4-Attachment L - Sample Score Sheet.xls
XLS spreadsheet 44 KB Posted
- Attached to
- Office Furniture - NASPO Valuepoint
- Solicitation number
- DL27-101
- Issued by
- Utah
About this file
This is a draft evaluation score sheet for an Office Furniture Request for Proposal issued by the State of Utah Division of Purchasing in collaboration with NASPO Valuepoint. The RFP may result in multiple awards, with contracts for a five-year term and vendors required to guarantee pricing for one year. The evaluation process establishes a technical criteria threshold of 455 points, with an additional 300 cost points available for a total possible score of 700 points. Proposals must meet ten mandatory requirements, including submission of technical criteria and cost sheets, demonstrated ability to meet the scope of work, Original Equipment Manufacturer (OEM) status, nationwide coverage, ten-year warranty on products, FOB Destination Prepaid shipping terms, a dedicated website, and offering only new products with a minimum guaranteed discount for the contract term.
The technical evaluation comprises six scoreable categories weighted as follows: Warranty and Remedies (30 points, 21.4%), Ordering, Delivery and Installation (30 points, 21.4%), Offerings, Collections and Materials (30 points, 21.4%), Environmental (10 points, 7.1%), Customer Service (20 points, 14.3%), and Authorized Dealer Relationship (20 points, 14.3%). Cost points are awarded based on a lowest-price formula, whereby the offeror with the lowest proposed price receives 100 percent of available cost points, and all other offerors receive points proportional to their price relative to the lowest bid. Awards will be made to all proposals achieving a combined score of at least 750 points (technical plus cost). The NASPO Valuepoint Administrative Fee is 0.4 percent of contract value.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Score Sheet
| Office Furniture - NASPO | ||||||||||
| SOLICITATION # DL27-101 | ||||||||||
| RFP EVALUATION SCORESHEET | ||||||||||
| DRAFT: This document is intended to be a draft and should not be returned to the Division of Purchasing. Please return this document to the evaluation committee chairperson | ||||||||||
| This document is not subject to GRAMA pursuant to Utah Administrative Code R33-7-702(2). | ||||||||||
| Score will be assigned as follows: | ||||||||||
| 0 = Fail, the proposal fails to address the requirements or criteria described in the RFP or cannot be assessed due to missing information | ||||||||||
| Firm Name: | 1 = Poor, the proposal inadequately addresses the requirements or criteria described in the RFP or cannot be assessed due to incomplete information | |||||||||
| 2 = Unsatisfactory, the proposal addresses the requirements or criteria described in the RFP in an unsatisfactory manner | ||||||||||
| Evaluator: | 3 = Satisfactory, the proposal addresses all requirements or criteria described in the RFP in a minimum satisfactory manner | |||||||||
| 4 = Good, the proposal addresses all requirements or criteria described in the RFP and in some respects exceeds them | ||||||||||
| Date: | 5 = Excellent, the proposal addresses and exceeds all of the requirements or criteria described in the RFP | |||||||||
| Minimum Mandatory Requirements | RFP Section | Evaluation (Pass/Fail) | ||||||||
| 1 | Offeror has submitted Technical Criteria | |||||||||
| 2 | Offeror has submitted Cost Sheet | |||||||||
| 3 | Offeror can meet Scope of Work | |||||||||
| 4 | Offeror is an OEM | |||||||||
| 5 | Minimum Discount guaranteed for contract term | |||||||||
| 6 | Nationwide coverage | |||||||||
| 7 | All products FOB Destination Prepaid and Allowed | |||||||||
| 8 | Dedicated Website | |||||||||
| 9 | 10 Year warranty | |||||||||
| 10 | New products only | |||||||||
| 0 | ||||||||||
| Scoreable Technical Criteria | RFP Section | Evaluator Score (0-5) | Criteria Weight | % of Tech Criteria | Points Possible | Points | ||||
| Earned | Minimum Required | |||||||||
| 1 | Warranty and Remedies | Att H | 30 | 21.4% | 150.00 | 0.00 | ||||
| 2 | Ordering, Delivery and Installation | Att H | 30 | 21.4% | 150.00 | 0.00 | ||||
| 3 | Offerings, Collections, and Materials | Att H | 30 | 21.4% | 150.00 | 0.00 | ||||
| 4 | Environmental | Att H | 10 | 7.1% | 50.00 | 0.00 | ||||
| 5 | Customer Service | Att H | 20 | 14.3% | 100.00 | 0.00 | ||||
| 6 | Authorized Dealer Relationship | Att H | 20 | 14.3% | 100.00 | 0.00 | ||||
| 13 | 0.0% | 0.00 | 0.00 | |||||||
| 14 | 0.0% | 0.00 | 0.00 | |||||||
| 15 | 0.0% | 0.00 | 0.00 | |||||||
| 16 | 0.0% | 0.00 | 0.00 | |||||||
| 17 | 0.0% | 0.00 | 0.00 | |||||||
| 18 | 0.0% | 0.00 | 0.00 | |||||||
| 19 | 0.0% | 0.00 | 0.00 | |||||||
| 20 | 0.0% | 0.00 | 0.00 | |||||||
| 21 | 0.0% | 0.00 | 0.00 | |||||||
| 22 | 0.0% | 0.00 | 0.00 | |||||||
| 23 | 0.0% | 0.00 | 0.00 | |||||||
| 100.0% | 700.00 | 0.00 | 0.00 | |||||||
| Required Technical Point Threshold | RFP Section | Min Percent | Min Points Required | Points Earned | Percent Earned | Evaluation | ||||
| Att H | 65% | 455.0 | 0.0 | 0.0% | 0 | |||||
| Cost | RFP Section | Low Cost Option | Offered Cost | Percent of Total | Points Possible | Points Earned | ||||
| 0.0 | 0.0 | |||||||||
| * Purchasing will use the following cost formula: The points assigned to each offerors cost proposal will be based on the lowest proposal price. The offeror with the lowest Proposed Price will receive 100% of the price points. All other offerors will receive a portion of the total cost points based on what percentage higher their Proposed Price is than the Lowest Proposed Price. The formula to compute the points is: Cost Points x (Lowest Proposed Price/Proposed Price). | Other cost evaluation methods may be used as long as they are within Procurement Code/Rule. Ensure the method for awarding points is clearly stated on the score sheeet and within the solicitation documents. | |||||||||
| Total Evaluation Points | Percent of Total | Points Possible | Points Earned | |||||||
| Total Technical Evaluation Points | 0% | 700.0 | 0.0 | |||||||
| Total Cost Evaluation Points | 0% | 0.0 | 0.0 | |||||||
| Total Evaluation Points | 0% | 700.0 | 0.0 |
File details come from the government source that posted it. Updated .