair of base substrates totaling 552 square yards in various locations and repair of drainage basins covering 389 square yards. Work includes installation of erosion and sediment control measures, full-depth pavement patching, installation of new subbase and bituminous base layers, application of bituminous tack coat and wearing course, installation of paint lines and crosswalks, cleaning of catch basins, and tar sealing around curbs and joints. The mandatory pre-bid conference and site visit is scheduled for April 14, 2026, at 1:00 PM at the Maintenance Building Parking Lot (Lower Campus), with electronic bids due by May 12, 2026, at 1:00 PM EDT through the PennBid platform. The project will be performed by a Separate Prime Contractor with the General Contractor serving as the Lead Prime Contractor, and one lane must remain open for use at all times during construction.

The project requires contractors to provide traffic control through flagmen, maintain roadway cleanliness, and comply with OSHA excavation regulations and Pennsylvania Prevailing Wage Act requirements. All work must be performed in accordance with the plans and specifications provided, with specific attention to drainage system details shown throughout the site plan, including storm drain invert elevations, manhole specifications, and pipe sizing. The contract documents are available at no cost through PennBid at https://pennbid.bonfirehub.com/, and interested bidders must register with the platform to download documents, receive updates, and submit bids electronically. Bidders may submit questions via the "Ask a Question" feature in PennBid, with responses and any necessary document changes posted on the platform.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D

PROJECT SITE

PROJECT

LOCATION

PLANS

SCALE: AS NOTED

DRAWING NO.

PLANNING/CONSTRUCTION OFFICEPLANNING/CONSTRUCTION OFFICE

FACILITIES MANAGEMENT DEPARTMENTFACILITIES MANAGEMENT DEPARTMENT

DRAWN BY:

CHECKED BY:CHECKED BY:

STATE SYSTEM OF HIGHER EDUCATION

COMMONWEALTH UNIVERSITY OF PA

TITLE:

NAME:

APPROVAL:

UNIVERSITY AND THE STATE SYSTEM BY:

DRAWINGS LISTED IN INDEX APPROVED FOR THE

PROJECT NUMBER:

DATE: 3-Apr-26

CWU-090-B

BLOOMSBURG LOWER CAMPUS

PAVING SWISHER DR

- 1

C H

E S

TN

U

T S

TR

E E

T P

A R

K

IN

G

LO

T

S W

IS

H

E R

D R

IV

E

LIBRARY - NORTH

PARKING LOT

LIBRARY - EAST

PARKING LOT

C O

U N

TR

Y

C

LU

B R

O A

D

LIGHTSTREET ROAD

LIGHTSTREET ROAD

TO I-8

SWISHER DRIVE

f e n c e f e n c e f e n c e

MOTORCYCLES

STOP

ANNEX

MAINTENANCE

BUCKINGHAM

MAINTENANCE

HEALTH & PHYSICAL

EDUCATION BUILDING

(HPE)

STOP

STOP

CENTER

DEVELOPMENT

CENTER

CENTER

S

TO

P

BOOK DEPOSIT BOX

POLICE

PARKING

POLICE

PARKING

POLICE

PARKING

POLICE

PARKING

POLICE

PARKING

UNIVERSITY POLICE

BUS

SHELTERWALLER STUDENT

RECREATION

CENTER

FENSTEMAKER

ALUMNI HOUSE

C H

E S

TN

U

T S

TR

E E

T

ANDRUSS

LIBRARY

BUCKALEW

PLACE

(PRESIDENT'S

RESIDENCE)

LOWER CAMPUS - EAST

PARKING

REC. CENTER WEST

PARKING LOT

ST

O R

M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

STORM

STORM

STORM

STORM

ST

O

R M

STORM

STORM

STORM

STORM

STORM

STORM

STORM

STORM

STO

R

M

STO

R

M

S

TO

R M

S

TO

R M

S

TO

R M

STO

R

M

STO

R

M

STO

R

M

S

TO

R M

STORM

STORM

STORM

STORM

STORM

STORM

STORM

STORM

STORM

STORM

STO

R

M

S

TO

R M

MH 33 inv 713

15"

