4-Bowling Green Riverfront Park Phase II - 60% Plans - Preliminary.pdf
PDF 60 MB Posted
- Solicitation number
- 2026-54
- Issued by
- Wayne County, Kentucky
About this file
This is a preliminary 60% design plans document for Phase II of the Bowling Green Riverfront Park project, prepared for the City of Bowling Green, Kentucky. The document outlines the design specifications and site plans for the riverfront park development as part of a Construction Manager at Risk (CMAR) delivery method project. The plans detail the physical layout, infrastructure improvements, landscaping elements, and site modifications required for Phase II of the park development. The project scope encompasses riverfront park improvements including site grading, utilities, hardscape features, and vegetation plans designed to enhance public access and recreational use of the riverfront area. The preliminary nature of these plans indicates they are presented at 60% completion, suitable for review and feedback before advancing to final design stages. These plans serve as the technical foundation for the CMAR selection process, providing qualified construction management firms with detailed project scope information necessary to develop proposals for preconstruction and construction phase services.
The preliminary design plans establish the baseline project scope and technical requirements that will inform cost estimating, constructability review, and value engineering during the preconstruction phase. As 60% level documents, these plans are intended to provide sufficient detail for cost planning and schedule development while allowing flexibility for refinement during final design. The plans demonstrate the City of Bowling Green's commitment to proceeding with the riverfront park enhancement project and establish clear design parameters for prospective CMAR firms to evaluate project complexity, phasing, and resource requirements. These preliminary documents will be available to bidding firms as part of the solicitation package to facilitate informed proposal development and cost projections for the preconstruction and construction management services.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .