4-Combined Project Budget, Scope of Work and Funding Worksheet.docx
DOCX document 35 KB Posted
- Solicitation number
- US.255474
- Issued by
- New Mexico
About this file
This is a Combined Project Budget, Scope of Work and Funding Worksheet template for the 2028 Colorado Capital Outlay Application, administered by the state of Colorado in partnership with applicant entities seeking renovation, code compliance, and new addition funding for facilities. The worksheet serves as the primary application instrument through which senior centers and similar organizations must document proposed projects, including distinct phases when multiple funding requests are necessary to complete work. Applicants are required to describe measurable work, affected locations, quantities, deliverables, exclusions, and the relationship of current phases to the full project scope. Planning and design activities—encompassing assessments, environmental testing, engineering, and cost estimates—may constitute a standalone phase for projects exceeding $225,000 in renovation costs or involving new construction. Completed planning and design documentation must accompany any application requesting construction funding. The worksheet does not establish specific response dates, due dates, site visits, or bidder conferences; instead, it functions as an instructional template to guide applicants in structuring comprehensive project proposals for capital outlay consideration.
The worksheet requires applicants to present current-phase costs separately from full-project costs without duplication, identify all funding sources with their status (secured, pending, or anticipated), and reconcile total project costs against identified funding to disclose any gaps. Applicants must distinguish prior expenditures from funds available for future work and explain contingencies and cost uncertainties. Permitting requirements must be identified and status documented, with particular attention to code-compliance deficiencies and corrective work deadlines where applicable. Supporting documentation—including itemized estimates, professional cost estimates, contractor quotes, planning and design proof for eligible projects, obtained permits, code-compliance reports, and commitment documentation for secured funding—must be attached. The application includes a final certification checklist requiring the applicant to verify that scope, budget, funding request, and schedule align, that current and full-project phases are clearly distinguished, and that no costs or funding sources are duplicated. No specific set-asides, incumbent contractors, award dates, or contract terms are identified in this template document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-2028 CO Certification Letter Template.docx | DOCX document | |
| 5-2028 Capital Outlay Application Manual with Examples.pdf | ||
| 3-Combined Project Budget, Scope of Work and Funding Worksheet Instruction Sheet.docx | DOCX document | |
| 1-2028 CO Certification Letter Instructions.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2028 CO Application Combined Project Budget, Scope of Work and Funding Worksheet Draft applicant template | Renovation, code compliance and new additions Instructions Complete one combined worksheet for the project or phase included in the application. Identify the current phase separately from the full project, from beginning to end.
Describe measurable work, affected locations, quantities, deliverables and exclusions. Add table rows or attachments as necessary.
Enter dollar amounts in the budget and funding tables. Use N/A where appropriate. Do not duplicate costs or funding sources.
Draft assumption: the $225,000 renovation threshold applies to total renovation project cost, not just the amount requested. Confirm this basis before final program release.
Renovations of $225,000 or less may not need formal planning and design, depending on scope. Permits may still be necessary; identify requirements and status.
Renovations greater than $225,000 and construction of new additions must include proof of completed planning and design appropriate to the requested work. If incomplete, identify planning and design as the initial phase. This draft treats additions as new construction; confirm before release.
Planning and design may include assessments, environmental testing, engineering, cost estimates and other preconstruction activities, not only schematics or blueprints.
This draft worksheet does not establish cost eligibility or guarantee funding. Confirm final application requirements before submission.
1. Applicant and project information Applicant/entity name:
Facility name and physical address:
Project title:
Contact name, title, telephone and email:
Project type: ☐ Renovation ☐ Code compliance ☐ New addition ☐ Combination Request type: ☐ Planning and design ☐ Renovation/construction ☐ Other: __________ Current phase number and title:
2. Scope of work A. Existing conditions and need: Describe the problem, affected areas and beneficiaries.
B. Proposed work: Describe what this application phase will accomplish.
| Work item / location |
| Quantity or extent |
| Specific work / deliverable |
1.
2.
3.
4.
5.
C. Exclusions and dependencies: What is not included, and what must occur first?
D. Overall project: Explain how this phase fits into the full project.
| Phase / title |
| Work and completion status |
| Estimated cost ($) |
| Timing |
Phase 1
Phase 2
Phase 3 / later
Can the current phase be used independently of future phases? ☐ Yes ☐ No. Explain:
Expected start: __________________ Expected completion: __________________ E. Service continuity: Describe closures, relocation or measures to maintain services.