52F

31B

31C

31D

STORM

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

52G 12"

52H

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

24"

52K

12"

12"

4"

S

TO

R M

24"

24"

STORMSTORMSTORMSTORMSTORMSTORMSTORMSTORM

52V

STORM

STORM

STORM

STORM

52X

STORM

STORM

STORM

STORM STORM

STORM

STORM

STORM

STORM

STORM

STO

RM

STO

RM

STORM STORM

STORM

STORM

STORM

STORM

STORM

STO

RM

S

TO

R M

S

TO

R M

S

TO

R M

S

TO

R M

S

TO

R M

S

TO

R M

S

TO

R M

S

TO

R M

S

TO

R M

S

TO

R M

S

TO

R M

S

TO

R M

S

TO

R M

S

TO

R M

S

TO

R M

S

TO

R M

52E

52L

52Y

32B

6AL

rim 702

5ALSTORM

4"

DRAIN

18" inv 695 rim 699

MH 40

MH

4"STM

STORM STORM STORM STORM STORM STORM STORM STORM STORM STORM STORM STORM

52Q

52A

30A

14C-DW

STORM

STO

RM

2WB

15"

STO

RM

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

15"

15"

STORM

STORM

STORM

STORM

STORM

STORM

12"

Q2

Q3

5 C O

N D

U

ITS

STORM

STORM

STORM

STORM

S

TO

R M

S

TO

R M

S

TO

R M

STORM STORM STORM

12" rim 207.5 inv in 202.5 inv out 202.0

STORM

FOOTER

8" STORM

STORM

C.O.

S

TO

R M

S

TO

R M

6"

C.O.

8" 6"

8"

52W

MH 36

rim 718

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

STORM

SD

S

TO

R M

S

TO

R M

S

TO

R M

S

TO

R M

S

TO

R M

S

TO

R M

S

TO

R M

S

TO

R M

S

TO

R M

S

TO

R M

S

TO

R M

S

TO

R M

STORM

STORM

STORM

4" to townsystem rim 717

MH 35

rim 711 inv 707

MH 32

rim 707 inv 703

12"

30J

52B

30B

14B

31AST

O R

M

24"

24"

12"

18"

4"

12"

12"

STORM

STORM

STORM

STORM

STORM

STORM

12"

S

TO

R M

S

TO

R M 24"

24" 24"

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

ST

O

R M

STORM

STORM

SD

SD 52NSD

ROOF

S

TO

R M rim 703 inv 694

18"

52J

MH 34 rim 718 inv 714

STORM

STORM

STORM

STORM

STORM

STORM

STORM

STORM

STORM

STORM

STORM

14A-DW

14D-P

S

TO

R M

S

TO

R M

S

TO

R M

S

TO

R M

STORM

STORM

8" 8"

4"

STORM

STORM

STORM

STORM

S

TO

R M

S

TO

R M

S

TO

R M

S

TO

R M

STORM

STORM

STORM

STORM

STORM

STORM

STORM

STORM

STORM

STORM

STORM

15"

15"

15"

3WB

1WB

4WB

STORM STORM STORM

S

TO

R M

STO

RM

STO

RM

STORM

STORM

STORM

STORM

STORM

15"

15"

15"

15"

15" 15" 15"

14C-DW

S

TO

R M

S

TO

R M

S

TO

R M

S

TO

R M

S

TO

R M

S

TO

R M

S

TO

R M

S

TO

R M

STORM

STORM

STORM

STORM

15"

STORM STORM

S

TO

R M

S

TO

R M

S

TO

R M

STORM

STORM

STORM

STORM

12"

12"

12"

Q1

Q5

STEEL PIPE

STORM

52D

STO

RM

4"

12"

12"

12"

52M

4"

MH 52-2

rim 711 inv 699

52C-P inv

12"

DRAIN

S

TO

R M

S

TO

R M

STORM

STORM

STORM

STORM

STORM STORM STORM STORM STORM STORM STORM STORM

10"8" 8" inv 715

STORM

STORM

STORM

S

TO

R M

S

TO

R M

S

TO

R M

S

TO

R M

S

TO

R M

STORM STORM STORM

STORM

SD

SD

SD SD SD SD SD SD SD SD SD

SD

SD

SD

SD

SD

SD

STORMSTORMSTORM

STORM

24" rim 699 inv 696

MH

rim 702.46

AL2 inv 696.26

MH

rim 708.76

AL1 inv 701.99

MH

rim 709.25 inv 704.25

INLINEDRAIN

7AL

C.O.

