(4)_Attch_4_Exhibit_A.pdf

PDF 96 KB Posted

Attached to
INFRASTRUCTURE UPGRADES ACROSS DELTA
Solicitation number
140G0321R0010
Issued by

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140G0321R0010 Attachment 4

Table 1: Work Order #1

Latitude Longitude Short Name Long Name Task Order

#1 Action Contingencies

37.942448 ‐121.532092 MDM‐RB Middle River at Middle River ‐‐ Right Bank TO #1 Drive Pile

37.942527 ‐121.533731 MDM‐LB Middle River at Middle River ‐‐ Left Bank TO #1 Drive Pile

37.969447 ‐121.572281 OBI‐RB Old River at Bacon Island ‐‐ Right Bank TO #1 Drive Pile

37.969668 ‐121.574022 OBI‐LB Old River at Bacon Island ‐‐ Left Bank TO #1 Drive Pile

38.012244 ‐121.670009 DSJ Dutch Slough TO #1 Drive Pile

38.109939 ‐121.578963 MOK Mokelumne River TO #1 Drive Pile

38.220595 ‐121.50745 NFM North Fork Moklumne River TO #1 Drive Pile

38.225366 ‐121.491129 SFM South Fork Mokelumne River TO #1 Drive Pile

38.3046 ‐121.575584 STM Steamboat Slough TO #1 Drive Pile

38.329026 ‐121.578128 SSS Sutter Slough TO #1 Drive Pile

File details come from the government source that posted it. Updated .