3. Planning, permitting and readiness Renovation category: ☐ $225,000 or less ☐ Greater than $225,000 ☐ N/A Planning/design status: ☐ Complete ☐ Partial ☐ Not started ☐ Not necessary for scope Explain the determination, completed activities, responsible professionals and remaining work:
Documents attached: ☐ Drawings/specifications ☐ Assessments ☐ Environmental testing ☐ Engineering evaluation ☐ Cost estimate ☐ Other: __________ Code compliance, if applicable: Identify deficiency, reviewing authority, corrective work and deadline. Attach supporting reports or notices.
Permits/approvals required? ☐ Yes ☐ No ☐ Not yet determined Who determined requirements and on what basis? If unknown, explain how and when they will be determined.
| Permit / approval and issuing authority |
| Status |
| Expected date / responsible party |
Outstanding issues: Describe procurement, site control, utility, approval or other readiness dependencies.
Project manager / responsible party:
4. Project budget Current-phase costs are a subset of full-project costs. Do not add the two columns together. For a single-phase project, the columns may match. Include costs across all phases in the full-project column and distinguish prior expenditures from remaining costs below.
| Cost category |
| Current phase ($) |
| Full project ($) |
Land acquisition, if applicable
Planning, architectural and engineering design
Facility/site assessments and surveys
Environmental testing and investigations
Permit and approval fees
Site preparation and utilities
Renovation / code-compliance work
New-addition construction
Equipment / installation included in scope
Construction administration / inspections / testing
Other (describe):
Contingency (explain basis):
TOTAL PROJECT COST
Current-phase total (A): $____________ Amount requested (B): $____________ Other funding needed for this phase (A − B): $____________ Full-project cost: $____________ Prior-phase costs already incurred: $____________ Remaining project costs, including current phase: $____________ Estimate preparer, preparation/update date, basis and supporting document references:
Explain contingency and any significant cost uncertainties:
5. Funding sources and reconciliation List each source once. Allocate amounts to the applicable phase. Do not represent funds already spent as available for new work. Identify secured, pending and anticipated funding separately.
| Source / reference |
| Status |
| Current phase ($) |
| Other phases ($) |
| This application request |
| Requested |
Secured / pending / anticipated
Secured / pending / anticipated
Secured / pending / anticipated
Secured / pending / anticipated
Secured / pending / anticipated
TOTAL IDENTIFIED FUNDING
Current-phase reconciliation
| Calculation |
| Amount ($) |
A. Current-phase cost (Section 4)
B. Amount requested in this application
C. Other secured funding allocated to current phase
D. Other pending/anticipated funding allocated to current phase
E. Unidentified funding gap: A − B − C − D
F. Amount not yet secured today: A − C (includes this request)
If E is negative, explain excess funding or revise allocations. Pending and anticipated sources remain uncertain until secured.
Funding restrictions, availability dates and plan if pending funds are not awarded:
Full-project reconciliation Total full-project cost: $____________ Total identified funding across all phases, including prior funding spent: $____________ Unidentified full-project funding gap: $____________ Of total identified funding, amount already spent on prior phases: $____________ Count the application request once. Reconcile full-project costs and funding on the same beginning-to-end basis; separately disclose prior expenditures.
6. Attachments and applicant review ☐ Itemized estimates, contractor quotes or professional cost estimates.
☐ Proof of completed planning/design for renovations greater than $225,000 and construction of new additions.
☐ Planning/design determination for renovations of $225,000 or less, with explanation if unnecessary.
☐ Obtained permits/approvals and schedule for remaining approvals.
☐ Code-compliance inspection reports, notices or assessments, if applicable.
☐ Commitment documentation for secured funding.
☐ Phase schedule and supplemental scope/budget information as needed.
Attachment list / document names:
Final checks ☐ Scope, budget, funding request and schedule describe the same work.
☐ Current phase and full project are clearly distinguished.
☐ Required planning/design proof is attached.
☐ Permitting requirements and status are identified, including for smaller renovations.
☐ No costs or funding are duplicated; funding status and gaps are disclosed.
☐ Prior expenditures are distinguished from funds available for future work.
Applicant acknowledgment I certify that the information provided accurately describes the proposed scope, project phase, cost estimates, funding status and readiness to proceed to the best of my knowledge.
Prepared by / title:
Signature: __________________________________ Date: __________________ 2028 CO | Draft combined project worksheet