12" inv 694

STORMSTORMSTORMSTORMSTORM

STORMSTORMSTORMSTORMSTORMSTORMSTORMSTORMSTORMSTORMSTORMSTORMSTORMSTORM

3AL

4AL

2AL

1AL

rim 701.18 inv 698.20

INLINEDRAIN

MH

PERF.FDN.DRAIN

STORM

S

TO

R M

15"

STORM

STORM

STORM

STORM

STORM

STORM

STORM

STORM

STORM

STORM

STORM

STORM

STORM

15"

15"

STORM

STORM

STORM

STORM

STO

R

M

ST

O

R M

STORM

STO

R

M

STO

R

M

STORM

STORM

STORM

STORM

STORM

STORM

STORM

199.0

STORM STORM

S

TO

R M

S

TO

R M

STORM

S

TO

R M

S

TO

R M

S

TO

R M

S

TO

R M

STORM

STORMSTORMSTORMSTORM

S

TO

R M

STORMSTORMSTORMSTORM

S

TO

R M

S

TO

R M

S

TO

R M

S

TO

R M

S

TO

R M

S

TO

R M

S

TO

R M

S

TO

R M

S

TO

R M

S

TO

R M

STORMSTORMSTORM

STORMSTORM

POLICE

PARKING

POLICE

PARKING

POLICE

PARKING

POLICE

PARKING

M E

TE

R

E D

P A

R K

IN

G

M E

TE

R

E D

P A

R K

IN

G

M E

TE

R

E D

P A

R K

IN

G

M E

TE

R

E D

P A

R K

IN

G

M E

TE

R

E D

P A

R K

IN

G

M E

TE

R

E D

P A

R K

IN

G

M E

TE

R

E D

P A

R K

IN

G

M E

TE

R

E D

P A

R K

IN

G

M E

TE

R

E D

P A

R K

IN

G

M E

TE

R

E D

P A

R K

IN

G

M E

TE

R

E D

P A

R K

IN

G

M E

TE

R

E D

P A

R K

IN

G

M E

TE

R

E D

P A

R K

IN

G

M E

TE

R

E D

P A

R K

IN

G

M E

TE

R

E D

P A

R K

IN

G

M E

TE

R

E D

P A

R K

IN

G

M E

TE

R

E D

P A

R K

IN

G

M E

TE

R

E D

P A

R K

IN

G

M E

TE

R

E D

P A

R K

IN

G

M E

TE

R

E D

P A

R K

IN

G

N O

P A

R K

IN

G

N O

P A

R K

IN

G

METERED

PARKING

METERED

PARKING

METERED

PARKING

METERED

PARKING

METERED

PARKING

METERED

PARKING

METERED

PARKING

METERED

PARKING

METERED

PARKING

METERED

PARKING

METERED

PARKING

METERED

PARKING

METERED

PARKING

METERED

PARKING

METERED

PARKING

METERED

PARKING

METERED

PARKING

METERED

PARKING

METERED

PARKING

METERED

PARKING

METERED

PARKING

METERED

PARKING

METERED

PARKING

METERED

PARKING

METERED

PARKING

METERED

PARKING

METERED

PARKING

METERED

PARKING

METERED

PARKING

METERED

PARKING

ARTS &

ADMIN

ST

O

P

REPAIR AROUND

DRAINAGE BASIN

ADD ALT #1

389 SQ YDS

AREA 106' x 33'

BASE BID #1CONT 1'-0"

BEYOND CURB

CONT 2'-0"

BEYOND ROAD

REPAIR AROUND

DRAINAGE BASIN

REPAIR BASE

SUBSTRATE

153 SQ. YDS.

REPAIR BASE

SUBSTRATE

93 SQ. YDS.

REPAIR BASE

SUBSTRATE

204 SQ. YDS.

REPAIR BASE

SUBSTRATE

102 SQ. YDS.

3425 SQ YDS

FOR MILLING

AND PAVING.

BASE BID

REPAIR AND REBUILD

REPAIR AND REBUILD

AROUND INLET PIPE

TOTAL LINEAR FEET

1460'-0"

AutoCAD SHX Text N

AutoCAD SHX Text

%%UCONSTRUCTION (ITEMS DESCRIBED ARE NOT IN CHRONOLOGICAL ORDER)

AutoCAD SHX Text

%%USWISHER DRIVE

AutoCAD SHX Text

- ALL WORK

AutoCAD SHX Text

- ALL WORK PERFORMED IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS.

AutoCAD SHX Text

ALL WORK DESCRIBED IN THE PLANS AND SPECIFICATIONS IS REQUIRED WHETHER

AutoCAD SHX Text

DESCRIBED IN THE NARRATIVE BELOW OR NOT.

AutoCAD SHX Text

INSTALL EROSION AND SEDIMENT CONTROL MEASURES AS NOTED/REQUIRED AND

AutoCAD SHX Text

ADD FILTER BAG INLET PROTECTION IN EACH INLET.

AutoCAD SHX Text

SAWCUT AND REMOVE EXISTING PAVEMENT AREAS FOR FULL DEPTH PATCHING AS

AutoCAD SHX Text

REQUIRED. LIMITS SHOWN ARE APPROXIMATE.

AutoCAD SHX Text

COMPLETE ALL REPAIRS AS INDICATED AND REQUIRED. ALL EXCAVATION SHALL

AutoCAD SHX Text

COMPLY WITH OSHA REGULATIONS.

AutoCAD SHX Text

INSTALL NEW SUBBASE AND BITUMINOUS BASE IN THE FULL DEPTH PAVEMENT PATCH

AutoCAD SHX Text

AREAS.

AutoCAD SHX Text

REMOVE INLET FILTER BAGS.

AutoCAD SHX Text

PLACE BITUMINOUS TACK COAT OVER ENTIRE EXISTING AND REPAIRED PAVEMENT

AutoCAD SHX Text

SURFACE AND INSTALL NEW BITUMINOUS WEARING COURSE.

AutoCAD SHX Text

INSTALL NEW PAINT LINES, CROSSWALK, AND SYMBOLS AS REQUIRED.

AutoCAD SHX Text

ONCE ALL DISTURBED AREAS ARE STABILIZED, REMOVE COMPOST FILTER SOCK.

AutoCAD SHX Text

CLEAN ALL CATCH BASINS RINGS, GRATE,VALVE BODY COVERS,

AutoCAD SHX Text

ECT.OF DEBRIS AND DIRT AND TAR.

AutoCAD SHX Text

ROADWAY SHALL BE MILLED 1.5" DEPTH 3500 SQ. YD.

AutoCAD SHX Text

ROADWAY SHALL BE SWEPT AND KEPT CLEAN AT ALL TIMES.

AutoCAD SHX Text

CONTRACTOR SHALL PROVIDE A FLAGMAN AT ALL TIMES FOR TRAFFIC CONTROL.

AutoCAD SHX Text

ONE LANE SHALL BE OPEN FOR USE AT ALL TIMES.

AutoCAD SHX Text

INSTALL TACK COATING TO EXISTING PAVEMENT AND OVERLAY FINIAL WEAR COURSE

AutoCAD SHX Text

WITH 1.5" ASPHALT LAYER.

AutoCAD SHX Text

TAR SEAL AROUND CURBS, JOINTS, VALVE BODY CAPS, ECT.

AutoCAD SHX Text

PROVIDE LINE STRIPING OF ROADWAY AND CROSS WALKS.

AutoCAD SHX Text

REFER TO SPECS FOR ADDITIONAL DETAILS.

Sheets and Views
24X36

File details come from the government source that posted it. Updated .